Quote 2209.pdf

PDF 2 MB Posted

Attached to
Release Competitive Sealed Bidding IL|23-416CMS-BOPM4-P-47273
Contract number
23-416CMS-BOPM4-P-47273
Issued by
Illinois

About this file

Document Summary

This is a quote (#2209) issued by Reicher Industries, based in Monroe Center, Illinois, to Elgin Mental Health Center in Elgin, Illinois, dated March 23, 2026. The quote outlines proposed work to replace a defective 3-inch Spence pressure reducing valve on the steam main and add a bypass pressure reducing valve to provide redundant steam pressure control.

The quoted work includes replacement and installation of pressure reducing valves, pilot valves, associated piping and fittings, field welding services, and contracted HVAC labor. The itemized costs are: Replacement Spence PRV ($18,050.00), Spence Pilot Valve ($2,680.00), Associated Pipe & Fittings ($7,420.00), Field Welding & Welder Mobilization ($7,890.00), 32 hours of contracted HVAC Foreman labor at $151.81 per hour ($4,857.92), and 32 hours of contracted HVAC Laborer at $137.19 per hour ($4,390.08). The total quote amount is $45,288.00. The quote is valid for 30 days, and the contractor assumes no responsibility for deficiencies in existing systems. Additional costs may apply if unforeseen conditions or adverse job conditions warrant changes to system design, equipment, or installation technique.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .