QALI_MG47_MG48.pdf

PDF 120 KB Posted

Attached to
Initiator Cartridge and Input Cartridge
Solicitation number
FA821321R3010
Issued by

About this file

This solicitation seeks initiators, cartridges, and input cartridges to support aircraft ejection and hatch removal systems. Line items 0001 through 0005 require MG47 and MG48 initiators, 1139-5 and 6161100 initiators, 2685300-301-02 and 6130300 initiators, 2684200-201-02 and 6131200 input cartridges, and 2685200-201-02 and 6130200 input cartridges. Delivery for line items 0001 through 0003 is required by October 2022 and June 2022 for line items 0003 through 0005. First article and production quantities are specified for line items 0003 through 0005, to be delivered to Hill Air Force Base, Utah and Tinker Air Force Base, Oklahoma. The solicitation is issued by the Department of the Air Force Materiel Command Lifecycle Management Center.

View the file

Other files

File Type Posted
21-50114_ItemDescriptions.pdf PDF
AIRSPEC_2150061.pdf PDF
SOWSPI.pdf PDF
REPSHIP11Mar14.pdf PDF
F012717161.pdf PDF
CDRLs_21-50061.pdf PDF
JQRS_HatchRemoverCtgs.pdf PDF
FA821321R3010.pdf PDF
ES7034.pdf PDF
21-50114CDRLs.pdf PDF
QALI_06092020.pdf PDF
21-50061_EDLs.pdf PDF
21-50061_ItemDescriptions.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contractor Name CAGE code

DCMA QAR Reviewer

Date Review Completed

Date Issued to Contractor

PR No. FD2020-

Date Contract Awarded

Final Delivery Date (FDD)

Program Name

DODIC

Part Number

The contractor is required to impose the listed below DCMA Inspection Points into the appropriate Work Orders.

All Work Orders pertaining to CRITICAL FLIGHT ITEMS must be identified on folders.

Mandatory - M: Stamp and/ or Signature on original documentation (i.e., Mfg. Planning, ATP, FAT Report, etc.)

Witness - W: GSI required to attend, may reduce level of effort after 50% of production lots found acceptable

Verification - V: Stamp and/or Signature required unless noted otherwise (may be done by written verification)

Monitor - R: Will monitor testing, may reduce to verification

Notify - N: By phone or daily schedule 24( R ) - 48 ( NR ) hours in advance

Additional requirements: (DCMA reserves the right to impose additional inspection points as deemed necessary.)

Prepared by:

Date

Concurrence Signature by QAR/DCMA:

QAR/DCMA

THIS PLANNING SHEET WILL BE UPDATED IF NECESSARY.

QUALITY ASSURANCE LETTER OF INSTRUCTION

Planning Requirements

COMMENTS

NOTICE

Engineer

Date

Sheet1

Contract No: 21-50114
Date Contract Awarded:
Final Delivery Date FDD:
Program Name: T-38/ F-5
DODIC: 1139-5, 1010-4, 6161100, 6161200
undefined: V
undefined_2: M
undefined_3: V
undefined_4: M
undefined_5: W
undefined_6: V
undefined_7: M
undefined_8: M
undefined_9:
undefined_10:
undefined_11:
undefined_12:
Text19:
Text20:
Text21:
Text22:
Text23:
Text24: 1.Inspection
Text25: 2. Leak Test
Text26: 3. X-Ray/N-Ray
Text27: 4. LAT Sample Selection
Text28: 5. LAT
Text29: 6. Preparation for Shipment
Text30: 7. AMMO Data Card Review
Text31: 8. Shippers (DD250, DD1149, Reports)
Text32: 9. Additional Requirements
Text33:
Text34:
Text35:
Text36: 1. Explosive Weight

2. Verify ATP contains both gross and fine leak checks, and gross leak and fine leak checks are performed.

3. Ensure film labeling correct. Ensure radiographic film readable/well-defined. DCMA not required to interpret film.

4. Randomly select LAT units per latest government approved ATP.

5. Prior to LAT ensure proper calibration and validation of all test equipment. Testing should occur in accordance with latest government approved ATP.

6. Ensure Paperwork is correct.

7. Verify all energetic materials: list original manufacturer, original lot no., and latest certification/recertification date < 24 months.

8. Ensure Paperwork is correct. Verify Packaging, Packing, Preservation & Marking (PPP&M)

9. Any additional requirements imposed by DCMA shall be approved by Project Engineer

2016-05-17T14:35:57-0600
KRAMER.LAWRENCE.C.1141472808
Text46: 10 June 2020
Text49:
Type name_1:
Type name_4:
Part Number: MG48, MG47
Noun:

File details come from the government source that posted it. Updated .