This project manual outlines the scope of work for federal project number 36C25023B0064 to remove an underground storage tank and replace it with an aboveground storage tank to fuel generators at the Aleda E. Lutz Department of Veterans Affairs Medical Center in Saginaw, Michigan. The project involves demolishing an existing 4,000-gallon UST installed in 1991, excavating and disposing of contaminated soils if found, installing a new 6,000-gallon double-wall AST with associated piping and monitoring systems, and constructing a masonry screen wall around the tank. The design work also includes updating spill prevention, control, and pollution incident prevention plans. Bids for the construction work are due on March 14, 2023. The construction budget is $300,000 with deductive alternates required to ensure the awarded contract remains within budget.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT # 655-22-202

Removal of UST and Replacement with AST for

Generator in Building 19

Aleda E. Lutz Department of Veterans Affairs Medical Center Saginaw, MI

PROJECT MANUAL

Bid Documents Submission

3/14/2023

PREPARED BY

This page is intentionally left blank.

Site: Aleda E. Lutz Medical Center, Project No. 655-22-202 Project Title: Removal of UST and Replacement with AST for Generator in Building 19

[i]

PROJECT MANUAL

TABLE OF CONTENTS

DESIGN NARRATIVE

PROJECT SCOPE OF WORK

CONSTRUCTION BUDGET

HAZARDOUS ABATEMENT

ENVIRONMENTAL

CIVIL

LANDSCAPE

STRUCTURAL

ARCHITECTURAL

FIRE PROTECTION

PLUMBING

MECHANICAL

ELECTRICAL

Appendix A: Concept Tank Enclosure

Appendix B: Concept Tank designs

Appendix C: Engineering Calculations

Appendix D: Above ground storage tank dimensions (6,000 gallon)

Project # 655-22-202, Removal of UST and Replacement with AST for Generator in Building 19

Bid Documents Submission Aleda E. Lutz Medical Center

[2]

DESIGN NARRATIVE

PROJECT SCOPE OF WORK

From contract document 36C25022R0055:

A/E Part One Services (also known as Design Phase) for this design project includes site visits, field investigation, conduct of studies and user interviews to prepare drawings, specifications and cost estimates for all facets of work and disciplines/trades to facilitate a construction project in order to remove Tank 5, a 4,000-gallon underground storage tank (UST) and replace it with an above ground storage tank (AST) feeding the generator in Building 19.

A/E must design project so that Building 19 Generator are kept running so that hospital remains functioning while replacement is occurring. There will be a need for a temporary tank to feed generators within Building 19. Work shall include preparation and submission of all environmental permits and reports, environmental testing, excavation, site restoration/improvements, physical security upgrades, and modernization of the mechanical, electrical, plumbing and technology systems to/from the new AST to the generator. A phasing plan must be developed to prevent disruptions to the medical center’s operations during the switch over of the Building 19 generator fuel tank from the UST to the AST. Environmental remediation of contaminated soil or other hazardous conditions discovered during the project shall also be included. The A/E shall also update of the facility’s plans for compliance with U.S Environmental Protection Agency (40 C.F.R 110 and 112), State of Michigan ([Act 451] MCL

324.3101 et seq. Part 5) and City of Saginaw, MI regulations to include but not limited to Stormwater Pollution Prevention Plan (SWPPP), Spill Prevention and Controls Countermeasure Plan (SPCCP) and the Pollution Incident Prevention Plan (PIPP).

A/E Part Two Services of this design project (also known as Construction Period Services) includes responding to construction contractor Requests For Information (RFIs) during the solicitation and construction phases of the construction project, attendance at pre-bid and post-award construction project conferences, review of construction material submittals and shop drawings, site visits during construction (both scheduled and emergent) to ensure compliance with the design drawings and specifications, preparation of site visit reports, coordination with project commissioning requirements, review of any construction project modifications for cost and technical acceptability, attendance at the final acceptance inspection, preparation of the punch list and preparation of record drawings of the completed construction project based on the construction contractor’s as-built drawings.

See document 36C25022R0055 for additional scope details and programming.

CONSTRUCTION BUDGET

The construction budget for this project is $300,000. Deduct alternates totaling 10% of the construction budget are required to be identified to assure award of contract within available funds.

The project is currently over budget. VA leadership provided direction to proceed with design despite construction budget issues.

HAZARDOUS ABATEMENT

No abatement of hazardous materials is anticipated.

ENVIRONMENTAL

Tank will be removed in accordance with VA specification 02 65 00 Underground Storage Tank Removal and in accordance with state and local rules. The project will be designed with the assumption that the installed tank is not leaking and abatement of the soils will not be required. Sampling is to be performed during tank removal. The

Bid Documents Submission Aleda E. Lutz Medical Center

[3] tank removal specifications outline the steps required if soil contamination is discovered during excavation.

Remediation will be performed, if necessary, in accordance with VA, state, and local requirements.

The design team will provide an update to the existing Spill Prevention, Control and Countermeasure (SPCC) plan and the existing Pollution Incident Prevention Plan (PIPP) to account for the new above-ground storage tank.

These plan updates will occur during the construction period

CIVIL

Location and Survey

Survey of the project area is planed during the schematic design development phase. This will provide verification of geographic marker in the State Plane Coordinate system/USGS, locate buildings, site work, utilities, and infrastructure.

Site Analysis

The project requires removal of one underground tank that currently contain fuel for generators. It will also provide a new above ground tank with screening to supply fuel for the emergency generators.

Civil Narrative

During Design Development the AE will submit narrative for site access, vehicular circulation, physical security standoffs, barriers, parking, emergency access, and items of environmental concern. The tank removal area will be evaluated for potential impact on adjacent utilities and electrical equipment.

Phasing

Phasing will largely be accomplished by providing a temporary fuel tank to serve the generators during demolition of the existing fuel tank and construction of the new fuel tank.

Erosion Control/Storm Water Management

The project will disturb less than 1 acre of area during all construction. Sediment control measures will consist of gravel fille “socks” and inlet protection for existing storm sewers. Temporary vehicle tracking measures will be placed to limit material leaving the site.

During Design Analysis, the AE will conduct a drainage analysis and provide calculations of existing and proposed site conditions to assess potential options for storm water management strategies and Coordinate with the VA.

LANDSCAPE

Landscaping is limited to repairs that match existing conditions.

STRUCTURAL

Screen walls with a concrete foundation will be provided around the new aboveground tank. These screen walls will be reinforced per input from the physical security specialist blast analysis. Foundations will also be provided for the new fuel tank.

ARCHITECTURAL

New Work:

The design intent is to extend the walls north of Building 19 and avoid nearby site electrical equipment. Wall construction for the enclosure is built with either 8” or 12” reinforced concrete masonry units (CMU) and brick.

The brick pattern shall match the coursing of the existing structure in both running bond and soldier. Concrete

Bid Documents Submission Aleda E. Lutz Medical Center

[4] coping shall be place on top of the wall. The height of the walls are 9’-4” to hide the 8’-0” diameter tank behind it.

Within the enclosure, gravel infill shall be added to help with drainage as this structure does not contain a roof. A double door shall be added to the East wall to keep it out of sight from the road and CLC while still providing adequate access.

The two existing wing walls of Building 19 may need to be demolished due to PSRDM requirements and need to be evaluated. Walls will be reinforced to meet requirements of the Physical Security & Resiliency Design Manual (PSRDM) for Utilities for Mission Critical buildings.

As for the appearance from the road and CLC, we are proposing a green screen trellising system that will allow vines and flowers to grow up the height of the wall to the north. Benches or a sitting area across from the CLC atrium and in front of the green wall would be a valid solution to utilize the remaining space of the site. Additional planting around the structure may be an option as well. This will be proposed as a deduct alternate.

See Appendix A for design concept sketches (now superseded by SD drawings)

Code Compliant Design:

All work will conform to the:

NFPA 101 Life Safety Code, National Fire Protection Association NFPA Fire Codes with the exception of NFPA 5000 and NFPA 900, National Fire Protection Association OSHA Standards

FIRE PROTECTION

No fire protection scope anticipated.

PLUMBING

Drainage and fuel systems to be addressed under Civil and Mechanical disciplines.

MECHANICAL

Existing

Tank 5 is an underground storage tank installed in 1991 and is made from a fiberglass material with a capacity of 4000 gallons. The tank is located north of building 19 next a small pad mounted electrical enclosure. The tank serves three generators each with their own day tanks. The tank is monitored by a Veeder-Root system.

Day tank #1 holds 100 gallons and is connected to generator #1. Day tank # 2 has a capacity of 150 gallons and is connected to generator #2. Day tank #3 has an estimated capacity of 100 gallons and is connected to generator #3. All day tanks have gravity overflow return piping back to the storage tank. Each generator has a remote outdoor radiator located to the North of building 19.

Demolition

Tank 5 is to be excavated and removed. All fuel oil and vent piping connected to tank 5 will be removed. All other tank accessories and monitoring systems will be removed. The tank will be removed in accordance with VA specification 02 65 00 UNDERGROUND STORAGE TANK REMOVAL and with local and state rules. This process includes:

Removing and disposal of liquid contents

Removing, cleaning, and disposing of the tank.

Testing and removing contaminated soils

Bid Documents Submission Aleda E. Lutz Medical Center

[5]

Backfilling and restoration

A temporary storage tank will be located to the west of building 19 on the unused ambulance access driveway.

The temporary tank will be connected to the three existing day tanks for the duration of demolition and construction.

New Work

A new UL-2085 double wall above ground storage tank will be installed in the area of the demolished underground storage tank. All new supply and return piping will be installed above ground to existing day tanks in Building 19. The tank will be mounted on foundations with concrete surrounding. A masonry screen wall will be constructed around the tank for aesthetics and compliance with the VA Physical Security and Resiliency Design Manual.

The tank and fuel piping will require supplemental heat to prevent gelling of diesel fuel. The tank heating is by a skid mounted pump with electric heater.

A new overflow tank with duplex return pumps will be required for the existing day tanks to replace the gravity overflow system. This is due to the change in elevation of the bulk storage tank relative to the day tank.

New tank level and leak detection systems will be installed. Alarms will be connected to the central BAS system pending confirmation that tie points to the existing are available.

Engineering Calculations

The calculations below are intended to estimate/verify the required capacity of the new fuel storage tank based on generators served in Building 19.

Scenario 1 – Constant Generator Load

Inputs and assumptions:

o Generator load: 75% (constant) o Fuel consumption:

Gen 1: 21.7 gph Gen 2: 21.7 gph Gen 3: 19 gph o Run time: 96 hours

Total storage required: 5990 gallons

Scenario 2 – Variable Generator Load

Inputs and assumptions:

o Generator load: 75% during day (16 hours), 50% during night (8 hours) o Fuel consumption – Day:

Gen 1: 21.7 gph Gen 2: 21.7 gph Gen 3: 19 gph o Fuel consumption – Night:

Gen 1: 15.7 gph Gen 2: 15.7 gph Gen 3: 13.4 gph o Run time: 96 hours Day total: 64 hr Night total: 32 hr

Bid Documents Submission Aleda E. Lutz Medical Center

[6]

Total storage required: 5427 gallons

Considering both scenarios, a 6000-gallon tank is used for the basis for design phase. Storage calculations and the resulting capacity will be verified with the VA. Supporting data is included in Appendix C.

Miscellaneous:

Seismic design considerations will be investigated.

All work will conform to:

PG 18-10 VA HVAC Design Manual NFPA 30 Flammable and Combustible Liquids Code NFPA 37 Standard for the Installation and Use of Stationary Combustion Engines and Gas Turbines

ELECTRICAL

Existing

Tank 5 provides fuel for generators #1, #2 and #3 located in Building 19. Generator capacities are 400KW, 400KW, and 350KW.

Demolition

The tank will be removed. Power will be disconnected to existing tank monitoring systems and other related accessories.

New Work

A new above ground tank will be provided. Power will be provided to the tank and pipe heating systems.

Power will be provided to the new monitoring systems and fuel transfer pumps.

LED Lighting will be provided. Lighting is anticipated both interior and exterior to the new screen wall.

No access controls or cameras are included.

Calculations:

Seismic design considerations will be investigated.

All work will conform to the:

National Electric Code, NFPA 70, 2020 Edition, National Fire Protection Association Standard for Electrical Safety in the Workplace, NFPA 70e, 2018 Edition, National Fire Protection Association

Bid Documents Submission Aleda E. Lutz Medical Center

[7]

Appendix A: Concept Tank Enclosure

Sketch of Building 19 Tank Enclosure Wall Section

Proposed Deduct Alternate - Green Screen Trellising System

Bid Documents Submission Aleda E. Lutz Medical Center

[8]

Appendix B: Concept Tank designs

Sketch: Tank and piping layout

Sketch: Alternate day tank overflow and return piping layout

Bid Documents Submission Aleda E. Lutz Medical Center

[9]

Appendix C: Engineering Calculations

Calc #1: Fuel consumption calculation for generator #1

Calc #2: Fuel consumption for generator #2

Bid Documents Submission Aleda E. Lutz Medical Center

[10]

Calc #3: Fuel consumption for generator #3

Calc #4: Total gallons of fuel used in both calculations

Bid Documents Submission Aleda E. Lutz Medical Center

[11]

Appendix D: Above ground storage tank dimensions (6,000 gallon)