Site_Visit_Agenda.pdf
PDF 30 KB Posted
- Attached to
- Fish Trap Brail Replacement at Keswick Dam Federal contract opportunity
- Solicitation number
- R15PS00748
About this file
Site Visit Agenda
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_No._0004 _SF-30.pdf | ||
| Amendment_0003_Blk._14_Cont._Page.pdf | ||
| SF30.pdf | ||
| 13_34_23_-_Fish_Brail_Frame.pdf | ||
| Keswick_Fish_Trap_contractor_sign_in_001.pdf | ||
| Continuation_of_Section_B Amendment_0003.pdf | ||
| 07_91_00_-_Fish_Brail_Seals.pdf | ||
| Keswick_Fish_Trap_contractor_sign_in_pg2_001.pdf | ||
| R15PS00748_Keswick_Fish_Trap-Q A.pdf | ||
| Amendment_0002_SF30.pdf | ||
| Amendment_0001_-_SF30.pdf | ||
| C0839_Specifications_Mar13_2015.pdf | ||
| 20-C0839_Drawing_Package.pdf | ||
| Attachment_3_Limitations_on_Subcontracting.pdf | ||
| Solicitation_No._R15PS00748.pdf | ||
| Attachment_1_Wage_Determination_Document_CA150009_01_May_2015.pdf | ||
| Attachment_2_Responsibility_Information.pdf | ||
| Attachment_4_Invoice_related_documents.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNITED STATES DEPARTMENT OF INTERIOR
BUREAU OF RECLAMATION
MID-PACIFIC REGION
SITE VISIT
MEETING AGENDA CONSIDERATIONS
TITLE: Keswick Fish Brail Replacement
SOLICITATION NO.: R15PS00748
SPECIFICATION NO.: 20-C0839
DATE OF SITE VISITS: June 9, 10:00 am PST
INTRODUCTION:
Erik Danger, Contracting Officer, Regional Office Sacramento Richard Welsh, Construction Engineer, Mid-Pacific Construction Office Steve Holmes, Construction Manager, Mid-Pacific Construction Office Kent Perkes, Contract Manager, Mid-Pacific Construction Office Charmayne Baldwin, Safety Manager, Mid-Pacific Construction Office Laurie Larson, Project Manager, Civil Engineer, Northern California Area Office
The solicitation was posted by the Regional Office, Division of Acquisition who will administrate the project along with the Mid-Pacific Construction Office. This solicitation is a Sealed Bid, Small Business Set-aside. The proposal due date is July 9, 2015 at 2:00 PST. We’ll discuss this later in the site visit.
Presently there is one amendment posted.
1. Amendment No. 1: Changed the point of contract for registering for the site visit from Laurie Larson to Randy Wyatt.
The intent of this site visit in not to read the contract specification, but to show you the site so that you may visually comprehend the scope of the work. You are reminded that you are responsible for abiding by the total specification package. This site visit is not mandatory.
I’ll walk you around the site today so you can collect data for your considerations.
I cannot answer any questions. Please do not ask any Reclamation employees questions on a side-bar. You may fill out the comment / questionnaire and e-mail it to Erik Danger using the information provided on the bottom of the page handed to you, or you may use your own format.
Please have comments/questions to Erik by COB Thursday, June 18, 2015, so that this information can be incorporated into an amendment to the specification.
PURPOSE OF THE WORK
The present system needs upgrades to replace wearing components.
ESTIMATED PRICE RANGE: Between $250 and $500 thousand.
PRINCIPAL COMPONENTS OF WORK
A. Replace existing fish brail structure.
1. Remove and store fish brail entrance structure and controls for re-use.
2. Apply shop coating to fish brail frame.
3. Replace composite grating.
4. Apply field touch up coating to exposed steel on the frame, including bolts.
B. Replace hoist equipment for fish brail hoist including wire ropes, sheaves, sheave brackets and associated equipment, reusing existing anchor bolts currently embedded in concrete.
C. Refurbish fish brail hoist motor, gearbox, drums, and braking system.
D. Prepare fish brail hoist motor, gearbox, drums, and braking system external surfaces and apply coatings.
SECTION 01 14 30
INTERRUPTION OF SERVICES
The Government will close the fish ladder inlet valve to accommodate interruption of services only during the following interval, provided there is a source of water available to the water customers:
Between July 31 and December 25.
The Contractor will be responsible for dewatering the fish brail holding pool and maintaining a dry work environment, including from inlet valve leakage and tailwater elevation rise.
SECTION 01 31 30
CONTRACT DOCUMENT MANAGEMENT SYSTEM (CDMS)
The contractor shall establish and use a contract document management system capable of generating, storing, tracking, categorizing, and managing contract documents.
SECTION 01 35 30
SAFETY PERSONNEL
This project requires an onsite safety representative and a safety professional to visit the site at least weekly.
SECTION 01 51 00
TEMPORARY UTILITIES
There is single phase 110 volts AC at the receptacles.
Non-potable water is available within the powerhouse.
There is compressed air available within the powerhouse.
There is not a telephone line available for the contractor.
The contractor shall provide restroom facilities.
SECTION 01 54 50
TEMPORARY ATTACHMENTS TO FISH TRAP WALLS
Temporary attachments may be made to concrete walls, but you must obtain the location of embedded conduits, pipes, cables, and ground mat before performing and drilling or cutting of concrete.
The concrete attachments would be removed after use and the concrete repaired.
SECTION 01 55 00
VEHICULAR ACCESS AND PARKING
Parking spaces in the upper lot will be designated as available to the construction personnel.
Other spaces for lay down and parking to be designated by COR during post award meeting.
Provide additional offsite parking when site space is not adequate.
SECTION 01 55 20
TRAFFIC CONTROL
There are requirements for road closure on top of the dam which will require notifications and permits from the Shasta County Public Works.
SECTION 01 57 30
WATER POLLUTION CONTROL
The contractor will have to obtain the 402 wastewater discharge permit.
SECTION 05 15 00
WIRE ROPE ASSEMBLY
Removal
Prior to removing the wire ropes and equipment, the fish brail is to be blocked in place at the maintenance level.
Remove fish brail hoist equipment for transport to refurbishment shop.
Remove embedded anchor bolt nuts without removing embedded anchor bolts.
Embedded anchor bolts shall be reused.
Installation
Furnish and install wire rope assembly on the existing embedded anchors.
SECTION 06 74 00
COMPOSITE GRATING
The contractor shall furnish and install composite grating.
SECTOIN 07 91 00
FISH BRAIL SEALS
The contractor shall furnish and install fish brail seals.
SECTION 09 96 20
COATINGS
There are coating requirements as noted in the tabulations.
Items include;
o Structural steel for fish brail o Fasteners and brackets o Gear boxes, motors and brake housings o Sheave brackets and blocks
SECTION 13 34 23
FISH BRAIL FRAME
Execution: Removal o Remove and store for reuse, the brail canopy and the brail entrance, including the pneumatic system equipment.
o Remove exiting fish brail in accordance with 01 54 00.
Execution: Installation o Assemble, install and test the fish brail system as specified.
SECTION 26 25 13
HOIST MOTOR
Remove, refurbish and reinstall the Fish Brail motor.
SECTION 41 22 43
HOIST MECHANICAL EQUIPMENT
Refurbish and test brail hoist equipment, including the gearbox, drums and braking system.
SECTION F: DELIVERIES OR PERFORMANCE
Page F-1: Liquidated Damages are $1,600 per day.
(Laurie to request operation of the system and expand on details during the process)
NOTES:
Photos: Photos are permitted.
Safety:
*Go over JHA before leaving the guard station.
*Pass around the sign in sheet *Hand out question/comment forms with instructions.