Attachment 2 - Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| R17PS00480_000001.pdf | ||
| R17PS00480_Attachment_4_-_Wage_Determination.pdf | ||
| R17PS00480_Attachment_6_-_Past_Performance_Questionnaire.pdf | ||
| R17PS00480_Request_for_Proposals.pdf | ||
| R17PS00480_Attachment_3_-_Bond_Forms.PDF | ||
| R17PS00480_Attachment_1_-_Specifications.pdf | ||
| R17PS00480_Attachment_5_-_Release_of_Claims.pdf | ||
| R17PS00480_Attachment_7_-_Subcontracting_Percentage_Worksheet.pdf | ||
| FedConnect File | — |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAWINGS
INFORMATION ONLY DRAWINGS
1292— —4806
_— Disconnect switches
________ ________ / NDS—09—AC706
J NDS—09—AC7O5
NDS—O9—AC7O4
________ Motor storter x355 duct / I F
& NDM-09-AC7O2 MS-09-~
~ (Bottom EL. I 4 1.500) Control darhper I I”
10 kW Unit heoter NCDO9AC7O2 NUH—09—AC702 10 kW Unit heoter
NUH—09—AC7O3
Bock— —355x355 draft
1 (bottom EL.
Motor storterdomper \
NMS—O9—AC703
SG36X30 Thermostat
3450 NTQ—09—AC7O
41.610 Typ.)
F EL. 38.260
SC.4LE AND CHLORINE
STORAGE ROOM
Indicating light
NIL—09—AC705
REFERENCE DRA WINGS
1292 —D— 1957, Heating, ventilation, and air—conditioning equipment designations 1292—0—4025, (For concrete general notes) 1292—0—4154, Chlorine building, general arrangement
L~ 1292—0—4156, Chlorine building, outline and reinf. design, Plan, sections, and details
1292—0—4635, Chlorine building, arch., floor plan 1292—0—4804, Heating, ventilation, and air—conditioning systems, general notes, reference drawings, and symbols 1292—D—4814, Heating, ventilatian, and air—conditioning systems, sections and details
ALWAYS THINK SAFETY ~
UNIIOV srAlOS
OEPAR7MENTOF fl~E IN7ERIOR 8UR~4U Of RECLAFS4TION
DESALTING PL4NT
• - ORINE BUILDING
HEATING, VENTILA ~G AND AIR—CONDITIONING
MS
PLAN AND TIONS
0 0
2 Disconnect switches
4700 cfm $porative NDS—O9—AC7O2 __________ Pipe trench NDS—O9—AC7O 1 Reinforced concrete base cooling unit NEC—09—AC7OI NDS—O9—AC703610 x 1170 Stationary louver
/ 965x 1170 r560 x 915 Control hamper NCD—09—AC7OI ~ Thermostat ~ Evoporat~e~
Switch I I NTQ—O9—AC7OI
NS,—09—AC702\
Stationary I Indicating light NIL—O9—AC louverI~ ( (~ Indicating light _________ _________
Switch NSj—O9 ________
________ -AC7O3~ __
~1O0~—
- 4700 cfm Evaporative cooling unit NEC—O9—AC7O2
Switch NS4—09—AC7O 1
D(~14) F(~14) 965 x 1170 Stationary louverDamper operator
Indicating ~ 66J/~” NDM—09—AC7O3
~ NIL—09—AC 4~. 751RL
Stationary louver
III© (~‘—---------
7 1/2 kW Unit heater
NUH—O9—AC7O4 —_...~
460 x 560 Stationary louver
Motor starter
NMS 09—AC701—~
omper operator
Aircontr&/- ~
SGI8x12 - —
800— —
CHLORINATOR ROOM —
i-lI ç41Ox305 —
Back—draft — damper
3000 cfm Axial fan
~~E(4814) •“l c?
~~Unflheater ~j1G /f. NUH—O9—AC7O~~__
Transformer 13.8KvL~~/480Y
USB—O9—O7
Transformer 13.8Kv ‘3’48OY
USB—O9—OO2O1
SECTION X—X
JAF
-< D (Typ all u it heaters)
Distribution center
[F j~1 _~____J-T
10.000 cfm Axial fan
X NUH—09—AC7O I
5 Back (bottom EL.
~ 10 kW Unit heater
40.700 Typ.)
NOTES
1. All dimensions are in millimeters unless otherwise noted.
2. All elevations are in meters.
3. Field verify all dimensions.—
-<i E(4814)
I EL.37.065—’
NIL—O9—AC7O 1 NMSO9AC7O2 915 x 915 Back draft damper Indicating light~~~ \ 12 Motor starter I ~ 965 xl 170 Stationary louver
1 170 x 915 Back—draft damper Switch NS~—O9—AC7O1 455 x 915 Back -<JG (4814) 20 x 1 170 Stationary louver draft damper 510 x 1170 Stationary louver ~65 x 1170 Stationary louver
1000 0
PL4N
1:50
JR
INFORMATION ONLY
DESIGNED ~D~1J~NBILRY ~ APPR~%~LLER
D54~_ ~L”Y!~ 5UBMITTED_.
CHE KEG _~J~?~5EBu
J. ~NNETT
2 I 3 4
RECLAMATION
Ma,uzgjng JffoterintheHfrst
B B ci ci ci ci ci B ci c-c
Railroad platform
RAILROAD TANK CAR SCALE
(NTS)
NOTES:
1. For reference drawings and notes see DCT—09—0020 1 single—line diagram 1292—0— 1803.
2. Size and number of all conduits necessoly to provide electrical power and distribution systems for all electrical equipment associated with this structure shall be determined by the contractor in accordance with the applicable portions of the specifications text and the latest edition of the N.E C., the contractor shall also determine the routing of all conduits including those that terminate in other areas.
Note 4 (—1841).
3. The contractor shall furnish and install 5 — 2 In. conduits originating at the north OCT and terminating in the area marked future remote terminal unit. The PMSC system (RTU’S and PMSC master statian) will be furnished and installed by others under separate contract. A consolidated DCT/RTU master interface terminal block section(s) shall be furnished and installed under this contract at the aprapriate end of the OCT lineup in order that the RTU can be handwired (by others) to the OCT without disturbing either. The contractor shall exchange information with the PMSC system equipment contractor and shall be responsible far all necessary design and coordinated manufacturer and installation for the OCT’S.
4. The overhead crane disconnect switch shall be located at the north OCT.
5. Refer to (—4798 and —1659).
6. For loads served by 120/240—volt panel boards that ore not shown here, refer to the appropriate process and instrumentation diogroms and general arrangement drawings as listed on the general notes drawing (—1803).
D
C
B ci
A ci
B
Unit substations concrete 5 x 5 pods. Note 5 a w U
(1) z F
(I)
-J
Future remote terminal unit
Note 3
I—, ~
Motor starter
I NMS—09—AC704
I~-1
IN FORMATION ONLY
N Robert fleer
100 0 100 200 300 400 500
Retort Ttcrer flrr~~t H,rrr,hI~
1:50 crcEcKrD
,rnnk~ffyy U DFNWR. COUuITL’u flATEE
DEPARTMENT OF TUE INTERIOR
IUREAU OF RECLAMATION
~A~C~mz% / &‘WJYO,’Y- s~2y.’cc e~Gx~tZ~ )fØW WA~4~v7
~&~CdW/c59,f ~‘1~6i~’ c~ ~3t5~~ i.~~ - ~ ,,~ ~
ACHLORINE BUILDING —
ISTRIBUTION CENTER
CT—09—0020 1
ELECTRI EQUIPMENT
LOCA S
“a ~ I ~ L’ /8c~26 1292_D_~18à’S\ Situ 560
1 I 2 I 3 4 I 5
4 I I 3 2 I 1
F
Disconnect switches
NDS— 12—AC7O 1
NDS— 12—AC7O2
NDS— 12—AC7OJ
Reinforced concrete base
AL
4700 cfm Evaporative cooling unit
NEC—72—AC7OI
Motor starter
NMS— 12—AC7O 1
Disconnect switches
NDS— 12—AC704
NDS— 12—AC705
NDS— 12—AC706
J 4700 cfm Evaporative cooling unit NEC— 12—AC702
Reinforced concrete base
Motor starter NMS— 12—AC702
NOTES
Far general notes, reference drawings, and symbols, see 1292—0—4804.
For designations, see 1292—0—1957.
Far concrete general notes, see 1292—0—4025.
REFERENCE DRAWINGS
General notes, reference drawings, and symbols, see 1292—0—4804
Designations, see 1292—D— 1957 Concrete general notes, see———— 1292—0—4 025 Lighting systems, see 1292—D—42J2 Structural design, see 1292—0—4004 Outline and reinforcement design plan and sections, see 1292—0—4026 Floor plan, elevations, and sections, see 1292—0—4641
5—78~~t AD~D~GREL
0—DUO. I
ALWAYS THINK SAFETY ~
UWI7ED STAlES
DEPARIMENT ~ ONE INIERIOR
BUREAU OPREDL4M.4TION
DESALTING PLANT
SULFURIC ACID ST EAREA, AND COMPRESSOR BUILDING
HEATIN, NTILATING AND
AIR—CONDI INC SY~STEMS
p
DESIGN TECH APPRZ~L~R
suswmoo LEO!._~
CHE~~~NN~ pp~W~ANDERSEW~’%~ BO7VNE11 O,ru smccr Mc
C400SESIEM C400 FILENAME ‘~“~ ~
1 292—D—4808
N
J
Flexible connector
(4814) E1> ._— 965 x 1170 Stationary louver Slope / 915 x 915 Backdraft damper
1 Ct <iD
D
1/2W Dia. water supply for evaporative cooling unit
Thermostat NTQ— 12—AC702
Flexible connector
-ci’ s orage area
Stat lana ~ Dia. water supply far 965 x 1170 Stationary louver JE (4814) evaporative coaling unit
PLAN
1000 0 5000
I I I I I 1:50
I I ~ ADDED CONTROL ROOM AND REMORED PUMPS.
INFOR ATIONO LY
I 12~2—U—4~U~”
5 4 3 2
Externol light
Personnel door
— 4407 [14’—5~]
~I I B
Top of curb, EL 38.870
Design
ALWAYS THINK SAFETY
UNITED STATES
DEPAR7MEN~OF TIlE INTERIOR
8UREAU OFRECLAAL4TION
COLORADO R BASIN S.4LINIrf CONTROL PROJECT
TITLE 1 OIVISIO ES.4LTING COMPLEX UNIT - ARIZONA
YUMA D TING PLANT
WQIC BUILD EXPANSION
BUILDING EL ONS
4 3
5 4 I I 3 1292—303—6292
1 1/2” Dia PVC drain line (buried 12” mm.)
New reinforced concrete apron, top edge to match existing apron i••—r- ~
#4 (grade 60) Rebar @ 18” ac. e.w.
with .3” cover (Typical)
D
Existing concrete apron
Existing concrete pipe trench
Core drill .3” dia hole through side of pipe trench far 1 1/2” dia PVC drain line (elbow down and terminate). After drain line installation pack cared hale with nan—shrink grout
Connect 1/2” Dia capper tubing to existing service water line New reinforced concrete apron, 43’—O X 6’—6” X 8”
1/2” Capper service water line, 1/2” Copper service water line See NOTE2
SOUTH ELEVATION (6291)
1 0 5 10 1,1,1 I I I I I
New reinforced concrete apron
.3/4” Dia capper drain line
SCALE OF FEET
SCALE OF FEET
DETAIL 2
5/8” Expansion joint material
Existing concrete apron
Existing concrete stem wall (metal wall panel section nat shawn)
SCALE OF FEET
1 3
#4 (grade 60) Rebar 0 18” o.c. e.w.
with 3” cover (Typical)
NOTES
1. Elevations are in meters unless otherwise specified,
2. Fasten service water line to concrete apron.
INFORMATION ONLY
IIII..?
— (6291)
ALWAYS THINK SAFETY
SCALE OF FEET
UNI7ED S14705
DEPARI5,’ThTQF DIE IN7FRICR
BUREAU OFRECLAAMISON
0 RIVER BASIN SALINITY CONTROL PROJECT
TITLE 1 SION — DESALTING COMPLEX UNIT — ARIZONA
Y ESALTING PLANT
WATER QUA IMPROVEMENT CENTER
EVAPORATIVE AIR CO SYSTEM MODIFICATIONS
SOUTH ELEVATION, S ON AND DETAILS
DESIGNED 3~!iWI TECH.APPR’S~9!~
~54I4W — — SUBMITIED — &
~4OD SEDIGN 1500 FILGN’JfE
ARIL19~
4 3
5 4 3
REFERENCE DRA WINGS
1292—303—5374 (Site plan, evop cooler mod) 1292—303—5376 (Section A—A) 1292—303—5377 (Section 8—B) 1292—303—5378 (East elevation) 1292—303—5286 (Site plan, WQIC)
NOTES:
1. Contractor shall provide oil moteriols, equipment and labor to furnish and install two (2) new evaporative air cooling sidedraft units w/264’~ x 26k” duct outlet openings and dual inlets;
golvanized duct ing w/1 and ~ insulation as shown, and hangers to be spaced as per manufacturers recommendations.
2. Contractor shall make electrical, service water and drainage connections for new evaporative air cooling units.
3. Contractor shall test the new evaporative air cooling units and shall be responsible for all corrections in the event the units do not operate.
4. See drawing 1292—303—5376 for Section A — A
—5377 for Section B — B —5378 for East Elevation
5. Contractor shall also construct new concrete apron extension.
6. The Contractor shall core drill through east end of Trench /1 for 1~w cooler drain line.
7. See drawing 1292—303—5286 for listing of WQIC building drawings.
1292—303—5375
D Concrete apron 3 000 wide
C
B
A
INFORMATION ONLY~
ALWAYS THINK SAFETY
~%qb%~ ovr9,~meNTw IHE INSRICR8u,qfAU ~RECLAM4TIC.’~
COLORADO RIWJ? &ASIN SALINITY CONTROL PROJECT
TITLE I DIVISION — DESALTING COUPLES UNIT — ARIZONA
YU744 DESALTING PLANT
WATER QUALI’1v IMPR0~MENT CENTER
EVAPORATIVEAIR COOLIEJO TEM MODIFICATIONS
PARTIAL P N
DEsIcNED__~_t2_~_E!i!s IH.AAL__Jt~ cHEcKEo -cllIrFo’Ircve4Ic.4L sERvicEs OIviSiCij
-~,~ ICROO FSLLR4WE
~ .. I l292—J3—~~ 2 2 ~~~ ~ ~ ~ESr2Cf5 ~,WE2S. 19961 1292—303—5375
5 4 3 2
NOTES
1. All dimensions ore in millimeters unless otherwise specified.
2. All elevations ore in meters unless otherwise specified.
.3. Field verify all dimensions.
INFORMATION ONLY
ALWAYS THINK
UNIIED STAlES OEPAR77.4ENT OF INE INTh71IOR
BUREAU OFRECLAM4TION
C 0 RIVER 5ASIN SALINflY CONTROL PROJECT
TITLE 1 0 SION — OES4LTING CoMPLEX UNIT — ARIZOi~L4
Vt) ‘~ES.4LTING PLANT
WQIC ~1~4~ING EXPANSION
EVAPORATIVE A~rf),1, TA#~ c~v’
- - lECH. APP
--~ SUBMITlEO~.!~!~_
- Alkh~iWIgff PC AFPRO~EQ - ~ -
~JL
J F-
Existing building Added building extension
38 mm Grout pod
SECTION A—A
(See dwg 5785 for evaporative air cooling system supply and drain piping) boo 0 I I