Project Execution Plan (PEP).zip

ZIP file 34 MB Posted

Attached to
Antarctic Research Vessel (ARV) Integrator, Solicitation Federal contract opportunity
Solicitation number
49100423R0010
Issued by
National Science Foundation

About this file

This document provides details of a solicitation released by the National Science Foundation for an Antarctic Research Vessel Integrator. The solicitation is for an Indefinite-Delivery Indefinite-Quantity contract with a single award and ten year ordering period to provide integrator services for the procurement of an Antarctic Research Vessel. The work will take place at contractor locations. It is a full and open competition without a small business set aside. The applicable NAICS code is 541330 with a $47 million size standard. The Product Service Code is C216. Interested parties must be registered in SAM by the award date. The solicitation includes vessel design documents available as PDFs or via request through SAM. All costs to respond are the responsibility of interested parties. NSF will provide any future information on SAM and reserves the right to amend the solicitation.

Other files for this federal contract opportunity

Other files attached to Antarctic Research Vessel (ARV) Integrator, Solicitation, newest first.
File Type Posted
Attachment 6 ARV Oral Presentation Questions 20240507.pdf PDF
ARV RFP QA (SAM) 20240506.xlsx XLSX spreadsheet
49100423R0010 ARV INTEGRATOR 20240506.pdf PDF
49100423R0010 0011 EX.pdf PDF
Room W2170 General Configuration.docx DOCX document
49100423R0010 ARV INTEGRATOR 20240506 Track Changes.docx DOCX document
49100423R0010 0010 EX.pdf PDF
49100423R0010 ARV INTEGRATOR 20240418.pdf PDF
49100423R0010 ARV INTEGRATOR 20240418 Track Changes.docx DOCX document
49100423R0010 ARV INTEGRATOR 20240417.pdf PDF
49100423R0010 0009 EX.pdf PDF
49100423R0010 ARV INTEGRATOR 20240417 Track Changes.docx DOCX document
49100423R0010 ARV INTEGRATOR 20240327 Track Changes.docx DOCX document
49100423R0010 ARV INTEGRATOR 20240327.pdf PDF
49100423R0010 0008 EX.pdf PDF
49100423R0010 ARV INTEGRATOR 20240322.pdf PDF
ARV RFP QA (SAM) 20240322.xlsx XLSX spreadsheet
Attachment 6 ARV Oral Presentation Questions 20240322.pdf PDF
49100423R0010 0007 EX.pdf PDF
49100423R0010 ARV INTEGRATOR 20240322 Track Changes.docx DOCX document
49100423R0010 ARV INTEGRATOR 20240319 Track Changes.docx DOCX document
ARV RFP QA (SAM) 20240319.xlsx XLSX spreadsheet
49100423R0010 0006 EX.pdf PDF
49100423R0010 ARV INTEGRATOR 20240319.pdf PDF
49100423R0010 0005 EX.pdf PDF
49100423R0010 ARV INTEGRATOR 20240318.pdf PDF
49100423R0010 ARV INTEGRATOR 20240318 Track Changes.docx DOCX document
Attachment 6 ARV Oral Presentation Questions.pdf PDF
49100423R0010 0004 EX.pdf PDF
49100423R0010 ARV INTEGRATOR 20240312 Track Changes.docx DOCX document
49100423R0010 ARV INTEGRATOR 20240312.pdf PDF
ARV RFP QA (SAM).xlsx XLSX spreadsheet
49100423R0010 0003 EX.pdf PDF
Amendment 3 Attachments 20240304.zip ZIP file
49100423R0010 ARV INTEGRATOR 20240223.pdf PDF
49100423R0010 0002 EX.pdf PDF
49100423R0010 0001 EX.pdf PDF
NSF Past Performance Letter 20240223.pdf PDF
NSF Past Performance Survey 20240223.docx DOCX document
49100423R0010 ARV INTEGRATOR 20240223 (Word).docx DOCX document
Section J Attachment 5 NSF Past Performance Questionnaire.pdf PDF
49100423R0010 0001 ARV.pdf PDF
Preliminary Design Drawings.zip ZIP file
49100423R0010 ARV INTEGRATOR.pdf PDF
Preliminary Design Reports Part 2 of 2.zip ZIP file
49100423R0010 ARV INTEGRATOR (Word).docx DOCX document
ARV Attachment List (SAM).xlsx XLSX spreadsheet
Preliminary Design Reports Part 1 of 2.zip ZIP file
Show all 48

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .