This document contains a solicitation for an Antarctic Research Vessel Integrator contract issued by the National Science Foundation. The solicitation seeks an integrator to oversee the design, construction, testing, and delivery of a new Antarctic research vessel over a ten year period. Key responsibilities for the integrator include managing the shipbuilder selection process, ensuring the detailed design and production engineering are completed on schedule, providing onsite support during fabrication and sea trials, and coordinating handover to the vessel operator. Offerors must submit responses by the date specified in Section L of the attached solicitation and be prepared to present their qualifications and approach in oral presentations covering their proposed processes for the shipbuilder selection, design oversight, and transition to operations. The single-award IDIQ contract has a period of performance of ten years from the date of award.

View the file

Other files for this federal contract opportunity

Other files attached to Antarctic Research Vessel (ARV) Integrator, Solicitation, newest first.
File Type Posted
Attachment 6 ARV Oral Presentation Questions 20240507.pdf PDF
ARV RFP QA (SAM) 20240506.xlsx XLSX spreadsheet
49100423R0010 0011 EX.pdf PDF
Room W2170 General Configuration.docx DOCX document
49100423R0010 ARV INTEGRATOR 20240506 Track Changes.docx DOCX document
49100423R0010 ARV INTEGRATOR 20240506.pdf PDF
49100423R0010 0010 EX.pdf PDF
49100423R0010 ARV INTEGRATOR 20240418.pdf PDF
49100423R0010 ARV INTEGRATOR 20240418 Track Changes.docx DOCX document
49100423R0010 0009 EX.pdf PDF
49100423R0010 ARV INTEGRATOR 20240417.pdf PDF
49100423R0010 ARV INTEGRATOR 20240417 Track Changes.docx DOCX document
49100423R0010 0008 EX.pdf PDF
49100423R0010 ARV INTEGRATOR 20240327 Track Changes.docx DOCX document
49100423R0010 ARV INTEGRATOR 20240327.pdf PDF
49100423R0010 ARV INTEGRATOR 20240322.pdf PDF
49100423R0010 0007 EX.pdf PDF
49100423R0010 ARV INTEGRATOR 20240322 Track Changes.docx DOCX document
ARV RFP QA (SAM) 20240322.xlsx XLSX spreadsheet
Attachment 6 ARV Oral Presentation Questions 20240322.pdf PDF
49100423R0010 0006 EX.pdf PDF
49100423R0010 ARV INTEGRATOR 20240319 Track Changes.docx DOCX document
ARV RFP QA (SAM) 20240319.xlsx XLSX spreadsheet
49100423R0010 ARV INTEGRATOR 20240319.pdf PDF
49100423R0010 0005 EX.pdf PDF
49100423R0010 ARV INTEGRATOR 20240318.pdf PDF
49100423R0010 ARV INTEGRATOR 20240318 Track Changes.docx DOCX document
49100423R0010 ARV INTEGRATOR 20240312 Track Changes.docx DOCX document
49100423R0010 0004 EX.pdf PDF
49100423R0010 ARV INTEGRATOR 20240312.pdf PDF
ARV RFP QA (SAM).xlsx XLSX spreadsheet
Amendment 3 Attachments 20240304.zip ZIP file
49100423R0010 0003 EX.pdf PDF
49100423R0010 ARV INTEGRATOR 20240223.pdf PDF
49100423R0010 0002 EX.pdf PDF
49100423R0010 0001 EX.pdf PDF
49100423R0010 ARV INTEGRATOR 20240223 (Word).docx DOCX document
NSF Past Performance Letter 20240223.pdf PDF
NSF Past Performance Survey 20240223.docx DOCX document
Section J Attachment 5 NSF Past Performance Questionnaire.pdf PDF
49100423R0010 0001 ARV.pdf PDF
Project Execution Plan (PEP).zip ZIP file
Preliminary Design Drawings.zip ZIP file
49100423R0010 ARV INTEGRATOR (Word).docx DOCX document
ARV Attachment List (SAM).xlsx XLSX spreadsheet
Preliminary Design Reports Part 1 of 2.zip ZIP file
49100423R0010 ARV INTEGRATOR.pdf PDF
Preliminary Design Reports Part 2 of 2.zip ZIP file
Show all 48

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

49100423R0010 ARV INTEGRATOR

Attachment 6 – Oral Presentation Questions

Oral Presentation Questions:

Offerors shall make presentations to the NSF describing their approach, organization, and experience with regards to the following three significant tasks in the Statement of Work (SOW) (SOW sections referenced below). Where possible, offerors will provide an example where the same or similar process/method has been used on previous projects. Per the solicitation instructions, offerors will be limited to 50 visual presentation slides, 15 written pages of written documentation (consistent with section L.5.3 requirements) provided with the presentation, and two hours of presentation time. Please see section L. 8 of the solicitation for further instructions. NSF reserves the right to ask questions for purposes of clarification at the end of the presentation or two hours, whichever comes first.

• C.2.3: Final Design Phase (Task 1) C.2.3.2: Ship Builder Solicitation, Evaluation, and Contract

C.2.3.2.d & e: Describe your proposed solicitation process and criteria for evaluating and selecting a qualified ship builder in a competitive manner.

C.2.3.2.f: Describe how and when your team will engage with the ship builder for value engineering to ensure the design is buildable by the selected ship builder within a proposed final budget and schedule.

• C.2.4: Construction Stage (Task 2) C.2.4.1 & 2: Ship Builder Oversight

C.2.4.1.b, c & e: Describe how your team will ensure a timely and comprehensive completion of the detailed design, regulatory approvals, and production engineering so that fabrication starts and stays on schedule.

C.2.4.2.a: Describe your approach to providing an on-site team and working with the ship builder to ensure the required quality of fabrication, tests and trials, management of changes, and maintaining schedule and costs within budget.

(Task 3) C.2.4.3: Transition to Operations C.2.4.3.c & d: Describe your approach for coordinating with the ship operator, NSF, and Science Advisory Subcommittee (SASC) for planning and conducting the science and ice sea trials.

C.2.4.3.e: Describe how you will manage the warranty period and post shakedown availability. Describe what your organizational structure will look like.