QALI_F-16_Initiators_and_TDs.pdf

PDF 918 KB Posted

Attached to
F15/F16 Initiators Federal contract opportunity
Solicitation number
FA821321R3003
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

This document outlines quality assurance inspection requirements for several initiators and time delay devices under various part numbers for use in F-16 and F-15 aircraft. The contractor must allow inspection at mandatory points including manufacturing documentation, leak testing, x-ray or gamma ray inspection, lot acceptance testing, and preparation for shipment. Additional inspection points may be required. The related federal contract opportunity is a solicitation from the Department of the Air Force Materiel Command Lifecycle Management Center at Hill Air Force Base for F-15/F-16 initiators. No other details are provided on required products, response dates, or pricing terms.

View the file

Other files for this federal contract opportunity

Other files attached to F15/F16 Initiators, newest first.
File Type Posted
FA821321R3003 001.pdf PDF
FA821321R3003.pdf PDF
Item_Description-combined.pdf PDF
807-Combined-Update.pdf PDF
TransInstruction4.pdf PDF
JHCS-Combined.pdf PDF
ADC_SOW.pdf PDF
FA821321R3003.pdf PDF
CDRL.pdf PDF
Bid_Sets_21-50089.pdf PDF
AIR_SPEC-50089-50090.pdf PDF
SPI-F011676621.pdf PDF
Bid_Sets_20-50090.pdf PDF
CADPAD_Item_Marking_Instruction.pdf PDF
SPI-F012717161.pdf PDF
SOW.pdf PDF
REPSHIP.pdf PDF
EDL-Combined.pdf PDF
SOW_SPI.pdf PDF
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contractor Name

CAGE code

PR No. FD2020-

Date Contract Awarded

Final Delivery Date (FDD)

Program Name

DODIC

Part Number

The contractor, at a minimum, shall allow DCMA to inspect the following points:

Mandatory - M: Stamp and/ or Signature on original documentation (i.e., Mfg. Planning, ATP, FAT Report, etc.)

Witness - W: GSI required to attend per comment section.

Verification - V: Stamp and/or Signature required unless noted otherwise (may be done by written verification) Monitor - R: Will monitor testing, may reduce to verification per comment section.

Notify - N: By phone or email prior to action.

Additional requirements: (DCMA reserves the right to impose additional inspection points as deemed necessary.)

Prepared by:

Date

THIS PLANNING SHEET WILL BE UPDATED IF NECESSARY.

QUALITY ASSURANCE LETTER OF INSTRUCTION

Planning Requirements

COMMENTS

NOTICE

Engineer Signature

Rev Date: 5 May 2019

Sheet1

Text46: 05 Jun 2020
2020-06-05T13:58:10-0600
TIDWELL.QUINN.RAY.1241451913
undefined_9: N
Text32: 9. Additional Requirements
undefined_8: M
Text31: 8. Shippers (DD250, Reports)
undefined_7: M
Text30: 7. AMMO Data Card Review
undefined_6: V
Text29: 6. Preparation for Shipment
undefined_5: W
Text28: 5. LAT
undefined_4: V
Text27: 4. LAT Sample Selection
undefined_3: V
Text26: 3. X-Ray/N-Ray
undefined_2: V
Text25: 2. Leak Test
undefined: V
Text36: 1. Explosive Weight

2. Verify gross leak and fine leak check are performed.

3. Ensure film labeling correct. Ensure radiographic film is readable and well-defined. DCMA is not required to interpret film.

4. Randomly select LAT units per latest government approved ATP.

5. Testing should occur in accordance with latest government approved ATP. Prior to LAT ensure proper calibration and validation of all test equipment. Witness proper test setup and at least the first 3 functional tests. Further witnessing may be required if there are known concerns with the item or requested by Government Engineer.

6. Ensure Paperwork is correct.

7. Verify all energetic materials: list original manufacturer,original lot number, and latest certification/recertification date < 24 months.

8. Ensure Paperwork is correct. Verify Packaging, Packing, Preservation & Marking (PPP&M)

9. Any additional requirements imposed by DCMA shall be approved by Government Project Engineer

Text24: 1.Inspection
Part Number: 2651100, 6073100, 2650100, 6074100, 1220-1, 6101100-04, 1255-1, 6101100-05, 1256-1, 6101100-06, 6064200, 2293200-1
DODIC: ME35, ME34, MT57, MT58, MT65, MT62, MJ16
Text20:
Text19:
Part Number Line 2:
Contract No: 21-50089, 50090
Date Contract Awarded:
Final Delivery Date FDD:
Program Name: F-16 & F-15

File details come from the government source that posted it. Updated .