20-C0839_Drawing_Package.pdf
PDF 9 MB Posted
- Attached to
- Fish Trap Brail Replacement at Keswick Dam Federal contract opportunity
- Solicitation number
- R15PS00748
About this file
Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_No._0004 _SF-30.pdf | ||
| Amendment_0003_Blk._14_Cont._Page.pdf | ||
| SF30.pdf | ||
| 13_34_23_-_Fish_Brail_Frame.pdf | ||
| Keswick_Fish_Trap_contractor_sign_in_001.pdf | ||
| Continuation_of_Section_B Amendment_0003.pdf | ||
| 07_91_00_-_Fish_Brail_Seals.pdf | ||
| Site_Visit_Agenda.pdf | ||
| Keswick_Fish_Trap_contractor_sign_in_pg2_001.pdf | ||
| R15PS00748_Keswick_Fish_Trap-Q A.pdf | ||
| Amendment_0002_SF30.pdf | ||
| Amendment_0001_-_SF30.pdf | ||
| C0839_Specifications_Mar13_2015.pdf | ||
| Attachment_3_Limitations_on_Subcontracting.pdf | ||
| Solicitation_No._R15PS00748.pdf | ||
| Attachment_1_Wage_Determination_Document_CA150009_01_May_2015.pdf | ||
| Attachment_2_Responsibility_Information.pdf | ||
| Attachment_4_Invoice_related_documents.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No. R15PS00748 Specifications No. 20-C0839
Drawings
Keswick Fish Brail Replacement Shasta Division – Keswick Dam, Powerplant, and Reservoir
Central Valley Project, California
U.S. Department of the Interior SPECIFICATIONS Bureau of Reclamation Mid-Pacific Region May 2015 jvincent Text Box jvincent jvincent Text Box jvincent Text Box jvincent Line jvincent Text Box
FOR INFORMATION ONLY
Line jvincent Line jvincent Text Box jvincent Text Box
FOR INFORMATION ONLY
jvincent Text Box jvincent
FOR INFORMATION ONLY
jvincent Line jvincent Line jvincent Text Box jvincent jvincent Line jvincent Text Box
FOR INFORMATION ONLY
jvincent jvincent Line jvincent Text Box
FOR INFORMATION ONLY
jvincent
Line jvincent Line jvincent Text Box
FOR INFORMATION ONLY
jvincent Text Box jvincent jvincent Line jvincent Text Box
FOR INFORMATION ONLY
jvincent jvincent Line jvincent Text Box
FOR INFORMATION ONLY
jvincent jvincent Line jvincent Text Box
FOR INFORMATION ONLY
jvincent jvincent Line jvincent Text Box
FOR INFORMATION ONLY
jvincent jvincent Text Box
FOR INFORMATION ONLY
jvincent Line jvincent jvincent Text Box
FOR INFORMATION ONLY
jvincent Line jvincent jvincent Text Box
FOR INFORMATION ONLY
jvincent Line jvincent jvincent Text Box
FOR INFORMATION ONLY
jvincent Line jvincent jvincent Text Box
FOR INFORMATION ONLY
jvincent Line jvincent jvincent Text Box
FOR INFORMATION ONLY
jvincent Line jvincent jvincent Line jvincent Text Box
FOR INFORMATION ONLY
jvincent
| 214-D-22522-RD-1 Location Map |
| 214-D-8113-RD-1Keswick Dam and Powerplant - General Plan |
| 214-D-8115-RD-3 Keswick Dam and Powerplant - Sections |
| 214-D-8954 Brail Entrance - Steel Framing |
| 214-D-9307-RD-1 Fish Trap - General Plan and Sections |
| 214-D-9130 Fish Trap - Brail Frame |
| 214-D-9131 Fish Trap - Brail Entrance |
| 214-214-10005 Fish Trap - Trap Entrance to Brail Pool - Text |
| 214-214-10006 Fish Trap - Brail Frame |
| 214-D-5554 Brail Hoist Installation |
| 214-D-8643 Brail Hoist and Sheaves |
| 214-D-9114 Trap Entrance - Winches, Sheaves, Ropes, Winch Stand |
| 214-214-9877 Fish Trap Mods - Brail Entrance - Details |
| 40-D-7102-RD-1 Layout |
File details come from the government source that posted it. Updated .