Project Statement 26434.pdf
PDF 1 MB Posted
- Solicitation number
- RFP 171 260000002564 3
- Issued by
- Wayne County, Michigan
About this file
This is a Project Statement from the Michigan Department of Technology, Management and Budget (DTMB) in partnership with the Michigan State Police (MSP) soliciting proposals for the relocation of the Northville Forensic Lab to the Detroit Public Safety Headquarters Building. The project involves design and construction services for phases 100 through 700 to relocate the DNA Lab and Latent Prints Lab to the third floor of 1301 3rd Street, Detroit, Michigan. The scope includes renovation of approximately 10,240 square feet across two vacant spaces: Space A (4,675 square feet) designated for office areas and Space B (5,070 square feet) for laboratory operations. A mandatory walk-through inspection is scheduled for September 15, 2026 at 10:00 AM at the Detroit Public Safety Headquarters. Proposal responses are due by 2:00 PM on Thursday, October 1, 2026, and must be submitted through the SIGMA VSS electronic portal. RFP questions must be submitted to the Project Director, Mustafa (Chris) Bahjet, by September 22, 2026 at 2:00 PM. The selected professional team will be required to conduct design meetings via Microsoft Teams with 50% and 90% reviews for phases 100-500, as well as coordinate bi-weekly construction progress meetings.
The contract is structured as a billable-rate arrangement with firms submitting a total cost for all phases as the bid amount. The project must comply with DCSPEC or MICHSPEC construction management standards depending on project cost and shall adhere to all applicable federal, state, and local codes and regulations administered by EPA, OSHA, DOT, DCH, EGLE, DNR, and MIOSHA. The design is based on a preliminary study completed by Hobbs & Black Associates in association with McClaren, Wilson & Lawrie, Inc., with key design considerations including biohazard protection systems, HVAC requirements with variable air volume controls, emergency power and UPS systems, security electronics with proximity-access systems, laboratory vestibules for contamination control, and chemically resistant flooring in laboratory spaces. Proposals should consolidate technical and cost elements into a single attachment not exceeding 25 megabytes.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP Billable Rate (Rev 2-26) 26434.pdf | ||
| RFP Addeudm #1 551_26434_MNB.pdf | ||
| SAMPLE Billable Rate Contract (Rev 04-25).pdf | ||
| Mechanical Equipment 26434.xlsx | XLSX spreadsheet | |
| RFP Add 2 Detroit Lab 551_26434.pdf | ||
| Addendum 1 - Mechanical Equipment 26434.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0427 (R 04/26)
PROJECT STATEMENT
STATE OF MICHIGAN
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
State Facilities Administration
Design and Construction Division 3111 West St. Joseph Street
Lansing, Michigan 48909
FILE NUMBER
551_26434.MNB
PROPOSAL DUE DATE
Thursday, October 1, 2026 at 2:00 PM
CLIENT AGENCY
Michigan State Police
PROJECT NAME AND LOCATION
Detroit Lab- Northville Lab Relocation
PROJECT ADDRESS
Third floor at 1301 3rd Street, Detroit, MI 48226
CLIENT AGENCY CONTACT
Sabrina Hornby Section Manager Budget, Finance, and Facilities Division Michigan State Police
TELEPHONE NUMBER
517.643.4519
CLIENT AGENCY CONTACT
Andrew Stack, Dept. Analyst Management Services Section Budget, Financial, and Facilities Division Michigan State Police
TELEPHONE NUMBER
517.614.9561
DTMB - DCD PROJECT DIRECTOR
Mustafa (Chris) Bahjet P.E Project Director
DTMB-DCD
TELEPHONE NUMBER
517.749.7519
WALK-THROUGH INSPECTION DATE, TIME, AND LOCATION:
September 15th, 2026, at 10:00 AM 1301 3rd Street, Detroit, MI 48226
Detroit Public Safety Headquarters
MANDATORY (Check box if Mandatory)
NOTE: An individual is only permitted to represent one bidder at a mandatory walk-through.
PROJECT DESCRIPTION/SERVICES REQUESTED:
The Dept. of Technology Management & Budget and in partnership with Dept of Michigan State Police is seeking proposals for phases 100 through 700 to relocate the Northville Forensic Lab program from Northville to the Detroit location on the 3rd floor of the Detroit Public Safety Headquarters Building.
The RFP is based on a preliminary study posted with the RFP that was completed by Hobbs & Black Associates in association with McClaren, Wilson & Lawrie, Inc. The study is attached to the project statement.
Meetings & Deliverables:
Design Meetings. The Billable -Rate contract requires 50% and 90% reviews for phases 100-through 500.
However, this level of review will be excessive. Present your proposed plan for combining phases and deliverables as you see appropriate.
Meetings will be conducted via Microsoft Teams, with occasional on-site meetings as needed.
Construction Progress Meeting:
There will be a construction progress meeting every other week where the selected professionals will coordinate, host and distribute meeting minutes.
Construction Management Specification:
DTMB uses either DCSPEC or MICHSPEC, depending on the project cost. Both front-end documents are posted on the DTMB Design & Construction website. Please avoid using your own construction management specification to prevent conflicts with the required standards.
Please NOTE:
• Proposal responses MUST be uploaded to SIGMA VSS.
https://sigma.michigan.gov/webapp/PRDVSS1X1/Advantage4
• Please enter the total cost for all phases as the bid amount.
• Firms are encouraged to combine their technical and cost proposals into one (1) attachment for proposal submission.
• Please remember that attachments can be no larger than 25mb.
• Do not wait until just before the 2:00 p.m. solicitation deadline to submit your proposal response.
SIGMA VSS will not allow a proposal to be submitted after 2:00 p.m., even if a portion of the proposal response has been uploaded.
• If you experience issues or have questions regarding your electronic submission, you must contact the SIGMA Help Desk for assistance prior to the 2:00 p.m., solicitation deadline. You may contact the SIGMA Help Desk by telephone at 517.284.0540 or toll-free at 888.734.9749. You may also email the SIGMA Help Desk at sigma-procurement-helpdesk@michigan.gov
• Please email the Design and Construction Contract Specialists if you are having SIGMA VSS issues. Please include your SIGMA ticket number and any supporting documentation (i.e., screenshots) to Anne Watros (WatrosA@michigan.gov) and Don Klein (KleinD4@michigan.gov).
• You may be asked by our contract specialists to email your proposal. Emailed submissions will require DCD approval and will be handled on a case-by-case basis.
• Approved emailed submissions MUST be received prior to 2:00 p.m. deadline to be considered responsive and responsible.
• Responses should not be emailed to the Project Director.
NIGP CODES 90607, 90638, 92507., 92531, 92533 & 92567
DESIRED SCHEDULE OF WORK; Present your own schedule.
ACCEPTING RFP QUESTIONS UNTIL: September 22nd at 2:00 PM Please do not submit online questions via VSS. ALL questions should be emailed to Chris Bahjet at BahjetcC@michigan.gov address no later than 2:00 p.m., Eastern on September 22nd at 2:00 PM
REFERENCE STANDARDS: This project will comply with all codes, standards, regulations, and workers' safety rules that are administered by federal agencies (EPA, OSHA, and DOT), state agencies (DCH, EGLE, DNR, and MIOSHA), and any other local regulations and standards that may apply.
This form is required to be a part of the professional service contract. (Authority: 1984 PA 431) Attachment(s)
1. Preliminary Study
2. Mechanical Equipment 26434, Excel file, note multiple tabs
- 11 pages https://sigma.michigan.gov/webapp/PRDVSS1X1/Advantage4 mailto:sigma-procurement-helpdesk@michigan.gov mailto:WatrosA@michigan.gov mailto:KleinD4@michigan.gov mailto:NAME@michigan.gov
Michigan State Police
Detroit Lab
Northville Lab Relocation
Edited Excerpts from a Phase 100 Study performed by Hobbs & Black of Michigan in association with McClaren, Wilson *& Lawrie Architects of Virginia.
File - Pre-Bid Walk-Through September 1 th
EXECUTIVE SUMMARY
GOALS
Flexibility and Expandability: Laboratories are evolving at a rapid rate. The development of new laboratory procedures, changes in crime trends and political considerations all tend to influence the type of laboratory work and quantities of evidence and samples being processed in the laboratory. As a result, laboratories frequently experience the need for growth and change over their life span. Over the course of time, new labs benefit greatly from incorporating design flexibility that makes change possible with greater ease and less cost. In addition, the building organizational concept also must provide expandability to accommodate the growth of laboratory programs, staff increases, and addition of new programs and equipment.
Biological Hazards/Chemical Hazards: Regulatory requirements issued by the United States Occupational Safety and Health Administration (OSHA) mandate the need to provide protection for workers encountering biohazard materials. The forensic science laboratory investigates a relatively high number of cases that originate from the criminal community, known to carry a higher incidence of dangerous diseases and drugs.
Primary risks to staff are posed by such dangerous pathogens as Hepatitis A, B, & C, Tuberculosis, HIV (AIDS), Aspergillus Fumigatus and the highly dangerous drug fentanyl; to name a few. High-risk materials also include all serological evidence (evidence saturated with body fluids or biological tissue). These materials must be treated with exceptional care.
Office Environments: All laboratory sections should include separate report-writing workstation areas near their laboratory space. These areas should be designed as standard office space with access to the laboratory corridor and adjacent laboratory area through a laboratory vestibule. Each scientist's 'clean' furniture workstation will be standard-sized, modular systems, open office. This office space has some degree of visual access to the adjacent laboratory it serves if possible.
Laboratory Vestibules: Lab vestibules should be provided at the entry points to laboratory areas to provide a physical and air (HVAC) separation between the biohazard zones and non-lab spaces. These vestibules minimize the potential transfer of airborne biological and chemical contaminants to clean areas such as main corridors and office areas. Vestibules also serve to isolate spaces having high potential for cross contamination such as DNA preamp and amp/post amp spaces. When leaving a biohazard or chemically hazardous zone, staff members are required by policy to remove laboratory coats and to clean up prior to moving to the office area. Similarly, when moving from the clean office zone to the biohazards area, staff members are required to put on protective laboratory clothing.
Laboratory Tours: The facility is to be designed so that guided tours of the laboratory can be conducted at the option and discretion of the laboratory.
Laboratory Work Surfaces: At laboratory bench surfaces where chemicals and acids will be used or biological hazards are present, epoxy resin countertops should be utilized. Generally, do not use stainless steel countertops, due to their expense. Work surfaces in non-laboratory areas, such as offices, administration, and clerical areas can be standard plastic laminate.
Acoustical Design Considerations: Noise can affect both personnel and equipment within the building and if it emanates to the exterior of the space, it can impact adjacent neighboring spaces. Control of HVAC noise and the careful selection of relevant architectural details can improve communications, speech privacy, and the general condition of work environments. Proper noise control design can also reduce long term, work-related hearing damage, fatigue, and general annoyance. It is best to consider noise control during the design stage rather than retrofit potentially more-costly noise control measures later.8 HVAC design, air volume control devices, breakout noise, and noise from lab instruments are some general conceptual level components related to acoustics.
Security Electronics: Equip the facility throughout with a monitored, proximity-access security system.
Provide access devices at doors to all laboratory sections and exterior entry doors. The system should have the capability of printing a status report with card access ID, date of access, and time of authorized entry, as well as unauthorized entries. Monitor key areas of the building and site by closed-circuit television with time lapse-video capture.
Emergency Power: The client should have the ability to operate selected aspects of the facility during a power outage. The 'emergency' power system is code-required to serve only emergency loads. The 'standby' system is connected to the same generator via separate transfer switches and distribution panels.
The exact equipment that will be on the standby power system will be determined in subsequent phases.
Uninterruptable Power System (UPS): As determined during design, the forensic lab will be powered by either a centralized UPS or point of use UPS units provided by the Owner. Room Data Sheets identify generally where UPS power is needed. If a centralized UPS system is utilized, specific UPS receptacles will be further identified and located in the design phase. Centralized UPS will be further identified in the engineering narratives and designed by the electrical engineer in the design phases. If point of use UPS units is utilized, Owner shall provide the sizes and power requirements of these units to be incorporated into the design.
JUSTIFICATION
Based on conversations with the State of Michigan and MSP, the DNA Lab and Latent Prints Lab are being evaluated to potentially be relocated from the Northville facility to the Detroit facility. The Detroit facility has two vacant spaces located on the third floor of their facility that are being considered. The team conducted multiple programming sessions with key MSP staff, along with onsite inspections of the existing facilities at the Northville and Detroit sites. Review of the existing utilities/systems in these areas were also inspected to verify they could be modified or added to in support of the new lab spaces.
PROJECT DESCRIPTION
The program study looked at relocating the DNA Lab & Latent Prints Lab into separate vacant spaces on the third floor of the Detroit Police Headquarters building. The project team made on-site visits to both facilities accompanied by both the State of Michigan and MSP to evaluate the existing operations, equipment that needed to be relocated and the over building systems in the vacated spaces.
A survey was submitted to the MSP staff, and their department leads to create a needs assessment of room sizes and workspaces that they felt necessary to create an optimal working environment. These surveys were then reviewed, and concept plans were developed and reviewed with MSP for feedback and additional information requested by the project team. When developing the concept plans, square footage numbers were included on the plans as reference showing what the program needs wanted to be based on staff feedback and what was actually provided due to space constraints.
Existing Available Spaces:
Space “A” 4,675 sf Space “B” 5,070 sf
Additional Space: 495 sf
Totals 10,240 sf
Build Out Spaces:
Space “A” – Office Area 4,675 sf Space “B” – DNA Lab 3,120 sf Space “B” – Latent Prints Lab: 2,445 sf
Totals 10,240 sf
BUILDING CONSTRUCTION SYSTEMS
Structural/Architectural The existing structural system of the building consists of steel columns and framing with spray-on fireproofing applied to the structural members. The program includes two vacant spaces, which we have labeled Space “A” and Space “B”, which is separated by a common corridor. The exterior perimeter walls are furred out with metal studs, but no finish material is applied to the studs. There are door openings that enter each space and the locations of these doors were incorporated into the overall design of these spaces.
When developing the design of Space “A” and Space “B”, it was determined that Space “A”, that is on the exterior façade of the building, would be utilized as the office area as there are existing windows along the façade that will be incorporated into the overall design of the space. Space “B” will be utilized as the laboratory space which seems to function better with the location of the existing utility lines that are needed for the development of this space.
All new interior partitions will be constructed with metal stud and gypsum board. These walls will be painted with low VOC paint and at evidence drying rooms, epoxy resin finish will be provided. New flooring will be provided, which will be chemically resistant, heat-welded, homogeneous in color, seamless, vinyl flooring in most laboratory spaces and epoxy resinous flooring in drying rooms. New ceilings will be provided and will consist of acoustical lay-in ceilings similar to Armstrong Ultima with NRC of .7 and reflectance of .9. In special applications such as laboratories, a vinyl coated, lay-in, ceiling will be utilized. A clean room ceiling with a high NRC and high light reflectance will be provided.
Mechanical Design The mechanical systems will be designed to be energy efficient and provide occupant comfort in the space.
The HVAC system will utilize existing high plume lab exhaust fans and make up air units to serve a variable air volume system in both of renovated spaces. Precise air flow supply and exhaust air valves and controls will be utilized in the lab space to maintain room pressure requirements and fume hood exhaust air flow for occupant safety. Existing high efficient condensing boilers will be utilized to serve all the reheat coils in the space.
Plumbing Design The plumbing systems will be designed to provide domestic water for all the plumbing fixtures and safety showers in an efficient and safe manor. The sanitary piping will be protected with neutralization kits at each lab sink. The plumbing will be served by the existing building’s domestic water system and existing domestic water heater.
Electrical Design The electrical systems associated with the forensic laboratory expansion shall be designed to integrate seamlessly with the existing facility infrastructure while supporting the specialized operational requirements of forensic science and DNA testing functions. The design will evaluate available capacity within the existing electrical distribution system and identify modifications necessary to serve the expanded laboratory spaces, support areas, and associated building systems.
APPENDIX A
PROGRAMMING NOTES
McClaren, Wilson Lawrie, Inc.
Laboratory Design Consultant 2026
In Association with HOBBS + BLACK
Page 1. 2
In Association with HOBBS + BLACK
Page 1. 3
In Association with HOBBS + BLACK
Page 1. 4
In Association with HOBBS + BLACK
Page 1. 5
In Association with HOBBS + BLACK
Page 1. 6
END
| 551_26434 Project Statement |
| Edited Study_ |
| final Cover page |
| 8_19-26 Edited MSP Northville Forensic Lab Relocation_ Summary |
| EXECUTIVE SUMMARY |
| GOALS |
Edit 8_19_2026 Redcated Less Admin Appendix
File details come from the government source that posted it. Updated .