This document is a Professional Services Bulletin (PSB 25-1) issued by the Illinois State Toll Highway Authority (Illinois Tollway) located in Downers Grove, Illinois. The bulletin solicits Statements of Interest (SOIs) from prequalified engineering and consulting firms for various professional services across multiple transportation infrastructure projects in Illinois, including Cook, DuPage, Lake, Winnebago, Boone, DeKalb, Kane, and Will Counties.
The bulletin outlines 16 separate professional service projects ranging from Phase II engineering services for bridge reconstructions, roadway rehabilitation, plaza improvements, and design services to Phase III construction management services. The projects involve work on multiple tollways including the Tri-State Tollway (I-294), Jane Addams Memorial Tollway (I-90), Reagan Memorial Tollway (I-88), Veterans Memorial Tollway (I-355), and Illinois Route 390. The construction estimate categories range from $0M to over $200M, with specific Disadvantaged Business Enterprise (DBE) and Veteran-Owned Small Business (VOSB) participation goals for each project. Consultants must be prequalified by the Illinois Department of Transportation (IDOT) and are required to self-perform at least 40% of the work, with submissions due by March 14, 2025.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PSB 25-1
PROFESSIONAL SERVICES BULLETIN 25-1
Addendum No. 3
Addendum No. 3 does not change the due date or time.
STATEMENTS OF INTEREST (SOIs) are due by 4:30:00 p.m. (Central Time)
Due Date: March 14, 2025
Successful Firm(s) will be notified.
Overall results will be posted on the Illinois Chief Procurement Officer’s eProcurement
System at: https://www.bidbuy.illinois.gov/
Professional Services Bulletin
No. 25-1 March 6, 2025
ILLINOIS TOLLWAY website: www.illinoistollway.com
Illinois Tollway 2700 Ogden Avenue, Downers Grove, IL 60515
PSB 25-1 March 6, 2025
ADDENDUM No. 3
REVISION DATE: March 6, 2025 PROFESSIONAL SERVICES BULLETIN No 25-1
Addendum No. 3 does not change the due date or time. Statements of Interest are due via the Trimble Unity Connect process: http://www.e-builder.net to the Illinois State Toll Highway Authority, by 4:30:00 p.m. Central Time, March 14, 2025.
QUESTIONS: The Tollway has received the following questions to PSB 25-1 via the SOI Mailbox. The Tollway offers the following responses:
Question 1: For Items 13 and 14, is a Scheduler required as Key Personnel? If so, are there specific certifications or qualifications needed for this role?
Answer: Yes, a Scheduler is required as Key Personnel for both Items 13 and 14. Please refer to Section 4.1 of the Construction Manager’s Manual for all minimum qualifications.
Question 2: Does Item 12 require survey and geotechnical engineering services?
Answer: Survey and geotechnical engineering services are not anticipated to be required.
Question 3: On Pages 17 and 18, under Section 4, it states that firms are required to acknowledge any known or potential conflicts of interest. Should these statements be uploaded to the Documents tab?
Answer: Reference Section 2.3 CONSULTANT/SUBCONSULTANT CONFLICTS OF INTEREST WITHIN TOLLWAY PROJECTS and Section 3.3.2.3 regarding the format for the SOI submittal. Firms should include statements acknowledging any known or potential conflicts of interest within their SOI.
Question 4: Resumes for Key Personnel are required to be submitted along with Exhibit A. Are resumes for support staff also required?
Answer: No. Only include/attach resumes for Key Personnel. Please refer to Section 3.4.4, Instruction for Trimble Submittal.
Question 5: For items 3, 4, 5 and 6, please provide preliminary studies or Phase I planning documents, associated correspondence with the relevant railroads or local agencies, existing bridge condition reports and any recent associated and/or surrounding mainline or bridge rehab plans.
Answer: Preliminary and Phase I studies were not conducted in conjunction with the referenced items. The Consultant selected for each will be required to provide the services necessary in accordance with the Illinois Tollway Design Section Engineer’s Manual as applicable. A Master Plan is not required. The remaining requested information will be shared with the selected firm.
Question 6: Will geotechnical and environmental services be needed for Items 7, 8, 9, or 10?
If so, will IDOT prequalifications be required?
Answer: Limited geotechnical and environmental services are anticipated to be required.
The IDOT prequalifications included in the item details will not be updated.
Question 7: On page 4 of 4 for Exhibit C-Current Obligations, how do we add rows to the table if our firm needs additional rows to disclose the remaining subconsultant fees?
Answer: Simply attach an additional page(s) to include a complete list in the PDF.
Question 8: Page 17, part 1.G under Section 3.3.2.3 states: ‘For each proposed DBE firm, include a current certification letter that shows that the DBE/VOSB firm is certified in its scope(s) of work stated in the SOI and its LOI. (IDOT Prequalification in the respective scope will meet this requirement.)’ Do these IDOT letters need to be attached as part of the Section SOI document (cover, SOI/approach, etc.?) or with the exhibits”
Answer: DBE and VOSB Evidence (current certification letters) are required to be uploaded per section 3.4.4. The IDOT prequalification letters do not need to be included.
Question 9: Are JV agreements between subconsultants acceptable on Tollway contracts?
Answer: No, unless the Joint Venture (JV) is a legal entity at the time of SOI submittal.
Refer to section 2.8 Teaming Agreements.
Question 10: Are P4G agreements between subconsultants allowed?
Answer: P4G agreements are intended to be between the Prime and a subconsultant, whether a standard P4G or reverse P4G.
Question 11: Section 3.4.4 mentions submitting Exhibits and forms for each “Team Member.”
Does this refer only to Joint Venture Teaming Members? Are Vendor Disclosure Forms (formerly Forms A), IPG Active Registered Vendor Disclosures (formerly Forms B), Illinois Board of Elections Registration Documents, and Standard Terms and Conditions required for all Prime Consultants/Team Members or also for Subconsultants?
Answer: Yes. Reference 3.4.5 COMMON MISTAKES and Section 3.4.4. If submitting a Teaming Agreement, the following forms are required of each Team member as defined in section 2.8 TEAMING AGREEMENTS.
Illinois Tollway Standard Business Terms and Conditions Illinois Board of Elections Registration document Vendor Disclosures (formerly Forms A) or IPG Active Registration Vendor
Disclosures (formerly Forms B) (Disclosures) Exhibit C - Current Obligations
PSB 25-1 Page | 1
NEW TO THIS PSB
An optional Pre-Proposal Meeting will be held on February 14, 2025, at 10:00 a.m. (CT) via Microsoft Teams.
e-Builder is now Trimble Unity Construct. If you are currently registered in e-Builder, your user ID will be active in Trimble.
PSB 25-1 Page | 2
TABLE OF CONTENTS
PART I: THE SCHEDULE
1.1 CONTACT INFORMATION 3
1.2 OFFICIAL NOTICE 3-4
1.3 ACCEPTANCE OF SCANNED SIGNATURES 4
1.4 PSB ITEM INDEX 5R-6R
1.5 PSB ITEM DETAILS A-1 –
A-27R
PART II: CONTRACT CLAUSES AND REQUIREMENTS
2.1 CONSULTANT/SUBCONSULTANT CONFLICTS OF INTEREST
WITHIN TOLLWAY PROJECTS
2.2 INSPECTOR GENERAL 8
2.3 FINANCIAL INFORMATION 8-9R
2.4 ILLINOIS TOLLWAY’S CONTRACT PAYMENT POLICY 9R
2.5 DISADVANTAGED BUSINESS ENTERPRISE (DBE) PARTICIPATION 9R-11
2.6 PARTNERING FOR GROWTH PROGRAM GUIDELINES 11
2.7 STATE OF ILLINOIS VETERAN SMALL BUSINESS PARTICIPATION
AND UTILIZATION PLAN
2.8 TEAMING AGREEMENT
11-12 12-13
2.9 MANUALS, PROCESSES AND GUIDELINES 13
2.10 PHASE II: DESIGN ENGINEERING SERVICES 13
2.11 PHASE III: CONSTRUCTION ENGINEERING SERVICES 13-14
2.12 CONSTRUCTION AND QUALITY ASSURANCE CONSULTANTS 14
2.13 QUALITY ASSURANCE PREQUALIFICATION CATEGORY 14
2.14 CLARIFICATION OF QUALITY CONTROL/QUALITY ASSURANCE
REQUIREMENTS
2.15 CONSULTANT CONTRACT FORMS 15
2.16 SELF-PERFORMANCE 15
PART III: REPRESENTATIONS AND INSTRUCTIONS
3.1 SELECTION CRITERIA 15
3.2 SCHEDULE FOR CONSULTANT SELECTION 16
3.3 GUIDELINES FOR SUBMITTING SOI 16-18
3.4 SUBMITTAL INSTRUCTIONS 18-23
3.5 DISCLOSURES AND CERTIFICATIONS 24
3.6 PROTEST PROCEDURE 25
3.7 USEFUL LINKS 26
3.8 ILLINOIS EPROCUREMENT BIDBUY NOTICE 26
3.9 INFORMATION ON ACCESSING THE ILLINOIS TOLLWAY WEBSITE 27
3.10 FUTURE PROFESSIONAL SERVICES BULLETIN NOTIFICATIONS 28
3.11 RESERVED 28
3.12 EXCHANGES WITH FIRMS AFTER SOI SUBMISSION 29
PSB 25-1 Page | 3
PART I: THE SCHEDULE
1.1 CONTACT INFORMATION
Illinois State Toll Highway Authority (ISTHA) 2700 Ogden Avenue Downers Grove, IL 60515
PSB 25-1 Coordinator: csstaff@getipass.com
PSB 25-1 Tech Support: wbpm@getipass.com
PSB 25-1 Trimble Unity Construct Training: wbpm@getipass.com
1.2 25-1 OFFICIAL NOTICE
This Professional Services Bulletin 25-1 (PSB 25-1) is the official notice of needed professional services for the Illinois State Toll Highway Authority (“Illinois Tollway”, “Tollway”), as authorized by the Architectural, Engineering, and Land Surveying Qualifications Based Selection Act, (30 ILCS 535/1, et seq.). This PSB contains information pertaining to the advertisement for Statements of Interest (SOI) and is part of the Chief Procurement Officer eProcurement System for the Illinois State Toll Highway Authority. PSB 25-1, including all Exhibits and forms, is available on the Illinois Tollway’s website at: https://www.illinoistollway.com/doing-business/construction-engineering/bids-bulletins-awards. Additional information is also posted on the Illinois Chief Procurement Officer’s eProcurement System at: https://www.bidbuy.illinois.gov/. For instructions on accessing the Illinois Tollway website, PSB, and Exhibits please refer to the Table of Contents. Instructions on receiving procurement opportunities are included in the “Illinois eProcurement BidBuy Notice” section of this PSB.
1.2.1 PSB 25-1 SUMMARY
Information for the Trimble Unity Construct (Trimble) process for PSB 25-1 can be found in the Public Folder at: https://app.e-builder.net/public/publicLanding.aspx?QS=8b550cb238ba4d768a53aa87d3c9cdcd
You will need the following before you can submit an SOI in Trimble:
Trimble resources, including PSB SOI user manual, FAQ file, and videos (see Public Folder link above) Webinar Training (see Section 3.7 Useful Links for training webinar registration link) Trimble Login ID (see Section 3.4 Submittal Instructions) Firm Code Name (see Section 3.4 Submittal Instructions)
An optional pre-proposal meeting will be held on Friday, February 14, 2025, at 10:00 a.m. (CT) Via Microsoft Teams.
Register here: https://events.gcc.teams.microsoft.com/event/2fc64b68-9ed5-47a9-99ac- 4d223bee359e@48475f88-04d3-4aa6-ae94-21dcfec788aa
PSB 25-1 Page | 4
All questions related to this PSB must be submitted electronically through the Trimble SOI Mailbox at PSB_25-1.01_Questions_and_RFIs@docs.e-builder.net no later than March 3, 2025 at 4:30:00 pm (CT).
The subject line should read: PSB 25-1 Question. Answers will be addressed via an Addendum published on the Tollway website and the Illinois eProcurement site, BidBuy. For Trimble technical questions, please contact the Trimble PSB Tech Support: wbpm@getipass.com.
This is not an invitation for bids. Consultants properly prequalified for the projects listed herein may indicate their desire to be considered for selection by submitting an SOI to the Illinois Tollway via the Trimble PSB 25-1 SOI process.
The Illinois Tollway follows the Qualifications Based Selection (QBS) process mandated by Illinois statute (30 ILCS 535): Architectural, Engineering, and Land Surveying Qualifications Based Selection Act for selecting qualified Consultants under this PSB.
1.3 ACCEPTANCE OF SCANNED SIGNATURES
Unless otherwise specified, the parties agree that proposals, contracts, certifications and disclosures, and other contract related documents to be entered into in connection with the resulting contract will be considered signed when the signature of a party is delivered by scanned image (e.g. .pdf or .tiff file extension name) as an attachment to the Trimble PSB SOI process. Such scanned signature will be treated in all respects as having the same effect as an original signature.
PSB 25-1 Page | 5R
1.4 PROFESSIONAL SERVICES BULLETIN NO. 25-1 ITEM INDEX
No.
Project No. /
County Description Page No.
I-25-2000 DuPage County
Illinois Route 390 Construction, Lake Street to County Farm Road, Phase II Engineering Services
A-1–A-2R
I-25-2001 Cook County
Tri-State Tollway (I-294), Bridge Reconstruction from 107th Street to Illinois Route 43 (Harlem Avenue), Phase II Engineering Services
A-3–A-4R
I-25-2002 Cook County
Tri-State Tollway (I-294), Bridge Reconstruction at Vincennes Road and Chicago Road, Phase II Engineering Services
A-5–A-6R
I-25-2003 Cook County
Tri-State Tollway (I-294), Bridge Reconstruction at Union Pacific Railroad (UPRR), Phase II Engineering Services
A-7–A-8R
I-25-2004 Cook County
Tri-State Tollway (I-294), Bridge Reconstruction at CSX Railroad, Phase II Engineering Services
A-9–A-10R
I-25-2005 DuPage County
Reagan Memorial Tollway (I-88), Bridge Reconstruction at Canadian National Railway, Phase II Engineering Services
A-11–A-12R
I-25-2006 Lake and Cook Counties
Tri-State Tollway (I-94/I-294), Plaza Improvements, Phase II Engineering Services
A-13–A-14R
I-25-2007 Winnebago, Boone, DeKalb and Kane Counties
Jane Addams Memorial Tollway (I-90) and Reagan Memorial Tollway (I-88), Plaza Improvements, Phase II Engineering Services
A-15–A-16R
I-25-2008 DuPage County
Reagan Memorial Tollway (I-88) and Veterans Memorial Tollway (I-355), Plaza Improvements, Phase II Engineering Services
A-17–A-18R
I-25-2009 DuPage, Cook and Will Counties
Veterans Memorial Tollway (I-355), Plaza Improvements, Phase II Engineering Services
A-19–A-20R
RR-25-2010
Winnebago County
Jane Addams Memorial Tollway (I-90), Roadway and Bridge Rehabilitation from Rockton Road (Mile Post 2.6) to Kishwaukee River (Mile Post 18.3), Phase II Engineering Services
A-21–A-22R
PSB 25-1 Page | 6R
No.
Project No. /
County Description Page No.
RR-25-4988
Systemwide
Systemwide, Design Services Upon Request. On-call and as-needed Phase II Engineering Services.
A-23R
I-24-4764 Cook & DuPage
Elgin O'Hare Western Access (I-490), Construction Management Services Upon Request. On-call and as-needed Construction Management Services.
A-24R
I-25-2011 Cook County
Tri-State Tollway (I-294), Construction Management Services Upon Request. On-call and as-needed Construction Management Services.
A-25R
I-25-2012 Cook County
Tri-State Tollway (I-294), ITS Improvements, Construction Management Services
A-26R
RR-25-9302
Systemwide
Systemwide, ITS Construction Management Services Upon Request. On-call and as-needed Construction Management Services.
A-27R
PSB 25-1 A-1
1.5 PSB ITEM DETAILS
1.5.1 Item 1: I-25-2000, Illinois Route 390 Construction, Lake Street to County Farm Road, Phase II Engineering Services
This project has a 26% D/M/WBE participation goal and 3% VOSB participation goal.
Phase II engineering services are required for the preparation of contract drawings, specifications and project related permits for roadway construction along Illinois Route 390 between Lake Street and County Farm Road in DuPage County, Illinois. The project limits generally include Illinois Route 390 from Lake Street to County Farm Road, Lake Street from Ontarioville Road to Greenbook Boulevard, and County Farm Road from Ontarioville Road to Greenbook Boulevard.
The work generally encompasses roadway and interchange design and shall include, but not be limited to, the design for the following items:
Construction of new Illinois Route 390 Tollway extension to County Farm Road Reconstruction of ramps at Illinois Route 390 and Lake Street Bridge deck overlay of the Lake Street Bridge over Illinois Route 390 Traffic signal installation at the new Illinois Route 390 and County Farm Road interchange Widening of County Farm Road Installation of a shared use path along County Farm Road Grading, landscaping, and noise wall improvements Installation of a new drainage system and modification of the existing drainage system Roadway lighting installation Signing and pavement marking improvements Erosion and sediment control installation
The work shall also include the following:
Geotechnical services Design of appropriate landscape and evaluation of soil erosion and sedimentation control measures and earthwork as necessary in accordance with the Tollway’s Environmental Studies manual.
Barrier warrant analysis Preparing Maintenance of Traffic plans, including providing alternative concepts for traffic and construction staging as appropriate, for the mainline toll highways and local roadways Utility coordination for protection and/or relocation of utilities Phase III support during construction All other appurtenant and miscellaneous items
Construction Estimate: Category C
The Prime Consultant must be prequalified by IDOT in the following categories:
Highways (Freeways) Location/Design Studies (New Construction/Major Reconstruction) Environmental Reports (Environmental Assessment) Special Studies (Location Drainage) Special Plans (Lighting: Complex) Structures (Highway Bridges: Typical) Special Services (Surveying) Special Plans (Traffic Signals)
The Tollway will allow a Prime consultant to meet the prequalification for Environmental Reports (Environmental Assessment), Special Studies (Location Drainage), Special Plans (Lighting: Complex), Structures (Highway Bridges: Typical), Special Services (Surveying), and Special Plans (Traffic Signals) through a subconsultant(s).
PSB 25-1 A-2R
Key personnel listed on Exhibit A for this project must include:
Project Manager (must be an Illinois Licensed Professional Engineer).
Project Engineer, that individual in charge who is directly involved in the development of the contract documents (must be an Illinois Licensed Professional Engineer).
Roadway designer, who will be responsible for roadway design related issues (must be an Illinois Licensed
Professional Engineer).
Structural designer, who will be responsible for structural design related issues (must be an Illinois Licensed
Structural Engineer).
Drainage designer, who will be responsible for drainage design related issues (must be an Illinois Licensed
Professional Engineer).
The Environmental Lead (EL), who will be responsible with coordinating the DSE team’s environmental studies.
QC/QA reviewer of all milestone submittals, who must be an Illinois Licensed Professional Engineer for roadway elements, or an Illinois Licensed Structural Engineer for structural elements.
Schedule: This project is scheduled to start in 2025. The substantial completion date for this project will be approximately 54 months after authorization to proceed inclusive of completion of Phase III support services during construction. Phase II design services are anticipated to be completed approximately 24 months after authorization to proceed. Final schedule will be determined at the time of negotiation.
This project is intended to be designed with the CADD models included as part of the Contract documents. The Consultant must comply with the current editions of the Illinois Tollway’s Computer Aided Design and Drafting (CADD) Standards Manual and BIM Implementation Manual, available on the Illinois Tollway’s website. This project will be managed through the Tollway’s web-based project management system. The Consultant will be required to participate in these procedures and will receive training on the system. The Tollway will furnish the Consultant with guidelines for the Consultant’s Quality Program (CQP). The CQP is due fourteen (14) days after Notice to Proceed.
The Consultant who is selected for this project will be notified and scheduled to attend a scope briefing with the Illinois Tollway.
PSB 25-1 A-3
1.5.2 Item 2 I-25-2001, Tri-State Tollway (I-294), Bridge Reconstruction from 107th Street to Illinois Route 43 (Harlem Avenue), Phase II Engineering Services
This project has a 27% D/M/WBE participation goal and 3% VOS/SDVOSBE participation goal.
Phase II engineering services are required for the preparation of contract drawings, specifications and project related permits for the reconstruction of various mainline bridges along the Tri-State Tollway (I-294) between 107th Street (Mile Post 15.6) and Illinois Route 43 (Harlem Avenue) (Mile Post 16.8) in Cook County, Illinois.
The work generally encompasses bridge reconstruction design, and shall include, but not be limited to, the following items:
Roadway design Structural design Bridge Type Studies Type, Size and Location (TS&L) plan preparation Environmental services Geotechnical services Lighting design Drainage design Maintenance of traffic design including that associated with local roadways Barrier warrant analysis Landscaping and soil erosion/sedimentation control design Pavement markings, delineators and signage design as necessary Utility coordination and design for protection and / or relocation of utilities Railroad coordination and preparation of documents for Railroad review and approval Phase III support during construction All other appurtenant and miscellaneous items
The following structures are included in this project:
I-294 over 107th Street (2 structures) I-294 over Norfolk Southern Railroad (2 structures) I-294 over Southwest Highway (2 structures) I-294 over Stony Creek (culvert) I-294 over Illinois Route 43 (Harlem Avenue) (2 structures)
Construction Estimate: Category F
The prime firm must be prequalified by IDOT in the following categories:
Structures (Highway Bridges: Typical) Highways (Freeways) Highways (Roads and Streets) Special Studies (Location Drainage)
The Tollway will allow a prime consultant to meet the prequalification for Highways (Roads and Streets) and Special Studies (Location Drainage) through a subconsultant(s).
Key personnel listed on Exhibit A for this project must include:
Project Manager (must be an Illinois Licensed Professional Engineer or Structural Engineer).
Project Engineer, that individual in charge who is directly involved in the development of the contract documents (must be an Illinois Licensed Professional Engineer).
Roadway designer, who will be responsible for roadway design related issues (must be an Illinois Licensed
Professional Engineer).
Structural designer, who will be responsible for structural design related issues (must be an Illinois Licensed
Structural Engineer).
Drainage designer, who will be responsible for drainage design related issues (must be an Illinois Licensed
Professional Engineer).
PSB 25-1 A-4R
QC/QA reviewer of all milestone submittals, who must be an Illinois Licensed Professional Engineer for roadway elements, or an Illinois Licensed Structural Engineer for structural elements.
Schedule: This project is scheduled to start in 2025. The substantial completion date for this project will be approximately 54 months after authorization to proceed inclusive of completion of Phase III support services during construction. Phase II design services are anticipated to be completed approximately 24 months after authorization to proceed. Final schedule will be determined at the time of negotiation.
This project is intended to be designed with the CADD models included as part of the Contract documents. The Consultant must comply with the current editions of the Illinois Tollway’s Computer Aided Design and Drafting (CADD) Standards Manual and BIM Implementation Manual, available on the Illinois Tollway’s website. This project will be managed through the Tollway’s web-based project management system. The Consultant will be required to participate in these procedures and will receive training on the system. The Tollway will furnish the Consultant with guidelines for the Consultant’s Quality Program (CQP). The CQP is due fourteen (14) days after Notice to Proceed.
The Consultant who is selected for this project will be notified and scheduled to attend a scope briefing with the
PSB 25-1 A-5
1.5.3 Item 3 I-25-2002, Tri-State Tollway (I-294), Bridge Reconstruction at Vincennes Road and Chicago Road, Phase II Engineering Services
This project has a 26% D/M/WBE participation goal and 3% VOS/SDVOSBE participation goal.
Phase II engineering services are required for the preparation of contract drawings, specifications and project related permits for the reconstruction of the Vincennes Road bridge over the Tri-State Tollway (I-294) at Mile Post
1.6 and the Chicago Road Bridge over the Tri-State Tollway (I-294) at Mile Post 1.2 Cook County, Illinois.
The work generally encompasses bridge reconstruction design, and shall include, but not be limited to, the following items:
Roadway design Structural design Bridge Type Studies Type, Size and Location (TS&L) plan preparation Environmental services Geotechnical services Lighting design Drainage design Maintenance of traffic design including that associated with local roadways Barrier warrant analysis Landscaping and soil erosion/sedimentation control design Pavement markings, delineators and signage design as necessary Utility coordination and design for protection and / or relocation of utilities Phase III support during construction All other appurtenant and miscellaneous items
The following structures are included in this project:
Vincennes Road bridge over I-294 Chicago Road bridge over I-294
Construction Estimate: Category B
The prime firm must be prequalified by IDOT in the following categories:
Structures (Highway Bridges: Typical) Highways (Freeways) Highways (Roads and Streets)
The Tollway will allow a prime consultant to meet the prequalification for Highways (Freeways), and Highways (Roads and Streets) through a subconsultant(s).
Key personnel listed on Exhibit A for this project must include:
Project Manager (must be an Illinois Licensed Professional Engineer or Structural Engineer).
Project Engineer, that individual in charge who is directly involved in the development of the contract documents (must be an Illinois Licensed Professional Engineer).
Roadway designer, who will be responsible for roadway design related issues (must be an Illinois Licensed
Professional Engineer).
Structural designer, who will be responsible for structural design related issues (must be an Illinois Licensed
Structural Engineer).
QC/QA reviewer of all milestone submittals, who must be an Illinois Licensed Professional Engineer for roadway elements, or an Illinois Licensed Structural Engineer for structural elements.
Schedule: This project is scheduled to start in 2025. The substantial completion date for this project will be approximately 36 months after authorization to proceed inclusive of completion of Phase III support services during construction. Phase II design services are anticipated to be completed approximately 18 months after authorization to proceed. Final schedule will be determined at the time of negotiation.
PSB 25-1 A-6R
This project is intended to be designed with the CADD models included as part of the Contract documents. The Consultant must comply with the current editions of the Illinois Tollway’s Computer Aided Design and Drafting (CADD) Standards Manual and BIM Implementation Manual, available on the Illinois Tollway’s website. This project will be managed through the Tollway’s web-based project management system. The Consultant will be required to participate in these procedures and will receive training on the system. The Tollway will furnish the Consultant with guidelines for the Consultant’s Quality Program (CQP). The CQP is due fourteen (14) days after Notice to Proceed.
The Consultant who is selected for this project will be notified and scheduled to attend a scope briefing with the
PSB 25-1 A-7
1.5.4 Item 4 I-25-2003, Tri-State Tollway (I-294), Bridge Reconstruction at Union Pacific Railroad (UPRR), Phase II Engineering Services
This project has a 21% D/M/WBE participation goal and 3% VOS/SDVOSBE participation goal.
Phase II engineering services are required for the preparation of contract drawings, specifications and project related permits for the reconstruction of the UPRR bridge over the Tri-State Tollway (I-294) at Mile Post 1.5 in Cook County, Illinois.
The work generally encompasses railroad bridge reconstruction design and shall include, but not be limited to, the following items:
Structural design Bridge Type Studies Type, Size and Location (TS&L) plan preparation Environmental services Geotechnical services Lighting design Drainage design Landscaping and soil erosion/sedimentation control design Pavement markings, delineators and signage design as necessary Barrier warrant analysis Maintenance of traffic design Utility coordination and protection and/or relocation of utilities Plats of acquisition and legal description preparation Railroad coordination and preparation of documents for Railroad review and approval Phase III support during construction All other appurtenant and miscellaneous items
Construction Estimate: Category B
The prime firm must be prequalified by IDOT in the following categories:
Structures (Railroad) Highways (Freeways) Transportation Studies (Railway Engineering)
The Tollway will allow a prime consultant to meet the prequalification for Transportation Studies (Railway Engineering) through a subconsultant.
Key personnel listed on Exhibit A for this project must include:
Project Manager (must be an Illinois Licensed Professional Engineer or Structural Engineer).
Project Engineer, that individual in charge who is directly involved in the development of the contract documents (must be an Illinois Licensed Professional Engineer).
Roadway designer, who will be responsible for roadway design related issues (must be an Illinois Licensed
Professional Engineer).
Structural designer, who will be responsible for structural design related issues (must be an Illinois Licensed
Structural Engineer).
Railroad designer, who will be responsible for railroad design related issues (must be an Illinois Licensed
Professional Engineer).
QC/QA reviewer of all milestone submittals, who must be an Illinois Licensed Professional Engineer for roadway elements, or an Illinois Licensed Structural Engineer for structural elements.
Schedule: This project is scheduled to start in 2025. The substantial completion date for this project will be approximately 60 months after authorization to proceed inclusive of completion of Phase III support services during construction. Phase II design services are anticipated to be completed approximately 30 months after authorization
PSB 25-1 A-8R
This project is intended to be designed with the CADD models included as part of the Contract documents. The Consultant must comply with the current editions of the Illinois Tollway’s Computer Aided Design and Drafting (CADD) Standards Manual and BIM Implementation Manual, available on the Illinois Tollway’s website. This project will be managed through the Tollway’s web-based project management system. The Consultant will be required to participate in these procedures and will receive training on the system. The Tollway will furnish the Consultant with guidelines for the Consultant’s Quality Program (CQP). The CQP is due fourteen (14) days after Notice to Proceed. The Consultant who is selected for this project will be notified and scheduled to attend a scope briefing with the Illinois Tollway.
PSB 25-1 A-9
1.5.5 Item 5 I-25-2004, Tri-State Tollway (I-294), Bridge Reconstruction at CSX Railroad, Phase II Engineering Services
This project has a 21% D/M/WBE participation goal and 3% VOS/SDVOSBE participation goal.
Phase II engineering services are required for the preparation of contract drawings, specifications and project related permits for the reconstruction of the CSX railroad bridge over the Tri-State Tollway (I-294) at Mile Post 2.1 in Cook County, Illinois.
The work generally encompasses railroad bridge reconstruction design and shall include, but not be limited to, the following items:
Structural design Bridge Type Studies Type, Size and Location (TS&L) plan preparation Environmental services Geotechnical services Lighting design Drainage design Landscaping and soil erosion/sedimentation control design Pavement markings, delineators and signage design as necessary Barrier warrant analysis Maintenance of traffic design Utility coordination and protection and/or relocation of utilities Plats of acquisition and legal descriptions Railroad coordination and preparation documents for Railroad review and approval Phase III support during construction All other appurtenant and miscellaneous items
Construction Estimate: Category B
The prime firm must be prequalified by IDOT in the following categories:
Structures (Railroad) Highways (Freeways) Transportation Studies (Railway Engineering)
The Tollway will allow a prime consultant to meet the prequalification for Transportation Studies (Railway Engineering) through a subconsultant.
Key personnel listed on Exhibit A for this project must include:
Project Manager (must be an Illinois Licensed Professional Engineer or Structural Engineer).
Project Engineer, that individual in charge who is directly involved in the development of the contract documents (must be an Illinois Licensed Professional Engineer).
Roadway designer, who will be responsible for roadway design related issues (must be an Illinois Licensed
Professional Engineer).
Structural designer, who will be responsible for structural design related issues (must be an Illinois Licensed
Structural Engineer).
Railroad designer, who will be responsible for railroad design related issues (must be an Illinois Licensed
Professional Engineer).
QC/QA reviewer of all milestone submittals, who must be an Illinois Licensed Professional Engineer for roadway elements, or an Illinois Licensed Structural Engineer for structural elements.
Schedule: This project is scheduled to start in 2025. The substantial completion date for this project will be approximately 60 months after authorization to proceed inclusive of completion of Phase III support services during construction. Phase II design services are anticipated to be completed approximately 30 months after authorization
PSB 25-1 A-10R
This project is intended to be designed with the CADD models included as part of the Contract documents. The Consultant must comply with the current editions of the Illinois Tollway’s Computer Aided Design and Drafting (CADD) Standards Manual and BIM Implementation Manual, available on the Illinois Tollway’s website. This project will be managed through the Tollway’s web-based project management system. The Consultant will be required to participate in these procedures and will receive training on the system. The Tollway will furnish the Consultant with guidelines for the Consultant’s Quality Program (CQP). The CQP is due fourteen (14) days after Notice to Proceed.
The Consultant who is selected for this project will be notified and scheduled to attend a scope briefing with the
PSB 25-1 A-11
1.5.6 Item 6 I-25-2005, Reagan Memorial Tollway (I-88), Bridge Reconstruction at Canadian National Railway, Phase II Engineering Services
This project has a 21% D/M/WBE participation goal and 3% VOS/SDVOSBE participation goal.
Phase II engineering services are required for the preparation of contract drawings, specifications and project related permits for the reconstruction of the Canadian National Railway bridge over the Reagan Memorial Tollway (I-88) at Mile Post 121.9 in DuPage County, Illinois.
The work generally encompasses railroad bridge reconstruction design and shall include, but not be limited to, the following items:
Structural design Bridge Type Studies Type, Size and Location (TS&L) plan preparation Environmental services Geotechnical services Lighting design Drainage design Landscaping and soil erosion/sedimentation control design Pavement markings, delineators and signage design as necessary Barrier warrant analysis Maintenance of traffic design Utility coordination and protection and/or relocation of utilities Plats of acquisition and legal description preparation Coordination and preparation of documents for Railroad review and approval Phase III support during construction All other appurtenant and miscellaneous items
Construction Estimate: Category B
The prime firm must be prequalified by IDOT in the following categories:
Structures (Railroad) Highways (Freeways) Transportation Studies (Railway Engineering)
The Tollway will allow a prime consultant to meet the prequalification for Transportation Studies (Railway Engineering) through a subconsultant.
Key personnel listed on Exhibit A for this project must include:
Project Manager (must be an Illinois Licensed Professional or Structural Engineer).
Project Engineer, that individual in charge who is directly involved in the development of the contract documents (must be an Illinois Licensed Professional Engineer).
Roadway designer, who will be responsible for roadway design related issues (must be an Illinois Licensed
Professional Engineer).
Structural designer, who will be responsible for structural design related issues (must be an Illinois Licensed
Structural Engineer).
Railroad designer, who will be responsible for railroad design related issues (must be an Illinois Licensed
Professional Engineer).
QC/QA reviewer of all milestone submittals, who must be an Illinois Licensed Professional Engineer for roadway elements, or an Illinois Licensed Structural Engineer for structural elements.
Schedule: This project is scheduled to start in 2025. The substantial completion date for this project will be approximately 60 months after authorization to proceed inclusive of completion of Phase III support services during construction. Phase II design services are anticipated to be completed approximately 30 months after authorization
PSB 25-1 A-12R
This project is intended to be designed with the CADD models included as part of the Contract documents. The Consultant must comply with the current editions of the Illinois Tollway’s Computer Aided Design and Drafting (CADD) Standards Manual and BIM Implementation Manual, available on the Illinois Tollway’s website. This project will be managed through the Tollway’s web-based project management system. The Consultant will be required to participate in these procedures and will receive training on the system. The Tollway will furnish the Consultant with guidelines for the Consultant’s Quality Program (CQP). The CQP is due fourteen (14) days after Notice to Proceed.
The Consultant who is selected for this project will be notified and scheduled to attend a scope briefing with the
PSB 25-1 A-13
1.5.7 Item 7 I-25-2006, Tri-State Tollway (I-94/I-294), Plaza Improvements, Phase II Engineering Services
This project has a 29% D/M/WBE participation goal and 3% VOSB participation goal.
Phase II engineering services are required for the preparation of engineering studies, contract drawings, and specifications and project related permits for related to plaza improvements throughout the Tollway system along the Tri-State Tollway (I-94/I-294) in Lake and Cook Counties, Illinois.
The Tollway has identified several ramp and mainline plaza locations throughout the Tollway system which may be candidates for repair, potential relocation, and replacement. Potential locations to be assessed may include, but are not limited to:
1. Plaza 20 at Illinois Route 137 (Buckley Road) along I-94
2. Plaza 21 (Waukegan) along I-94
3. Plaza 22 at Illinois Route 60 (Town Line Road) along I-94
4. Plaza 23 at Illinois Route 22 (Half Day Road) along I-94
5. Plaza 27 at Willow Road along I-294
This list will be reviewed and confirmed through scope briefing and may be extended to include Tollway mainline plazas or other ramp plazas.
The work generally encompasses roadway and ramp design and shall also include, but not be limited to the following:
Toll plaza design Drainage design Lighting and electrical design Environmental services Geotechnical services Erosion control Signing and pavement marking design Barrier warrant analysis Maintenance of traffic design Utility coordination and protection and/or relocation of utilities Phase III support during construction All other appurtenant and miscellaneous items
Construction Estimate: Category B
The prime firm must be prequalified by IDOT in the following categories:
Highways (Freeways) Special Services (Electrical Engineering) Special Services (Surveying)
The Tollway will allow a Prime Consultant to meet the prequalification for Special Services (Electrical Engineering) and Special Services (Surveying) through a subconsultant(s).
Key personnel listed on Exhibit A for this project must include:
Project Manager (must be an Illinois Licensed Professional Engineer).
Project Engineer, that individual in charge who is directly involved in the development of the contract documents (must be an Illinois Licensed Professional Engineer).
Roadway designer, who will be responsible for roadway design related issues (must be an Illinois Licensed
Professional Engineer).
Electrical designer, who will be responsible for electrical design related issues (must be an Illinois Licensed
QC/QA reviewer of all milestone submittals, who must be an Illinois Licensed Professional Engineer.
PSB 25-1 A-14R
Schedule: This project is scheduled to start in 2025. The substantial completion date for this project will be approximately 36 months after authorization to proceed inclusive of completion of Phase III support services during construction. Phase II design services are anticipated to be completed approximately 18 months after authorization to proceed. Final schedule will be determined at the time of negotiation.
The Consultant must comply with the current edition of the Illinois Tollway’s Computer Aided Design and Drafting (CADD) Standards Manual available on the Illinois Tollway’s website. This project will be managed through the Tollway’s web-based project management system. The Consultant will be required to participate in these procedures and will receive training on the system. The Tollway will furnish the Consultant with guidelines for the Consultant’s Quality Program (CQP). The CQP is due fourteen (14) days after Notice to Proceed. The Consultant who is selected for this project will be notified and scheduled to attend a scope briefing with the Illinois Tollway.
PSB 25-1 A-15
1.5.8 Item 8 I-25-2007, Jane Addams Memorial Tollway (I-90) and Reagan Memorial Tollway (I-88), Plaza Improvements, Phase II Engineering Services
This project has a 29% D/M/WBE participation goal and 3% VOSB participation goal.
Phase II engineering services are required for the preparation of contract drawings, specifications and project related permits for plaza improvements long the Jane Addams Memorial Tollway (I-90) and Reagan Memorial Tollway (I-88) in Winnebago, Boone, DeKalb and Kane Counties, Illinois.
The Tollway has identified several ramp plaza locations throughout the Tollway system which may be candidates for repair, potential relocation, and replacement. Potential locations to be assessed may include, but are not limited to:
1. Plaza 3 at Genoa Road along I-90
2. Plaza 4 at Illinois Route 173 (West Lane Road) along I-90
3. Plaza 59 at Farnsworth Avenue along I-88 (eastbound entrance ramp)
4. Plaza 65 at Peace Road along I-88
5. Plaza 67 at Annie Glidden Road along I-88
This list will be reviewed and confirmed through scope briefing and may be extended to include Tollway mainline plazas or other ramp plazas.
The work generally encompasses roadway and ramp design and shall also include, but not be limited to the following:
Toll plaza design Drainage design Lighting and electrical design Environmental services Geotechnical services Erosion control Signing and pavement marking design Barrier warrant analysis Maintenance of traffic Utility coordination and protection and/or relocation of utilities Phase III support during construction All other appurtenant and miscellaneous items
Construction Estimate: Category A
The prime firm must be prequalified by IDOT in the following categories:
Highways (Freeways) Special Services (Electrical Engineering) Special Services (Surveying)
The Tollway will allow a Prime Consultant to meet the prequalification for Special Services (Electrical Engineering) and Special Services (Surveying) through a subconsultant(s).
Key personnel listed on Exhibit A for this project must include:
Project Manager (must be an Illinois Licensed Professional Engineer).
Project Engineer, that individual in charge who is directly involved in the development of the contract documents (must be an Illinois Licensed Professional Engineer).
Roadway designer, who will be responsible for roadway design related issues (must be an Illinois Licensed
Professional Engineer).
Electrical designer, who will be responsible for electrical design related issues (must be an Illinois Licensed
PSB 25-1 A-16R
Schedule: This project is scheduled to start in 2025. The substantial completion date for this project will be approximately 36 months after authorization to proceed inclusive of completion of Phase III support services during construction. Phase II design services are anticipated to be completed approximately 18 months after authorization to proceed. Final schedule will be determined at the time of negotiation.
The Consultant must comply with the current edition of the Illinois Tollway’s Computer Aided Design and Drafting (CADD) Standards Manual available on the Illinois Tollway’s website. This project will be managed through the Tollway’s web-based project management system. The Consultant will be required to participate in these procedures and will receive training on the system. The Tollway will furnish the Consultant with guidelines for the Consultant’s Quality Program (CQP). The CQP is due fourteen (14) days after Notice to Proceed. The Consultant who is selected for this project will be notified and scheduled to attend a scope briefing with the Illinois Tollway.
PSB 25-1 A-17
1.5.9 Item 9 I-25-2008, Reagan Memorial Tollway (I-88) and Veterans Memorial Tollway (I-355), Plaza Improvements, Phase II Engineering Services
This project has a 29% D/M/WBE participation goal and 3% VOSB participation goal.
Phase II engineering services are required for the preparation of contract drawings, specifications and project related permits for plaza improvements along the Reagan Memorial Tollway (I-88) and Veterans Memorial Tollway (I-355) in DuPage County, Illinois.
The Tollway has identified several ramp plaza locations throughout the Tollway system which may be candidates for repair, potential relocation, and replacement. Potential locations to be assessed may include, but are not limited to:
1. Plaza 53 at Spring Road (22nd Street) along I-88
2. Plaza 54 at Illinois Route 83 (Kingery Highway) along I-88
3. Plaza 55 at Midwest Road along I-88
4. Plaza 77 at Illinois Route 38 (Roosevelt Road) along I-355
5. Plaza 79 at Illinois Route 56 (Butterfield Road) along I-355
6. Plaza 81 at Ogden Avenue (U.S. 34) along I-355 and I-88
This list will be reviewed and confirmed through scope briefing and may be extended to include Tollway mainline plazas or other ramp plazas.
The work generally encompasses roadway and ramp design and shall also include, but not be limited to the following:
Toll plaza design Drainage design Lighting and electrical design Environmental services Geotechnical services Erosion control Signing and pavement marking design Barrier warrant analysis Maintenance of traffic Utility coordination and protection and/or relocation of utilities Phase III support during construction All other appurtenant and miscellaneous items
Construction Estimate: Category B
The prime firm must be prequalified by IDOT in the following categories:
Highways (Freeways) Special Services (Electrical Engineering) Special Services (Surveying)
The Tollway will allow a Prime Consultant to meet the prequalification for Special Services (Electrical Engineering) and Special Services (Surveying) through a subconsultant(s).
Key personnel listed on Exhibit A for this project must include:
Project Manager (must be an Illinois Licensed Professional Engineer).
Project Engineer, that individual in charge who is directly involved in the development of the contract documents (must be an Illinois Licensed Professional Engineer).
Roadway designer, who will be responsible for roadway design related issues (must be an Illinois Licensed
Professional Engineer).
Electrical designer, who will be responsible for electrical design related issues (must be an Illinois Licensed
PSB 25-1 A-18R
Schedule: This project is scheduled to start in 2025. The substantial completion date for this project will be approximately 36 months after authorization to proceed inclusive of completion of Phase III support services during construction. Phase II design services are anticipated to be completed approximately 18 months after authorization to proceed. Final schedule will be determined at the time of negotiation.
The Consultant must comply with the current edition of the Illinois Tollway’s Computer Aided Design and Drafting (CADD) Standards Manual available on the Illinois Tollway’s website. This project will be managed through the Tollway’s web-based project management system. The Consultant will be required to participate in these procedures and will receive training on the system. The Tollway will furnish the Consultant with guidelines for the Consultant’s Quality Program (CQP). The CQP is due fourteen (14) days after Notice to Proceed. The Consultant who is selected for this project will be notified and scheduled to attend a scope briefing with the Illinois Tollway.
PSB 25-1 A-19
1.5.10 Item 10 I-25-2009, Veterans Memorial Tollway (I-355), Plaza Improvements, Phase II Engineering Services
This project has a 29% D/M/WBE participation goal and 3% VOSB participation goal.
Phase II engineering services are required for the preparation of contract drawings, specifications and project related permits for plaza improvements along the Veterans Memorial Tollway (I-355) in DuPage Cook and Will Counties, Illinois.
The Tollway has identified several ramp plaza locations throughout the Tollway system which may be candidates for repair, potential relocation, and replacement. Potential locations to be assessed may include, but are not limited to:
1. Plaza 83 at Maple Avenue along I-355
2. Plaza 85 at 63rd Street along I-355
3. Plaza 87 at 75th Street along I-355
4. Plaza 90 at Boughton Road along I-355
5. Plaza 93 at 127th Street along I-355
6. Plaza 95 at Archer Avenue (143rd Street) along I-355
7. Plaza 97 at Illinois Route 7 (159th Street) along I-355
8. Plaza 101 at U.S. 6 (Southwest Highway) along I-355
This list will be reviewed and confirmed through scope briefing and may be extended to include Tollway mainline plazas or other ramp plazas.
The work generally encompasses roadway and ramp design and shall also include, but not be limited to the following:
Toll plaza design Drainage design Lighting and electrical design Environmental services Geotechnical services Erosion control Signing and pavement marking design Barrier warrant analysis Maintenance of traffic Utility coordination and protection and/or relocation of utilities Phase III support during construction All other appurtenant and miscellaneous items
Construction Estimate: Category B
The prime firm must be prequalified by IDOT in the following categories:
Highways (Freeways) Special Services (Electrical Engineering) Special Services (Surveying)