PRIME-SUB_FORM_for_Contractors_26-B-54LL,_C2072.xls
XLS spreadsheet 38 KB Posted
- Attached to
- Bird Flight Cage Pools - Construction Project State and local contract opportunity
- Solicitation number
- 26-B-54LL
- Issued by
- Volusia County, Florida
About this file
This is a Prime/Subcontractor Form for Volusia County, Florida's Invitation for Bid (ITB No. 26-B-54LL, Contract No. C-2072) for the Bird Flight Cage Pools Construction Project at the Marine Science Center Bird Hospital in Ponce Inlet. The project involves the removal of two existing in-ground bird pools and the design, construction, and installation of two new concrete in-ground bird pools featuring saltwater/chlorinated systems with specified drainage, return line, and skimmer configurations. The design phase must be completed within 30 days, with construction and installation completed within 60 days, for a total project duration of 90 days. A non-mandatory pre-bid meeting is scheduled for March 12, 2026, at 11:00 am at the project site, with questions due by March 26, 2026, at 11:59 pm, and bid submission required by April 9, 2026, at 3:00 pm via the County's eProcurement Portal. Bids must remain firm for 120 days after bid opening, and the form requires bidders to identify all proposed subcontractors by discipline, including Electrical, Plumbing, and Swimming Pools, with dollar values and percentages of work allocated to each contractor.
The estimated construction cost is $50,000.00, with the final award value to be determined upon bid opening and evaluation. Bidders must possess a valid Florida General Contractor's license and demonstrate experience with at least three similar in-ground saltwater concrete pool projects. Volusia County offers a local bid preference of three percent to bidders with a permanent location in specified counties for at least six months prior to bid closing, with an additional two percent preference if local subcontractors constitute 51 percent or greater of subcontracted work. A bid bond of not less than five percent of the bid amount is required, and Payment and Performance Bonds may be waived for this project as it falls below the $200,000.00 threshold. Contractors must maintain comprehensive insurance coverage, including Workers' Compensation, Commercial General Liability of $1,000,000 per occurrence, Auto Liability with combined single limits of $1,000,000, Installation Floater coverage, and Professional Liability of $300,000. All insurance providers must be rated A- or better by A.M. Best & Company, and Volusia County must be named as an additional insured with primary and non-contributory coverage. The County retains five percent of each monthly payment as retainage until final payment, and liquidated damages are assessed at $100.00 per day for delays beyond the completion date.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| Bird_Flight_Cage_Pools_-_Construction_Project.pdf | ||
| Bird_Flight_Cage_Pools_-_Construction_Project.pdf | ||
| Basic_Insurance_Requirements,_26-B-54LL,_C2072.pdf | ||
| Sales_Tax_Exemption_Procedure_26-B-54,_C2072.pdf | ||
| Flight_Cage_Bird_Pools_Drawings.pdf | ||
| Sales_Tax_Exemption_Procedure_26-B-54,_C2072.pdf | ||
| Bid_Documents_26-B-54LL,_C2072.pdf | ||
| Flight_Cage_Bird_Pools_Drawings.pdf | ||
| MASTER_Construction_Contract,_26-B-54LL,_C2072.pdf | ||
| Basic_Insurance_Requirements,_26-B-54LL,_C2072.pdf | ||
| Bid_Documents_26-B-54LL,_C2072.pdf | ||
| MASTER_Construction_Contract,_26-B-54LL,_C2072.pdf | ||
| PRIME-SUB_FORM_for_Contractors_26-B-54LL,_C2072.xls | XLS spreadsheet | |
| Flight_Cage_Bird_Pools_SOW_2026.pdf | ||
| Flight_Cage_Bird_Pools_SOW_2026.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Contract No. C-2072 | ITB No. 26-B-54LL | ||||
| PRIME/SUBCONTRACTOR FORM | |||||
| FAILURE TO COMPLETE AND RETURN THIS FORM MAY RESULT IN A NON-RESPONSIVE BID | |||||
| Bidders are to list ALL Subcontractors that he/she proposed to perform scope of work for this project. The bidder hereby states that he/she proposes, if awarded the contract to hire the following Subcontractor(s) for this project. Prime Contractor is responsible for ensuring that all Subcontractors hold the appropriate license(s). Any change to the Subcontractors during the completion of this project shall receive prior approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not allow change to the total submitted base bid pricing. | |||||
| TOTAL BID | $ - 0 | This number should match the Total Bid Price |
(inclusive of performance/payment bond, if applicable) as listed on Bid Form
| PRIME CONTRACTOR | Company name and complete address | Dollar Value performed by Prime Contractor | % of Work performed by Contractor |
| $ - 0 | 0.00% | ||
| List appropriate sub contractors to be used for each displine listed below, if prime is self performing note self performing in the box under company name and address and submit $0.00 to equal 0 % as this should be included in the green box above. If additional subcontractors are required and their discipline is not listed below they may be added in the blank rows. This form will also be used to determine local preference in accordance with Section 2.8, D. Local Bid Preference in the solicitation. | |||
| Anticipated Subcontractor Disciplines required for this project. | Company name and complete address | Dollar Value performed by Subcontractor(s) | % of Work performed by Subcontractor |
| Electrical | $ - 0 | 0.00% | |
| Plumbing | $ - 0 | 0.00% | |
| Swimming Pools | $ - 0 | 0.00% | |
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| Bidders shall complete the areas shaded in GREEN, which shall be the dollar values assigned to each Contractor (Prime and Subs). All other cells shall be automatically calculated. The total listed in the GREY cell must equal 100% | $ - 0 | 0% |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .