QALI_MG47_MG48.pdf
PDF 120 KB Posted
- Attached to
- Initiator Cartridge and Input Cartridge
- Solicitation number
- FA821321R3010
About this file
This solicitation seeks initiators, cartridges, and input cartridges to support aircraft ejection and hatch removal systems. Line items 0001 through 0005 require MG47 and MG48 initiators, 1139-5 and 6161100 initiators, 2685300-301-02 and 6130300 initiators, 2684200-201-02 and 6131200 input cartridges, and 2685200-201-02 and 6130200 input cartridges. Delivery for line items 0001 through 0003 is required by October 2022 and June 2022 for line items 0003 through 0005. First article and production quantities are specified for line items 0003 through 0005, to be delivered to Hill Air Force Base, Utah and Tinker Air Force Base, Oklahoma. The solicitation is issued by the Department of the Air Force Materiel Command Lifecycle Management Center.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 21-50114_ItemDescriptions.pdf | ||
| AIRSPEC_2150061.pdf | ||
| SOWSPI.pdf | ||
| REPSHIP11Mar14.pdf | ||
| F012717161.pdf | ||
| CDRLs_21-50061.pdf | ||
| JQRS_HatchRemoverCtgs.pdf | ||
| FA821321R3010.pdf | ||
| ES7034.pdf | ||
| 21-50114CDRLs.pdf | ||
| QALI_06092020.pdf | ||
| 21-50061_EDLs.pdf | ||
| 21-50061_ItemDescriptions.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contractor Name CAGE code
DCMA QAR Reviewer
Date Review Completed
Date Issued to Contractor
PR No. FD2020-
Date Contract Awarded
Final Delivery Date (FDD)
Program Name
DODIC
Part Number
The contractor is required to impose the listed below DCMA Inspection Points into the appropriate Work Orders.
All Work Orders pertaining to CRITICAL FLIGHT ITEMS must be identified on folders.
Mandatory - M: Stamp and/ or Signature on original documentation (i.e., Mfg. Planning, ATP, FAT Report, etc.)
Witness - W: GSI required to attend, may reduce level of effort after 50% of production lots found acceptable
Verification - V: Stamp and/or Signature required unless noted otherwise (may be done by written verification)
Monitor - R: Will monitor testing, may reduce to verification
Notify - N: By phone or daily schedule 24( R ) - 48 ( NR ) hours in advance
Additional requirements: (DCMA reserves the right to impose additional inspection points as deemed necessary.)
Prepared by:
Date
Concurrence Signature by QAR/DCMA:
QAR/DCMA
THIS PLANNING SHEET WILL BE UPDATED IF NECESSARY.
QUALITY ASSURANCE LETTER OF INSTRUCTION
Planning Requirements
COMMENTS
NOTICE
Engineer
Date
Sheet1
| Contract No: 21-50114 |
| Date Contract Awarded: |
| Final Delivery Date FDD: |
| Program Name: T-38/ F-5 |
| DODIC: 1139-5, 1010-4, 6161100, 6161200 |
| undefined: V |
| undefined_2: M |
| undefined_3: V |
| undefined_4: M |
| undefined_5: W |
| undefined_6: V |
| undefined_7: M |
| undefined_8: M |
| undefined_9: |
| undefined_10: |
| undefined_11: |
| undefined_12: |
| Text19: |
| Text20: |
| Text21: |
| Text22: |
| Text23: |
| Text24: 1.Inspection |
| Text25: 2. Leak Test |
| Text26: 3. X-Ray/N-Ray |
| Text27: 4. LAT Sample Selection |
| Text28: 5. LAT |
| Text29: 6. Preparation for Shipment |
| Text30: 7. AMMO Data Card Review |
| Text31: 8. Shippers (DD250, DD1149, Reports) |
| Text32: 9. Additional Requirements |
| Text33: |
| Text34: |
| Text35: |
| Text36: 1. Explosive Weight |
2. Verify ATP contains both gross and fine leak checks, and gross leak and fine leak checks are performed.
3. Ensure film labeling correct. Ensure radiographic film readable/well-defined. DCMA not required to interpret film.
4. Randomly select LAT units per latest government approved ATP.
5. Prior to LAT ensure proper calibration and validation of all test equipment. Testing should occur in accordance with latest government approved ATP.
6. Ensure Paperwork is correct.
7. Verify all energetic materials: list original manufacturer, original lot no., and latest certification/recertification date < 24 months.
8. Ensure Paperwork is correct. Verify Packaging, Packing, Preservation & Marking (PPP&M)
9. Any additional requirements imposed by DCMA shall be approved by Project Engineer
| 2016-05-17T14:35:57-0600 | |
| KRAMER.LAWRENCE.C.1141472808 |
| Text46: 10 June 2020 |
| Text49: |
| Type name_1: |
| Type name_4: |
| Part Number: MG48, MG47 |
| Noun: |
File details come from the government source that posted it. Updated .