This document is a Question and Answer document related to a Request for Proposals (RFP) for an Abandoned Mine Lands Geological Analysis contract issued by the State of Nevada's Division of Minerals. The RFP is for the analysis of mineral potential and abandoned mine sites across Nevada, primarily on federal lands. The contract will involve field work using four-wheel drive vehicles and ESRI mapping software provided by the Division. The RFP has a question deadline of March 8 and the State indicates there is no preference for selecting a single or multiple consultants. The State will be responsible for obtaining access to public and private lands for the work. Vendors may modify the provided cost schedule to include additional positions and charges for support equipment.

The cost schedule allows for the use of a qualified engineer as an alternative to a geologist. There is a 5-page limit on the qualifications section, which applies separately to the prime contractor and any subcontractors. The State will not be conducting mine stability analysis as part of this contract.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Q&A

QUESTION_NBR

QUESTION_SUBJECT
QUESTION_TEXT
ANSWER_TEXT
Deadline for questions
The RFP for this project has a deadline for questions of March 8, however the website lists a deadline of March 4. Which date is correct?
March 8, is the Deadline for questions as stated in the RFP document.
Assay Data
What is the intent to collect assay data for diagnostic rock samples?

To further analyze mineral potential

Four-Wheel Drive Experience
What is acceptable proof for four-wheel drive experience?
Description of pervious work requiring four-wheel drive.
Software Information
What supplemental software, licensing, data format/schema and database connectivity information can be provided on the computer tablet that is issued by the Division of Minerals?
Currently the Division of Minerals utilizes ESRI mapping software and the field tablets will be outfitted with the necessary software to complete the field work
Location of abandoned mines
Are a majority of the identified abandoned mines on federally owned property?
The majority of the identified abandoned mines will be on federal lands.
Mine Stability Analysis
To what extent is mine stability analysis to be conducted, with respect to historical shafts/adits?
Mine stability analysis will not be conducted. Please refer to section 2.8 in the RFP.
Number of Consultants Selected
Is the States preference to have multiple consultants selected for this RFP based upon the full area of coverage?
There is no State preference on multiple or a single consultant being selected for this contract. The decision may be determined by the vendors proposed regions of work.
Surveying
Will the state require a PLS for field surveying?
No
Cost Schedule-Attachment G
Attachment G- Cost Schedule: Would a qualified Engineer be an acceptable alternate for a Geologist? Can the Cost Schedule be altered to include additional positions?
You may alter the cost schedule positions but please describe in the notes, why any change/addition in personnel away from the current cost schedule is necessary and still meets the requirements in section 2.6.
Cost Schedule-Attachment G
Attachment G- Cost Schedule: Is it allowed to attach an additional rate sheet for support equipment, i.e. GPS, off-road terrain vehicles, etc?
Attachment G has been updated. Please see the revised cost schedule to include form for additonal charges.
5-page limit
Regarding 8.2.2.6: Will this section go against the 5-page limit specified in 3.1.9?
No, this section will not go against the page limit.
Access to sites
Is the Vendor going to be responsible for obtaining consents for access to sites of public and private lands?
No. The Division of Minerals will work with the appropriate federal agencies and private land holders for access to the mine sites.
5-Page Limit
The qualifications section is limited to 5 pages. Is that 5 pages for the prime and all subconsultants, or are the subs allowed to provide 5 pages of qualifications also?
The limit is 5 pages per vendor. Subcontractors are an additional vendor.