PSB 26-1_AddendumNo.2_03192026.pdf

PDF 847 KB Posted

Attached to
PSB 26-1 Professional Services Bulletin
Solicitation number
26-557THA-ENGCO-B-51413
Issued by
Cook County, Illinois

About this file

This is Addendum No. 2 to Professional Services Bulletin 26-1 issued by the Illinois State Toll Highway Authority (Illinois Tollway) on March 19, 2026. The bulletin advertises nine professional services contracts for design, construction management, land acquisition, and facilities services across the Illinois Tollway system. Statements of Interest (SOIs) are due by 4:30:00 p.m. Central Time on March 27, 2026, submitted electronically through the Trimble Unity Construct platform. An optional pre-proposal meeting is scheduled for March 12, 2026, at 4:30 p.m. at the Crowne Plaza Chicago O'Hare Hotel in Rosemont, Illinois, with a virtual option via Microsoft Teams; both require registration. The deadline for questions is March 17, 2026, at 4:30 p.m. The nine items include construction corridor and construction management services for the Elgin O'Hare Western Access project (Item 1, estimated $75-100M), Tri-State Tollway interchange reconstruction (Item 2, estimated $25-50M), system-wide design services on-call (Item 3, $3M upper limit), facilities design services on-call (Item 4, $3M upper limit), system-wide construction management on-call (Items 5 and 6, $3M each), facilities construction management on-call (Item 7, $3M upper limit), land acquisition services on-call (Item 8, $2M upper limit), and Phase II engineering for the West Landside Reserve Area (Item 9, estimated $150-200M). Contract selection is anticipated for May 2026, with estimated Board approval in June 2026 and Notice to Proceed in August 2026. Addendum No. 2 revises the scope and prequalification requirements for Items 1 and 2, updates key personnel requirements for Item 7, and provides responses to nine submitted questions regarding DBE certification documentation, subconsultant participation, key personnel requirements, and P4G program availability.

Each contract includes Disadvantaged Business Enterprise (DBE) participation goals ranging from 19 to 30 percent and Veteran-Owned Small Business (VOSB) participation goals of 3 percent, with firms required to demonstrate good faith efforts to meet or exceed these goals or request waivers with documented justification. Firms must be prequalified by the Illinois Department of Transportation (IDOT) in specified categories and must disclose any known or potential conflicts of interest. The Direct Labor Multiplier for Phase I and II services is 2.8, and for Phase III Construction Management services is also 2.8, while personnel permanently assigned to Illinois Tollway facilities use a 2.5 multiplier. Payment will not be issued for costs incurred in the preceding calendar year if invoices are not received by February 28th of the subsequent fiscal year. Prime Consultants must self-perform no less than 40 percent of the work, and teams are limited to three participants. Required submissions include Statements of Interest with organizational charts, relevant project experience (minimum three projects from the past five years), Key Personnel resumes and availability information (Exhibits A and D), current obligations documentation (Exhibit C), DBE/VOSB participation plans with current certification letters (Exhibits F and H), vendor disclosures, and Illinois Tollway Standard Business Terms and Conditions. All SOIs must be submitted electronically through Trimble Unity Construct by the deadline, with late submissions rejected automatically.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PSB 26-1

PROFESSIONAL SERVICES BULLETIN 26-1

ADDENDUM No. 2

Professional Services Bulletin

No. 26-1 Addendum No. 2 March 19, 2026

ILLINOIS TOLLWAY website: www.illinoistollway.com

Illinois Tollway 2700 Ogden Avenue, Downers Grove, IL 60515

PSB 26-1 Addendum No. 2

Addendum No. 2 does not change the due date or time

STATEMENTS OF INTEREST (SOIs) are due by 4:30:00 p.m. (Central Time)

Due Date: March 27, 2026 Successful Firm(s) will be notified.

Overall results will be posted on the Illinois Chief Procurement Officer’s eProcurement System at: https://www.bidbuy.illinois.gov/ https://www.illinoistollway.com/ https://www.bidbuy.illinois.gov/

ADDENDUM No. 2 PROFESSIONAL SERVICES BULLETIN No 26-1

REVISION DATE: March 19, 2026

Addendum No. 2 does not change the due date or time that Statements of Interest are due.

Statements of Interest are due via the Trimble Unity Construct process: https://app.e-builder.net/ to the Illinois State Toll Highway Authority by 4:30:00 PM Central Time, March 27, 2026.

The following revisions are being made via Addendum No.2 to Professional Services Bulletin (PSB) No. 26-1. The bulletin is being reissued in its entirety with changes noted and shall supersede all prior versions. If you downloaded the bulletin prior to the noted Addendum/Revision Date, you should incorporate the revisions or download and use a new copy of the bulletin.

The revisions being made through this addendum include the following:

• Item 1, the anticipated scope and prequalification requirements have been revised.

• Item 2, the anticipated scope has been revised.

• Item 7, Key Personnel requirements have been updated.

• Exhibit A - Key Personnel, has been revised to account for updates to Item 7 and

Item 8.

QUESTIONS: The Tollway has received the following questions pertaining to PSB 26-1 via the SOI Mailbox. The Tollway offers the following responses:

Question 1: Given the ongoing transitional recertification of DBE firms, please confirm that use of firms listed in the Illinois Unified Certification Program (ILUCP) DBE Directory can be used towards DBE credit. Also confirm what documents are acceptable to show DBE status?

Answer: Please consult the Illinois Unified Certification Program (“ILUCP”) DBE Directory as a reference source for DBEs and the City of Chicago, the County of Cook M/WBE directories as reference sources for M/WBEs firms certified by the City of Chicago or the County of Cook, or the Small Business Administration SBA 8(a) directory for SBA 8(a)s certified by the Small Business Administration. Please see links below for each directory:

• ILUCP: https://webapps.dot.illinois.gov/UCP/ExternalSearch

• City of Chicago’s M/WBE Directory: https://chicago.mwdbe.com/

• County of Cook, Illinois: https://cookcounty.diversitycompliance.com/

• Small Business Administration’s SBA 8(a) Directory: https://www.sba.gov/federal-contracting/contracting-assistance-programs/8a-business-development-program Evidence of certification may include the certification letter or a screenshot/print out from the source of certification.

https://app.e-builder.net/ https://app.e-builder.net/ https://webapps.dot.illinois.gov/UCP/ExternalSearch https://chicago.mwdbe.com/ https://cookcounty.diversitycompliance.com/ https://www.sba.gov/federal-contracting/contracting-assistance-programs/8a-business-development-program https://www.sba.gov/federal-contracting/contracting-assistance-programs/8a-business-development-program

Question 2: If a firm is participating only as a subconsultant and not as the Prime Consultant, is the firm required to access eBuilder/TUC or upload any materials?

Answer: Only the Prime consultant submits the Statement of Interest and required documents through eBuilder/TUC. Subconsultants do not upload files and should coordinate with the Prime consultant in accordance with the submittal instructions of PSB 26-1.

Question 3: Can you confirm if a Project Engineer is a key personnel requirement for Item 8?

Answer: No. A Project Engineer is not required for Item 8 and Exhibit A has been updated accordingly.

Question 4: Is the Reverse P4G Program available for this PSB?

Answer: Yes. Refer to 2.6 PARTNERING FOR GROWTH PROGRAM GUIDELINES (formerly Partnership-Mentor/Protégé Program Guidelines).

Question 5: For Item 1, confirm the Tollway will allow a Prime Consultant to meet the prequalifications for Airports (Design), Structures (Highway: Complex), Structures (Railroad), Special Services (Surveying) through a sub-consultant.

Answer: The item description has been updated and the Tollway will allow a Prime Consultant to meet the prequalifications for Airports (Design), Structures (Highway: Complex), Structures (Railroad), Special Services (Surveying) through a subconsultant.

Question 6: For Item 1 the item description states "Phase II design engineering services support during construction, as outlined in Section 2.10, will be required to be performed within this contract." Are respondents required to include the original DSE in the Statement of Interest?

Answer: Firms submitting Statements of Interest will be required to perform the services outlined in Section 2.10 PHASE II: DESIGN ENGINEERING SERVICES.

Question 7: Regarding the VOSB Goal Facilitation Form posted in BidBuy, could you please clarify what actions, if any, are required of SOI submitters in response to this document?

Answer: No action is required. The form is intended to socialize current VOSB certified firms that expressed interest in possibly participating as a subconsultant or Prime for this solicitation.

Question 8: Are surveying services anticipated for Items 3 or 9?

Answer: Typical survey services to support the anticipated scope of work as described in each item should be assumed.

Question 9: Regarding the DBE and VOSB requirements:

• Given the nature of current DBE certifications, what documents are acceptable to show DBE status?

• It’s my understanding that not all firms have received responses yet regarding their required recertification following the IFR this fall. I’m also under the impression that an approval of recertification letter is not the same as a standard DBE Certification Letter.

Answer: See response to Question 1.

PSB 26-1 Page | 1

NEW TO THIS PSB

An optional In-Person Pre-Proposal meeting will be held on Thursday, March 12, 2026, at 4:30 p.m. (CT) at the following location:

Crowne Plaza Chicago O’Hare Hotel and Conference Center 5440 North River Road Rosemont, IL 60018

Register here: In-Person PSB 26-1 Pre-Proposal Meeting

A virtual option will also be provided via Microsoft Teams at:

Register here: Virtual PSB 26-1 Pre-Proposal Meeting

Please note that registration for either event is required and can be completed using the links above.

e-Builder is now Trimble Unity Construct. If you are currently registered in e-Builder, your user ID will be active in Trimble Unity Construct.

https://lp.constantcontactpages.com/ev/reg/xr9h3h5 https://events.gcc.teams.microsoft.com/event/46961d76-dd80-439c-9987-8cd774df06ce%4048475f88-04d3-4aa6-ae94-21dcfec788aa

PSB 26-1 Page | 2

TABLE OF CONTENTS

PART I: THE SCHEDULE

1.1 CONTACT INFORMATION 3

1.2 OFFICIAL NOTICE 3-4

1.3 ACCEPTANCE OF SCANNED SIGNATURES 4

1.4 PSB ITEM INDEX 5

1.5 PSB ITEM DETAILS A-1R –A-14

PART II: CONTRACT CLAUSES AND REQUIREMENTS

2.1 CONSULTANT/SUBCONSULTANT CONFLICTS OF INTEREST

WITHIN TOLLWAY PROJECTS

2.2 INSPECTOR GENERAL 7

2.3 FINANCIAL INFORMATION 7-8

2.4 ILLINOIS TOLLWAY’S CONTRACT PAYMENT POLICY 8

2.5 DISADVANTAGED BUSINESS ENTERPRISE (DBE) PARTICIPATION 8-10

2.6 PARTNERING FOR GROWTH PROGRAM GUIDELINES 10

2.7 STATE OF ILLINOIS VETERAN SMALL BUSINESS PARTICIPATION

AND UTILIZATION PLAN

2.8 TEAMING AGREEMENT

10-11 11-12

2.9 MANUALS, PROCESSES AND GUIDELINES 12

2.10 PHASE II: DESIGN ENGINEERING SERVICES 12

2.11 PHASE III: CONSTRUCTION ENGINEERING SERVICES 12-13

2.12 CONSTRUCTION AND QUALITY ASSURANCE CONSULTANTS 13

2.13 QUALITY ASSURANCE PREQUALIFICATION CATEGORY 13

2.14 CLARIFICATION OF QUALITY CONTROL/QUALITY ASSURANCE

REQUIREMENTS

2.15 CONSULTANT CONTRACT FORMS 14

2.16 SELF-PERFORMANCE 14

PART III: REPRESENTATIONS AND INSTRUCTIONS

3.1 SELECTION CRITERIA 14

3.2 SCHEDULE FOR CONSULTANT SELECTION 15

3.3 GUIDELINES FOR SUBMITTING SOI 15-17

3.4 SUBMITTAL INSTRUCTIONS 17-22

3.5 DISCLOSURES AND CERTIFICATIONS 23

3.6 PROTEST PROCEDURE 24

3.7 USEFUL LINKS 25

3.8 ILLINOIS EPROCUREMENT BIDBUY NOTICE 25

3.9 INFORMATION ON ACCESSING THE ILLINOIS TOLLWAY WEBSITE 26

3.10 FUTURE PROFESSIONAL SERVICES BULLETIN NOTIFICATIONS 27

3.11 RESERVED 27

3.12 EXCHANGES WITH FIRMS AFTER SOI SUBMISSION 28

PSB 26-1 Page | 3

PART I: THE SCHEDULE

1.1 CONTACT INFORMATION

Illinois State Toll Highway Authority (ISTHA) 2700 Ogden Avenue Downers Grove, IL 60515

PSB 26-1 Coordinator: csstaff@getipass.com

PSB 26-1 Tech Support: support@wbpmsupport.zendesk.com

PSB 26-1 Trimble Unity Construct Training: support@wbpmsupport.zendesk.com

1.2 26-1 OFFICIAL NOTICE

This Professional Services Bulletin 26-1 (PSB 26-1) is the official notice of needed professional services for the Illinois State Toll Highway Authority (“Illinois Tollway”, “Tollway”), as authorized by the Architectural, Engineering, and Land Surveying Qualifications Based Selection Act, (30 ILCS 535/1, et seq.). This PSB contains information pertaining to the advertisement for Statements of Interest (SOI) and is part of the Chief Procurement Officer eProcurement System for the Illinois State Toll Highway Authority. PSB 26-1, including all Exhibits and forms, is available on the Illinois Tollway’s website at: https://www.illinoistollway.com/doing-business/construction-engineering/bids-bulletins-awards. Additional information is also posted on the Illinois Chief Procurement Officer’s eProcurement System at: https://www.bidbuy.illinois.gov/. For instructions on accessing the Illinois Tollway website, PSB, and Exhibits please refer to the Table of Contents. Instructions on receiving procurement opportunities are included in the “Illinois eProcurement BidBuy Notice” section of this PSB.

1.2.1 PSB 26-1 SUMMARY

Information for the Trimble Unity Construct process for PSB 26-1 can be found in the Public Folder at:

https://app.e-builder.net/public/publicLanding.aspx?QS=8b550cb238ba4d768a53aa87d3c9cdcd

You will need the following before you can submit an SOI in Trimble Unity Construct:

• Trimble Unity Construct resources, including PSB SOI user manual, FAQ file, and videos (see

Public Folder link above)

• Webinar Training (see Section 3.7 Useful Links for training webinar registration link)

• Trimble Unity Construct Login ID (see Section 3.4 Submittal Instructions)

• Firm Code Name (see Section 3.4 Submittal Instructions)

An optional In-Person Pre-Proposal meeting will be held on Thursday, March 12, 2026, at 4:30 p.m.

(CT) at the following location:

Crowne Plaza Chicago O’Hare Hotel and Conference Center 5440 North River Road Rosemont, IL 60018 Register here: In-Person PSB 26-1 Pre-Proposal Meeting

A virtual option will also be provided via Microsoft Teams.

Register here: Virtual PSB 26-1 Pre-Proposal Meeting

Please note that registration for either event is required and can be completed using the links above.

mailto:csstaff@getipass.com mailto:support@wbpmsupport.zendesk.com mailto:support@wbpmsupport.zendesk.com https://www.illinoistollway.com/doing-business/construction-engineering/bids-bulletins-awards https://www.illinoistollway.com/doing-business/construction-engineering/bids-bulletins-awards https://www.illinoistollway.com/doing-business/construction-engineering/bids-bulletins-awards http://www.purchase.state.il.us/ https://app.e-builder.net/public/publicLanding.aspx?QS=8b550cb238ba4d768a53aa87d3c9cdcd https://lp.constantcontactpages.com/ev/reg/xr9h3h5 https://events.gcc.teams.microsoft.com/event/46961d76-dd80-439c-9987-8cd774df06ce%4048475f88-04d3-4aa6-ae94-21dcfec788aa

PSB 26-1 Page | 4

All questions related to this PSB must be submitted electronically through the Trimble Unity Construct SOI Mailbox at PSB_Project_26-1.01_Questions_and_RFIs@docs.e-builder.net no later than March 17, 2026 at 4:30:00 pm (CT). The subject line should read: PSB 26-1 Question. Answers will be addressed via an Addendum published on the Tollway website and the Illinois eProcurement site, BidBuy. For Trimble Unity Construct technical questions, please contact the Trimble Unity Construct PSB Tech Support:

support@wbpmsupport.zendesk.com.

This is not an invitation for bids. Consultants properly prequalified for the projects listed herein may indicate their desire to be considered for selection by submitting an SOI to the Illinois Tollway via the Trimble Unity Construct PSB 26-1 SOI process.

The Illinois Tollway follows the Qualifications Based Selection (QBS) process mandated by Illinois statute (30 ILCS 535): Architectural, Engineering, and Land Surveying Qualifications Based Selection Act for selecting qualified Consultants under this PSB.

1.3 ACCEPTANCE OF SCANNED SIGNATURES

Unless otherwise specified, the parties agree that proposals, contracts, certifications and disclosures, and other contract related documents to be entered into in connection with the resulting contract will be considered signed when the signature of a party is delivered by scanned image (e.g. .pdf or .tiff file extension name) as an attachment to the Trimble Unity Construct PSB SOI process. Such scanned signature will be treated in all respects as having the same effect as an original signature.

mailto:PSB_Project_26-1.01_Questions_and_RFIs@docs.e-builder.net mailto:support@wbpmsupport.zendesk.com

PSB 26-1 Page | 5

1.4 PROFESSIONAL SERVICES BULLETIN NO. 26-1 ITEM INDEX

No. Project No. /

County

Description

Page No.

I-26-2039 DuPage and Cook Counties

Elgin O'Hare Western Access (IL 390/I-490), Construction Corridor Manager and Construction Manager (CCM/CM)

A-1R–A-3R

I-26-2040 DuPage and Cook Counties

Tri-State Tollway (I-294), Interchange Reconstruction, Asphalt Overlay and Pavement Marking, Cermak Plaza 35 (MP 30.0) to North Avenue (MP 33.5), Construction Management Services

A-4R–A-5R

RR-26-2041

Systemwide

Systemwide, Design Services Upon Request On-call and as-needed Phase II Engineering Services.

A-6

RR-26-9312

Systemwide

Systemwide, Facilities Design Services Upon Request On-call and as-needed Phase II Engineering Services.

A-7

RR-26-2042

Systemwide

Systemwide, Construction Management Services Upon Request On-call and as-needed Construction Management Services.

A-8

RR-26-2043

Systemwide

Systemwide, Construction Management Services Upon Request

A-9

RR-26-2044

Systemwide

Systemwide, Facilities Construction Management Services Upon Request

A-10R

I-26-2045 Systemwide

Land Acquisition Services Upon Request On-call and as-needed Land Acquisition Services.

A11-A12

I-26-2046 DuPage/Cook

Elgin O’Hare Western Access (I-490), West Landside Reserve Area, Phase II Engineering Services.

A13-A14

1.5 PSB ITEM DETAILS

1.5.1 Item 1: I-26-2039, Elgin O'Hare Western Access (IL 390/I-490), Construction Corridor Manager and Construction Manager (CCM/CM).

This project has a 28% D/M/WBE participation goal and 3% VOSB participation goal.

Construction Corridor Management Services and Construction Management Services (CCM/CM) are required for the Elgin O’Hare Western Access (I-490) corridor. The CCM/CM shall provide services as directed by the Tollway. The project limits for CCM services are anticipated to include the entire I-490 corridor and all projects included in this corridor. In addition, select projects along the Illinois Route 390 corridor may be included as determined at the time of negotiations.

Construction Corridor Management Services

The work encompassing construction corridor management services shall include but not be limited to the following:

1. Overseeing delivery of the I-490 project which includes assuming full responsibility for the schedule and budget.

2. Coordinating with Phase III Construction Management (CM) consultants to ensure that CM services are performed consistent with Tollway and corridor requirements.

3. Constructability review of contracts under design.

4. Review of packaging and timing of contracts under design.

5. Construction claims, tracking, review and resolution.

6. Serve as the Tollway’s representative, along with the Tollway’s Project Manager, on any construction/coordination committees with outside agencies and/or entities. These services shall include providing a communications plan and preparing materials for presentations and meetings as necessary.

7. Public coordination support which shall include regular review of project information included on the Tollway website. This shall also include leading Local Advisory Committee coordination under the direction of the Tollway.

8. Airport coordination services, including communication with the Chicago Department of Aviation and Federal Aviation Administration related to project status, activities planned within or near the secured area of O’Hare International Airport, and all other necessary services to ensure adherence to all applicable requirements.

9. Industry Coordination.

10. Coordination with the Design Corridor Manager (DCM) which shall include specific coordination relative to the corridor schedule, budget and overall delivery per established timelines.

11. Coordination with the Railroad Executive Coordinator related to railroad impacts on corridor schedule, phasing, and changes during construction.

12. Supporting and providing materials for, as necessary, railroad coordination being provided by others.

Construction Management Services

Construction Management services are required for construction inspection and supervision for the I-490 Bensenville Yard Overpass from Franklin Avenue to IL 19 under construction contract I-20-4727. Additional inspection services may also be required for other construction contracts within the corridor. The work is ongoing and is expected to be completed in 2028.

The Consultant will perform on-site inspection, review layout of contract work, provide geotechnical inspection and testing, prepare records, maintain documentation, submit pay estimates, and change orders and any other duties requiring the services of an engineer to complete this project on a timely basis and in accordance with Tollway specifications and the Construction Manager’s Manual. The Consultant must complete and submit final measurements, calculations, and final contract documents to the Tollway no later than six (6) weeks after completion of the Punch List for the project.

Phase II design engineering services support during construction as outlined in Section 2.10 will be required to be performed within this contract.

Construction Management Services Construction Estimate: Category D

PSB 26-1 Page | A-1R P

Firms must be prequalified by IDOT in the following categories:

Highways (Freeways) Airports (Design) Structures (Highway: Complex) Structures (Railroad) Special Services (Construction Inspection) Special Services (Surveying)

The Tollway will allow a Prime consultant to meet the prequalifications for Airports (Design), Structures (Highway:

Complex), Structures (Railroad), Special Services (Surveying) through a subconsultant.

Key personnel listed in Exhibit A for this project must include:

• Project Manager (must be an Illinois Licensed Professional Engineer)

• Construction Corridor Manager (must be an Illinois Licensed Professional Engineer).

• Construction Engineer, who will be responsible for reviewing the constructability of the contract plans

(must be an Illinois Licensed Professional Engineer).

• Resident Engineer

• Materials Coordinator

• Document Technician (The person actively performing the documentation on the project must possess a current IDOT Construction Documentation certificate. Include the Documentation Certificate Number for IDOT.)

• Materials QA Technician

• Scheduler

Please see the following revisions (in bold italics) to Section 3.3 GUIDELINES FOR SUBMITTING STATEMENTS OF INTEREST (SOI) of this PSB Item only.

3.3.2.3, Section 1. Executive Summary (limit of 10 pages)

3.3.2.3 Section 1, F. Project Approach (include brief statement of firm’s unique qualifications and experience, approach to the project’s specific challenges such as maintenance of traffic, environmental constraints, budget constraints, schedule and budget risks, schedule constraints and design challenges). Include a project team matrix that clearly illustrates the key personnel and subconsultants included in the organizational structure proposed to accomplish the management, technical, and administrative services required, etc. Project Approach should also include the following:

Method for Providing CCM Services The firm shall propose their method for providing Construction Corridor Management services; however, in general, the Tollway is interested in how the Consultant will address the following:

1. Staffing: This includes interaction and integration of the firm’s team with the Tollway’s employees.

2. A description of how the firm plans to coordinate with the Railroad Executive Coordinator, General Engineering Consultant, Traffic Engineer and Program Management Office teams.

3. A description of how the firm plans to coordinate with existing and future Construction Management contracts, the Design Section Engineers and the Design Corridor Manager.

4. A description of how the firm plans to coordinate with existing and future Construction contracts.

5. Maintenance of Traffic: This includes a description of how the firm plans to monitor and coordinate maintenance of traffic during construction, and a description of potential issues and how they would address them during construction. This shall include the proposed approach to the opening of sections of the I-490 corridor when completed.

6. Utilities: This includes a description of how the firm plans to coordinate and mitigate utility issues during construction.

7. Communication: Provide a description of the firm’s communication plan during construction, including how it will coordinate with the Tollway’s Communication Department on lane closures and other construction activities to support public outreach, as well as how the firm will communicate with the Tollway overall.

PSB 26-1 Page | A-2R

Section 3. Relevant Project Experience

For CM Services: Include a minimum of three (3) relevant projects of equal or greater complexity accomplished within the past five (5) years, demonstrating the firm’s experience in the type of work required for this project. Color graphics and photographs may be sent with the files.

For CCM Services: The firm should describe its experience in providing project management and coordination services similar to the services required and described above. This description should specifically address the firm's record in delivering completed projects on time and on budget.

The firm should summarize any relevant experience working with transportation agencies and other governmental bodies operating in this region and/or with which the Tollway regularly works or interacts, including the Illinois Department of Transportation (IDOT), the Federal Highway Administration (FHWA), the Environmental Protection Agency, the Chicago Department of Aviation (CDA), Federal Aviation Administration (FAA) and the United States Army Corps of Engineers. The summary of experience should include airport design and coordination experience including modeling airspace 7460, navigational aids and airport policies and procedures including dig books and security requirements.

Include performance ratings for past work done for the Illinois Tollway, IDOT, or any other government agencies or public bodies, if applicable.

For definitions and requirements please see the Illinois Tollway Construction Manager’s manual found on the Illinois Tollway website at:

https://www.illinoistollway.com/doing-business/construction-engineering/manuals-processes-guidelines#Manuals

Schedule: This project is scheduled to start in 2026. Construction of this project is ongoing and scheduled to be completed by 2030.

The Consultant must comply with the current edition of the Illinois Tollway’s Computer Aided Design and Drafting (CADD) Standards Manual available on the Illinois Tollway’s website. This project will be managed through the Tollway’s web-based project management system. The Consultant will be required to participate in these procedures and will receive training on the system. The Tollway will furnish the Consultant with guidelines for the Consultant’s Quality Program (CQP). The CQP is due fourteen (14) days after Notice to Proceed. The Consultant who is selected for this project will be notified and scheduled to attend a scope briefing with the Illinois Tollway.

PSB 26-1 Page | A-3R https://www.illinoistollway.com/doing-business/construction-engineering/manuals-processes-guidelines#Manuals https://www.illinoistollway.com/doing-business/construction-engineering/manuals-processes-guidelines#Manuals https://www.illinoistollway.com/doing-business/construction-engineering/manuals-processes-guidelines#Manuals

1.5.2 Item 2: I-26-2040, Tri-State Tollway (I-294), Interchange Reconstruction, Asphalt Overlay and Pavement Marking, Cermak Plaza 35 (MP 30.0) to North Avenue (MP 33.5), Construction Management Services.

This project has a 29% D/M/WBE participation goal and 3% VOSB participation goal.

Phase III engineering services are required for construction inspection and supervision on the Central Tri- State Tollway (I-294) from Cermak Plaza 35 to North Avenue, in DuPage and Cook Counties.

The work generally encompasses roadway, bridge and ramp reconstruction and widening, retaining wall construction, noise abatement wall construction, mainline, shoulder and ramp asphalt overlay, drainage improvements, landscape improvements, lighting and Intelligent Transportation Systems (ITS), pavement marking and signing installation, maintenance of traffic, erosion and sediment control and other associated work included for the following four projects:

• Completion of remaining interchange construction between Cermak Plaza 35 and St. Charles Road under construction contract I-21-4836. This work is ongoing and is expected to be completed in summer 2027.

• Asphalt overlay and pavement marking improvements Cermak Road to North Avenue

• Local road rehabilitation

• Landscape planting improvements

The Consultant will perform on-site inspection, review layout of contract work, provide geotechnical inspection and testing, prepare records, maintain documentation, submit pay estimates and perform any other duties requiring the services of an engineer to complete this project on a timely basis and in accordance with Tollway specifications. The Consultant may be required to review pre-final contract documents submitted to the Tollway. The Consultant must complete and submit final measurements, calculations and final contract documents to the Tollway no later than six (6) weeks after completion of punchlist work for the project.

Construction Estimate: Category B

Firms must be prequalified by IDOT in the following category:

Special Services (Construction Inspection) Structures (Highway Bridges: Complex)

The Tollway will allow a Prime consultant to meet the prequalifications for Structures (Highway Bridges:

Complex) through a subconsultant.

Key personnel listed on Exhibit A for this project must include:

• Project Manager (must be an Illinois Licensed Professional Engineer)

• Resident Engineer

• Materials Coordinator

• Document Technician (The person actively performing the documentation on the project must possess a current IDOT Construction Documentation certificate. Include the Documentation Certificate Number for IDOT.)

• Materials QA Technician

• Scheduler

The Resident Engineer for construction contract I-21-4836 will be provided by others through Summer 2027.

For definitions and requirements please see the Illinois Tollway Construction Manager’s manual found on the Illinois Tollway website at:

https://www.illinoistollway.com/doing-business/construction-engineering/manuals-processes-guidelines#Manuals

Schedule: This project is scheduled to start in 2026. The substantial completion date for this project will be approximately 24 months after authorization to proceed.

The Consultant must comply with the current edition of the Illinois Tollway’s Computer Aided Design and Drafting (CADD) Standards Manual available on the Illinois Tollway’s website. This project will be managed

PSB 26-1 Page | A-4R https://www.illinoistollway.com/doing-business/construction-engineering/manuals-processes-guidelines#Manuals https://www.illinoistollway.com/doing-business/construction-engineering/manuals-processes-guidelines#Manuals https://www.illinoistollway.com/doing-business/construction-engineering/manuals-processes-guidelines#Manuals through the Tollway’s web-based project management system. The Consultant will be required to participate in these procedures and will receive training on the system. The Tollway will furnish the Consultant with guidelines for the Consultant’s Quality Program (CQP). The CQP is due fourteen (14) days after Notice to Proceed. The Consultant who is selected for this project will be notified and scheduled to attend a scope

PSB 26-1 Page | A-5R

1.5.3 Item 3: RR-26-2041, Systemwide, Design Services Upon Request.

This project has a 28% D/M/WBE participation goal and 3% VOSB participation goal.

Phase II engineering services are required for preparation of contract plans, performing engineering studies and providing other technical services as directed by the Illinois Tollway. Tasks will include design for projects identified by the Tollway, and may include, but not be limited to the following:

1. Pavement Repairs

2. Bridge Repairs

3. Pavement Marking Improvements

4. On call and as-needed work on the Tollway system

The upper limit of compensation will be set at $3,000,000 to be authorized for use as needed.

The Prime Consultant must be prequalified by IDOT in the following categories:

Highways (Freeways) Structures (Highway Bridges: Typical)

The Tollway will allow a Prime Consultant to meet the prequalification for Structures (Highway Bridges:

Typical) through a subconsultant.

Key personnel listed on Exhibit A for this project must include:

• Project Manager (must be an Illinois Licensed Professional Engineer)

• Project Engineer, who is directly involved in the development of the contract documents (must be an

Illinois Licensed Professional Engineer)

• Roadway designer, who will be responsible for roadway design related issues (must be an Illinois

Licensed Professional Engineer)

• Structural designer, who will be responsible for structural design related issues (must be an Illinois

Licensed Structural Engineer)

• QC/QA reviewer of all milestone submittals, who must be an Illinois Licensed Professional Engineer for roadway elements, or an Illinois Licensed Structural Engineer for structural elements

Schedule: This project is scheduled to start in 2026. The substantial completion date for this project will be approximately 60 months after authorization to proceed.

The Consultant must comply with the current edition of the Illinois Tollway’s Computer Aided Design and Drafting (CADD) Standards Manual available on the Illinois Tollway’s website. This project will be managed through the Tollway’s web-based project management system. The Consultant will be required to participate in these procedures and will receive training on the system. The Tollway will furnish the Consultant with guidelines for the Consultant’s Quality Program (CQP). The CQP is due fourteen (14) days after Notice to Proceed. The Consultant who is selected for this project will be notified and scheduled to attend a scope

PSB 26-1 Page | A-6

1.5.4 Item 4: RR-26-9312, Systemwide, Facilities Design Services Upon Request.

This project has a 19% D/M/WBE participation goal and 3% VOSB participation goal.

Phase II engineering services are required for preparation of contract plans, performing engineering studies and providing other technical services as directed by the Illinois Tollway. Tasks will include design for projects at facilities identified by the Tollway, and may include, but not be limited to the following:

1. Facility Repairs

2. Design support for Job Order Contracting (JOC) projects

3. On call and as-needed work on the Tollway system

The upper limit of compensation will be set at $3,000,000 to be authorized for use as needed.

The Prime Consultant must be prequalified by IDOT in the following categories:

Special Services (Architecture) Special Services (Electrical Engineering) Special Services (Mechanical Engineering)

The Tollway will allow a Prime Consultant to meet the prequalification for Special Services (Electrical Engineering) and Special Services (Mechanical Engineering) through a subconsultant.

Key personnel listed on Exhibit A for this project must include:

• Project Manager (must be an Illinois Licensed Professional Engineer)

• Project Engineer, who is directly involved in the development of the contract documents (must be an

Illinois Licensed Professional Engineer)

• Architect, who will be responsible for architectural related issues (must be an Illinois Licensed

Professional Architect)

• Electrical designer, who will be responsible for electrical design related issues (must be an Illinois

Licensed Professional Engineer)

• Mechanical designer, who will be responsible for mechanical design related issues (must be an

Illinois Licensed Professional Engineer)

• QC/QA reviewer of all milestone submittals, who must be an Illinois Licensed Professional Engineer for roadway elements, or an Illinois Licensed Structural Engineer for structural elements

Schedule: This project is scheduled to start in 2026. The substantial completion date for this project will be approximately 60 months after authorization to proceed.

The Consultant must comply with the current edition of the Illinois Tollway’s Computer Aided Design and Drafting (CADD) Standards Manual available on the Illinois Tollway’s website. This project will be managed through the Tollway’s web-based project management system. The Consultant will be required to participate in these procedures and will receive training on the system. The Tollway will furnish the Consultant with guidelines for the Consultant’s Quality Program (CQP). The CQP is due fourteen (14) days after Notice to Proceed. The Consultant who is selected for this project will be notified and scheduled to attend a scope

PSB 26-1 Page | A-7

1.5.5 Item 5: RR-26-2042, Systemwide, Construction Management Services Upon Request.

This project has a 30% D/M/WBE participation goal and 3% VOSB participation goal.

Phase III engineering services are required for the construction inspection and supervision at selected locations on the Tollway system. Task orders under the blanket agreement will be negotiated and authorized by the Tollway on an as-needed basis. Typical tasks will include projects that are required for the Tollway system, and may include, but not be limited to the following projects:

1. Pavement repairs

2. Bridge repairs

3. On call and as-needed work related to the Tollway System.

The upper limit of compensation will be set at $3,000,000.00 to be authorized for use as individual projects are needed.

The Consultant will perform on-site inspection, review layout of contract including design changes, provide geotechnical inspection and testing, prepare records, maintain documentation, submit pay estimates, and change orders and any other duties requiring the services of an engineer to complete this project on a timely basis and in accordance with Tollway specifications. The Consultant may be required to review and make comments on Pre-Final Design Plans submitted to the Tollway for constructability. The Consultant must complete and submit final measurements, calculations, and final contract documents to the Tollway no later than six (6) weeks after completion of Punch List for the project.

The Prime Consultant must be prequalified by IDOT in the following category:

Structures (Highway Bridges: Typical)

The Tollway will allow a Prime Consultant to meet the prequalification category requirement for Structures (Highway Bridges: Typical) through a subconsultant.

Key personnel listed on Exhibit A for this project must include:

• Project Manager (must be an Illinois Licensed Professional Engineer)

• Resident Engineer

• Materials Coordinator

• Document Technician (The person actively performing the documentation on the project must possess a current IDOT Construction Document certificate. Include the Documentation Certificate Number for IDOT.)

• Materials QA Technician

For definitions and requirements please see the Illinois Tollway Construction Managers manual found on the Illinois Tollway website at:

https://www.illinoistollway.com/doing-business/construction-engineering/manuals-processes-guidelines#Manuals

Schedule: This project is scheduled to start in 2026. The substantial completion date for this project will be

The Consultant must comply with the current edition of the Illinois Tollway’s Computer Aided Design and Drafting (CADD) Standards Manual available on the Illinois Tollway’s website. This project will be managed through the Tollway’s web-based project management system (WBPM). The Consultant will receive WBPM system training and will be required to utilize the WBPM system as part of the delivery of services. The Tollway will furnish the Consultant with guidelines for the Consultant’s Quality Program (CQP). The CQP is due fourteen (14) days after Notice to Proceed. The Consultant who is selected for this project will be notified and scheduled to attend a scope briefing with the Illinois Tollway.

PSB 26-1 Page | A-8 https://www.illinoistollway.com/doing-business/construction-engineering/manuals-processes-guidelines#Manuals https://www.illinoistollway.com/doing-business/construction-engineering/manuals-processes-guidelines#Manuals https://www.illinoistollway.com/doing-business/construction-engineering/manuals-processes-guidelines#Manuals

1.5.6 Item 6: RR-26-2043, Systemwide, Construction Management Services Upon Request.

Phase III engineering services are required for the construction inspection and supervision at selected locations on the Tollway system. Task orders under the blanket agreement will be negotiated and authorized by the Tollway on an as-needed basis. Typical tasks will include projects that are required for the Tollway system, and may include, but not be limited to the following projects:

1. Pavement repairs

2. Bridge repairs

3. Surety and warranty repairs

4. On call and as-needed work related to the Tollway System.

The upper limit of compensation will be set at $3,000,000.00 to be authorized for use as individual projects

The Consultant will perform on-site inspection, review layout of contract including design changes, provide geotechnical inspection and testing, prepare records, maintain documentation, submit pay estimates, and change orders and any other duties requiring the services of an engineer to complete this project on a timely basis and in accordance with Tollway specifications. The Consultant may be required to review and make comments on Pre-Final Design Plans submitted to the Tollway for constructability. The Consultant must complete and submit final measurements, calculations, and final contract documents to the Tollway no later

Structures (Highway Bridges: Typical)

The Tollway will allow a Prime Consultant to meet the prequalification category requirement for Structures (Highway Bridges: Typical) through a subconsultant.

Key personnel listed on Exhibit A for this project must include:

• Project Manager (must be an Illinois Licensed Professional Engineer)

• Resident Engineer

• Materials Coordinator

• Document Technician (The person actively performing the documentation on the project must possess a current IDOT Construction Document certificate. Include the Documentation Certificate Number for IDOT.)

• Materials QA Technician

For definitions and requirements please see the Illinois Tollway Construction Managers manual found on the Illinois Tollway website at:

https://www.illinoistollway.com/doing-business/construction-engineering/manuals-processes-guidelines#Manuals

Schedule: This project is scheduled to start in 2026. The substantial completion date for this project will be

The Consultant must comply with the current edition of the Illinois Tollway’s Computer Aided Design and Drafting (CADD) Standards Manual available on the Illinois Tollway’s website. This project will be managed through the Tollway’s web-based project management system (WBPM). The Consultant will receive WBPM system training and will be required to utilize the WBPM system as part of the delivery of services. The Tollway will furnish the Consultant with guidelines for the Consultant’s Quality Program (CQP). The CQP is due fourteen (14) days after Notice to Proceed. The Consultant who is selected for this project will be notified

PSB 26-1 Page | A-9 https://www.illinoistollway.com/doing-business/construction-engineering/manuals-processes-guidelines#Manuals https://www.illinoistollway.com/doing-business/construction-engineering/manuals-processes-guidelines#Manuals https://www.illinoistollway.com/doing-business/construction-engineering/manuals-processes-guidelines#Manuals

1.5.7 Item 7: RR-26-2044, Systemwide, Facilities Construction Management Services Upon Request.

Phase III engineering services are required for the construction inspection and supervision at selected locations for projects related to facilities on the Tollway system. Task orders under the blanket agreement will be negotiated and authorized by the Tollway on an as-needed basis. Typical tasks will include projects that are required for the Tollway system, and may include, but not be limited to the following projects:

1. Facility repairs

2. Building improvements

3. On call and as-needed work related to the Tollway System.

The upper limit of compensation will be set at $3,000,000.00 to be authorized for use as individual projects

The Consultant will perform on-site inspection, review layout of contract including design changes, provide geotechnical inspection and testing, prepare records, maintain documentation, submit pay estimates, and change orders and any other duties requiring the services of an engineer to complete this project on a timely basis and in accordance with Tollway specifications. The Consultant may be required to review and make comments on Pre-Final Design Plans submitted to the Tollway for constructability. The Consultant must complete and submit final measurements, calculations, and final contract documents to the Tollway no later

Key personnel listed on Exhibit A for this project must include:

• Project Manager (must be an Illinois Licensed Professional Engineer)

• Resident Engineer

• Materials Coordinator

• Building Construction Inspector

• Document Technician (The person actively performing the documentation on the project must possess a current IDOT Construction Document certificate. Include the Documentation Certificate Number for IDOT.)

• Materials QA Technician

For definitions and requirements please see the Illinois Tollway Construction Managers manual found on the Illinois Tollway website at:

https://www.illinoistollway.com/doing-business/construction-engineering/manuals-processes-guidelines#Manuals

The Building Construction Inspector shall have demonstrated experience in managing, overseeing, or inspecting building construction projects. The Inspector shall be knowledgeable in structural, architectural, mechanical, electrical, and plumbing systems, as well as applicable building codes, materials, and construction requirements.

Schedule: This project is scheduled to start in 2026. The substantial completion date for this project will be approximately 60 months after authorization to proceed.

The Consultant must comply with the current edition of the Illinois Tollway’s Computer Aided Design and Drafting (CADD) Standards Manual available on the Illinois Tollway’s website. This project will be managed through the Tollway’s web-based project management system (WBPM). The Consultant will receive WBPM system training and will be required to utilize the WBPM system as part of the delivery of services. The Tollway will furnish the Consultant with guidelines for the Consultant’s Quality Program (CQP). The CQP is due fourteen (14) days after Notice to Proceed. The Consultant who is selected for this project will be notified

PSB 26-1 Page | A-10R https://www.illinoistollway.com/doing-business/construction-engineering/manuals-processes-guidelines#Manuals https://www.illinoistollway.com/doing-business/construction-engineering/manuals-processes-guidelines#Manuals https://www.illinoistollway.com/doing-business/construction-engineering/manuals-processes-guidelines#Manuals

1.5.8 Item 8: I-26-2045, Land Acquisition Services Upon Request.

This project has a 26% D/M/WBE participation goal and 3% VOSB participation goal.

Land acquisition and surveying services are required on the Tollway system. Task orders under the blanket agreement will be negotiated and authorized by the Tollway on an as-needed basis. The Tollway may assign tasks for the purpose of obtaining land acquisition services and may include preparation and review of plats and legal descriptions, engineering surveys, engineering plan review, specialty reports, aerial surveys, plats of highways, title work (title commitments, later dates, title policies, etc.), appraisals, review appraisals, negotiations, and relocation assistance as well as other related professional services that support land acquisition, surveying, or project delivery needs.

The upper limit of compensation will be set at $2,000,000 to be authorized for use as needed.

The Prime Consultant must be prequalified by IDOT in the following categories:

Special Services (Surveying) Specialty Agents (Appraiser) Specialty Agents (Negotiator) Specialty Agents (Relocation Agent) Specialty Agents (Review Appraiser)

The Tollway will allow a Prime Consultant to meet the prequalification category requirement for Specialty Agents (Appraiser), Specialty Agents (Negotiator), Specialty Agents (Relocation Agent) and Specialty Agents (Review Appraiser) through a subconsultant.

In addition to the above prequalification, the Tollway prefers that the Firms (or their subconsultants) have experience and knowledge of the Illinois Toll Highway Act (Toll Highway Act, 605 ILCS 10/), the Illinois Eminent Domain Act (735 ILCS30/), The Federal Uniform Relocation Assistance and Real Property Acquisition Policy Act, as amended, Public Law 91-646 and the implementing regulations in 49 CFR Part 24.

• Project Manager (must be an Illinois Licensed Professional Engineer or Illinois Licensed Professional Land Surveyor)

• Surveyor, who will assume the duties for land surveying (must be an Illinois Licensed Professional Land Surveyor)

• Appraiser, who will prepare appraisals related to land acquisition required in conjunction with Tollway projects or other land related issues as necessary

• Review Appraiser who will perform review of appraisals performed by others related to land acquisition or other land related issues as necessary

• Title Specialist, the person(s) responsible for performing title work related to land acquisition or other land related issues as necessary; the work shall include review of title commitments and other work associated with land acquisition closings

• QC/QA reviewer

The Appraiser, Review Appraiser, Negotiator and Relocation Agent must be prequalified on IDOT’s Land Acquisition Services Approved Specialty Agent List.

The consultant providing title work must be registered with the State of Illinois by an Illinois-licensed title insurance underwriter and be currently and duly authorized by the State of Illinois to act as an escrow agent.

The consultant providing title work must also have a minimum of ten (10) years’ experience providing title insurance services with five (5) years’ experience in providing title services to the right of way industry and title services in Illinois specifically in Cook County, DuPage County, Will County, Kane County, Lake County, McHenry County, Boone County, Winnebago County, DeKalb County, Ogle County, Lee County, and Whiteside County.

Any Specialty Report work that may be required will require work to be performed by a Specialty Agent, who is typically a Professional Engineer, Professional Structural Engineer, Professional Land Surveyor, Architect, or appropriately licensed person(s) in that specific field where more investigation/study is required to complete

PSB 26-1 Page | A-11 the valuation of a parcel. These personnel may be required under this contract, but are not required to be listed on Exhibit A.

Schedule: This project is scheduled to start in 2026. The substantial completion date for this project will be approximately 60 months after authorization to proceed.

The Consultant must comply with the current edition of the Illinois Tollway’s Computer Aided Design and Drafting (CADD) Standards Manual available on the Illinois Tollway’s website. This project will be managed through the Tollway’s web-based project management system. The Consultant will be required to participate in these procedures and will receive training on the system. The Tollway will furnish the Consultant with guidelines for the Consultant’s Quality Program (CQP). The CQP is due fourteen (14) days after Notice to Proceed. The Consultant who is selected for this project will be notified and scheduled to attend a scope

PSB 26-1 Page | A-12

1.5.9 Item 9: I-26-2046, Elgin O’Hare Western Access (I-490): West Landside Reserve Area, Phase II Engineering Services.

This project has a 22% D/M/WBE participation goal and 3% VOSB participation goal.

Phase II engineering services are required for the preparation of engineering studies, contract drawings, specifications, and providing other technical services as directed by the Illinois Tollway for surface transportation improvements located immediately east of the I-490 and IL 390 interchange in DuPage County and Cook County, Illinois.

The Consultant will be required to have experience with design and construction adjacent to O’Hare International…

This is the start of the file's text. The full file is on GovTribe.