Price Schedule Instructions
| Price Schedule Instructions |
| Labor Rates: Enter the labor rate, per hour, for the categories called for in the solicitaion. A Vendor can propose services for all categories offering in the service area. |
| Parts and Materials: Provide the % mark-up from your costs, as defined in the solicitation. |
Price List for Parts and Materials: Provide the name of the pricing list you will be using for associated products
| Sample Price Schedule: |
| For the Shop Location(s) this Price Schedule applies to: Submit pricing for various labor rates offered by entering the hourly labor rates for services offered in column C. Next, provide the % mark-up from cost for all of the parts and materials that they offer on in column F. Then provide the names of the key/primary supplier/manufacturers where they will purchase these materials from in column H along with a List of what materials are purchased from each supplier in column I. For Body and Collision repair Check all counties where offereing service in the Service Area Section, this is the area where Estimates will be provided at no additional cost. If offering Estimate Services outside the service area enter the additional counties covered, Price Rate per mile, and shop address starting point. Only Estimate Services for Body and Collision that are done outside of the service area will be allowed to charge mileage rate, mileage rate must reflect all costs of out of service area estimates. Responders may add tabs with different pricing as needed for other location(s) that different service areas or have different pricing. |
SHOP LOCATION(s) for this Price Schedule Osseo, Anoka, Blaine locations
LABOR, PARTS, AND MATERIAL
| Labor Rates | | Parts/Raw Materials (Cost-Plus Percent Mark-Up) | | | Price List of Parts | |
| Category | Labor Rate/Hour | Parts | % Mark-up from Raw Material Cost | Manufacturer/Supplier Name | Manufacturer/Supplier Name | Catalog Date |
or
| Number | Discount of List (%) | | | | | | | | |
| | Mechanical | 100.00 | New OEM Parts | 10% | ORS OEM | ABC Auto Parts | ABC Auto Parts List January 1, 2026 | 25% |
| | Diagnostic | 100.00 | Used Parts | 10% | TUV Salvage | QRS Equipment | QRS OEM Parts Catalog #230 | 15% |
| | Body | 125.00 | Body Panels/Trim/etc. | 12% | Body Panels R' Us | Aftermarket Parts Co | Aftermarket Parts Co Product List 1/1/2026 | 12% |
| | Paint | 125.00 | Raw Material | % Mark-up from Raw Material Cost | | | | |
| | Machining/Fabrication/Welding | | Steel | 15% | ABC Steel | | | |
| | Hydraulic | | Galvanized Steel | | | | | |
| | Other (replace text w/labor type) | | Stainless Steel | | | | | |
| | | | Aluminum | | | | | |
| | | | Coated Steel | | | | | |
| | | | Other (replace text w/ material) | | | | | |
| | SERVICE AREA(S) | | | | | | | |
| Counties Offering Service In (check all that apply) | | | | |
| Aitkin | | Isanti | Pipestone | |
| Anoka | X | Itasca | Polk | |
| Becker | | Jackson | Pope | |
| Beltrami | | Kanabec | Ramsey | |
| Benton | | Kandiyohi | Red Lake | |
| Big Stone | | Kittson | Redwood | |
| Blue Earth | | Koochiching | Renville | |
| Brown | | Lac Qui Parle | Rice | |
| Carlton | | Lake | Rock | |
| Carver | | Lake of the Woods | Roseau | |
| Cass | | Le Sueur | St. Louis | |
| Chippewa | | Lincoln | Scott | |
| Chisago | | Lyon | Sherburne | |
| Clay | | Mahnomen | Sibley | |
| Clearwater | | Marshall | Stearns | |
| Cook | | Martin | Steele | |
| Cottonwood | | McLeod | Stevens | |
| Crow Wing | | Meeker | Swift | |
| Dakota | | Mille Lacs | Todd | |
| Dodge | | Morrison | Traverse | |
| Douglas | | Mower | Wabasha | |
| Faribault | | Murray | Wadena | |
| Filmore | | Nicollet | Waseca | |
| Freeborn | | Nobles | Washington | |
| Goodhue | | Norman | Watonwan | |
| Grant | | Olmsted | Wilkin | |
| Hennepin | X | Otter Tail | Winona | |
| Houston | | Pennington | Wright | |
| Hubbard | | Pine | Yellow Medicine | |
| Estimations Outside Service Area (Optional) | | | | Price Rate per mile (round trip miles) |
| Ramsey, Sherburne, Stearns, Isanti | | | | $0.90 |
| | | | Shop Address starting point |
| | | | 123 Main St., City, MN 55555 |
Service Area
| Exhibit D Price Schedule |
| SERVICE AREA |
| Counties Offering Service In (check all that apply) | | | |
| Aitkin | Isanti | Pipestone | |
| Anoka | Itasca | Polk | |
| Becker | Jackson | Pope | |
| Beltrami | Kanabec | Ramsey | |
| Benton | Kandiyohi | Red Lake | |
| Big Stone | Kittson | Redwood | |
| Blue Earth | Koochiching | Renville | |
| Brown | Lac Qui Parle | Rice | |
| Carlton | Lake | Rock | |
| Carver | Lake of the Woods | Roseau | |
| Cass | Le Sueur | St. Louis | |
| Chippewa | Lincoln | Scott | |
| Chisago | Lyon | Sherburne | |
| Clay | Mahnomen | Sibley | |
| Clearwater | Marshall | Stearns | |
| Cook | Martin | Steele | |
| Cottonwood | McLeod | Stevens | |
| Crow Wing | Meeker | Swift | |
| Dakota | Mille Lacs | Todd | |
| Dodge | Morrison | Traverse | |
| Douglas | Mower | Wabasha | |
| Faribault | Murray | Wadena | |
| Filmore | Nicollet | Waseca | |
| Freeborn | Nobles | Washington | |
| Goodhue | Norman | Watonwan | |
| Grant | Olmsted | Wilkin | |
| Hennepin | Otter Tail | Winona | |
| Houston | Pennington | Wright | |
| Hubbard | Pine | Yellow Medicine | |
| Estimations Outside Service Area (Optional) | | | Price Rate per mile (round trip miles) |
| (list counties outside offered area here) | | | |
| | | Shop Address starting point |
CAT 1 Heavy Equipment
| Exhibit D Price Schedule | BUSINESS INFORMATION |
| Vendor Name |
| Price Schedule instructions are available on the Insturction tab. | Contact Person |
| StreetAddress |
| City/State/Zip |
| Phone |
| Email |
| SHOP LOCATION(s) | |
| SHOP LOCATION(s) for this Price Schedule | |
LABOR, PARTS, AND MATERIAL
| Labor Rates | | Parts/Raw Materials (Cost-Plus Percent Mark-Up) | | | Price List of Parts | |
| Category | Labor Rate/Hour | Parts | % Mark-up on Parts | Manufacturer/Supplier Name | Manufacturer/Supplier Name | Catalog Date |
or
| Number | Discount of List (%) | | | |
| | Mechanical | New OEM Parts | |
| | Diagnostic | Used Parts | |
| | Electrical | Raw Material | % Mark-up from Raw Material Cost |
| | Hydraulic | Steel | |
| | Welding and Fabrication | Galvanized Steel | |
| | Upfitting and Installation | Stainless Steel | |
| | Inspection | Aluminum | |
| | Other (replace text w/labor type) | Coated Steel | |
| | | Sheet metal | |
| | | Other (replace text w/ material) | |
| Transportation/Towing | Price |
| Price per Loaded Mile | |
CAT 2 Med-Heavy Truck
| Exhibit D Price Schedule | BUSINESS INFORMATION |
| Vendor Name |
| Price Schedule instructions are available on the instruction tab. | Contact Person |
| StreetAddress |
| City/State/Zip |
| Phone |
| Email |
| SHOP LOCATION(s) | |
| SHOP LOCATION(s) for this Price Schedule | |
LABOR, PARTS, AND MATERIAL
| Labor Rates | | Parts/Raw Materials (Cost-Plus Percent Mark-Up) | | | Price List of Parts | |
| Category | Labor Rate/Hour | Parts | % Mark-up on Parts | Manufacturer/Supplier Name | Manufacturer/Supplier Name | Catalog Date |
or
| Number | Discount of List (%) | | | |
| | Mechanical | New OEM Parts | |
| | Diagnostic | Used Parts | |
| | Electrical | Raw Material | % Mark-up from Raw Material Cost |
| | Hydraulic | Steel | |
| | Welding and Fabrication | Galvanized Steel | |
| | Upfitting and Installation | Stainless Steel | |
| | Inspection | Aluminum | |
| | Other (replace text w/labor type) | Coated Steel | |
| | | Sheet metal | |
| | | Other (replace text w/ material) | |
| Transportation/Towing | Price |
| Price per Loaded Mile | |
CAT 3 Body Collision
| Exhibit D Price Schedule | BUSINESS INFORMATION |
| Vendor Name |
| Price Schedule instructions are available on the instruction tab. | Contact Person |
| StreetAddress |
| City/State/Zip |
| Phone |
| Email |
| SHOP LOCATION(s) | |
| SHOP LOCATION(s) for this Price Schedule | |
LABOR, PARTS, AND MATERIAL
| Labor Rates | | Parts/Raw Materials (Cost-Plus Percent Mark-Up) | | | Price List of Parts | |
| Category | Labor Rate/Hour | Parts | % Mark-up on Parts | Manufacturer/Supplier Name | Manufacturer/Supplier Name | Catalog Date |
or
| Number | Discount of List (%) | | | |
| | Mechanical | New OEM Parts | |
| | Diagnostic | Used Parts | |
| | Electrical | Raw Material | % Mark-up from Raw Material Cost |
| | Hydraulic | Steel | |
| | Welding and Fabrication | Galvanized Steel | |
| | Upfitting and Installation | Stainless Steel | |
| | Inspection | Aluminum | |
| | Other (replace text w/labor type) | Coated Steel | |
| | | Sheet metal | |
| | | Other (replace text w/ material) | |
| Transportation/Towing | Price |
| Price per Loaded Mile | |
CAT 4Transit Bus
| Exhibit D Price Schedule | BUSINESS INFORMATION |
| Vendor Name |
| Price Schedule instructions are available on the instruction tab. | Contact Person |
| StreetAddress |
| City/State/Zip |
| Phone |
| Email |
| SHOP LOCATION(s) | |
| SHOP LOCATION(s) for this Price Schedule | |
LABOR, PARTS, AND MATERIAL
| Labor Rates | | Parts/Raw Materials (Cost-Plus Percent Mark-Up) | | | Price List of Parts | |
| Category | Labor Rate/Hour | Parts | % Mark-up on Parts | Manufacturer/Supplier Name | Manufacturer/Supplier Name | Catalog Date |
or
| Number | Discount of List (%) | | | |
| | Mechanical | New OEM Parts | |
| | Diagnostic | Used Parts | |
| | Electrical | Raw Material | % Mark-up from Raw Material Cost |
| | Hydraulic | Steel | |
| | Welding and Fabrication | Galvanized Steel | |
| | Upfitting and Installation | Stainless Steel | |
| | Inspection | Aluminum | |
| | Other (replace text w/labor type) | Coated Steel | |
| | | Sheet metal | |
| | | Other (replace text w/ material) | |
| Transportation/Towing | Price |
| Price per Loaded Mile | |
CAT 5 School Bus
| Exhibit D Price Schedule | BUSINESS INFORMATION |
| Vendor Name |
| Price Schedule instructions are available on the instruction tab. | Contact Person |
| StreetAddress |
| City/State/Zip |
| Phone |
| Email |
| SHOP LOCATION(s) | |
| SHOP LOCATION(s) for this Price Schedule | |
LABOR, PARTS, AND MATERIAL
| Labor Rates | | Parts/Raw Materials (Cost-Plus Percent Mark-Up) | | | Price List of Parts | |
| Category | Labor Rate/Hour | Parts | % Mark-up on Parts | Manufacturer/Supplier Name | Manufacturer/Supplier Name | Catalog Date |
or
| Number | Discount of List (%) | | | |
| | Mechanical | New OEM Parts | |
| | Diagnostic | Used Parts | |
| | Electrical | Raw Material | % Mark-up from Raw Material Cost |
| | Hydraulic | Steel | |
| | Welding and Fabrication | Galvanized Steel | |
| | Upfitting and Installation | Stainless Steel | |
| | Inspection | Aluminum | |
| | Other (replace text w/labor type) | Coated Steel | |
| | | Sheet metal | |
| | | Other (replace text w/ material) | |
| Transportation/Towing | Price |
| Price per Loaded Mile | |
CAT 6 Aerial Cranes and Lifts
| Exhibit D Price Schedule | BUSINESS INFORMATION |
| Vendor Name |
| Price Schedule instructions are available on the instruction tab. | Contact Person |
| StreetAddress |
| City/State/Zip |
| Phone |
| Email |
| SHOP LOCATION(s) | |
| SHOP LOCATION(s) for this Price Schedule | |
LABOR, PARTS, AND MATERIAL
| Labor Rates | | Parts/Raw Materials (Cost-Plus Percent Mark-Up) | | | Price List of Parts | |
| Category | Labor Rate/Hour | Parts | % Mark-up on Parts | Manufacturer/Supplier Name | Manufacturer/Supplier Name | Catalog Date |
or
| Number | Discount of List (%) | | | |
| | Mechanical | New OEM Parts | |
| | Diagnostic | Used Parts | |
| | Electrical | Raw Material | % Mark-up from Raw Material Cost |
| | Hydraulic | Steel | |
| | Welding and Fabrication | Galvanized Steel | |
| | Upfitting and Installation | Stainless Steel | |
| | Inspection | Aluminum | |
| | Other (replace text w/labor type) | Coated Steel | |
| | | Sheet metal | |
| | | Other (replace text w/ material) | |
| Transportation/Towing | Price |
| Price per Loaded Mile | |
CAT 7 MTWV
| Exhibit D Price Schedule | BUSINESS INFORMATION |
| Vendor Name |
| Price Schedule instructions are available on the instruction tab. | Contact Person |
| StreetAddress |
| City/State/Zip |
| Phone |
| Email |
| SHOP LOCATION(s) | |
| SHOP LOCATION(s) for this Price Schedule | |
LABOR, PARTS, AND MATERIAL
| Labor Rates | | Parts/Raw Materials (Cost-Plus Percent Mark-Up) | | | Price List of Parts | |
| Category | Labor Rate/Hour | Parts | % Mark-up on Parts | Manufacturer/Supplier Name | Manufacturer/Supplier Name | Catalog Date |
or
| Number | Discount of List (%) | | | |
| | Mechanical | New OEM Parts | |
| | Diagnostic | Used Parts | |
| | Electrical | Raw Material | % Mark-up from Raw Material Cost |
| | Hydraulic | Steel | |
| | Welding and Fabrication | Galvanized Steel | |
| | Upfitting and Installation | Stainless Steel | |
| | Inspection | Aluminum | |
| | Other (replace text w/labor type) | Coated Steel | |
| | | Sheet metal | |
| | | Other (replace text w/ material) | |
| Transportation/Towing | Price |
| Price per Loaded Mile | |