ES7034.pdf

PDF 84 KB Posted

Attached to
Initiator Cartridge and Input Cartridge
Solicitation number
FA821321R3010
Issued by

About this file

This solicitation seeks cartridge-based initiators and input cartridges for aircraft ejection systems and hatch removal. Line items include initiator cartridges, input cartridges for aft and forward hatch removal, and initiator cartridge actuated devices. First article test and production quantities are specified for each line item, with delivery required by June and October 2022 to Hill Air Force Base and Tinker Air Force Base. Electronic bidding procedures will be used for this solicitation issued by the Department of the Air Force Materiel Command Lifecycle Management Center.

View the file

Other files

File Type Posted
21-50114_ItemDescriptions.pdf PDF
AIRSPEC_2150061.pdf PDF
SOWSPI.pdf PDF
REPSHIP11Mar14.pdf PDF
F012717161.pdf PDF
CDRLs_21-50061.pdf PDF
JQRS_HatchRemoverCtgs.pdf PDF
FA821321R3010.pdf PDF
QALI_MG47_MG48.pdf PDF
21-50114CDRLs.pdf PDF
QALI_06092020.pdf PDF
21-50061_EDLs.pdf PDF
21-50061_ItemDescriptions.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 5

(ES7034)

REWORK AND REPAIR OF NONCONFORMING MATERIAL

Jan 2012 (version)

(a) Rework and Repair are defined as follows:

(1) Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.

(2) Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.

(b) Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the Government Quality Assurance Representative (QAR) for review prior to implementation. Rework procedures are subject to the QAR's disapproval.

(c) Repair procedures shall be documented by the Contractor and submitted on a Request for Deviation/Waiver, DD Form 1694, to the Contracting Officer for review and written approval prior to implementation.

(d) Whenever the Contractor submits a repair or rework procedure for Government review, the submission shall also include a description of the cause for the nonconformances and a description of the action taken or to be taken to prevent recurrence.

(e) The rework or repair procedure shall also contain a provision for reinspection which will take precedence over the Technical Data Package requirements and shall, in addition, provide the Government assurance that the reworked or repaired items have met reprocessing requirements.

(f) Rework and repair is a supply chain flow-down requirement that applies to contractors and their suppliers, vendors or subcontractors.

(End of clause)

(ES7034)

File details come from the government source that posted it. Updated .