RCI Guard Shack_05.19.2025 AE.pdf
PDF 18 MB Posted
- Attached to
- RCI ODRC Guard Shacks DRCB-25-3402
- Solicitation number
- SRC0000029436
- Issued by
- Sandusky County, Ohio
About this file
These technical design documents prepared by Decisive Dynamics, LLC detail the architectural and engineering plans for a Guard Shack Installation project at the Ross Correctional Institution (RCI) located in Chillicothe, Ross County, Ohio. The project involves installing a 10' x 16' prefabricated guard shack with associated site preparation, including fence removal, concrete foundation work, sidewalk modifications, and utility connections. The design plans are dated May 2025 and include comprehensive drawings covering site layout, construction details, electrical specifications, and installation requirements, with the project number 2025-0027.
The documents provide precise technical specifications for the guard shack, including foundation details with 6" stone base and concrete slab, utility connections, and site integration. The plans are prepared for the Ohio Department of Rehabilitation and Correction (DRC) and include detailed engineering drawings covering site plan, electrical systems, construction details, and equipment installation requirements. The design incorporates standard engineering practices for institutional facility improvements, with specific attention to site constraints, utility interfaces, and structural requirements. The project appears to be part of a standardized facility upgrade process, with drawings prepared to meet state and local building codes and institutional security standards.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DR
AW
N B
Y:
N O
RE
VI
SI
O
N
DA
TE
123456789
5/
/2
DE
CI
SI
VE
D
YN
AM
IC
S, L
LC
SI
LV
ER
B
RA
N
CH
D R
DE
LA
W
AR
E, O
H
DE
CI
SI
VE
DY
N
AM
IC
S.
CO
M
CO
VE
R
SH
EE
T
RO
SS
C O
RR
EC
TI
O
N
AL
IN
ST
IT
U
TI
O
N G
U
AR
D
SH
AC
K
IN
ST
AL
LA
TI
O
N
CI
TY
O
F
CH
IL
LI
CO
TH
E
RO
SS
C
O U
N
TY
, O
HI
O
C-001
CH
EC
KE
D
BY
1"
0'
DK
P
DP
D
DA
TE
DW
G
S
CA
LE
PR
O
JE
CT
N O
AP
PR
O
VE
D
BY
VICINITY MAP:
SCALE: 1" = 1000'
ROSS CORRECTIONAL INSTITUTION
GUARD SHACK INSTALLATION
CITY OF CHILLICOTHE, ROSS COUNTY, OHIO
MAY 2025
PROJECT AREA
ROSS COUNTY
PROJECT:
ROSS CORRECTIONAL INSTITUTION (RCI)
GUARD SHACK INSTALLATION
ADDRESS:
16197 OH-104
CHILLICOTHE, OHIO 45601
PREPARED FOR:
ROSS CORRECTIONAL INSTITUTE
16149 STATE ROUTE 104
CHILLICOTHE, OHIO 45601
DRAWING INDEX
SHEET TITLE
C-001 COVER SHEET
C-002 GENERAL NOTES
C-003 GENERAL CONSTRUCTION DETAILS
C-101 GUARD SHACK PLAN VIEW
E-001 GENERAL INFORMATION ELECTRICAL
E-501 DETAILS ELECTRICAL
ES101 RCI SITE PLAN ELECTRICAL
-0
REGISTERED ENGINEER'S
SIGNATURE AND SEAL
ENGINEER:
5/20/2025
DATE
PREPARED BY:
DECISIVE DYNAMICS, LLC
255 SILVER BRANCH DR
DELAWARE, OH 43015
PHONE: (614) 359-6321
AutoCAD SHX Text C:\Users\david.pfeffer\OneDrive - Decisive Dynamics\Projects\2025\2025-0027_RCI Shack DOC Permits\DWG\RCI 10-ft x 16-ft Building Plan.dwg: 1 - TITLE
AutoCAD SHX Text
OH-104
AutoCAD SHX Text
HINES BLVD
AutoCAD SHX Text
SANDUSKY BLVD
AutoCAD SHX Text
MOUNDSVILLE RD
AutoCAD SHX Text
EGYPT PIKE
AutoCAD SHX Text
CINCINNATI AVE
AutoCAD SHX Text
GRAFTON ST
AutoCAD SHX Text
PLEASANT VALLEY RD
AutoCAD SHX Text
US-35
AutoCAD SHX Text
OH-104
AutoCAD SHX Text
SCIOTO RIVER
DR
AW
N B
Y:
N O
RE
VI
SI
O
N
DA
TE
123456789
5/
/2
DE
CI
SI
VE
D
YN
AM
IC
S, L
LC
SI
LV
ER
B
RA
N
CH
D R
DE
LA
W
AR
E, O
H
DE
CI
SI
VE
DY
N
AM
IC
S.
CO
M
G
EN
ER
AL
N O
TE
S
RO
SS
C O
RR
EC
TI
O
N
AL
IN
ST
IT
U
TI
O
N G
U
AR
D
SH
AC
K
IN
ST
AL
LA
TI
O
N
CI
TY
O
F
CH
IL
LI
CO
TH
E
RO
SS
C
O U
N
TY
, O
HI
O
C-002
CH
EC
KE
D
BY
N /A
DK
P
DP
D
DA
TE
DW
G S
CA
LE
PR
O
JE
CT
N
O
AP
PR
O
VE
D
BY
-0
AutoCAD SHX Text C:\Users\david.pfeffer\OneDrive - Decisive Dynamics\Projects\2025\2025-0027_RCI Shack DOC Permits\DWG\RCI 10-ft x 16-ft Building Plan.dwg: 2 - NOTES
AutoCAD SHX Text SPECIFICATIONS: THE CURRENT OHIO DEPARTMENT OF TRANSPORTATION (ODOT) "CONSTRUCTION AND MATERIAL CURRENT OHIO DEPARTMENT OF TRANSPORTATION (ODOT) "CONSTRUCTION AND MATERIAL CURRENT OHIO DEPARTMENT OF TRANSPORTATION (ODOT) "CONSTRUCTION AND MATERIAL OHIO DEPARTMENT OF TRANSPORTATION (ODOT) "CONSTRUCTION AND MATERIAL OHIO DEPARTMENT OF TRANSPORTATION (ODOT) "CONSTRUCTION AND MATERIAL DEPARTMENT OF TRANSPORTATION (ODOT) "CONSTRUCTION AND MATERIAL DEPARTMENT OF TRANSPORTATION (ODOT) "CONSTRUCTION AND MATERIAL OF TRANSPORTATION (ODOT) "CONSTRUCTION AND MATERIAL OF TRANSPORTATION (ODOT) "CONSTRUCTION AND MATERIAL TRANSPORTATION (ODOT) "CONSTRUCTION AND MATERIAL TRANSPORTATION (ODOT) "CONSTRUCTION AND MATERIAL (ODOT) "CONSTRUCTION AND MATERIAL (ODOT) "CONSTRUCTION AND MATERIAL "CONSTRUCTION AND MATERIAL "CONSTRUCTION AND MATERIAL AND MATERIAL AND MATERIAL MATERIAL MATERIAL SPECIFICATIONS" (CMSC), TOGETHER WITH THE REQUIREMENTS OF ROSS COUNTY, INCLUDING ALL (CMSC), TOGETHER WITH THE REQUIREMENTS OF ROSS COUNTY, INCLUDING ALL (CMSC), TOGETHER WITH THE REQUIREMENTS OF ROSS COUNTY, INCLUDING ALL TOGETHER WITH THE REQUIREMENTS OF ROSS COUNTY, INCLUDING ALL TOGETHER WITH THE REQUIREMENTS OF ROSS COUNTY, INCLUDING ALL WITH THE REQUIREMENTS OF ROSS COUNTY, INCLUDING ALL WITH THE REQUIREMENTS OF ROSS COUNTY, INCLUDING ALL THE REQUIREMENTS OF ROSS COUNTY, INCLUDING ALL THE REQUIREMENTS OF ROSS COUNTY, INCLUDING ALL REQUIREMENTS OF ROSS COUNTY, INCLUDING ALL REQUIREMENTS OF ROSS COUNTY, INCLUDING ALL OF ROSS COUNTY, INCLUDING ALL OF ROSS COUNTY, INCLUDING ALL ROSS COUNTY, INCLUDING ALL ROSS COUNTY, INCLUDING ALL COUNTY, INCLUDING ALL COUNTY, INCLUDING ALL INCLUDING ALL INCLUDING ALL ALL ALL SUPPLEMENTS THERETO, IN FORCE ON THE DATE OF THE CONTRACT SHALL GOVERN ALL MATERIALS AND THERETO, IN FORCE ON THE DATE OF THE CONTRACT SHALL GOVERN ALL MATERIALS AND THERETO, IN FORCE ON THE DATE OF THE CONTRACT SHALL GOVERN ALL MATERIALS AND IN FORCE ON THE DATE OF THE CONTRACT SHALL GOVERN ALL MATERIALS AND IN FORCE ON THE DATE OF THE CONTRACT SHALL GOVERN ALL MATERIALS AND FORCE ON THE DATE OF THE CONTRACT SHALL GOVERN ALL MATERIALS AND FORCE ON THE DATE OF THE CONTRACT SHALL GOVERN ALL MATERIALS AND ON THE DATE OF THE CONTRACT SHALL GOVERN ALL MATERIALS AND ON THE DATE OF THE CONTRACT SHALL GOVERN ALL MATERIALS AND THE DATE OF THE CONTRACT SHALL GOVERN ALL MATERIALS AND THE DATE OF THE CONTRACT SHALL GOVERN ALL MATERIALS AND DATE OF THE CONTRACT SHALL GOVERN ALL MATERIALS AND DATE OF THE CONTRACT SHALL GOVERN ALL MATERIALS AND OF THE CONTRACT SHALL GOVERN ALL MATERIALS AND OF THE CONTRACT SHALL GOVERN ALL MATERIALS AND THE CONTRACT SHALL GOVERN ALL MATERIALS AND THE CONTRACT SHALL GOVERN ALL MATERIALS AND CONTRACT SHALL GOVERN ALL MATERIALS AND CONTRACT SHALL GOVERN ALL MATERIALS AND SHALL GOVERN ALL MATERIALS AND SHALL GOVERN ALL MATERIALS AND GOVERN ALL MATERIALS AND GOVERN ALL MATERIALS AND ALL MATERIALS AND ALL MATERIALS AND MATERIALS AND MATERIALS AND AND AND WORKMANSHIP INVOLVED IN THE IMPROVEMENTS SHOWN ON THESE PLANS EXCEPT AS SUCH INVOLVED IN THE IMPROVEMENTS SHOWN ON THESE PLANS EXCEPT AS SUCH INVOLVED IN THE IMPROVEMENTS SHOWN ON THESE PLANS EXCEPT AS SUCH IN THE IMPROVEMENTS SHOWN ON THESE PLANS EXCEPT AS SUCH IN THE IMPROVEMENTS SHOWN ON THESE PLANS EXCEPT AS SUCH THE IMPROVEMENTS SHOWN ON THESE PLANS EXCEPT AS SUCH THE IMPROVEMENTS SHOWN ON THESE PLANS EXCEPT AS SUCH IMPROVEMENTS SHOWN ON THESE PLANS EXCEPT AS SUCH IMPROVEMENTS SHOWN ON THESE PLANS EXCEPT AS SUCH SHOWN ON THESE PLANS EXCEPT AS SUCH SHOWN ON THESE PLANS EXCEPT AS SUCH ON THESE PLANS EXCEPT AS SUCH ON THESE PLANS EXCEPT AS SUCH THESE PLANS EXCEPT AS SUCH THESE PLANS EXCEPT AS SUCH PLANS EXCEPT AS SUCH PLANS EXCEPT AS SUCH EXCEPT AS SUCH EXCEPT AS SUCH AS SUCH AS SUCH SUCH SUCH SPECIFICATIONS ARE MODIFIED BY THE FOLLOWING SPECIFICATIONS, OR BY THE CONSTRUCTION DETAILS ARE MODIFIED BY THE FOLLOWING SPECIFICATIONS, OR BY THE CONSTRUCTION DETAILS ARE MODIFIED BY THE FOLLOWING SPECIFICATIONS, OR BY THE CONSTRUCTION DETAILS MODIFIED BY THE FOLLOWING SPECIFICATIONS, OR BY THE CONSTRUCTION DETAILS MODIFIED BY THE FOLLOWING SPECIFICATIONS, OR BY THE CONSTRUCTION DETAILS BY THE FOLLOWING SPECIFICATIONS, OR BY THE CONSTRUCTION DETAILS BY THE FOLLOWING SPECIFICATIONS, OR BY THE CONSTRUCTION DETAILS THE FOLLOWING SPECIFICATIONS, OR BY THE CONSTRUCTION DETAILS THE FOLLOWING SPECIFICATIONS, OR BY THE CONSTRUCTION DETAILS FOLLOWING SPECIFICATIONS, OR BY THE CONSTRUCTION DETAILS FOLLOWING SPECIFICATIONS, OR BY THE CONSTRUCTION DETAILS SPECIFICATIONS, OR BY THE CONSTRUCTION DETAILS SPECIFICATIONS, OR BY THE CONSTRUCTION DETAILS OR BY THE CONSTRUCTION DETAILS OR BY THE CONSTRUCTION DETAILS BY THE CONSTRUCTION DETAILS BY THE CONSTRUCTION DETAILS THE CONSTRUCTION DETAILS THE CONSTRUCTION DETAILS CONSTRUCTION DETAILS CONSTRUCTION DETAILS DETAILS DETAILS SET FORTH HEREIN. IN CASE OF ANY CONFLICT AMONG THESE IDENTIFIED TECHNICAL SPECIFICATIONS, FORTH HEREIN. IN CASE OF ANY CONFLICT AMONG THESE IDENTIFIED TECHNICAL SPECIFICATIONS, FORTH HEREIN. IN CASE OF ANY CONFLICT AMONG THESE IDENTIFIED TECHNICAL SPECIFICATIONS, HEREIN. IN CASE OF ANY CONFLICT AMONG THESE IDENTIFIED TECHNICAL SPECIFICATIONS, HEREIN. IN CASE OF ANY CONFLICT AMONG THESE IDENTIFIED TECHNICAL SPECIFICATIONS, IN CASE OF ANY CONFLICT AMONG THESE IDENTIFIED TECHNICAL SPECIFICATIONS, IN CASE OF ANY CONFLICT AMONG THESE IDENTIFIED TECHNICAL SPECIFICATIONS, CASE OF ANY CONFLICT AMONG THESE IDENTIFIED TECHNICAL SPECIFICATIONS, CASE OF ANY CONFLICT AMONG THESE IDENTIFIED TECHNICAL SPECIFICATIONS, OF ANY CONFLICT AMONG THESE IDENTIFIED TECHNICAL SPECIFICATIONS, OF ANY CONFLICT AMONG THESE IDENTIFIED TECHNICAL SPECIFICATIONS, ANY CONFLICT AMONG THESE IDENTIFIED TECHNICAL SPECIFICATIONS, ANY CONFLICT AMONG THESE IDENTIFIED TECHNICAL SPECIFICATIONS, CONFLICT AMONG THESE IDENTIFIED TECHNICAL SPECIFICATIONS, CONFLICT AMONG THESE IDENTIFIED TECHNICAL SPECIFICATIONS, AMONG THESE IDENTIFIED TECHNICAL SPECIFICATIONS, AMONG THESE IDENTIFIED TECHNICAL SPECIFICATIONS, THESE IDENTIFIED TECHNICAL SPECIFICATIONS, THESE IDENTIFIED TECHNICAL SPECIFICATIONS, IDENTIFIED TECHNICAL SPECIFICATIONS, IDENTIFIED TECHNICAL SPECIFICATIONS, TECHNICAL SPECIFICATIONS, TECHNICAL SPECIFICATIONS, SPECIFICATIONS, SPECIFICATIONS, THE GREATER REQUIREMENT SHALL TAKE PRECEDENCE (AS DETERMINED BY THE SOLE DISCRETION OF GREATER REQUIREMENT SHALL TAKE PRECEDENCE (AS DETERMINED BY THE SOLE DISCRETION OF GREATER REQUIREMENT SHALL TAKE PRECEDENCE (AS DETERMINED BY THE SOLE DISCRETION OF REQUIREMENT SHALL TAKE PRECEDENCE (AS DETERMINED BY THE SOLE DISCRETION OF REQUIREMENT SHALL TAKE PRECEDENCE (AS DETERMINED BY THE SOLE DISCRETION OF SHALL TAKE PRECEDENCE (AS DETERMINED BY THE SOLE DISCRETION OF SHALL TAKE PRECEDENCE (AS DETERMINED BY THE SOLE DISCRETION OF TAKE PRECEDENCE (AS DETERMINED BY THE SOLE DISCRETION OF TAKE PRECEDENCE (AS DETERMINED BY THE SOLE DISCRETION OF PRECEDENCE (AS DETERMINED BY THE SOLE DISCRETION OF PRECEDENCE (AS DETERMINED BY THE SOLE DISCRETION OF (AS DETERMINED BY THE SOLE DISCRETION OF (AS DETERMINED BY THE SOLE DISCRETION OF DETERMINED BY THE SOLE DISCRETION OF DETERMINED BY THE SOLE DISCRETION OF BY THE SOLE DISCRETION OF BY THE SOLE DISCRETION OF THE SOLE DISCRETION OF THE SOLE DISCRETION OF SOLE DISCRETION OF SOLE DISCRETION OF DISCRETION OF DISCRETION OF OF OF THE COUNTY ENGINEER) UNLESS DIRECTED OTHERWISE BY THE COUNTY ENGINEER. GENERAL PROVISIONS OF THE ODOT CMS EXCEPT AS MODIFIED HEREIN, SHALL NOT APPLY. THIS PROVISIONS OF THE ODOT CMS EXCEPT AS MODIFIED HEREIN, SHALL NOT APPLY. THIS PROVISIONS OF THE ODOT CMS EXCEPT AS MODIFIED HEREIN, SHALL NOT APPLY. THIS OF THE ODOT CMS EXCEPT AS MODIFIED HEREIN, SHALL NOT APPLY. THIS OF THE ODOT CMS EXCEPT AS MODIFIED HEREIN, SHALL NOT APPLY. THIS THE ODOT CMS EXCEPT AS MODIFIED HEREIN, SHALL NOT APPLY. THIS THE ODOT CMS EXCEPT AS MODIFIED HEREIN, SHALL NOT APPLY. THIS ODOT CMS EXCEPT AS MODIFIED HEREIN, SHALL NOT APPLY. THIS ODOT CMS EXCEPT AS MODIFIED HEREIN, SHALL NOT APPLY. THIS CMS EXCEPT AS MODIFIED HEREIN, SHALL NOT APPLY. THIS CMS EXCEPT AS MODIFIED HEREIN, SHALL NOT APPLY. THIS EXCEPT AS MODIFIED HEREIN, SHALL NOT APPLY. THIS EXCEPT AS MODIFIED HEREIN, SHALL NOT APPLY. THIS AS MODIFIED HEREIN, SHALL NOT APPLY. THIS AS MODIFIED HEREIN, SHALL NOT APPLY. THIS MODIFIED HEREIN, SHALL NOT APPLY. THIS MODIFIED HEREIN, SHALL NOT APPLY. THIS HEREIN, SHALL NOT APPLY. THIS HEREIN, SHALL NOT APPLY. THIS SHALL NOT APPLY. THIS SHALL NOT APPLY. THIS NOT APPLY. THIS NOT APPLY. THIS APPLY. THIS APPLY. THIS THIS THIS EXCLUSION INCLUDES BUT IS NOT NECESSARILY LIMITED TO DIVISION 100 OF THE ODOT CMS. PERTINENT SPECIFICATIONS: ASTM C33 CONCRETE AGGREGATES CONCRETE AGGREGATES ASTM C39 METHOD OF TEST FOR COMPRESSIVE STRENGTH OF CYLINDRICAL CONCRETE SPECIMENS METHOD OF TEST FOR COMPRESSIVE STRENGTH OF CYLINDRICAL CONCRETE SPECIMENS ASTM C94 READY-MIXED CONCRETE READY-MIXED CONCRETE ASTM C143 METHOD OF TEST FOR SLUMP OF CONCRETE METHOD OF TEST FOR SLUMP OF CONCRETE ASTM C150 PORTLAND CEMENT PORTLAND CEMENT ASTM A185 STEEL WELDED WIRE REINFORCEMENT, PLAIN, OR CONCRETE STEEL WELDED WIRE REINFORCEMENT, PLAIN, OR CONCRETE ASTM C192 METHOD OF MAKING AND CURING TEST SPECIMENS IN THE LABORATORY METHOD OF MAKING AND CURING TEST SPECIMENS IN THE LABORATORY ASTM C231 TEST METHOD FOR AIR CONTENT OF FRESHLY MIXED CONCRETE BY PRESSURE METHOD TEST METHOD FOR AIR CONTENT OF FRESHLY MIXED CONCRETE BY PRESSURE METHOD ASTM C309 LIQUID MEMBRANE-FORMING COMPOUNDS FOR CURING CONCRETE LIQUID MEMBRANE-FORMING COMPOUNDS FOR CURING CONCRETE ASTM C494 CHEMICAL ADMIXTURES FOR CONCRETE CHEMICAL ADMIXTURES FOR CONCRETE ASTM A615 DEFORMED AND PLAIN CARBON-STEEL BARS FOR CONCRETE REINFORCEMENT DEFORMED AND PLAIN CARBON-STEEL BARS FOR CONCRETE REINFORCEMENT ASTM C618 COOL FLY ASH AND RAW OR CALCINED NATURAL POZZOLAN FOR USE IN CONCRETE COOL FLY ASH AND RAW OR CALCINED NATURAL POZZOLAN FOR USE IN CONCRETE ASTM C979 PIGMENTS FOR INTEGRALLY COLORED CONCRETE PIGMENTS FOR INTEGRALLY COLORED CONCRETE ACI 211.1 SELECTING PROPORTIONS FOR NORMAL, HEAVYWEIGHT, AND MASS CONCRETE SELECTING PROPORTIONS FOR NORMAL, HEAVYWEIGHT, AND MASS CONCRETE ACI 306 COLD WEATHER CONCRETING COLD WEATHER CONCRETING ACI 318 STRUCTURAL CONCRETE AND COMMENTARY (INCLUDES ERRATA) STRUCTURAL CONCRETE AND COMMENTARY (INCLUDES ERRATA) PCI MNL 116 QUALITY CONTROL FOR PLANTS AND PRODUCTION OF PRECAST PRESTRESSED CONCRETE QUALITY CONTROL FOR PLANTS AND PRODUCTION OF PRECAST PRESTRESSED CONCRETE SAFETY REQUIREMENTS: THE CONTRACTOR AND ANY AND ALL SUBCONTRACTORS SHALL BE SOLELY RESPONSIBLE FOR COMPLYING CONTRACTOR AND ANY AND ALL SUBCONTRACTORS SHALL BE SOLELY RESPONSIBLE FOR COMPLYING CONTRACTOR AND ANY AND ALL SUBCONTRACTORS SHALL BE SOLELY RESPONSIBLE FOR COMPLYING AND ANY AND ALL SUBCONTRACTORS SHALL BE SOLELY RESPONSIBLE FOR COMPLYING AND ANY AND ALL SUBCONTRACTORS SHALL BE SOLELY RESPONSIBLE FOR COMPLYING ANY AND ALL SUBCONTRACTORS SHALL BE SOLELY RESPONSIBLE FOR COMPLYING ANY AND ALL SUBCONTRACTORS SHALL BE SOLELY RESPONSIBLE FOR COMPLYING AND ALL SUBCONTRACTORS SHALL BE SOLELY RESPONSIBLE FOR COMPLYING AND ALL SUBCONTRACTORS SHALL BE SOLELY RESPONSIBLE FOR COMPLYING ALL SUBCONTRACTORS SHALL BE SOLELY RESPONSIBLE FOR COMPLYING ALL SUBCONTRACTORS SHALL BE SOLELY RESPONSIBLE FOR COMPLYING SUBCONTRACTORS SHALL BE SOLELY RESPONSIBLE FOR COMPLYING SUBCONTRACTORS SHALL BE SOLELY RESPONSIBLE FOR COMPLYING SHALL BE SOLELY RESPONSIBLE FOR COMPLYING SHALL BE SOLELY RESPONSIBLE FOR COMPLYING BE SOLELY RESPONSIBLE FOR COMPLYING BE SOLELY RESPONSIBLE FOR COMPLYING SOLELY RESPONSIBLE FOR COMPLYING SOLELY RESPONSIBLE FOR COMPLYING RESPONSIBLE FOR COMPLYING RESPONSIBLE FOR COMPLYING FOR COMPLYING FOR COMPLYING COMPLYING COMPLYING WITH ALL FEDERAL, STATE, AND LOCAL SAFETY REQUIREMENTS, TOGETHER WITH EXERCISING PRECAUTIONS ALL FEDERAL, STATE, AND LOCAL SAFETY REQUIREMENTS, TOGETHER WITH EXERCISING PRECAUTIONS ALL FEDERAL, STATE, AND LOCAL SAFETY REQUIREMENTS, TOGETHER WITH EXERCISING PRECAUTIONS FEDERAL, STATE, AND LOCAL SAFETY REQUIREMENTS, TOGETHER WITH EXERCISING PRECAUTIONS FEDERAL, STATE, AND LOCAL SAFETY REQUIREMENTS, TOGETHER WITH EXERCISING PRECAUTIONS STATE, AND LOCAL SAFETY REQUIREMENTS, TOGETHER WITH EXERCISING PRECAUTIONS STATE, AND LOCAL SAFETY REQUIREMENTS, TOGETHER WITH EXERCISING PRECAUTIONS AND LOCAL SAFETY REQUIREMENTS, TOGETHER WITH EXERCISING PRECAUTIONS AND LOCAL SAFETY REQUIREMENTS, TOGETHER WITH EXERCISING PRECAUTIONS LOCAL SAFETY REQUIREMENTS, TOGETHER WITH EXERCISING PRECAUTIONS LOCAL SAFETY REQUIREMENTS, TOGETHER WITH EXERCISING PRECAUTIONS SAFETY REQUIREMENTS, TOGETHER WITH EXERCISING PRECAUTIONS SAFETY REQUIREMENTS, TOGETHER WITH EXERCISING PRECAUTIONS REQUIREMENTS, TOGETHER WITH EXERCISING PRECAUTIONS REQUIREMENTS, TOGETHER WITH EXERCISING PRECAUTIONS TOGETHER WITH EXERCISING PRECAUTIONS TOGETHER WITH EXERCISING PRECAUTIONS WITH EXERCISING PRECAUTIONS WITH EXERCISING PRECAUTIONS EXERCISING PRECAUTIONS EXERCISING PRECAUTIONS PRECAUTIONS PRECAUTIONS AT ALL TIMES FOR THE PROTECTION OF PERSONS (INCLUDING EMPLOYEES) AND PROPERTY. IT IS ALSO ALL TIMES FOR THE PROTECTION OF PERSONS (INCLUDING EMPLOYEES) AND PROPERTY. IT IS ALSO ALL TIMES FOR THE PROTECTION OF PERSONS (INCLUDING EMPLOYEES) AND PROPERTY. IT IS ALSO TIMES FOR THE PROTECTION OF PERSONS (INCLUDING EMPLOYEES) AND PROPERTY. IT IS ALSO TIMES FOR THE PROTECTION OF PERSONS (INCLUDING EMPLOYEES) AND PROPERTY. IT IS ALSO FOR THE PROTECTION OF PERSONS (INCLUDING EMPLOYEES) AND PROPERTY. IT IS ALSO FOR THE PROTECTION OF PERSONS (INCLUDING EMPLOYEES) AND PROPERTY. IT IS ALSO THE PROTECTION OF PERSONS (INCLUDING EMPLOYEES) AND PROPERTY. IT IS ALSO THE PROTECTION OF PERSONS (INCLUDING EMPLOYEES) AND PROPERTY. IT IS ALSO PROTECTION OF PERSONS (INCLUDING EMPLOYEES) AND PROPERTY. IT IS ALSO PROTECTION OF PERSONS (INCLUDING EMPLOYEES) AND PROPERTY. IT IS ALSO OF PERSONS (INCLUDING EMPLOYEES) AND PROPERTY. IT IS ALSO OF PERSONS (INCLUDING EMPLOYEES) AND PROPERTY. IT IS ALSO PERSONS (INCLUDING EMPLOYEES) AND PROPERTY. IT IS ALSO PERSONS (INCLUDING EMPLOYEES) AND PROPERTY. IT IS ALSO (INCLUDING EMPLOYEES) AND PROPERTY. IT IS ALSO (INCLUDING EMPLOYEES) AND PROPERTY. IT IS ALSO EMPLOYEES) AND PROPERTY. IT IS ALSO EMPLOYEES) AND PROPERTY. IT IS ALSO AND PROPERTY. IT IS ALSO AND PROPERTY. IT IS ALSO PROPERTY. IT IS ALSO PROPERTY. IT IS ALSO IT IS ALSO IT IS ALSO IS ALSO IS ALSO ALSO ALSO SOLELY THE RESPONSIBILITY OF THE CONTRACTOR AND SUBCONTRACTOR TO INITIATE, MAINTAIN, AND THE RESPONSIBILITY OF THE CONTRACTOR AND SUBCONTRACTOR TO INITIATE, MAINTAIN, AND THE RESPONSIBILITY OF THE CONTRACTOR AND SUBCONTRACTOR TO INITIATE, MAINTAIN, AND RESPONSIBILITY OF THE CONTRACTOR AND SUBCONTRACTOR TO INITIATE, MAINTAIN, AND RESPONSIBILITY OF THE CONTRACTOR AND SUBCONTRACTOR TO INITIATE, MAINTAIN, AND OF THE CONTRACTOR AND SUBCONTRACTOR TO INITIATE, MAINTAIN, AND OF THE CONTRACTOR AND SUBCONTRACTOR TO INITIATE, MAINTAIN, AND THE CONTRACTOR AND SUBCONTRACTOR TO INITIATE, MAINTAIN, AND THE CONTRACTOR AND SUBCONTRACTOR TO INITIATE, MAINTAIN, AND CONTRACTOR AND SUBCONTRACTOR TO INITIATE, MAINTAIN, AND CONTRACTOR AND SUBCONTRACTOR TO INITIATE, MAINTAIN, AND AND SUBCONTRACTOR TO INITIATE, MAINTAIN, AND AND SUBCONTRACTOR TO INITIATE, MAINTAIN, AND SUBCONTRACTOR TO INITIATE, MAINTAIN, AND SUBCONTRACTOR TO INITIATE, MAINTAIN, AND TO INITIATE, MAINTAIN, AND TO INITIATE, MAINTAIN, AND INITIATE, MAINTAIN, AND INITIATE, MAINTAIN, AND MAINTAIN, AND MAINTAIN, AND AND AND SUPERVISE ALL SAFETY REQUIREMENTS, PRECAUTIONS, AND PROGRAMS IN CONNECTIONWITH THE WORK, ALL SAFETY REQUIREMENTS, PRECAUTIONS, AND PROGRAMS IN CONNECTIONWITH THE WORK, ALL SAFETY REQUIREMENTS, PRECAUTIONS, AND PROGRAMS IN CONNECTIONWITH THE WORK, SAFETY REQUIREMENTS, PRECAUTIONS, AND PROGRAMS IN CONNECTIONWITH THE WORK, SAFETY REQUIREMENTS, PRECAUTIONS, AND PROGRAMS IN CONNECTIONWITH THE WORK, REQUIREMENTS, PRECAUTIONS, AND PROGRAMS IN CONNECTIONWITH THE WORK, REQUIREMENTS, PRECAUTIONS, AND PROGRAMS IN CONNECTIONWITH THE WORK, PRECAUTIONS, AND PROGRAMS IN CONNECTIONWITH THE WORK, PRECAUTIONS, AND PROGRAMS IN CONNECTIONWITH THE WORK, AND PROGRAMS IN CONNECTIONWITH THE WORK, AND PROGRAMS IN CONNECTIONWITH THE WORK, PROGRAMS IN CONNECTIONWITH THE WORK, PROGRAMS IN CONNECTIONWITH THE WORK, IN CONNECTIONWITH THE WORK, IN CONNECTIONWITH THE WORK, CONNECTIONWITH THE WORK, CONNECTIONWITH THE WORK, THE WORK, THE WORK, WORK, WORK, INCLUDING ALL OSHA RULES AND REGULATIONS. UTILITIES: THE IDENTITY AND LOCATIONS OF EXISTING UNDERGROUND UTILITIES IN THE CONSTRUCTION AREA HAVE IDENTITY AND LOCATIONS OF EXISTING UNDERGROUND UTILITIES IN THE CONSTRUCTION AREA HAVE IDENTITY AND LOCATIONS OF EXISTING UNDERGROUND UTILITIES IN THE CONSTRUCTION AREA HAVE AND LOCATIONS OF EXISTING UNDERGROUND UTILITIES IN THE CONSTRUCTION AREA HAVE AND LOCATIONS OF EXISTING UNDERGROUND UTILITIES IN THE CONSTRUCTION AREA HAVE LOCATIONS OF EXISTING UNDERGROUND UTILITIES IN THE CONSTRUCTION AREA HAVE LOCATIONS OF EXISTING UNDERGROUND UTILITIES IN THE CONSTRUCTION AREA HAVE OF EXISTING UNDERGROUND UTILITIES IN THE CONSTRUCTION AREA HAVE OF EXISTING UNDERGROUND UTILITIES IN THE CONSTRUCTION AREA HAVE EXISTING UNDERGROUND UTILITIES IN THE CONSTRUCTION AREA HAVE EXISTING UNDERGROUND UTILITIES IN THE CONSTRUCTION AREA HAVE UNDERGROUND UTILITIES IN THE CONSTRUCTION AREA HAVE UNDERGROUND UTILITIES IN THE CONSTRUCTION AREA HAVE UTILITIES IN THE CONSTRUCTION AREA HAVE UTILITIES IN THE CONSTRUCTION AREA HAVE IN THE CONSTRUCTION AREA HAVE IN THE CONSTRUCTION AREA HAVE THE CONSTRUCTION AREA HAVE THE CONSTRUCTION AREA HAVE CONSTRUCTION AREA HAVE CONSTRUCTION AREA HAVE AREA HAVE AREA HAVE HAVE HAVE BEEN SHOWN ON THE APPROVED CONSTRUCTION DRAWINGS AS ACCURATELY AS PROVIDED BY THE SHOWN ON THE APPROVED CONSTRUCTION DRAWINGS AS ACCURATELY AS PROVIDED BY THE SHOWN ON THE APPROVED CONSTRUCTION DRAWINGS AS ACCURATELY AS PROVIDED BY THE ON THE APPROVED CONSTRUCTION DRAWINGS AS ACCURATELY AS PROVIDED BY THE ON THE APPROVED CONSTRUCTION DRAWINGS AS ACCURATELY AS PROVIDED BY THE THE APPROVED CONSTRUCTION DRAWINGS AS ACCURATELY AS PROVIDED BY THE THE APPROVED CONSTRUCTION DRAWINGS AS ACCURATELY AS PROVIDED BY THE APPROVED CONSTRUCTION DRAWINGS AS ACCURATELY AS PROVIDED BY THE APPROVED CONSTRUCTION DRAWINGS AS ACCURATELY AS PROVIDED BY THE CONSTRUCTION DRAWINGS AS ACCURATELY AS PROVIDED BY THE CONSTRUCTION DRAWINGS AS ACCURATELY AS PROVIDED BY THE DRAWINGS AS ACCURATELY AS PROVIDED BY THE DRAWINGS AS ACCURATELY AS PROVIDED BY THE AS ACCURATELY AS PROVIDED BY THE AS ACCURATELY AS PROVIDED BY THE ACCURATELY AS PROVIDED BY THE ACCURATELY AS PROVIDED BY THE AS PROVIDED BY THE AS PROVIDED BY THE PROVIDED BY THE PROVIDED BY THE BY THE BY THE THE THE OWNER OF THE UNDERGROUND UTILITY AS REQUIRED BY SECTION 153.64 OR SECTION 3781.27 OF THE OF THE UNDERGROUND UTILITY AS REQUIRED BY SECTION 153.64 OR SECTION 3781.27 OF THE OF THE UNDERGROUND UTILITY AS REQUIRED BY SECTION 153.64 OR SECTION 3781.27 OF THE THE UNDERGROUND UTILITY AS REQUIRED BY SECTION 153.64 OR SECTION 3781.27 OF THE THE UNDERGROUND UTILITY AS REQUIRED BY SECTION 153.64 OR SECTION 3781.27 OF THE UNDERGROUND UTILITY AS REQUIRED BY SECTION 153.64 OR SECTION 3781.27 OF THE UNDERGROUND UTILITY AS REQUIRED BY SECTION 153.64 OR SECTION 3781.27 OF THE UTILITY AS REQUIRED BY SECTION 153.64 OR SECTION 3781.27 OF THE UTILITY AS REQUIRED BY SECTION 153.64 OR SECTION 3781.27 OF THE AS REQUIRED BY SECTION 153.64 OR SECTION 3781.27 OF THE AS REQUIRED BY SECTION 153.64 OR SECTION 3781.27 OF THE REQUIRED BY SECTION 153.64 OR SECTION 3781.27 OF THE REQUIRED BY SECTION 153.64 OR SECTION 3781.27 OF THE BY SECTION 153.64 OR SECTION 3781.27 OF THE BY SECTION 153.64 OR SECTION 3781.27 OF THE SECTION 153.64 OR SECTION 3781.27 OF THE SECTION 153.64 OR SECTION 3781.27 OF THE 153.64 OR SECTION 3781.27 OF THE 153.64 OR SECTION 3781.27 OF THE OR SECTION 3781.27 OF THE OR SECTION 3781.27 OF THE SECTION 3781.27 OF THE SECTION 3781.27 OF THE 3781.27 OF THE 3781.27 OF THE OF THE OF THE THE THE OHIO REVISED CODE. ROSS COUNTY AND THE ENGINEER ASSUME NO RESPONSIBILITY FOR THE REVISED CODE. ROSS COUNTY AND THE ENGINEER ASSUME NO RESPONSIBILITY FOR THE REVISED CODE. ROSS COUNTY AND THE ENGINEER ASSUME NO RESPONSIBILITY FOR THE CODE. ROSS COUNTY AND THE ENGINEER ASSUME NO RESPONSIBILITY FOR THE CODE. ROSS COUNTY AND THE ENGINEER ASSUME NO RESPONSIBILITY FOR THE ROSS COUNTY AND THE ENGINEER ASSUME NO RESPONSIBILITY FOR THE ROSS COUNTY AND THE ENGINEER ASSUME NO RESPONSIBILITY FOR THE COUNTY AND THE ENGINEER ASSUME NO RESPONSIBILITY FOR THE COUNTY AND THE ENGINEER ASSUME NO RESPONSIBILITY FOR THE AND THE ENGINEER ASSUME NO RESPONSIBILITY FOR THE AND THE ENGINEER ASSUME NO RESPONSIBILITY FOR THE THE ENGINEER ASSUME NO RESPONSIBILITY FOR THE THE ENGINEER ASSUME NO RESPONSIBILITY FOR THE ENGINEER ASSUME NO RESPONSIBILITY FOR THE ENGINEER ASSUME NO RESPONSIBILITY FOR THE ASSUME NO RESPONSIBILITY FOR THE ASSUME NO RESPONSIBILITY FOR THE NO RESPONSIBILITY FOR THE NO RESPONSIBILITY FOR THE RESPONSIBILITY FOR THE RESPONSIBILITY FOR THE FOR THE FOR THE THE THE ACCURACY OF LOCATIONS OR DEPTHS OF UNDERGROUND FACILITIES SHOWN ON THE APPROVED OF LOCATIONS OR DEPTHS OF UNDERGROUND FACILITIES SHOWN ON THE APPROVED OF LOCATIONS OR DEPTHS OF UNDERGROUND FACILITIES SHOWN ON THE APPROVED LOCATIONS OR DEPTHS OF UNDERGROUND FACILITIES SHOWN ON THE APPROVED LOCATIONS OR DEPTHS OF UNDERGROUND FACILITIES SHOWN ON THE APPROVED OR DEPTHS OF UNDERGROUND FACILITIES SHOWN ON THE APPROVED OR DEPTHS OF UNDERGROUND FACILITIES SHOWN ON THE APPROVED DEPTHS OF UNDERGROUND FACILITIES SHOWN ON THE APPROVED DEPTHS OF UNDERGROUND FACILITIES SHOWN ON THE APPROVED OF UNDERGROUND FACILITIES SHOWN ON THE APPROVED OF UNDERGROUND FACILITIES SHOWN ON THE APPROVED UNDERGROUND FACILITIES SHOWN ON THE APPROVED UNDERGROUND FACILITIES SHOWN ON THE APPROVED FACILITIES SHOWN ON THE APPROVED FACILITIES SHOWN ON THE APPROVED SHOWN ON THE APPROVED SHOWN ON THE APPROVED ON THE APPROVED ON THE APPROVED THE APPROVED THE APPROVED APPROVED APPROVED CONSTRUCTION DRAWINGS. WHEN UNKNOWN OR INCORRECTLY LOCATED UNDERGROUND UTILITIES ARE DRAWINGS. WHEN UNKNOWN OR INCORRECTLY LOCATED UNDERGROUND UTILITIES ARE DRAWINGS. WHEN UNKNOWN OR INCORRECTLY LOCATED UNDERGROUND UTILITIES ARE WHEN UNKNOWN OR INCORRECTLY LOCATED UNDERGROUND UTILITIES ARE WHEN UNKNOWN OR INCORRECTLY LOCATED UNDERGROUND UTILITIES ARE UNKNOWN OR INCORRECTLY LOCATED UNDERGROUND UTILITIES ARE UNKNOWN OR INCORRECTLY LOCATED UNDERGROUND UTILITIES ARE OR INCORRECTLY LOCATED UNDERGROUND UTILITIES ARE OR INCORRECTLY LOCATED UNDERGROUND UTILITIES ARE INCORRECTLY LOCATED UNDERGROUND UTILITIES ARE INCORRECTLY LOCATED UNDERGROUND UTILITIES ARE LOCATED UNDERGROUND UTILITIES ARE LOCATED UNDERGROUND UTILITIES ARE UNDERGROUND UTILITIES ARE UNDERGROUND UTILITIES ARE UTILITIES ARE UTILITIES ARE ARE ARE ENCOUNTERED DURING CONSTRUCTION, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE UTILITY OWNER, DURING CONSTRUCTION, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE UTILITY OWNER, DURING CONSTRUCTION, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE UTILITY OWNER, CONSTRUCTION, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE UTILITY OWNER, CONSTRUCTION, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE UTILITY OWNER, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE UTILITY OWNER, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE UTILITY OWNER, CONTRACTOR SHALL IMMEDIATELY NOTIFY THE UTILITY OWNER, CONTRACTOR SHALL IMMEDIATELY NOTIFY THE UTILITY OWNER, SHALL IMMEDIATELY NOTIFY THE UTILITY OWNER, SHALL IMMEDIATELY NOTIFY THE UTILITY OWNER, IMMEDIATELY NOTIFY THE UTILITY OWNER, IMMEDIATELY NOTIFY THE UTILITY OWNER, NOTIFY THE UTILITY OWNER, NOTIFY THE UTILITY OWNER, THE UTILITY OWNER, THE UTILITY OWNER, UTILITY OWNER, UTILITY OWNER, OWNER, OWNER, THE COUNTY AND THE DESIGN ENGINEER. THE CONTRACTOR IS RESPONSIBLE FOR HIRING AN UNDERGROUND UTILITY LOCATOR TO MARK UTILITIES CONTRACTOR IS RESPONSIBLE FOR HIRING AN UNDERGROUND UTILITY LOCATOR TO MARK UTILITIES CONTRACTOR IS RESPONSIBLE FOR HIRING AN UNDERGROUND UTILITY LOCATOR TO MARK UTILITIES IS RESPONSIBLE FOR HIRING AN UNDERGROUND UTILITY LOCATOR TO MARK UTILITIES IS RESPONSIBLE FOR HIRING AN UNDERGROUND UTILITY LOCATOR TO MARK UTILITIES RESPONSIBLE FOR HIRING AN UNDERGROUND UTILITY LOCATOR TO MARK UTILITIES RESPONSIBLE FOR HIRING AN UNDERGROUND UTILITY LOCATOR TO MARK UTILITIES FOR HIRING AN UNDERGROUND UTILITY LOCATOR TO MARK UTILITIES FOR HIRING AN UNDERGROUND UTILITY LOCATOR TO MARK UTILITIES HIRING AN UNDERGROUND UTILITY LOCATOR TO MARK UTILITIES HIRING AN UNDERGROUND UTILITY LOCATOR TO MARK UTILITIES AN UNDERGROUND UTILITY LOCATOR TO MARK UTILITIES AN UNDERGROUND UTILITY LOCATOR TO MARK UTILITIES UNDERGROUND UTILITY LOCATOR TO MARK UTILITIES UNDERGROUND UTILITY LOCATOR TO MARK UTILITIES UTILITY LOCATOR TO MARK UTILITIES UTILITY LOCATOR TO MARK UTILITIES LOCATOR TO MARK UTILITIES LOCATOR TO MARK UTILITIES TO MARK UTILITIES TO MARK UTILITIES MARK UTILITIES MARK UTILITIES UTILITIES UTILITIES PRIOR TO EXCAVATION. CONTRACTOR SHALL SIMILARLY CONTACT ALL UTILITY OWNERS. THE CONTRACTOR IS RESPONSIBLE FOR THE INVESTIGATION, LOCATION, SUPPORT, PROTECTION AND CONTRACTOR IS RESPONSIBLE FOR THE INVESTIGATION, LOCATION, SUPPORT, PROTECTION AND CONTRACTOR IS RESPONSIBLE FOR THE INVESTIGATION, LOCATION, SUPPORT, PROTECTION AND IS RESPONSIBLE FOR THE INVESTIGATION, LOCATION, SUPPORT, PROTECTION AND IS RESPONSIBLE FOR THE INVESTIGATION, LOCATION, SUPPORT, PROTECTION AND RESPONSIBLE FOR THE INVESTIGATION, LOCATION, SUPPORT, PROTECTION AND RESPONSIBLE FOR THE INVESTIGATION, LOCATION, SUPPORT, PROTECTION AND FOR THE INVESTIGATION, LOCATION, SUPPORT, PROTECTION AND FOR THE INVESTIGATION, LOCATION, SUPPORT, PROTECTION AND THE INVESTIGATION, LOCATION, SUPPORT, PROTECTION AND THE INVESTIGATION, LOCATION, SUPPORT, PROTECTION AND INVESTIGATION, LOCATION, SUPPORT, PROTECTION AND INVESTIGATION, LOCATION, SUPPORT, PROTECTION AND LOCATION, SUPPORT, PROTECTION AND LOCATION, SUPPORT, PROTECTION AND SUPPORT, PROTECTION AND SUPPORT, PROTECTION AND PROTECTION AND PROTECTION AND AND AND RESTORATION OF ALL EXISTING UTILITIES AND APPURTENANCES WHETHER SHOWN ON THE PLANS OR NOT. OF ALL EXISTING UTILITIES AND APPURTENANCES WHETHER SHOWN ON THE PLANS OR NOT. OF ALL EXISTING UTILITIES AND APPURTENANCES WHETHER SHOWN ON THE PLANS OR NOT. ALL EXISTING UTILITIES AND APPURTENANCES WHETHER SHOWN ON THE PLANS OR NOT. ALL EXISTING UTILITIES AND APPURTENANCES WHETHER SHOWN ON THE PLANS OR NOT. EXISTING UTILITIES AND APPURTENANCES WHETHER SHOWN ON THE PLANS OR NOT. EXISTING UTILITIES AND APPURTENANCES WHETHER SHOWN ON THE PLANS OR NOT. UTILITIES AND APPURTENANCES WHETHER SHOWN ON THE PLANS OR NOT. UTILITIES AND APPURTENANCES WHETHER SHOWN ON THE PLANS OR NOT. AND APPURTENANCES WHETHER SHOWN ON THE PLANS OR NOT. AND APPURTENANCES WHETHER SHOWN ON THE PLANS OR NOT. APPURTENANCES WHETHER SHOWN ON THE PLANS OR NOT. APPURTENANCES WHETHER SHOWN ON THE PLANS OR NOT. WHETHER SHOWN ON THE PLANS OR NOT. WHETHER SHOWN ON THE PLANS OR NOT. SHOWN ON THE PLANS OR NOT. SHOWN ON THE PLANS OR NOT. ON THE PLANS OR NOT. ON THE PLANS OR NOT. THE PLANS OR NOT. THE PLANS OR NOT. PLANS OR NOT. PLANS OR NOT. OR NOT. OR NOT. NOT. NOT. THE CONTRACTOR SHALL PROCEED WITH THE WORK AND PROTECT ALL UNDERGROUND UTILITIES IN A CONTRACTOR SHALL PROCEED WITH THE WORK AND PROTECT ALL UNDERGROUND UTILITIES IN A CONTRACTOR SHALL PROCEED WITH THE WORK AND PROTECT ALL UNDERGROUND UTILITIES IN A SHALL PROCEED WITH THE WORK AND PROTECT ALL UNDERGROUND UTILITIES IN A SHALL PROCEED WITH THE WORK AND PROTECT ALL UNDERGROUND UTILITIES IN A PROCEED WITH THE WORK AND PROTECT ALL UNDERGROUND UTILITIES IN A PROCEED WITH THE WORK AND PROTECT ALL UNDERGROUND UTILITIES IN A WITH THE WORK AND PROTECT ALL UNDERGROUND UTILITIES IN A WITH THE WORK AND PROTECT ALL UNDERGROUND UTILITIES IN A THE WORK AND PROTECT ALL UNDERGROUND UTILITIES IN A THE WORK AND PROTECT ALL UNDERGROUND UTILITIES IN A WORK AND PROTECT ALL UNDERGROUND UTILITIES IN A WORK AND PROTECT ALL UNDERGROUND UTILITIES IN A AND PROTECT ALL UNDERGROUND UTILITIES IN A AND PROTECT ALL UNDERGROUND UTILITIES IN A PROTECT ALL UNDERGROUND UTILITIES IN A PROTECT ALL UNDERGROUND UTILITIES IN A ALL UNDERGROUND UTILITIES IN A ALL UNDERGROUND UTILITIES IN A UNDERGROUND UTILITIES IN A UNDERGROUND UTILITIES IN A UTILITIES IN A UTILITIES IN A IN A IN A A A MANNER AT LEAST AS CAUTIOUS AND PROTECTIVE OF SAFETY AND UNDERGROUND UTILITIES AS THOSE AT LEAST AS CAUTIOUS AND PROTECTIVE OF SAFETY AND UNDERGROUND UTILITIES AS THOSE AT LEAST AS CAUTIOUS AND PROTECTIVE OF SAFETY AND UNDERGROUND UTILITIES AS THOSE LEAST AS CAUTIOUS AND PROTECTIVE OF SAFETY AND UNDERGROUND UTILITIES AS THOSE LEAST AS CAUTIOUS AND PROTECTIVE OF SAFETY AND UNDERGROUND UTILITIES AS THOSE AS CAUTIOUS AND PROTECTIVE OF SAFETY AND UNDERGROUND UTILITIES AS THOSE AS CAUTIOUS AND PROTECTIVE OF SAFETY AND UNDERGROUND UTILITIES AS THOSE CAUTIOUS AND PROTECTIVE OF SAFETY AND UNDERGROUND UTILITIES AS THOSE CAUTIOUS AND PROTECTIVE OF SAFETY AND UNDERGROUND UTILITIES AS THOSE AND PROTECTIVE OF SAFETY AND UNDERGROUND UTILITIES AS THOSE AND PROTECTIVE OF SAFETY AND UNDERGROUND UTILITIES AS THOSE PROTECTIVE OF SAFETY AND UNDERGROUND UTILITIES AS THOSE PROTECTIVE OF SAFETY AND UNDERGROUND UTILITIES AS THOSE OF SAFETY AND UNDERGROUND UTILITIES AS THOSE OF SAFETY AND UNDERGROUND UTILITIES AS THOSE SAFETY AND UNDERGROUND UTILITIES AS THOSE SAFETY AND UNDERGROUND UTILITIES AS THOSE AND UNDERGROUND UTILITIES AS THOSE AND UNDERGROUND UTILITIES AS THOSE UNDERGROUND UTILITIES AS THOSE UNDERGROUND UTILITIES AS THOSE UTILITIES AS THOSE UTILITIES AS THOSE AS THOSE AS THOSE THOSE THOSE METHODS IDENTIFIED IN SECTIONS 3781.25 THROUGH 3781.30 OF THE OHIO REVISED CODE. EXPOSE EXISTING UTILITY: WHERE POTENTIAL GRADE AND ALIGNMENT CONFLICTS MIGHT OCCUR WITH EXISTING UTILITIES, OR AS POTENTIAL GRADE AND ALIGNMENT CONFLICTS MIGHT OCCUR WITH EXISTING UTILITIES, OR AS POTENTIAL GRADE AND ALIGNMENT CONFLICTS MIGHT OCCUR WITH EXISTING UTILITIES, OR AS GRADE AND ALIGNMENT CONFLICTS MIGHT OCCUR WITH EXISTING UTILITIES, OR AS GRADE AND ALIGNMENT CONFLICTS MIGHT OCCUR WITH EXISTING UTILITIES, OR AS AND ALIGNMENT CONFLICTS MIGHT OCCUR WITH EXISTING UTILITIES, OR AS AND ALIGNMENT CONFLICTS MIGHT OCCUR WITH EXISTING UTILITIES, OR AS ALIGNMENT CONFLICTS MIGHT OCCUR WITH EXISTING UTILITIES, OR AS ALIGNMENT CONFLICTS MIGHT OCCUR WITH EXISTING UTILITIES, OR AS CONFLICTS MIGHT OCCUR WITH EXISTING UTILITIES, OR AS CONFLICTS MIGHT OCCUR WITH EXISTING UTILITIES, OR AS MIGHT OCCUR WITH EXISTING UTILITIES, OR AS MIGHT OCCUR WITH EXISTING UTILITIES, OR AS OCCUR WITH EXISTING UTILITIES, OR AS OCCUR WITH EXISTING UTILITIES, OR AS WITH EXISTING UTILITIES, OR AS WITH EXISTING UTILITIES, OR AS EXISTING UTILITIES, OR AS EXISTING UTILITIES, OR AS UTILITIES, OR AS UTILITIES, OR AS OR AS OR AS AS AS SPECIFICALLY CALLED OUT ON THE PLANS (THESE LOCATIONS ARE NOTED THUS: EXPOSE), THE CALLED OUT ON THE PLANS (THESE LOCATIONS ARE NOTED THUS: EXPOSE), THE CALLED OUT ON THE PLANS (THESE LOCATIONS ARE NOTED THUS: EXPOSE), THE OUT ON THE PLANS (THESE LOCATIONS ARE NOTED THUS: EXPOSE), THE OUT ON THE PLANS (THESE LOCATIONS ARE NOTED THUS: EXPOSE), THE ON THE PLANS (THESE LOCATIONS ARE NOTED THUS: EXPOSE), THE ON THE PLANS (THESE LOCATIONS ARE NOTED THUS: EXPOSE), THE THE PLANS (THESE LOCATIONS ARE NOTED THUS: EXPOSE), THE THE PLANS (THESE LOCATIONS ARE NOTED THUS: EXPOSE), THE PLANS (THESE LOCATIONS ARE NOTED THUS: EXPOSE), THE PLANS (THESE LOCATIONS ARE NOTED THUS: EXPOSE), THE (THESE LOCATIONS ARE NOTED THUS: EXPOSE), THE (THESE LOCATIONS ARE NOTED THUS: EXPOSE), THE LOCATIONS ARE NOTED THUS: EXPOSE), THE LOCATIONS ARE NOTED THUS: EXPOSE), THE ARE NOTED THUS: EXPOSE), THE ARE NOTED THUS: EXPOSE), THE NOTED THUS: EXPOSE), THE NOTED THUS: EXPOSE), THE THUS: EXPOSE), THE THUS: EXPOSE), THE EXPOSE), THE EXPOSE), THE THE THE CONTRACTOR SHALL EXPOSE UTILITIES OR STRUCTURE SUFFICIENTLY IN ADVANCE OF LAYING PIPE FOR SHALL EXPOSE UTILITIES OR STRUCTURE SUFFICIENTLY IN ADVANCE OF LAYING PIPE FOR SHALL EXPOSE UTILITIES OR STRUCTURE SUFFICIENTLY IN ADVANCE OF LAYING PIPE FOR EXPOSE UTILITIES OR STRUCTURE SUFFICIENTLY IN ADVANCE OF LAYING PIPE FOR EXPOSE UTILITIES OR STRUCTURE SUFFICIENTLY IN ADVANCE OF LAYING PIPE FOR UTILITIES OR STRUCTURE SUFFICIENTLY IN ADVANCE OF LAYING PIPE FOR UTILITIES OR STRUCTURE SUFFICIENTLY IN ADVANCE OF LAYING PIPE FOR OR STRUCTURE SUFFICIENTLY IN ADVANCE OF LAYING PIPE FOR OR STRUCTURE SUFFICIENTLY IN ADVANCE OF LAYING PIPE FOR STRUCTURE SUFFICIENTLY IN ADVANCE OF LAYING PIPE FOR STRUCTURE SUFFICIENTLY IN ADVANCE OF LAYING PIPE FOR SUFFICIENTLY IN ADVANCE OF LAYING PIPE FOR SUFFICIENTLY IN ADVANCE OF LAYING PIPE FOR IN ADVANCE OF LAYING PIPE FOR IN ADVANCE OF LAYING PIPE FOR ADVANCE OF LAYING PIPE FOR ADVANCE OF LAYING PIPE FOR OF LAYING PIPE FOR OF LAYING PIPE FOR LAYING PIPE FOR LAYING PIPE FOR PIPE FOR PIPE FOR FOR FOR THE DESIGN ENGINEER TO VERIFY THE VERTICAL AND HORIZONTAL EFFECT ON THE PROPOSED DESIGN ENGINEER TO VERIFY THE VERTICAL AND HORIZONTAL EFFECT ON THE PROPOSED DESIGN ENGINEER TO VERIFY THE VERTICAL AND HORIZONTAL EFFECT ON THE PROPOSED ENGINEER TO VERIFY THE VERTICAL AND HORIZONTAL EFFECT ON THE PROPOSED ENGINEER TO VERIFY THE VERTICAL AND HORIZONTAL EFFECT ON THE PROPOSED TO VERIFY THE VERTICAL AND HORIZONTAL EFFECT ON THE PROPOSED TO VERIFY THE VERTICAL AND HORIZONTAL EFFECT ON THE PROPOSED VERIFY THE VERTICAL AND HORIZONTAL EFFECT ON THE PROPOSED VERIFY THE VERTICAL AND HORIZONTAL EFFECT ON THE PROPOSED THE VERTICAL AND HORIZONTAL EFFECT ON THE PROPOSED THE VERTICAL AND HORIZONTAL EFFECT ON THE PROPOSED VERTICAL AND HORIZONTAL EFFECT ON THE PROPOSED VERTICAL AND HORIZONTAL EFFECT ON THE PROPOSED AND HORIZONTAL EFFECT ON THE PROPOSED AND HORIZONTAL EFFECT ON THE PROPOSED HORIZONTAL EFFECT ON THE PROPOSED HORIZONTAL EFFECT ON THE PROPOSED EFFECT ON THE PROPOSED EFFECT ON THE PROPOSED ON THE PROPOSED ON THE PROPOSED THE PROPOSED THE PROPOSED PROPOSED PROPOSED CONSTRUCTION. ANY DISCREPANCY WITH THE PLANS SHALL BE COORDINATED WITH THE ENGINEER TO ANY DISCREPANCY WITH THE PLANS SHALL BE COORDINATED WITH THE ENGINEER TO ANY DISCREPANCY WITH THE PLANS SHALL BE COORDINATED WITH THE ENGINEER TO DISCREPANCY WITH THE PLANS SHALL BE COORDINATED WITH THE ENGINEER TO DISCREPANCY WITH THE PLANS SHALL BE COORDINATED WITH THE ENGINEER TO WITH THE PLANS SHALL BE COORDINATED WITH THE ENGINEER TO WITH THE PLANS SHALL BE COORDINATED WITH THE ENGINEER TO THE PLANS SHALL BE COORDINATED WITH THE ENGINEER TO THE PLANS SHALL BE COORDINATED WITH THE ENGINEER TO PLANS SHALL BE COORDINATED WITH THE ENGINEER TO PLANS SHALL BE COORDINATED WITH THE ENGINEER TO SHALL BE COORDINATED WITH THE ENGINEER TO SHALL BE COORDINATED WITH THE ENGINEER TO BE COORDINATED WITH THE ENGINEER TO BE COORDINATED WITH THE ENGINEER TO COORDINATED WITH THE ENGINEER TO COORDINATED WITH THE ENGINEER TO WITH THE ENGINEER TO WITH THE ENGINEER TO THE ENGINEER TO THE ENGINEER TO ENGINEER TO ENGINEER TO TO TO ENSURE THAT THERE ARE NO CONSTRUCTION OR CONFLICT ISSUES ASSOCIATED WITH SAID DISCREPANCY. THAT THERE ARE NO CONSTRUCTION OR CONFLICT ISSUES ASSOCIATED WITH SAID DISCREPANCY. THAT THERE ARE NO CONSTRUCTION OR CONFLICT ISSUES ASSOCIATED WITH SAID DISCREPANCY. THERE ARE NO CONSTRUCTION OR CONFLICT ISSUES ASSOCIATED WITH SAID DISCREPANCY. THERE ARE NO CONSTRUCTION OR CONFLICT ISSUES ASSOCIATED WITH SAID DISCREPANCY. ARE NO CONSTRUCTION OR CONFLICT ISSUES ASSOCIATED WITH SAID DISCREPANCY. ARE NO CONSTRUCTION OR CONFLICT ISSUES ASSOCIATED WITH SAID DISCREPANCY. NO CONSTRUCTION OR CONFLICT ISSUES ASSOCIATED WITH SAID DISCREPANCY. NO CONSTRUCTION OR CONFLICT ISSUES ASSOCIATED WITH SAID DISCREPANCY. CONSTRUCTION OR CONFLICT ISSUES ASSOCIATED WITH SAID DISCREPANCY. CONSTRUCTION OR CONFLICT ISSUES ASSOCIATED WITH SAID DISCREPANCY. OR CONFLICT ISSUES ASSOCIATED WITH SAID DISCREPANCY. OR CONFLICT ISSUES ASSOCIATED WITH SAID DISCREPANCY. CONFLICT ISSUES ASSOCIATED WITH SAID DISCREPANCY. CONFLICT ISSUES ASSOCIATED WITH SAID DISCREPANCY. ISSUES ASSOCIATED WITH SAID DISCREPANCY. ISSUES ASSOCIATED WITH SAID DISCREPANCY. ASSOCIATED WITH SAID DISCREPANCY. ASSOCIATED WITH SAID DISCREPANCY. WITH SAID DISCREPANCY. WITH SAID DISCREPANCY. SAID DISCREPANCY. SAID DISCREPANCY. DISCREPANCY. DISCREPANCY. THE COST OF THIS WORK SHALL BE INCLUDED IN THE UNIT PRICE BID FOR THE VARIOUS IMPROVEMENT COST OF THIS WORK SHALL BE INCLUDED IN THE UNIT PRICE BID FOR THE VARIOUS IMPROVEMENT COST OF THIS WORK SHALL BE INCLUDED IN THE UNIT PRICE BID FOR THE VARIOUS IMPROVEMENT OF THIS WORK SHALL BE INCLUDED IN THE UNIT PRICE BID FOR THE VARIOUS IMPROVEMENT OF THIS WORK SHALL BE INCLUDED IN THE UNIT PRICE BID FOR THE VARIOUS IMPROVEMENT THIS WORK SHALL BE INCLUDED IN THE UNIT PRICE BID FOR THE VARIOUS IMPROVEMENT THIS WORK SHALL BE INCLUDED IN THE UNIT PRICE BID FOR THE VARIOUS IMPROVEMENT WORK SHALL BE INCLUDED IN THE UNIT PRICE BID FOR THE VARIOUS IMPROVEMENT WORK SHALL BE INCLUDED IN THE UNIT PRICE BID FOR THE VARIOUS IMPROVEMENT SHALL BE INCLUDED IN THE UNIT PRICE BID FOR THE VARIOUS IMPROVEMENT SHALL BE INCLUDED IN THE UNIT PRICE BID FOR THE VARIOUS IMPROVEMENT BE INCLUDED IN THE UNIT PRICE BID FOR THE VARIOUS IMPROVEMENT BE INCLUDED IN THE UNIT PRICE BID FOR THE VARIOUS IMPROVEMENT INCLUDED IN THE UNIT PRICE BID FOR THE VARIOUS IMPROVEMENT INCLUDED IN THE UNIT PRICE BID FOR THE VARIOUS IMPROVEMENT IN THE UNIT PRICE BID FOR THE VARIOUS IMPROVEMENT IN THE UNIT PRICE BID FOR THE VARIOUS IMPROVEMENT THE UNIT PRICE BID FOR THE VARIOUS IMPROVEMENT THE UNIT PRICE BID FOR THE VARIOUS IMPROVEMENT UNIT PRICE BID FOR THE VARIOUS IMPROVEMENT UNIT PRICE BID FOR THE VARIOUS IMPROVEMENT PRICE BID FOR THE VARIOUS IMPROVEMENT PRICE BID FOR THE VARIOUS IMPROVEMENT BID FOR THE VARIOUS IMPROVEMENT BID FOR THE VARIOUS IMPROVEMENT FOR THE VARIOUS IMPROVEMENT FOR THE VARIOUS IMPROVEMENT THE VARIOUS IMPROVEMENT THE VARIOUS IMPROVEMENT VARIOUS IMPROVEMENT VARIOUS IMPROVEMENT IMPROVEMENT IMPROVEMENT ITEMS. SITE VISIT: THE CONTRACTOR SHALL PERFORM FIELD RECONNAISSANCE TO BECOME ACQUAINTED WITH THE EXISTING CONTRACTOR SHALL PERFORM FIELD RECONNAISSANCE TO BECOME ACQUAINTED WITH THE EXISTING CONTRACTOR SHALL PERFORM FIELD RECONNAISSANCE TO BECOME ACQUAINTED WITH THE EXISTING SHALL PERFORM FIELD RECONNAISSANCE TO BECOME ACQUAINTED WITH THE EXISTING SHALL PERFORM FIELD RECONNAISSANCE TO BECOME ACQUAINTED WITH THE EXISTING PERFORM FIELD RECONNAISSANCE TO BECOME ACQUAINTED WITH THE EXISTING PERFORM FIELD RECONNAISSANCE TO BECOME ACQUAINTED WITH THE EXISTING FIELD RECONNAISSANCE TO BECOME ACQUAINTED WITH THE EXISTING FIELD RECONNAISSANCE TO BECOME ACQUAINTED WITH THE EXISTING RECONNAISSANCE TO BECOME ACQUAINTED WITH THE EXISTING RECONNAISSANCE TO BECOME ACQUAINTED WITH THE EXISTING TO BECOME ACQUAINTED WITH THE EXISTING TO BECOME ACQUAINTED WITH THE EXISTING BECOME ACQUAINTED WITH THE EXISTING BECOME ACQUAINTED WITH THE EXISTING ACQUAINTED WITH THE EXISTING ACQUAINTED WITH THE EXISTING WITH THE EXISTING WITH THE EXISTING THE EXISTING THE EXISTING EXISTING EXISTING SITE CONDITIONS AND THE POTENTIAL EFFECTS UPON THE SCOPE OF WORK. MISCELLANEOUS WORK: THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, TOOLS, EQUIPMENT, SERVICES, AND RELATED CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, TOOLS, EQUIPMENT, SERVICES, AND RELATED CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, TOOLS, EQUIPMENT, SERVICES, AND RELATED SHALL FURNISH ALL LABOR, MATERIALS, TOOLS, EQUIPMENT, SERVICES, AND RELATED SHALL FURNISH ALL LABOR, MATERIALS, TOOLS, EQUIPMENT, SERVICES, AND RELATED FURNISH ALL LABOR, MATERIALS, TOOLS, EQUIPMENT, SERVICES, AND RELATED FURNISH ALL LABOR, MATERIALS, TOOLS, EQUIPMENT, SERVICES, AND RELATED ALL LABOR, MATERIALS, TOOLS, EQUIPMENT, SERVICES, AND RELATED ALL LABOR, MATERIALS, TOOLS, EQUIPMENT, SERVICES, AND RELATED LABOR, MATERIALS, TOOLS, EQUIPMENT, SERVICES, AND RELATED LABOR, MATERIALS, TOOLS, EQUIPMENT, SERVICES, AND RELATED MATERIALS, TOOLS, EQUIPMENT, SERVICES, AND RELATED MATERIALS, TOOLS, EQUIPMENT, SERVICES, AND RELATED TOOLS, EQUIPMENT, SERVICES, AND RELATED TOOLS, EQUIPMENT, SERVICES, AND RELATED EQUIPMENT, SERVICES, AND RELATED EQUIPMENT, SERVICES, AND RELATED SERVICES, AND RELATED SERVICES, AND RELATED AND RELATED AND RELATED RELATED RELATED ACCESSORIES FOR A COMPLETE PROJECT, AS SHOWN AND DESCRIBED IN THE PLANS AND FOR A COMPLETE PROJECT, AS SHOWN AND DESCRIBED IN THE PLANS AND FOR A COMPLETE PROJECT, AS SHOWN AND DESCRIBED IN THE PLANS AND A COMPLETE PROJECT, AS SHOWN AND DESCRIBED IN THE PLANS AND A COMPLETE PROJECT, AS SHOWN AND DESCRIBED IN THE PLANS AND COMPLETE PROJECT, AS SHOWN AND DESCRIBED IN THE PLANS AND COMPLETE PROJECT, AS SHOWN AND DESCRIBED IN THE PLANS AND PROJECT, AS SHOWN AND DESCRIBED IN THE PLANS AND PROJECT, AS SHOWN AND DESCRIBED IN THE PLANS AND AS SHOWN AND DESCRIBED IN THE PLANS AND AS SHOWN AND DESCRIBED IN THE PLANS AND SHOWN AND DESCRIBED IN THE PLANS AND SHOWN AND DESCRIBED IN THE PLANS AND AND DESCRIBED IN THE PLANS AND AND DESCRIBED IN THE PLANS AND DESCRIBED IN THE PLANS AND DESCRIBED IN THE PLANS AND IN THE PLANS AND IN THE PLANS AND THE PLANS AND THE PLANS AND PLANS AND PLANS AND AND AND SPECIFICATIONS. THE PRICE FOR ITEMS OF WORK OR MATERIALS SHOWN ON THE PLANS OR PROVIDED THE PRICE FOR ITEMS OF WORK OR MATERIALS SHOWN ON THE PLANS OR PROVIDED THE PRICE FOR ITEMS OF WORK OR MATERIALS SHOWN ON THE PLANS OR PROVIDED PRICE FOR ITEMS OF WORK OR MATERIALS SHOWN ON THE PLANS OR PROVIDED PRICE FOR ITEMS OF WORK OR MATERIALS SHOWN ON THE PLANS OR PROVIDED FOR ITEMS OF WORK OR MATERIALS SHOWN ON THE PLANS OR PROVIDED FOR ITEMS OF WORK OR MATERIALS SHOWN ON THE PLANS OR PROVIDED ITEMS OF WORK OR MATERIALS SHOWN ON THE PLANS OR PROVIDED ITEMS OF WORK OR MATERIALS SHOWN ON THE PLANS OR PROVIDED OF WORK OR MATERIALS SHOWN ON THE PLANS OR PROVIDED OF WORK OR MATERIALS SHOWN ON THE PLANS OR PROVIDED WORK OR MATERIALS SHOWN ON THE PLANS OR PROVIDED WORK OR MATERIALS SHOWN ON THE PLANS OR PROVIDED OR MATERIALS SHOWN ON THE PLANS OR PROVIDED OR MATERIALS SHOWN ON THE PLANS OR PROVIDED MATERIALS SHOWN ON THE PLANS OR PROVIDED MATERIALS SHOWN ON THE PLANS OR PROVIDED SHOWN ON THE PLANS OR PROVIDED SHOWN ON THE PLANS OR PROVIDED ON THE PLANS OR PROVIDED ON THE PLANS OR PROVIDED THE PLANS OR PROVIDED THE PLANS OR PROVIDED PLANS OR PROVIDED PLANS OR PROVIDED OR PROVIDED OR PROVIDED PROVIDED PROVIDED FOR IN THE SPECIFICATIONS OR SPECIAL PROVISIONS FOR WHICH NO SPECIFIC METHOD OF PAYMENT IS IN THE SPECIFICATIONS OR SPECIAL PROVISIONS FOR WHICH NO SPECIFIC METHOD OF PAYMENT IS IN THE SPECIFICATIONS OR SPECIAL PROVISIONS FOR WHICH NO SPECIFIC METHOD OF PAYMENT IS THE SPECIFICATIONS OR SPECIAL PROVISIONS FOR WHICH NO SPECIFIC METHOD OF PAYMENT IS THE SPECIFICATIONS OR SPECIAL PROVISIONS FOR WHICH NO SPECIFIC METHOD OF PAYMENT IS SPECIFICATIONS OR SPECIAL PROVISIONS FOR WHICH NO SPECIFIC METHOD OF PAYMENT IS SPECIFICATIONS OR SPECIAL PROVISIONS FOR WHICH NO SPECIFIC METHOD OF PAYMENT IS OR SPECIAL PROVISIONS FOR WHICH NO SPECIFIC METHOD OF PAYMENT IS OR SPECIAL PROVISIONS FOR WHICH NO SPECIFIC METHOD OF PAYMENT IS SPECIAL PROVISIONS FOR WHICH NO SPECIFIC METHOD OF PAYMENT IS SPECIAL PROVISIONS FOR WHICH NO SPECIFIC METHOD OF PAYMENT IS PROVISIONS FOR WHICH NO SPECIFIC METHOD OF PAYMENT IS PROVISIONS FOR WHICH NO SPECIFIC METHOD OF PAYMENT IS FOR WHICH NO SPECIFIC METHOD OF PAYMENT IS FOR WHICH NO SPECIFIC METHOD OF PAYMENT IS WHICH NO SPECIFIC METHOD OF PAYMENT IS WHICH NO SPECIFIC METHOD OF PAYMENT IS NO SPECIFIC METHOD OF PAYMENT IS NO SPECIFIC METHOD OF PAYMENT IS SPECIFIC METHOD OF PAYMENT IS SPECIFIC METHOD OF PAYMENT IS METHOD OF PAYMENT IS METHOD OF PAYMENT IS OF PAYMENT IS OF PAYMENT IS PAYMENT IS PAYMENT IS IS IS PROVIDED, SHALL BE PERFORMED BY THE CONTRACTOR AND THE COSTS INCLUDED AMONG THE PRICE SHALL BE PERFORMED BY THE CONTRACTOR AND THE COSTS INCLUDED AMONG THE PRICE SHALL BE PERFORMED BY THE CONTRACTOR AND THE COSTS INCLUDED AMONG THE PRICE BE PERFORMED BY THE CONTRACTOR AND THE COSTS INCLUDED AMONG THE PRICE BE PERFORMED BY THE CONTRACTOR AND THE COSTS INCLUDED AMONG THE PRICE PERFORMED BY THE CONTRACTOR AND THE COSTS INCLUDED AMONG THE PRICE PERFORMED BY THE CONTRACTOR AND THE COSTS INCLUDED AMONG THE PRICE BY THE CONTRACTOR AND THE COSTS INCLUDED AMONG THE PRICE BY THE CONTRACTOR AND THE COSTS INCLUDED AMONG THE PRICE THE CONTRACTOR AND THE COSTS INCLUDED AMONG THE PRICE THE CONTRACTOR AND THE COSTS INCLUDED AMONG THE PRICE CONTRACTOR AND THE COSTS INCLUDED AMONG THE PRICE CONTRACTOR AND THE COSTS INCLUDED AMONG THE PRICE AND THE COSTS INCLUDED AMONG THE PRICE AND THE COSTS INCLUDED AMONG THE PRICE THE COSTS INCLUDED AMONG THE PRICE THE COSTS INCLUDED AMONG THE PRICE COSTS INCLUDED AMONG THE PRICE COSTS INCLUDED AMONG THE PRICE INCLUDED AMONG THE PRICE INCLUDED AMONG THE PRICE AMONG THE PRICE AMONG THE PRICE THE PRICE THE PRICE PRICE PRICE BID ITEMS. SUBMISSION OF A BID SHALL BE CONSIDERED EVIDENCE THAT THE BIDDER IS SATISFIED WITH ITEMS. SUBMISSION OF A BID SHALL BE CONSIDERED EVIDENCE THAT THE BIDDER IS SATISFIED WITH ITEMS. SUBMISSION OF A BID SHALL BE CONSIDERED EVIDENCE THAT THE BIDDER IS SATISFIED WITH SUBMISSION OF A BID SHALL BE CONSIDERED EVIDENCE THAT THE BIDDER IS SATISFIED WITH SUBMISSION OF A BID SHALL BE CONSIDERED EVIDENCE THAT THE BIDDER IS SATISFIED WITH OF A BID SHALL BE CONSIDERED EVIDENCE THAT THE BIDDER IS SATISFIED WITH OF A BID SHALL BE CONSIDERED EVIDENCE THAT THE BIDDER IS SATISFIED WITH A BID SHALL BE CONSIDERED EVIDENCE THAT THE BIDDER IS SATISFIED WITH A BID SHALL BE CONSIDERED EVIDENCE THAT THE BIDDER IS SATISFIED WITH BID SHALL BE CONSIDERED EVIDENCE THAT THE BIDDER IS SATISFIED WITH BID SHALL BE CONSIDERED EVIDENCE THAT THE BIDDER IS SATISFIED WITH SHALL BE CONSIDERED EVIDENCE THAT THE BIDDER IS SATISFIED WITH SHALL BE CONSIDERED EVIDENCE THAT THE BIDDER IS SATISFIED WITH BE CONSIDERED EVIDENCE THAT THE BIDDER IS SATISFIED WITH BE CONSIDERED EVIDENCE THAT THE BIDDER IS SATISFIED WITH CONSIDERED EVIDENCE THAT THE BIDDER IS SATISFIED WITH CONSIDERED EVIDENCE THAT THE BIDDER IS SATISFIED WITH EVIDENCE THAT THE BIDDER IS SATISFIED WITH EVIDENCE THAT THE BIDDER IS SATISFIED WITH THAT THE BIDDER IS SATISFIED WITH THAT THE BIDDER IS SATISFIED WITH THE BIDDER IS SATISFIED WITH THE BIDDER IS SATISFIED WITH BIDDER IS SATISFIED WITH BIDDER IS SATISFIED WITH IS SATISFIED WITH IS SATISFIED WITH SATISFIED WITH SATISFIED WITH WITH WITH THE PLANS AND CONDITIONS, AS SHOWN. NO ADDITIONAL COMPENSATION WILL BE PAID TO THE PLANS AND CONDITIONS, AS SHOWN. NO ADDITIONAL COMPENSATION WILL BE PAID TO THE PLANS AND CONDITIONS, AS SHOWN. NO ADDITIONAL COMPENSATION WILL BE PAID TO THE AND CONDITIONS, AS SHOWN. NO ADDITIONAL COMPENSATION WILL BE PAID TO THE AND CONDITIONS, AS SHOWN. NO ADDITIONAL COMPENSATION WILL BE PAID TO THE CONDITIONS, AS SHOWN. NO ADDITIONAL COMPENSATION WILL BE PAID TO THE CONDITIONS, AS SHOWN. NO ADDITIONAL COMPENSATION WILL BE PAID TO THE AS SHOWN. NO ADDITIONAL COMPENSATION WILL BE PAID TO THE AS SHOWN. NO ADDITIONAL COMPENSATION WILL BE PAID TO THE SHOWN. NO ADDITIONAL COMPENSATION WILL BE PAID TO THE SHOWN. NO ADDITIONAL COMPENSATION WILL BE PAID TO THE NO ADDITIONAL COMPENSATION WILL BE PAID TO THE NO ADDITIONAL COMPENSATION WILL BE PAID TO THE ADDITIONAL COMPENSATION WILL BE PAID TO THE ADDITIONAL COMPENSATION WILL BE PAID TO THE COMPENSATION WILL BE PAID TO THE COMPENSATION WILL BE PAID TO THE WILL BE PAID TO THE WILL BE PAID TO THE BE PAID TO THE BE PAID TO THE PAID TO THE PAID TO THE TO THE TO THE THE THE CONTRACTOR FOR COMPLIANCE WITH THE PLANS, SPECIFICATIONS, OR SPECIAL PROVISIONS. SUBSURFACE SOIL DATA: SUBSURFACE INVESTIGATIONS WERE NOT TAKEN BY THE ENGINEER. IT IS THE RESPONSIBILITY OF THE INVESTIGATIONS WERE NOT TAKEN BY THE ENGINEER. IT IS THE RESPONSIBILITY OF THE INVESTIGATIONS WERE NOT TAKEN BY THE ENGINEER. IT IS THE RESPONSIBILITY OF THE WERE NOT TAKEN BY THE ENGINEER. IT IS THE RESPONSIBILITY OF THE WERE NOT TAKEN BY THE ENGINEER. IT IS THE RESPONSIBILITY OF THE NOT TAKEN BY THE ENGINEER.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .