This is a Statement of Work for water meter replacement at McConnell Air Force Base in Wichita, Kansas. The project (PRQE262839) requires removal of existing water meters from 12 buildings (Buildings 3, 4, 33, 36, 37, 40, 41, 42, 48, 49, 50, and 65) and installation of new Sierra Instruments 203-4-CP-NIST Ultrasonic Digital Liquid Flow Meters with modbus communication at each location. The contractor must conduct comprehensive pre-installation site assessments to evaluate existing meter configurations, verify pipe materials and sizing, identify installation requirements and access restrictions, document possible utility outage windows, and assess current DDC panel locations and protocols. The scope of work includes provision and installation of dedicated power sources where needed, physical and software integration with existing DDC systems, startup, calibration, operational testing to verify accurate flow measurement and data reporting, and complete site cleanup. Upon completion, the contractor must provide installation reports, calibration certificates, and operations and maintenance manuals, with coordination required from CE personnel for programming and DDC system integration.

The contractor must comply with all applicable federal, state, and local codes and standards, including OSHA requirements, National Electric Code, ASHRAE, ASME, and Kansas Department of Health regulations. Additional requirements include coordination with local utilities, locating utilities for any excavations exceeding 12 inches, obtaining confined space entry permits if required, submitting Safety Data Sheets for all hazardous materials, and managing hazardous waste through the base's designated office. The contractor must conduct a pre-construction meeting with all personnel, arrange base access through CE Operations at (316) 759-7490 during business hours, remove all generated debris to an approved off-base location with documentation, and provide all necessary resources, equipment, and labor without utilizing government resources or personnel.

View the file

Other files

File Type Posted
Sources Sought Response Form.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Water Meter Replacement – Multiple Sites

MCCONNELL AFB, WICHITA, KS (KANSAS ANG)

PROJECT PRQE 262839

9 June 2026

SW-1 LOCATION: Multiple sites at McConnell AFB, Wichita, Kansas. Arrangements for entrance onto McConnell AFB must be made by contacting CE Operations at (316) 759-7490 between the hours of 7:00 a.m. and 4:00 p.m., Monday through Friday.

SW-2 SCOPE OF WORK: The work covered in this contract consists of furnishing all labor, expertise, equipment, materials, facilities, transportation, and appliances necessary to perform operations in connection with the work described in paragraph SW-3. It is the intent of the government for the contractor to provide a complete and useable system. Any relevant details required for a complete system that are omitted in the contract plans and specifications will be provided by the Contractor at no cost to the government.

SW-3 SUMMARY OF WORK: Work shall consist of the following: Remove existing water meters in Buildings 3, 4, 33, 36, 37, 40, 41, 42, 48, 49, 50, and 65. At all sites, install new Sierra Instruments 203-4-CP-NIST Ultrasonic Digital Liquid Flow Meter with modbus communication.

The contractor is to conduct pre-installation site assessments to evaluate existing meter configurations, verify pipe materials, sizing, specific installation requirements, identify access restrictions, document possible outage windows, coordinate utility shut offs, and assess current DDC panel locations and protocols. The scope includes provision and installation of dedicated power sources for each meter where needed, physical and software integration with existing DDC systems, startup, calibration, operational testing to verify accurate flow measurement and date reporting, and site cleanup. Upon completion, contractor to provide installation reports, calibration certificates, and O&M manuals.

Additional information: Coordination with CE will be required for programming and integration with existing DDC system.

SW-4 CODES & STANDARDS: All work performed under this contract shall be in accordance with federal, state and local codes & standards, as well as widely accepted industry standards, including but not limited to: American Institute of Architects, American Concrete Institute, American Institute of Electrical Engineers, American Institute of Steel Construction, American National Standards Institute, American Society of Heating, Refrigerating and Air-Conditioning Engineers, American Society of Mechanical Engineers, American Society of Testing Materials, National Bureau of Standards, National Electric Code, American Welding Society, Brick Institute of America, Building Officials and Code Administrators, Federal Aviation Administration, National Fire Protection Association, National Electric Code, Occupational Safety & Health Administration, Rubber Manufacturers Association, Underwriters Laboratories, and the Kansas DOT standard specification. Additionally, all requirements of the Kansas Department of Health must be satisfied in their entirety for any work performed or materials bought under this contract. Failure to comply with any of the aforementioned codes and standards shall be considered as a failure to comply to contract specifications.

SW-5 UTILITIES: Contractors shall coordinate with all local utilities having jurisdiction.

SW-6 CALL BEFORE YOU DIG: All contractors shall be responsible for locating any or all utilities for any excavations or penetrations into the ground greater than 12” deep.

SW-7 CONFINED SPACE: The Contractor shall provide a confined space entry permit to the Base Engineers Office prior to any entry into a permit-required confined space. The following steps shall be accomplished to acquire authorization to open or enter a confined space:

1. The Contractor shall provide written notice to the Contracting Office Technical Representative, (COTR) defining exact location of space requiring entry.

2. A KANG Confined Space Supervisor shall brief the Contractor on the following:

a. The contents of the space and known hazards that make the space permit required.

b. The precautions and procedures that have been implemented by the organization to protect KANG personnel.

c. Emergency rescue responsibilities to determine whether the Contractor supplies the rescue team or if the installation fire department is expected to supply a rescue function.

d. It is the Contractor’s responsibility to contact the Fire Chief on the installation if the Contractor is planning to use the installation fire department as a rescue function.

e. Standard procedures if the project requires a combined effort involving both KANG and contracted personnel to access the space at the same time.

f. Contractor shall follow Air Force Occupational Safety and Health Standard 91-25 and Occupational Safety and Health Administration 29 CFR 1910.146.

3. A written record of the briefing shall be signed by the Contractor and Confined Space Supervisor and kept on file in the project folder.

4. The Contractor accepts full responsibility at this point to initiate and maintain the permit and supply all material, equipment and labor to test, monitor, enter and exit the space in a safe manner.

5. The Contractor’s Confined Space Entry Permit shall be kept on site during entry to the space. A copy of the Contractor’s Permit shall be returned to the COTR at the completion of the project.

SW-8 MATERIALS: All materials shall conform to specifications, applicable industry codes and standards and the manufacturer's recommendations, whichever is more stringent. In addition, Hazardous Materials (HAZMATs) brought onto any Department of Defense (DoD) installation shall be properly identified, managed, and tracked. A certificate of compliance and Safety Data Sheets (SDS) are required for all materials supplied.

1.1. FEDERAL ACQUISITION REGULATION (FAR) CLAUSES.

1.1.1. FAR 52.223-3, Hazardous Material Identification and Material Safety Data. Contractors are required to list any HAZMATs to be delivered under the contract. The appropriate SDS shall be submitted and list any appropriate identification number such as a National Stock Number (NSN) or Special Item Number (SIN). The apparently successful contractor agrees to submit these items prior to the award of the contract. Failure to submit the SDSs prior to award may result in the apparently successful contractor being considered non-responsible and ineligible for award. If after the contract is awarded and there is a change in the makeup of the materials previously submitted making them inaccurate or incomplete, then the Contractor shall promptly notify the contracting officer and resubmit the data.

1.1.2. FAR 52.223-5, Pollution Prevention and Right-to-Know Information. Contractors shall provide all information needed by Federal facilities to comply with the following, emergency notice requirements, list of material SDSs, emergency and hazardous chemical inventory forms, toxic chemical release inventory, and recycling information.

1.1.3. FAR 52.223-7, Notice of Radioactive Materials. Contractors shall notify the contracting officer in writing before delivering items that contain radioactive materials. The notice must also be provided before completing any servicing required by the contract. At a minimum, the written notice shall include and expound on the part(s) of the item that contain radioactive materials, the name and activity of the isotope, the material’s manufacturer, and any other information the contractor knows that will help users understand the hazards involved.

1.1.4. FAR 52.223-19, Compliance with Environmental Management Systems (EMS). Contractors shall conform with all operational controls identified in the applicable agency of facility EMS and provide monitoring and measurement information necessary for the Government to address environmental performance relative to the goals of the EMS.

1.2. MCCONNELL AFB HAZARDOUS MATERIALS MANAGEMENT PROGRAM (HMMP).

1.2.1. HMMP § 3.6.1., Contractors are not required to use EESOH-MIS. However, contractors must submit to the Contracting Officer Representative (COR) the information and supporting documentation (including current manufacturer’s SDS) necessary to obtain HAZMAT usage authorization.

1.2.2. HMMP § 3.6.2., The COR shall coordinate with the 22 CES/CEIEC Hazardous Material Program Manager to obtain approval of all hazardous materials that are brought on-site by the contractor.

1.2.3. HMMP § 3.6.3., The contractor shall maintain an up-to-date hazardous material inventory and a complete copy of all approved SDSs for all materials used on the job site. All contractors will report data on the HAZMAT used during the performance of the contract and by the 6th of each month, send a list to the COR reporting the quantity of each material used during the preceding month. The COR will submit that data to 22 CES/CEIEC, EESOH-MIS Support Office, Bldg. 1096.

1.2.4. HMMP § 3.6.4., If the contractor needs to bring a new material on the installation that was not included in the original HAZMAT listing, the contractor must notify the COR who will coordinate with the EESOH-MIS Support Office for authorization of the new material.

1.2.5. HMMP § 3.6.5., The contractor shall take appropriate actions to comply with waste minimization and pollution prevention practices and policies. If a contractor generates hazardous waste while performing their contract on McConnell AFB, they will coordinate with the Hazardous Waste Office for disposal instructions.

SW-9 SITE INSPECTION: The Contractor is required to acknowledge, at time of Bid Opening that said contractor has inspected and is fully cognizant of conditions at the site. No allowance or consideration will be given after award for any condition(s) which was(were) existing at the time of the site visit.

SW-10 BASE ACCESS: The contractor shall be granted access to McConnell Air Force Base to complete this project. All other areas are off limits. The Government reserves the right to deny access to any person, with no consequence to the contract.

SW-11 SAFETY: Compliance with OSHA and other applicable laws and regulations for the protection of employees is exclusively the obligation of the commercial contractor. Government employees must comply with AFOSH. All contractors and employees will attend a pre-construction meeting prior to project work beginning.

SW-12 CLEAN-UP: Clean-up and remove debris generated by this contract to an approved off-base location. Two (2) copies of the receiving (tipping or dumping) tickets, with a cover letter from the Prime Contractor stating the full name and address of the location to which debris was taken.

SW-13 GOVERNMENT RESOURCES: No Government resources shall be made available to the contractor, unless otherwise stated in this Statement of Work. The contractor shall provide for all necessary resources to provide a complete and usable facility or systems as described in the contract documents. The contractor shall not obligate Government resources in any manner. The Government shall seek remedy for any obligation or encumbrance imposed by the Contractors actions. Government resources include, but are not limited to, government owned materials, equipment, tools, vehicles, personnel and facilities.

SW-14 SUPPLEMENTAL ATTACHMENTS:

1. NA