Parkut building documents.pdf

PDF 1 MB Posted

Attached to
RCI ODRC Guard Shacks DRCB-25-3402
Solicitation number
SRC0000029436
Issued by
Sandusky County, Ohio

About this file

This document is a detailed quotation from Par-Kut International for a portable steel guard house building for the Ross Correctional Facility in Chillicothe, Ohio. The quotation is for one 10' x 16' Presidential model guard house (Part# PK1610'), priced at $78,395.00, with an additional $3,495.00 for transportation. The building includes an Ohio Code Compliance Label and is quoted with prices firm until 6/23/2025. The standard building lead time is estimated at 24-26 working weeks after receipt of approved drawings. The quotation terms include a 20% down payment, with the balance due net 30 days.

The detailed specifications outline a comprehensive portable steel building with multiple features, including single unit welded galvanized steel construction, 14-gauge exterior and 18-gauge interior walls, a 12-gauge galvanized steel treadplate floor, and 4" insulated walls and roof. The building includes electrical components such as a 100 Amp load center, LED lighting, quad receptacles, HVAC, sliding windows, swinging doors, and a stainless-steel counter. The unit comes with a one-year warranty and includes a single paint color applied to both interior and exterior. The quotation explicitly states that Par-Kut does not perform onsite work and that installation, foundation preparation, and electrical hookup are the responsibility of the purchaser.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Portable Steel Buildings since 1954

40961 Production Drive · Harrison Twp,. Michigan 48045-1351 Telephone: (586) 468-2947 (800) 394-6599

Prepared for: DATE: 4/3/2025 Billie Sparks QT# 0006304032025 Ross Correctional Facility

Guard House Prices firm until: 6/23/2025 Chillicothe, OH 45601 Quantity Part# Description UOM Sell Total 1 PK1610' 10' x 16' Presidential ea $78,395.00 $78,395.00 Ohio Code Compliace Label Included

*** Sales Tax Not Included *** *** FREIGHT COST IS ONLY AN ESTIMATE AND MUST BE CALCULATED AT TIME OF SHIPPING ***

Transportation $3,495.00 Sales Tax Sub Total $81,890.00

Total $81,890.00

*** PAR-KUT DOES NO ONSITE WORK ***

Standard Building Lead Times: Estimated 24-26 Working Weeks after receipt of Approved Drawings.

Prepared by:

Larry Moore lmoore@parkut.com

586-468-2947 ext. 229

Terms:

20% down, Balance: Net 30 This quotation excludes any materials not specifically identified within. No provisions for liquidated damages, retainage, or indemnification of others included. As a material supplier, Par-Kut is not subject to the general or specific conditions of the contract documents.

Internet Based Invoicing and Payments made by Credit Cards are subject to a 3.5% surcharge.

It is the buyers' responsiblilty to pay sales tax directly to the state.

Par-Kut only collects sales tax for Michigan, Ohio, and Florida.

If you are sales tax-exempt (all states), please provide your exemption/resale certificate at time of purchase.

SPECIFICATIONS:

DWG# 25LAM10X16OH

Parkut Building Model# PK1610 PRESIDENTIAL Building size is 10' x 16' with Window Mullions, Wall Ribs, Hip Roof, 12"Canopy and an 8" Fascia Single Unit Welded Galvanized Steel - Exterior Walls 14 Gauge / Interior Walls 18 Gauge 7' 6" Floor to Finished Ceiling Height 4" Insulated Double Pan Walls 8" Insulated Double Pan Roof 4" Insulated Base 12 Gauge Galvanized Steel Treadplate Floor L-Shaped Stainless-Steel Counter with pull out storage Drawer and 2" Diameter Holes in Countertop Insulated Glazing in Walls and Door, set in Aluminum Frames

(2) Horizontal Sliding Windows

(2) 36" Swinging Doors with all associated Hardware and Weather Stripping Equipped with N.E.C. Compliant Electrical System using U.L. Listed Components 100 Amp 120/240V Load Center Square D Model # QO112M100P

(2) Quad Receptacles

(2) 48" LED Light Fixture with Wall Switch

(2) Lithonia WPXLEDP1 LED Wall Packs with Photocell and Wall Switches mounted above Doors Data Jack prep: empty 1/2 EMT piped to Junction Box (no wiring provided by Par-Kut) HVAC : GE AZES515DCXXA 240V 15,000 BTU AC/Heat Through Wall Unit Price includes single Paint Color applied to Interior and Exterior of the Building

(4) Exterior Anchor Clips, 1 in each Corner Removable Lifting Rings mounted in the Roof 1 Year Warranty Included

Accepted by:_______________________________________________________ Date:_______

Disclaimer Thank you for requesting this quotation. The price quoted above does not include offloading, onsite work, installation, supervision, electric hook up, sales tax, engineering calculations, or architectural drawings. Our standard shop drawings will be provided upon receipt of written Purchase Order and 20% Deposit. The securing of building permits and compliance with appropriate building codes is the responsibility of the purchaser of the building.

Shipping terms are F.O.B - Factory. If completed booths require storage at Par-Kut factory for more than 2 weeks after completion, weekly storage charges will apply

One year warranty on building material and appliances only, unless otherwise noted. Warranty period begins at time of delivery.

Finish painted color of choice from Par-Kut standards. Colors can be viewed @ http://www.parkut.com/downloads/colors/. Lead times subject to change without notice. No unloading or onsite work by Par-Kut.

*Unless mentioned otherwise in this quote, CB panel shall be our standard Square D, Model #QO112M100 with factory installed

100amp main and branch breakers only for factory installed electrical devices.

NOTE: If order is cancelled, purchaser is responsible for cost of drafting/engineering time invested.

Par-Kut project specific design approval drawings must be returned within three (3) weeks of transmittal or face potential material cost increases. 2022 has brought on spikes in steel costs due to low supply and high demand.

Par-Kut ordering process is as follows:

P.O. sent to Par-Kut.

Par-Kut will process order and invoice for the 20% deposit.

Approval Drawings will be generated and sent after receipt of deposit. (Please allow 5-10 Business days)

Building will be put into our production schedule after receipt of clean, signed, Approval Drawings. (Lead-Time Starts)

Target Ship Date Document will be sent out along with onsite contact information request.

Prior to completion of building, Par-Kut Shipping Dept. will reach out to site contact to coordinate delivery.

Building Ships to the site.

Installation Suggestions:

1. Pour concrete island minimum 6" deep- reinforced. The island should be a minimum of 12" wider than the roofline dimensions to allow a 6" concrete border on each side of the building roofline. Level the pad and install a steel pipe bollard at each corner of the building to further protect it from damage caused by traffic.

2. Provide three wire 240v/110v single phase service to the concrete island (typical).

3. Buildings arrive flatbed truck. Driver will contact you 24 hours prior to delivery to arrange for off - loading. Use either a forklift truck or overhead crane to offload the building, depending on configuration - confirm method prior to shipment. Square the building on the pad, shim if required and anchor.

4. Standard recommended concrete anchor bolts are 5/8" x 4-1/2" galvanized or stainless steel, or comply with local codes -whichever is most stringent.

5. Make final electrical connections and clean the work area.

LARRY MOORE

RJP

SHEET

3/8"=12"

10' X 16'05-23-2025

A-1

PO#

DWG#

ROSS CORRECTIONAL

CHILLICOTHE, OH

R

NO TE : T H IS PR I N T A N D D E S IG N A R E T H E PR OP E R TY

O F P A R - K U T I N T E R N A T I O N A L , I N C . I T M U S T N O T B E R E P R O D U C E D I N A N Y M A N N E R , N O R S H A L L I T B E S U B M I T T E D T O O U T S I D E P A R T I E S F O R E X A M I N A T I O N W I T H O U T O U R C O N S E N T . I T S H A L L B E U S E D O N L Y A S A M E A N S O F R E F E R E N C E T O W O R K D E S I G N E D A N D F U R N I S H E D B Y P A R - K U T .

P A R - K U T R E S E R V E S T H E R I G H T T O M A K E C H A N G E S

T O D E S IG N F OR E N G IN E E R I N G PU R PO S ES W I T H OU T

N O T I C E . R E V I S I O N S M A Y N O T B E N O T E D .

25LAM10X16OH

PAR-KUT INTERNATIONAL, INC.

40961 Production Drive

Harrison Twp., Mich.

48045-1351

PH. (586) 468-2947

www.parkut.com

OVERALL SHIPPING DIMENSIONS: 12'-2"W X 18'-2"L X 10'-9"H ±

ESTIMATED WEIGHT: 16,000 LBS. ±

SOME ITEMS MAY BE SHIPPED LOOSE TO MEET SHIPPING CONSTRAINTS.

DRAIN DOWNSPOUTS ARE SHIPPED LOOSE AND INSTALLED ON SITE BY

OTHERS.

SHIPPING NOTES

HIGH GLOSS FINISH PAINT COLOR: TBD

MDM STANDING SEAM STEEL ROOF COLOR: TBD

GLAZING MULLION COLOR: TBD

GENERAL NOTES & COLORS

PLAN VIEW

E 2

E 1

E

3E

1S

3 4"

41" 41"

1 4"

7 8"

7 8"

60" 60" 60"

1 4"

4" 401

4" 36"

S

16'-0" BOOTH

18'-0" WITH CANOPY

18'-2" WITH MDM ROOF

'-0

" B

OO

TH

'-0

" W

IT

H

CA

NO

PY

O

VE

RH

AN

G

4" WALL

TYP.

'-2

" W

IT

H M

DM

R

OO

F

S 1 SECTION

NO SCALE

R=16.8 INSULATION

14GA. PAINTED GALV. STEEL COUNTER

18GA. GALV. STEEL INNER PANEL

14GA. GALV. STEEL OUTER PANEL

2" X 4" STEEL TUBE BASE

12GA. GALV. 4-WAY DIAMOND

PLATE STEEL FLOOR

2" X 8" STEEL TUBE

SEE GENERAL CONSTRUCTION

NOTES FOR SAFETY GLAZING

SPECIFICATIONS

EXTERIOR LIGHT

18GA. STEEL COVER PLATE

R=16.8 INSULATION

WOJAN IN ALUMINUM WINDOW FRAME

12"

16'-4" WITH BASE TRIM

'-4

" W

IT

H

BA

SE

T

RI

M

8"

2" X 4" BASE TRIM

PAINTED 14GA. FORMED STEEL RAISED RIB

PAINTED 14GA. 1" X 2" TUBE STEEL RAISED RIB

12GA. GALV. STEEL CANOPY

14GA. GALV. STEEL CEILING

R=16.8 INSULATION

MDM STANDING SEAM ROOF

*WINDOW MULLIONS ARE

MANUFACTURED INSIDE GLAZING *

2" SOFFIT VENT (X4)

Par-Kut International CSI Format

Standard Booth Specifications

PART 1 – GENERAL

1.1 Provide all labor, equipment and materials to furnish and install prefabricated portable steel building(s) where shown on the drawings.

1.2 Related work specified elsewhere

1.2.1 Electrical service supply and connection.

1.2.2 Site/foundation work.

1.2.3 Unloading, placement, installation and anchoring.

1.2.4 Plumbing & piping (if required).

1.3 References

1.3.1 Prefabricated building manufacturer shall provide the locations and owners of 3 similar buildings that have been in service more than three years so that the architect can inspect on site and obtain a statement from the owners on the quality of workmanship (fit and finish).

1.4 Submittals

1.4.1 Upon award of order, manufacturer shall prepare and submit shop drawings for each different building required for this project. Drawings shall include elevations, section, floor plan, electric schedule, service entrance locations, and anchor clip detail.

1.4.2 Color charts illustrating available colors and patterns for specified finishes shall be submitted to owner for prompt selections.

1.5 Quality assurance

1.5.1 Structures shall be the product of a manufacturer with a minimum of 20 years-documented experience in the design and fabrication of portable steel buildings.

1.5.2 The approved manufacturer is Par-Kut International, Inc., 40961 Production Drive, Harrison Township, Michigan, 48045, Phone (586) 468-2947, Fax (586) 463-6059, website: www.parkut.com, email:

sales@parkut.com.

1.5.3 Manufacturer shall maintain and furnish proof of maintenance of quality assurance program with regularly scheduled independent third party testing. Production process will include 5-stage, 36-step inspection.

1.5.4 Prefabricated buildings by manufacturers other than the one approved shall submit sufficient data to enable approval to be given. As a minimum: design drawings and/or calculations, applicable certifications, catalog information, and color samples showing equal range of variety.

1.5.5 A request for substitution must include a list of three or more projects in satisfactory service for not less than three years that use products identical to those being proposed for substitution. For each project, provide name, address, and telephone number of the A/E firm, the contractor and the owner. Requests for substitution after bids have been submitted will not be considered.

1.5.6 Electrical devices factory installed within the prefabricated building shall be UL listed. Factory installed wiring system shall comply with the current NFPA’s National Electrical Code.

1.5.7 Adherence to applicable portions of state and local building codes is the responsibility of the installing contractor. Building manufacturer shall not be responsible for permits, special engineering calculations, or architectural type drawings unless otherwise notified in writing three weeks prior to release of bid document.

1.5.8 Design loads: Live Loads: Floor 50 PSF, roof 50 PSF, wind 100 MPH.

PART 2 - PRODUCTS

2.1 Short form specification: Pre-assembled booth unit(s) shall be Model __________ (Model is determined by length first then width. i.e. 6’ x 8’ booth is model 86) as manufactured by Par-Kut International, Inc.

2.2 Structure: Prefabricated steel building shall be single unit welded steel construction with 14-gauge galvannealed steel panels and tubing on the exterior and 18-gauge galvannealed steel interior panels.

Building to be shipped completely assembled. All welded joints ground smooth. Aluminum or fiberglass construction not acceptable.

2.3 Base and floor: Base height shall be 4 inches for outside use. Floor shall be 12-gauge galvanized steel, 4-way tread plate. Four 1/4" steel angle iron anchor clips with pre-drilled holes are provided to secure building. Anchors provided by installer shall be galvanized or stainless steel.

2.4 Door(s) shall be top-suspended heavy duty sliding steel, fully weather-stripped. Include Adams Rite® #1850 hook bolt type lock, view window and all roller assembly hardware. Trolleys shall be ball bearing, adjustable pendant type.

2.5 Windows: Shall be clear anodized aluminum construction and include glazing and all hardware as required.

Provide sliding windows as shown on drawings for ventilation and/or transaction purposes. Include insect screens in ventilation windows.

2.6 Glazing: All windows and doors shall contain clear tempered safety glass, 1/8” minimum thickness

2.7 Finish: All interior and exterior steel surfaces except rooftop and floor shall be painted with High Performance, Rust Inhibitive, DuPont® Imron™ Polyurethane paint. Choice of single color paint as selected by owner from Par-Kut’s standard colors.

2.8 Canopy: Shall be 14-gauge minimum galvannealed steel and standard overhang shall extend 3" beyond the walls. Standard fascia height shall be 6".

2.9 Roof: Provide lifting ring(s) welded in roof for onsite lifting of unit. Roof surface shall be 14-gauge galvannealed steel sheet. Roof seams shall be continuously welded, caulked and weatherproofed. Roof shall drain to downspout(s).

2.10 Insulation: Walls shall be insulated with 4" rigid fiberglass board, R=16.4. Roof structure fully insulated, R=14.8

2.11 Work counter: One 14-gauge painted steel counter across width of booth. Include one 16" wide steel storage drawer. Counter shall be welded in place. Include one electrical cord access hole install in counter above receptacle.

2.12 Electrical: Unit shall be delivered complete with all wiring required for fluorescent light with lamp and switch, one 110V duplex outlet, heater, a 100A 12-circuit load center with branch circuit breakers and 100A main breaker. All wiring shall be copper #12 AWG minimum, enclosed in EMT. All fittings, wiring devices and fixtures UL listed. Ready for site connection. Three wire 240/120V single-phase service required.

2.13 Heater: Electrical wall heater shall be fan-forced type including integral thermostat. Minimum heater size shall be 120V/1500W. (Specify optional 208/240V units for larger buildings and cold climates.)

2.14 Optional features: Provide items available from manufacturer's optional equipment list at direction of owner/architect to best meet site requirements.

PART 3 - EXECUTION

3.1 General: Install prefabricated buildings on flat and level concrete pad in accordance with the manufacturer's recommendations and placement drawings. Position units over utility stub-ups, verify building is level and anchor.

* Par-Kut reserves the right to improve these specifications without notice.

Parkut documents.pdf
25LAM10X16OH.pdf
spec-std-csi 4.pdf

File details come from the government source that posted it. Updated .