Amendment No. 0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| R17PS00480_Attachment_4_-_Wage_Determination.pdf | ||
| R17PS00480_Attachment_6_-_Past_Performance_Questionnaire.pdf | ||
| R17PS00480_Request_for_Proposals.pdf | ||
| R17PS00480_Attachment_1_-_Specifications.pdf | ||
| R17PS00480_Attachment_2_-_Drawings.PDF | ||
| R17PS00480_Attachment_5_-_Release_of_Claims.pdf | ||
| R17PS00480_Attachment_7_-_Subcontracting_Percentage_Worksheet.pdf | ||
| R17PS00480_Attachment_3_-_Bond_Forms.PDF | ||
| FedConnect File | — |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
R17PS00480
x x
3 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Yuma AZ 85364
R34
7301 Calle Agua Salada Yuma Area Office Lower Colorado Region Bureau of Reclamation
07/05/2017000001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/05/2017
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PROJECT TITLE: Evaporative Cooler Replacement at Yuma, AZ
PURPOSE OF AMENDMENT: The purpose of this amendment is to change the time for the receipt of proposals, schedule a second organized site visit, incorporate into the contract FAR
52.219-14, transmit the site visit sign-in sheet, replace three drawings, and provide answers to questions.
RECEIPT OF PROPOSALS: The time for receipt of proposals is reduced by three hours; the time is changed from 1700 (hour) local time to 1400 (hour) local time. The time and date for receipt of proposals is 1400 (hour) local time 08/04/2017 (date).
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Dennis Dillard
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
R17PS00480/000001
ACKNOWLEDGEMENT: This amendment must be acknowledged. Block 11 states the required process to acknowledge this amendment.
DESCRIPTION OF CHANGES: The Request for Proposals is revised to incorporate the following changes.
All changes are marked with a vertical line on the left side border; and the change note is clouded on the drawings.
CHANGES:
1. The time for receipt of proposals is reduced by three hours; the time is changed from 1700
(hour) local time to 1400 (hour) local time. The time and date for receipt of proposals is 1400
(hour) local time 08/04/2017 (date).
2. A second organized site visit is scheduled.
L.8 FAR 52.236-27, Alternate I, Site Visit, is revised to add a second organized site visit on
Wednesday, July 26, 2017, at 9:00 am local/Mountain Standard Time Zone.
3. FAR 52.219-14, Limitations on Subcontracting
(Jan 2017), is incorporated by reference at I.1
FAR 52.252-2, Clauses Incorporated by Reference.
4. The July 12, 2017, site visit sign-in sheet is attached.
5. Drawings
1292-303-60059 dated 2017-01-13, 1292-303-60062 dated 2017-01-13, and
1292-303-60064 dated 2017-01-13 are revised and replaced with drawings
1292-303-60059 REV NO 1.1 dated 2017-07-13, 1292-303-60062 REV NO 1 dated 2017-07-14, and
1292-303-60064 REV NO 1 dated 2017-07-13.
6. The answers to the questions are attached.
ATTACHMENTS:
R17PS00480 PAGES I-2 AND L-5
R17PS00480 SITE VISIT SIGN-IN SHEET 07122017
DRAWINGS:
1292-303-60059 REV NO 1.1 DATED 2017-07-13,
1292-303-60062 REV NO 1 DATED 2017-07-14, AND
1292-303-60064 REV NO 1 DATED 2017-07-13.
R17PS00480 QUESTIONS AND ANSWERS 01
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Document No.
R17PS00480_000001
Document Title Evaporative Cooler Replacement, Yuma Area Office, Yuma, Arizona
THIS PAGE INTENTIONALLY LEFT BLANK
Part II-Section I Contract Clauses
Document No.
R17PS00480
Document Title Evaporative Cooler Replacement, Yuma Area Office, Yuma Arizona
I-2
52.215-21 Alt
IV
Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data--Modifications (Oct 2010) - Alternate IV (Oct 2010)
OCT 2010
52.219-8 Utilization of Small Business Concerns NOV 2016 52.219-14 Limitations on Subcontracting JAN 2017 52.219-27 Notice of Service-Disabled Veteran-Owned Small Business Set-
Aside
NOV 2011
52.219-28 Post-Award Small Business Program Representation JUL 2013 52.222-3 Convict Labor JUN 2003 52.222-4 Contract Work Hours and Safety Standards--Overtime
Compensation
MAY 2014
52.222-6 Construction Wage Rate Requirements MAY 2014 52.222-7 Withholding of Funds MAY 2014 52.222-8 Payrolls and Basic Records MAY 2014 52.222-9 Apprentices and Trainees JUL 2005 52.222-10 Compliance with Copeland Act Requirements FEB 1998 52.222-11 Subcontracts (Labor Standards) MAY 2014 52.222-12 Contract Termination--Debarment MAY 2014 52.222-13 Compliance with Construction Wage Rate Requirements and
Related Regulations
MAY 2014
52.222-14 Disputes Concerning Labor Standards FEB 1988 52.222-15 Certification of Eligibility MAY 2014 52.222-21 Prohibition of Segregated Facilities APR 2015 52.222-26 Equal Opportunity SEPT 2016 52.222-27 Affirmative Action Compliance Requirements for Construction APR 2015 52.222-35 Equal Opportunity for Veterans OCT 2015 52.222-36 Equal Opportunity for Workers with Disabilities JUL 2014 52.222-37 Employment Reports on Veterans FEB 2016 52.222-40 Notification of Employee Rights Under the National Labor
Relations Act Dec 2010
52.222-50 Combating Trafficking in Persons MAR 2015 52.222-54 Employment Eligibility Verification OCT 2015 52.222-55 Minimum Wages Under Executive Order 13658 DEC 2015 52.223-3 Alt I Hazardous Material Identification and Material Safety Data (Jan
1997) - Alternate I (Jul 1995)
JAN 1997
52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011 52.223-6 Drug-Free Workplace MAY 2001 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While
Driving
AUG 2011
52.225-13 Restrictions on Certain Foreign Purchases JUN 2008 52.227-1 Authorization and Consent DEC 2007 52.227-2 Notice and Assistance Regarding Patent and Copyright
Infringement
DEC 2007
52.227-4 Patent Indemnity--Construction Contracts DEC 2007 52.228-2 Additional Bond Security OCT 1997 52.228-5 Insurance--Work on a Government Installation JAN 1997 52.228-11 Pledges Of Assets JAN 2012 52.228-12 Prospective Subcontractor Requests for Bonds MAY 2014 52.228-14 Irrevocable Letter of Credit NOV 2014 52.228-15 Performance and Payment Bonds--Construction OCT 2010 52.229-3 Federal, State, And Local Taxes FEB 2013
Part IV-Section L Instructions, Conditions and Notices to Offerors
Document No.
R17PS00480
Document Title Evaporative Cooler Replacement, Yuma Area Office, Yuma Arizona
L-5
(b) Organized site visits are scheduled for—
July 12, 2017, at 9:00 am local/Mountain Standard Time Zone; and
July 26, 2017, at 9:00 am local/Mountain Standard Time Zone.
(c) Participants will meet at—
Bureau of Reclamation, Lower Colorado Region Yuma Area Office, Main Administrative Building, Conference Room 120 7301 Calle Agua Salada Yuma, Arizona 85364
Attendees should park in the visitors’ parking spaces in front of the building.
(d) Notification requirements: At least two (2) days before the date of the site visit, parties planning to attend the site visit must send the company name, and names of attendees to:
Luis Gallardo, Contract Specialist, at lgallardo@usbr.gov
(End of Provision)
L.9 52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS APR 1984
(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of ”(DEVIATION)” after the date of the provision.
(b) The use in this solicitation of any Department of the Interior Acquisition Regulation (48 CFR Chapter 14) provision with an authorized deviation is indicated by the addition of “(DEVIATION)” after the name of the regulation.
(End of Provision)
L.10 1452.211-6 BRAND NAME OR EQUAL (AUG 1999) (DEVIATION) AUG 1999
(a) If an item in this solicitation is identified as “brand name or equal,” the purchase description reflects the characteristics and level of quality that will satisfy the Government’s needs. The salient physical, functional, or performance characteristics that “equal” products must meet are specified in the solicitation.
(b) To be considered for award, offers of “equal” products, including “equal” products of the brand name manufacturer, must—
(1) Meet the salient physical, functional, or performance characteristic specified in this solicitation;
(2) Clearly identify the item by—
(i) Brand name, if any; and
(ii) Make or model number;
(3) Include descriptive literature such as illustrations, drawings, or a clear reference to previously furnished descriptive data or information available to the Contracting Officer; and
(4) Clearly describe any modifications the offeror plans to make in a product to make it conform to the solicitation requirements. Mark any descriptive material to clearly show the modifications.
Document Title
RECLAM A rTION U.S. Department of �he Interior .J-\. Bureau of Reclamation
ManaginM Water in the West
Sign In Sheet Site Visit
Solicitation No. R17PS004BO- Evaporative Cooler Replacement Date: Wednesday, July 12, 2016- 9:00 A.M. MST
Represent Representative's Name & Job Title
D PRIME YV1£1�
D SUB
D SUPPLIER
�VT.
\'. PRIME
�M\�
0 SUB
0 SUPPLIER
GOVT.
D PRIME N\t>-\c IA.'-.._ rb�� ;--
D SUB
D SUPPLIER
D GOVT.
L PRIME M 11�� � i:.�G
C SUB
C- SUPPLIER
r GOVT.
p(JAIME /1tf-r f::... � vt_).Pf
D SUB
JJ_SUPPLIER
D GOVT.
�PRIME 5" c tJ1"1 We· f "it."J'1
D SUB
D SUPPLIER
0 GOVT.
0 PRIME fo,.;Jc /)16flF\v7C'suB
0 SUPPLIER
D GOVT.
Firm's Name & Address
. u38� v V D Cn0snz..uaiw
V V C> , ..
�' xS Gto <..t P
5tER�l\ \J\5Th vr�
R� Ulf.� U'ttsf-rv(.tllO/\
Vu.,1110-f/? � .:{) e ,,, e C ,_ C, '1 S1 A,,,:; 7 , P4 t),elll 5'1 J. f>itl...
Tel/Fax Numbers Email Address
TEL.:
FAX:/
Emal!:
TEL.: � ,(sfi;)""": I\ °lO
FAX:
Email:� e_M,�1
�- C.
TEL.: lf q_ b - � l r- h \1 C, FAX:
Emall: �rki..."'-- h'"e.L".3
TEL:520 678 1Z.1,'/
FAX:
Ema[I; Mlre��1-tth.
TEL.: Cf lk- z.t 0-Ul'J
FAX:
Email:�t. (!:,/Ju) {h.
U2ll sh-vc.. 4- l� •• c, TEL.: 9':J � .2.. /0 I� ·.P,-
FAX:
Emall:S'c..,.1fW e (C.clo C};>n,s1r .,,d,';,·l- c
TEL.: f,;l8- ]� 5 -lj 7 4
FAX:
Email: {, ((} lj lP rt< fl. q, �
I�
'I�
,..0 v.
Represent Representative's Firm's Name & Address Tel/Fax Numbers Name &Job Title Email Address
D PRIME sleJ� U1e'S5tUJe Lt 5/$R
TEL.:
D SUB FAX:
D SUPPLIER Emall:
jt'.'GOVT.
D PRIME TEL.:
D SUB FAX:
D SUPPLIER
�----·�V; L \��)<:...GOVT.
l...Sf:>fL Email:
D PRIME TEL.:
D SUB FAX:
D SUPPLIER
f��f'J\Jx�� Email:
t)'GOVT. So L{S �le
D PRIME
l"'\���O<f�O TEL.: C\ LI\- :, U\ °1, .-'b \ 'L '\
D SUB
V\S�\-
FAX:
D SUPPLIER Email: \����\\��\,{"f1
�GOVT.
D PRIME TEL.:
D SUB FAX:
D SUPPLIER Email:
D GOVT.
D PRIME TEL.:
D SUB FAX:
D SUPPLIER Email:
D GOVT.
D PRIME TEL.:
B SUB - - FAX: -
D SUPPLIER Email:
D GOVT.
D PRIME TEL.:
D SUB FAX:
D SUPPLIER Email:
D GOVT.
R17PS00480 - Evaporative Cooler Replacement
Document Title
Document Title
R17PS00480 Amendment 000001 Page 1
R17PS00480 Questions and Answers 01
Question 01: Where the existing ductwork is being replace with new double-wall duct, can the exterior dimension of the new ductwork be sized to match the existing wall penetration? Increasing the exterior dimension of the ductwork will require increasing the size of the wall penetration and re-framing the existing red-iron on the inside of the building. Another alternative would be to make the transition from the new double walled duct to the existing single walled duct on the exterior rather than the interior side of the existing wall penetration. Please clarify: install per drawings and resize the penetration, resize the duct to match the penetration, or move the point of connection to the exterior.
Answer 01: The double wall duct needs to penetrate the wall as we have had problems with duct condensate rusting out the wall sandwich panels in other buildings.
However, Drawing sheet 1292-303-60059 (sheet 2) duct note for coolers NEC-16- AC709 and NEC-16-AC708 has been changed to include moving the ductwork out away from the building. We realize the geometry of the duct will change due to the double wall construction. Drawing 1292-303-60062 (sheet 3) has been changed to add the option of either side draft or updraft configurations for these two units.
Question 02: The water supply for the new coolers is to be connected to the existing gate valves. Many of them appear to be in questionable working condition. Should we include replacing the existing gate valves with new ball valves?
Answer 02: Drawing sheet 1292-303-60064 (Sheet 5) typical utility connections for WQIC, Chlorine & Compressor Building note has been changed to include replacing the isolation valve with a brass body, lever operated ball valve with PTFE seats.
Question 03: Many of the evaporative coolers being replaced appears to be larger than the evaporative coolers specified to replace them.
On the WQIC building the south elevations (2 west evap. Coolers), the east elevations 2 evap. Coolers and the north elevations 2 evap. Coolers have model numbers that are hard to read but they appear to all have the same model number DM120E. That would make them all 12000 CFM cabinets.
On the compressor building and the chlorine building the evaporative coolers have data tags that are unreadable but appear to be larger than 4700 to 5000 CFM specified to replace them.
Do we replace with the evaporative coolers with the sizes specified or with evaporative coolers equal to the existing cooler sizes?
Answer 03: Use the size shown on the schedules.
Document Title
| R17PS00480 Pages I-2 and L-5.pdf |
| 65.pdf |
| Luis Gallardo, Contract Specialist, at lgallardo@usbr.gov |
| (End of Provision) |
File details come from the government source that posted it. Updated .