This document contains a solicitation for an Indefinite-Delivery Indefinite-Quantity contract to provide integrator services for the procurement of an Antarctic Research Vessel. The National Science Foundation is seeking a single-award IDIQ with an ordering period of ten years from date of award. Work will take place at contractor locations. The solicitation is full and open competition without set-asides. The applicable NAICS code is 541330 with a size standard of $47M. The Product Service Code is C216. All respondents must be registered in SAM by the award date. The solicitation includes attachments pertaining to vessel design documents available publicly in PDF format, with native files accessible via SAM. The solicitation is released as both PDF and Word documents. Responses are due as detailed in Section L, with the NSF reserving the right to amend the solicitation throughout.
View the file
Other files for this federal contract opportunity
Show all 48
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PD PEP
| Main Body PEP | |
| Appendix 01 | Science Mission Requirements |
| Appendix 02 | FD Phase Schedule |
| Appendix 02 | PD Phase Schedule |
| Appendix 03 | WBS Dictionary |
| Appendix 04 | Scope Management Plan |
| Appendix 05 | Scope Delineation Plan |
| Appendix 06 | Basis of Estimate |
| Appendix 06.1 | Cost Book |
| Appendix 07 | Integrated Master Schedule |
| Appendix 07.1 | ARV Schedule Rev 41 (xls) |
| Appendix 08 | Change Control Plan |
| Appendix 09 | Risk Registries and Risk Forms |
| Appendix 09.1 | Risk Register (CS) - Redacted Logic |
| Appendix 10 | Risk and Contingency Analysis |
| Appendix 12 | Contingency Management Plan |
| Appendix 13 | Systems Engineering Plan |
| Appendix 14 | Configuration Control Plan |
| Appendix 15 | Master Document List |
| Appendix 17 | Integration and Testing Plan |
| Appendix 18 | Operational Readiness Plan |
PD Drawings
| Dwg # | Table 1 - Drawings | Rev Uploaded | Native File | Native File Type |
| 5E1-001-D001 | General Arrangement Drawing | P5 | √ | .dwg [CAD Drawing] |
| 5E1-002-D101 | Topside Arrangement Drawing | P4 | √ | .dwg [CAD Drawing] |
| 5E1-003-D101 | 3D Rendering of Wholeship Exterior | P2 | √ | ARV-DH_Composite (Navisworks File) |
| 5E1-003-D201 | 3D Structural Producibility Model | P0 | √ | ARV-HULL_Composite (Navisworks File) |
| 5E1-071-D001 | Equipment Removal Drawing | P1 | √ | .dwg [CAD Drawing] |
| 5E1-100-D001 | Hull Lines Drawing | P3 | √ | .dwg [CAD Drawing] |
| 5E1-100-D101 | Blocking Plan | P0 | √ | .dwg [CAD Drawing] |
| 5E1-110-D001 | Hull Structure - Shell Expansion | P2 | √ | .dwg [CAD Drawing] |
| 5E1-116-D101 | Hull Structure - Profiles | P0 | √ | .dwg [CAD Drawing] |
| 5E1-117-D001 | Hull Structure - Midship Section | P3 | √ | .dwg [CAD Drawing] |
| 5E1-117-D101 | Hull Structure - Typical Sections | P0 | √ | .dwg [CAD Drawing] |
| 5E1-120-D001 | Hull Structure - Misc Bulkheads | P0 | √ | .dwg [CAD Drawing] |
| 5E1-130-D001 | Hull Structure - Decks & Platforms | P2 | √ | .dwg [CAD Drawing] |
| 5E1-150-D001 | Superstructure Structure Drawing | P2 | √ | .dwg [CAD Drawing] |
| 5E1-261-D001 | Fuel Oil System [See Below for Mission Fuel System] | P3 | √ | .dwg [CAD Drawing] |
| 5E1-262-D001 | Lube Oil System | P3 | √ | .dwg [CAD Drawing] |
| 5E1-301-D001 | Electrical System One-Line Diagram | P3 | √ | .dwg [CAD Drawing] |
| 5E1-301-D101 | Scientific Electronic Arrangement Drawing | P4 | √ | .dwg [CAD Drawing] |
| 5E1-403-D001 | Lifesaving Drawing | P3 | √ | .dwg [CAD Drawing] |
| 5E1-415-D001 | Shipwide Network Diagram | P4 | √ | .vsdx [MS Vizio File] |
| 5E1-501-D001 | Machinery Arrangement Drawing | P4 | √ | .dwg [CAD Drawing] |
| 5E1-510-D001 | HVAC Systems Drawing [See Below for related drawings] | P2 | √ | .dwg [CAD Drawing] |
| 5E1-513-D001 | Machinery Space Ventilation Diagram | P0 | √ | .dwg [CAD Drawing] |
| 5E1-517-D001 | Waste Heat Recovery System & Hot Water Heating System | P2 | √ | .dwg [CAD Drawing] |
| 5E1-517-D101 | Deck De-icing Plan | P3 | √ | .dwg [CAD Drawing] |
| 5E1-520-D001 | Seawater Service System | P3 | √ | .dwg [CAD Drawing] |
| 5E1-521-D001 | Firemain System | P2 | √ | .dwg [CAD Drawing] |
| 5E1-524-D001 | Science Seawater System | P3 | √ | .dwg [CAD Drawing] |
| 5E1-528-D001 | Sewage System | P2 | √ | .dwg [CAD Drawing] |
| 5E1-529-D001 | Bilge and Oily Waste System | P2 | √ | .dwg [CAD Drawing] |
| 5E1-529-D101 | Ballast System | P3 | √ | .dwg [CAD Drawing] |
| 5E1-529-D201 | Roll Tank System | P4 | √ | .dwg [CAD Drawing] |
| 5E1-532-D001 | Freshwater Cooling System | P3 | √ | .dwg [CAD Drawing] |
| 5E1-532-D101 | Jacket Water Cooling Drawing | P3 | √ | .dwg [CAD Drawing] |
| 5E1-532-D201 | Chilled Water System | P2 | √ | .dwg [CAD Drawing] |
| 5E1-533-D001 | Potable Water Service System | P2 | √ | .dwg [CAD Drawing] |
| 5E1-544-D001 | Mission Fuel System [Cargo Oil System] | P3 | √ | .dwg [CAD Drawing] |
| 5E1-551-D001 | Starting Air System | P3 | √ | .dwg [CAD Drawing] |
| 5E1-551-D101 | Control and Ship Service Compressed Air System | P3 | √ | .dwg [CAD Drawing] |
| 5E1-555-D001 | Fire Extinguishing Systems | P2 | √ | .dwg [CAD Drawing] |
| 5E1-580-D001 | Handling Systems and Scientific Deployment Drawing | P4 | √ | .dwg [CAD Drawing] |
| 5E1-581-D001 | Anchoring Drawing | P0 | √ | .dwg [CAD Drawing] |
| 5E1-582-D001 | Mooring and Towing Drawing | P0 | √ | .dwg [CAD Drawing] |
| 5E1-601-D001 | Science Space Arrangement Drawing | P4 | √ | .dwg [CAD Drawing] |
| 5E1-635-D001 | Insulation Plan | P3 | √ | .dwg [CAD Drawing] |
| Drawing Groups from RFP table 1 included multiple files that are listed above with color code | |
| Anchoring and Mooring Drawing | See Above |
| Ship and Scientific Compressed Air System [See Below for two air system drawings] | See Above |
| Structural Drawings: Midship, Decks and Platforms and Shell Expansion | See Above |
PD Reports
| Analyses / Technical Documents | Rev Uploaded | Dwg # | Native File Uploaded | Location |
| Picture Window Assessment | P0 | 5E1-625-R001 | Part 1 of 2 | |
| Pollution Control Systems Report | P2 | 5E1-593-R001 | Part 1 of 2 | |
| RHIB Builder Specification | P1 | 5E1-583-R004 | Part 1 of 2 | |
| Landing Craft Builder Specification | P1 | 5E1-583-R002 | Part 1 of 2 | |
| Scientific Workboat Builder Specification | P1 | 5E1-583-R001 | Part 1 of 2 | |
| Smart HVAC Power Demand Study | P0 | 5E1-512-R101 | Part 1 of 2 | |
| Security Control Traceability Matrix (SCTM) | P4 | 5E1-402-P001 | MS Excel | Part 1 of 2 |
| Alternate Engines with Aftertreatment Compatibility Study | P0 | 5E1-310-R001 | MS Excel | Part 1 of 2 |
| Electric Power Load Analysis | P3 | 5E1-300-D001 | MS Excel | Part 1 of 2 |
| Electric Plant Load Analysis - Appendix A | P3 | 5E1-300-D001 | MS Excel | Part 1 of 2 |
| Stack Gas Analysis Report | P0 | 5E1-259-R001 | Part 1 of 2 | |
| Mast Analysis Report | P0 | 5E1-170-R001 | Part 1 of 2 | |
| Medium Helicopter Assessment Memo | P0 | 5E1-130-R102 | Part 1 of 2 | |
| Enhanced Aviation Deck Capabilities Assessment | P0 | 5E1-130-R101 | Part 1 of 2 | |
| Model Test Program Plan SOW | P0 | 5E1-098-P002 | Part 2 of 2 | |
| Model Test Program Plan (open water and ice) | P1 | 5E1-098-P001 | Part 2 of 2 | |
| Model Test Report (open water and ice) | P3 | 5E1-096-R101 | Part 2 of 2 | |
| Design Weight Estimate | P4 | 5E1-096-R001 | MS Excel | Part 2 of 2 |
| Test and Evaluation Management Plan (TEMP) | P1 | 5E1-092-P001 | Part 2 of 2 | |
| Master Equipment List | P3 | 5E1-086-R001 | MS Excel | Part 2 of 2 |
| Seakeeping Performance Report | P3 | 5E1-079-R101 | MS Excel | Part 2 of 2 |
| Intact and Damage Stability Report | P3 | 5E1-079-R001 | Part 2 of 2 | |
| Hazardous Materials Management Plan (HMMP) | P3 | 5E1-077-P101 | Part 2 of 2 | |
| Hazardous Materials Management Plan (HMMP) Appendix 1 Haz Mat Target List.xlsm | P3 | 5E1-077-P101 | MS Excel | Part 2 of 2 |
| System Safety Plan (SSP) | P4 | 5E1-077-P001 | Part 2 of 2 | |
| System Safety Plan Appendix 1 Hazard Tracking System.xlsx | P4 | 5E1-077-P001 | MS Excel | Part 2 of 2 |
| Reliability, Availability, and Maintainability (RAM) Plan | P5 | 5E1-076-P001 | Part 2 of 2 | |
| Underwater Radiated Noise and Sonar Self-Noise Report | P3 | 5E1-073-R201 | Part 2 of 2 | |
| Vibration Report | P2 | 5E1-073-R102 | Part 2 of 2 | |
| Airborne Noise Report | P3 | 5E1-073-R101 | Part 2 of 2 | |
| Habitability Study | P3 | 5E1-073-R001 | Part 2 of 2 | |
| Noise Control Plan | P3 | 5E1-073-P301 | Part 2 of 2 | |
| Polar Operations Design Features Report | P0 | 5E1-070-R401 | Part 2 of 2 | |
| SMR Requirement Traceability Matrix | P2 | 5E1-070-R301 | Part 2 of 2 | |
| SMR Requirement Traceablity Matrix_Appendix A | P2 | 5E1-070-R301 | MS Excel | Part 2 of 2 |
| ARV CAMEO Model Report | P1 | 5E1-070-R102 | CAMEO Model | Part 2 of 2 |
| Action Item Status Memo | P0 | 5E1-070-R007 | Part 2 of 2 | |
| Requirements Verification Matrix | P5 | 5E1-070-P101 | MS Excel | Part 2 of 2 |
| Sys Eng Mgmt Plan (SEMP) | P0 | 5E1-070-P001 | Part 2 of 2 | |
| Area/Volume Report | P4 | 5E1-066-R001 | MS Excel | Part 2 of 2 |
| Dynamic Positioning System Performance Report | P3 | 5E1-065-R001 | Part 2 of 2 | |
| Electric Propulsion Architecture Trade-Off Study | P1 | 5E1-062-R101 | Part 2 of 2 | |
| Propulsion System Report | P2 | 5E1-062-R001 | Part 2 of 2 | |
| Structural Design Report | P3 | 5E1-061-R001 | Part 2 of 2 | |
| Human Systems Interface (HSI) Report | P1 | 5E1-060-R101 | Part 2 of 2 | |
| Novel or Emerging Technologies Report | P1 | 5E1-052-R301 | Part 2 of 2 | |
| Transducer/Centerboard Trade-Off Study | P2 | 5E1-052-R201 | Part 2 of 2 | |
| Green Ship Alternative Studies | P2 | 5E1-052-R101 | Part 2 of 2 | |
| Trade-Off Studies | P2 | 5E1-052-R001 | Part 2 of 2 | |
| Hull Form Trade-Off Study | P3 | 5E1-051-R001 | Part 2 of 2 | |
| Icebreaking Performance Report | P2 | 5E1-050-R201 | Part 2 of 2 | |
| Bubble Sweepdown Computational Fluid Dynamics Report | P3 | 5E1-050-R101 | Part 2 of 2 | |
| Maneuvering Performance Report | P2 | 5E1-050-R011 | Part 2 of 2 | |
| Speed and Power Analysis Report | P3 | 5E1-050-R001 | Part 2 of 2 | |
| Range and Endurance Calculations Report | P4 | 5E1-050_R021 | MS Excel | Part 2 of 2 |
| Logistics Support Plan | P1 | 5E1-034-P001 | Part 2 of 2 | |
| Science Systems Report | P3 | 5E1-020-R101 | Part 2 of 2 | |
| Icebreaker Producibilty White Paper | P0 | 5E1-003-R301 | Part 2 of 2 | |
| Design Summary Report | P4 | 5E1-003-R001 | Part 2 of 2 | |
| ARV Placemat | - | 5E1-003-P501 | Part 2 of 2 | |
| Topside SATCOM Trade-Off Study | P0 | 5E1-002-R102 | Part 2 of 2 | |
| Science Outfitting List | P0 | 5E1-000-R401 | MS Excel | Part 2 of 2 |
| Regulatory Body Communications and Correspondence | P3 | 5E1-000-R201 | Part 2 of 2 | |
| Builder Specifications | P2 | 5E1-000-R001 | MS Word | Part 2 of 2 |
| Configuration Change Report | P1 | 5E1-000-P136 | Part 2 of 2 | |
| Configuration Change Report App A | P1 | 5E1-000-P136 | MS Excel | Part 2 of 2 |
Native Format Files
| File Number, Name and Revision # or Date | File Extension | File Type | Size | Location |
| 5E1-000-R001 Builder Specification Rev P2 | docx File | Word document | 2178 KB | Part 1 of 3 |
| 5E1-000-R201 Regulatory Body Communications and Correspondence Rev P3 Appendix 2 | xlsx File | Excel workbook | 40 KB | Part 1 of 3 |
| 5E1-000-R401 Science Outfitting List Rev P0 | xlsx File | Excel workbook | 323 KB | Part 1 of 3 |
| 5E1-001-D001 General Arrangement Rev P5 | dwg File | CAD File | 30183 KB | Part 1 of 3 |
| 5E1-002-D101 Topside Arrangement Drawing Rev P4 | dwg File | CAD File | 27585 KB | Part 1 of 3 |
| 5E1-003-D201 ARV-DH_COMPOSITE 8-15-23 | nwd File | Navisworks File - 3D Model | 2747 KB | Part 1 of 3 |
| 5E1-003-D201 ARV-HULL_COMPOSITE 8-15-23 | nwd File | Navisworks File - 3D Model | 9140 KB | Part 1 of 3 |
| 5E1-050-R021 Range and Endurance Calculations Report Rev P4 Appendix 1 | xlsx File | Excel workbook | 148 KB | Part 1 of 3 |
| 5E1-066-R001 Area Volume Report Rev P4 | xlsx File | Excel workbook | 246 KB | Part 1 of 3 |
| 5E1-070-P101 Requirement Verification Matrix RVM Rev P5 Appendix A | xlsx File | Excel workbook | 768 KB | Part 1 of 3 |
| 5E1-070-P104 ARV Cameo Model for Preliminary Design_Rev P0 | mdzip File | Zip File with Cameo Model Files | 25419 KB | Part 1 of 3 |
| 5E1-071-D001 Equipment Removal Drawing Rev P1 | dwg File | CAD File | 24671 KB | Part 1 of 3 |
| 5E1-076-P003 ARV Reliasoft Analysis Model Rev P5 | rsr21 File | ReliaSoft RGA Database | 43316 KB | Part 1 of 3 |
| 5E1-079-R101 Seakeeping Performance Report Rev P3 Appendix 1 | xlsx File | Excel workbook | 1881 KB | Part 1 of 3 |
| 5E1-086-R001 Master Equipment List Rev P3 | xlsx File | Excel workbook | 209 KB | Part 1 of 3 |
| 5E1-096-R001 Design Weight Estimate Rev P4 Appendices 1 – 3 | xlsx File | Excel workbook | 68 KB | Part 1 of 3 |
| 5E1-100-D001 Hull Lines Rev P3 | dwg File | CAD File | 3309 KB | Part 2 of 3 |
| 5E1-100-D101 Blocking Plan Rev P0 | dwg File | CAD File | 8017 KB | Part 2 of 3 |
| 5E1-110-D001 Hull Structure - Shell Expansion Rev P2 | dwg File | CAD File | 1643 KB | Part 2 of 3 |
| 5E1-116-D101 Hull Structure - Profiles Rev P0 | dwg File | CAD File | 2930 KB | Part 2 of 3 |
| 5E1-117-D001 Hull Structure - Midship Section Rev P3 | dwg File | CAD File | 1656 KB | Part 2 of 3 |
| 5E1-117-D101 Hull Structure - Typical Sections Rev P0 | dwg File | CAD File | 2844 KB | Part 2 of 3 |
| 5E1-120-D001 Hull Structure - Misc Bulkheads Rev P0 | dwg File | CAD File | 3036 KB | Part 2 of 3 |
| 5E1-130-D001 Hull Structure - Decks & Platforms Rev P2 | dwg File | CAD File | 2884 KB | Part 2 of 3 |
| 5E1-150-D001 Superstructure Structure Rev P2 | dwg File | CAD File | 15103 KB | Part 2 of 3 |
| 5E1-261-D001 Fuel Oil System Rev P3 | dwg File | CAD File | 1864 KB | Part 2 of 3 |
| 5E1-262-D001 Lube Oil System Rev P3 | dwg File | CAD File | 1499 KB | Part 2 of 3 |
| 5E1-300-D001 Electric Plant Load Analysis Rev P3 | xlsx File | Excel workbook | 638 KB | Part 2 of 3 |
| 5E1-300-D001 Electric Plant Load Analysis Rev P3 Appendix A | xlsx File | Excel workbook | 76 KB | Part 2 of 3 |
| 5E1-301-D001 Electrical System One-Line Diagram Rev P3 | dwg File | CAD File | 2140 KB | Part 2 of 3 |
| 5E1-301-D101 Scientific Electronic Systems Arrangement Rev P4 | dwg File | CAD File | 38784 KB | Part 2 of 3 |
| 5E1-310-R001 Alternate Engines with Aftertreatment Compatibility Study Rev P0 Appendix 1 | xlsx File | Excel workbook | 64 KB | Part 2 of 3 |
| 5E1-402-P001 Security Control Trac Matrix (SCTM) Rev P4 | xlsx File | Excel workbook | 110 KB | Part 2 of 3 |
| 5E1-403-D001 Lifesaving Drawing Rev P3 | dwg File | CAD File | 15701 KB | Part 2 of 3 |
| 5E1-415-D001 Shipwide Network Diagram Rev P4 | vsdx File | MS Vizio File | 3502 KB | Part 2 of 3 |
| 5E1-501-D001 Machinery Arrangement Rev P4 | dwg File | CAD File | 11655 KB | Part 2 of 3 |
| 5E1-510-D001 HVAC Systems Rev P2 | dwg File | CAD File | 7416 KB | Part 2 of 3 |
| 5E1-513-D001 Machinery Space Ventilation Diagram Rev P0 | dwg File | CAD File | 17817 KB | Part 2 of 3 |
| 5E1-517-D001 Waste Heat Recovery System & Hot Water Heating System Rev P2 | dwg File | CAD File | 1575 KB | Part 2 of 3 |
| 5E1-517-D101 Deck De-Icing Plan [Mechanical] Rev P3 | dwg File | CAD File | 36320 KB | Part 2 of 3 |
| 5E1-520-D001 Seawater Service System Rev P2 | dwg File | CAD File | 1495 KB | Part 2 of 3 |
| 5E1-521-D001 Firemain System Rev P2 | dwg File | CAD File | 1398 KB | Part 2 of 3 |
| 5E1-524-D001 Science Seawater System Rev P3 | dwg File | CAD File | 1596 KB | Part 2 of 3 |
| 5E1-528-D001 Sewage System Rev P2 | dwg File | CAD File | 2776 KB | Part 2 of 3 |
| 5E1-529-D001 Bilge and Oily Waste System Rev P2 | dwg File | CAD File | 29652 KB | Part 2 of 3 |
| 5E1-529-D101 Ballast System Rev P3 | dwg File | CAD File | 2560 KB | Part 3 of 3 |
| 5E1-529-D201 Roll Tank System Rev P4 | dwg File | CAD File | 3110 KB | Part 3 of 3 |
| 5E1-532-D001 Freshwater Cooling System Rev P3 | dwg File | CAD File | 1484 KB | Part 3 of 3 |
| 5E1-532-D101 Jacket Water Cooling System Rev P3 | dwg File | CAD File | 1496 KB | Part 3 of 3 |
| 5E1-532-D201 Chilled Water System Rev P2 | dwg File | CAD File | 1454 KB | Part 3 of 3 |
| 5E1-533-D001 Potable Water Service System Rev P2 | dwg File | CAD File | 1680 KB | Part 3 of 3 |
| 5E1-544-D001 Mission Fuel System Rev P3 | dwg File | CAD File | 1293 KB | Part 3 of 3 |
| 5E1-551-D001 Starting Air System Rev P3 | dwg File | CAD File | 1303 KB | Part 3 of 3 |
| 5E1-551-D101 Control and Ship Service Compressed Air System Rev P3 | dwg File | CAD File | 1443 KB | Part 3 of 3 |
| 5E1-555-D001 Fire Extinguishing Systems Rev P2 | dwg File | CAD File | 31687 KB | Part 3 of 3 |
| 5E1-580-D001 Handling Systems And Scientific Package Deployment Drawing Rev P4 | dwg File | CAD File | 67842 KB | Part 3 of 3 |
| 5E1-581-D001 Anchoring Drawing Rev P0 | dwg File | CAD File | 5165 KB | Part 3 of 3 |
| 5E1-582-D001 Mooring and Towing Drawing Rev P0 | dwg File | CAD File | 7665 KB | Part 3 of 3 |
| 5E1-583-R001 Scientific Workboat Builder Specification Rev P1 | docx File | Word document | 1655 KB | Part 3 of 3 |
| 5E1-583-R002 Landing Craft Builder Specification Rev P1 | docx File | Word document | 1562 KB | Part 3 of 3 |
| 5E1-583-R004 RHIB Builder Specification Rev P1 | docx File | Word document | 1554 KB | Part 3 of 3 |
| 5E1-601-D001 Science Space Arrangement Rev P4 | dwg File | CAD File | 6368 KB | Part 3 of 3 |
| 5E1-635-D001 Insulation Plan Rev P3 | dwg File | CAD File | 23359 KB | Part 3 of 3 |
image1.png