This document contains a justification for qualification requirements and a related federal contract opportunity solicitation. The justification document establishes qualification requirements suppliers must meet to be eligible to bid on contracts for five types of hatch remover cartridges and initiators used in B-1B aircraft. Suppliers must notify the design control activity of their intent to qualify, certify their facilities and processes, submit test plans and reports for evaluation, and produce qualification test articles for inspection. Qualification is estimated to take 360 days. The related solicitation seeks offers for the five cartridge and initiator items, with quantities ranging from 62 to 97 each. Proposals are due by 28 October 2022, and first articles are required to be delivered by 30 June 2022 to Tinker Air Force Base.

View the file

Other files

File Type Posted
21-50114_ItemDescriptions.pdf PDF
AIRSPEC_2150061.pdf PDF
SOWSPI.pdf PDF
REPSHIP11Mar14.pdf PDF
F012717161.pdf PDF
CDRLs_21-50061.pdf PDF
FA821321R3010.pdf PDF
QALI_MG47_MG48.pdf PDF
ES7034.pdf PDF
21-50114CDRLs.pdf PDF
QALI_06092020.pdf PDF
21-50061_EDLs.pdf PDF
21-50061_ItemDescriptions.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JUSTIFICATION FOR QUALIFICATION REQUIREMENTS

FAR 9.202(a) and DoD 4120.24M

Section A: Item Identification

NSN Cage Part Number ALT NSN Cage Part Number

DODIC NOUN

1377012698058ES 17610 2685200-201-02 1377014549875ES 93455 6130200 MT75 Input Cart, Aft Hatch Rem

1377012698059ES 17610 2685300-301-02 1377014549874ES 93455 6130300 MT19 Output Init, Aft Hatch Rem

1377012700860ES 17610 2684200-201-02 1377014549862ES 93455 6131200 MU88 Input Cart, fwd hatch rem

1377012700861ES 17610 2684300-301-02 1377014549860ES 93455 6131100 MU22 Output Init, fwd hatch rem

Noun: Collins and CED Hatch Removers

Application: B-1B

Section B: Justification for Establishing a Qualification Requirement and Reason Why Qualification Requirement Must Be Demonstrated Prior to Any Contract Award.

1. The Collins and CED Hatch Removers are critical safety items (CSI). Characteristics associated with the manufacture of Inert Items, if not correct, would result in product functional degradations. This item performs a critical function on the aircraft and special equipment is required for its manufacture and testing. Special care and attention is required but not limited to finish, processing, assembly, performance, and part interchangeability of this item. These items are proprietary to Collins and CED.

2. The prospective bidder’s ability to interpret engineering drawings and specifications and the execution of the qualification requirements specified herein are necessary to verify the structural and functional integrity and/or form, fit, and function of the item being procured.

3. Failure to procure this item from a fully qualified source could result in failure of the part, degradation of aircraft mission capability, or loss of aircraft and crew.

4. Completion of the specified pre-contract award qualification requirements, will ensure the government that the prospective offeror is technically capable of producing the item in compliance with the applicable technical specifications and associated drawings and within the schedule and economic constraints of our contracts. To protect the interests of the Air Force, only United States suppliers will be considered. There are sufficient technical and schedule risks, which can only be minimized by completion of the requirements prior to contract award.

Section C: Qualification Requirements That Must be Satisfied to Become a Qualified Source and Qualification Waiver Requirements.

1. Prequalification Notice. The offeror shall notify AFLCMC/EBHJ CAD/PAD IPT or, if responding to a solicitation, the contracting officer in AFLCMC/PKZ of intent to qualify as a source for this item.

2. Facilities. The offeror must certify to the design control activity (AFLCMC/EBHJ CAD/PAD IPT) that they have the required facilities and equipment to manufacture, inspect, test, and package the item. The offeror shall make their facilities, equipment, tooling, and personnel available for evaluation and inspection by the government.

3. Data Verification. A qualification test procedure per DI-NDTI-80604 and a qualification test report per DI-NDTI-80604 shall be provided through the AFLCMC/EBHKB contracting office to the AFLCMC/EBHJ CAD/PAD IPT. Qualification testing must be accomplished in accordance with 68B710072.

4. Process Verification. The offeror shall identify sources for materials and standards for internally used processes. The offeror shall further define/provide written procedures for the utilization of any special test or inspection facilities and/or equipment. This documentation shall also include a diagnostic procedure showing the process the items being produced would undergo. The production process shall show how the offeror shall test, inspect, diagnose, produce and perform a final functional checkout. Development of special test procedures not available from the government is required. The offeror shall develop those procedures for review and approval by the design control activity identified in paragraph 2 above. The contractor must be capable of locating alternative components to minimize any diminishing manufacturing sources (DMS) problems.

5. Test and Evaluation or Verification. The offeror shall submit to the design control activity an explanation of how they will certify that the test methods and production procedures meet the specifications for the item. The government retains the option to inspect the offeror’s production and testing facilities. To allow for government inspection, the offeror’s facilities shall be made available to government inspection during the qualification effort upon 10 days written notice.

6. Qualification Article. Upon satisfactory compliance with the provisions of paragraphs 1 to 5 above, the offeror shall build and test the item in accordance with 68B710072 to demonstrate production capability, form and function and also provide an inert sample to demonstrate proper fit. This production and testing shall be done at the offeror’s expense.

Estimated likely costs for government-unique testing and evaluation which will be incurred by the potential offeror to become qualified: $5,000 to $50,000 +.

7. Sensitive Military Technology. Not applicable.

8. Testing and Production Evaluation. The offeror shall be required to submit a complete test report for the production capability demonstration verifying compliance with all performance, environmental, mechanical, and quality assurance requirements, including top level drawing and all related item and source control drawings. In addition the test report shall contain detailed documentation describing the testing procedures during production.

This data shall describe in detail the point(s) in the production process that testing occurred, and if failures were noted, the corrective action taken and the results of the retest. The government retains the option to inspect the production and testing process, including on-site witnessing of any or all production and testing activities. The offeror is responsible and liable for ensuring compliance with all applicable system and item requirements. The offeror will provide notification to the government of testing and evaluation 30 days in advance so the government can witness, if desired, as well as coordinate needed activities, support, etc.

9. Time Completion Estimate. The design control activity estimates completion of qualification efforts should require 360 days. This is based on complexity and hazards associated with the item and other factors. This is not a deadline but a notification to a potential offeror of the time believed to be required. Events that occur during the qualification process may increase or perhaps decrease, this time depending on individual circumstances.

10. Time Limitation. An offeror may not be denied the opportunity to submit and have considered, an offer for a contract if the offeror can demonstrate to the satisfaction of the contracting officer and cognizant engineering activity that the offeror (or its product) meets these standards for qualification or can meet them before the date specified for award of the contract. The award will not be delayed to provide the contractor with an opportunity to demonstrate its ability to meet the standard specified in this source qualification statement.

11. Evaluation of Proposals Not Previously Qualified. The offeror must be fully qualified in order to be eligible for a contract award. Therefore, the offeror must fulfill all of the requirements stated, in writing, in this Justification for Qualification Requirements before the date specified for award of the contract. The government reserves the right to award a contract at the time specified for award, to a qualified source even though other sources may not have finished qualifying.

12. Waiver. Any offeror who has had previous experience in the production of the Handles or other similar items may apply to the design control activity identified in paragraph 2 for a waiver of all or part of the above requirements. A waiver will be granted only if the design control activity can establish the qualification of the offeror from previous knowledge/interface or from written inputs from the offeror.

13. Approval. Once the qualification requirements are met, the offeror will be listed as an approved source for this item. Approval, however, does not guarantee subsequent contract award.

Approved Sources: Cage Code Vendor P/N Collins 17610 See list above CED 93455 See list above

Section D: Signatures.

6/10/2019

X dds Devin Swanson AFLCMC/EBHJ System Engineer Signed by: SWANSON.DEVIN.D.1385800432

6/11/2019

X Kevin Flinders Kevin G Flinders, NH-04, DAF Chief, Systems Support Contracting Division AFLC...

Signed by: FLINDERS.KEVIN.G.1231477949

JUSTIFICATION FOR QUALIFICATION REQUIREMENTS
Section A: Item Identification