PRIME-SUB_FORM_for_Contractors_26-B-54LL,_C2072.xls

XLS spreadsheet 38 KB Posted

Attached to
Bird Flight Cage Pools - Construction Project State and local contract opportunity
Solicitation number
26-B-54LL
Issued by
Volusia County, Florida

About this file

This is a Prime/Subcontractor Form for Volusia County, Florida, related to ITB No. 26-B-54LL and Contract No. C-2072 for the Bird Flight Cage Pools Construction Project at the Marine Science Center Bird Hospital. The project involves the removal of two existing in-ground bird pools and the design, construction, and installation of two new concrete, in-ground bird pools. Bidders are required to complete and submit this form as part of their bid response; failure to do so may result in a non-responsive bid designation. The form requires identification of all proposed subcontractors and their respective scopes of work, with anticipated disciplines including electrical, plumbing, and swimming pools work.

The form requires bidders to allocate the total bid price between the prime contractor and all subcontractors, with each party's dollar value and percentage of work clearly identified. All monetary values and percentages must be entered in green-shaded cells, while other cells calculate automatically. The total of all allocations must equal 100 percent and match the total bid price submitted on the Bid Form, inclusive of any performance or payment bonds. The prime contractor is responsible for ensuring all subcontractors hold appropriate licenses, and any changes to proposed subcontractors during project completion require prior written approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not permit modifications to the total base bid pricing. This form also serves to determine local preference eligibility in accordance with Section 2.8, D of the solicitation documents.

View the file

Other files for this state and local contract opportunity

Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Contract No. C-2072ITB No. 26-B-54LL
PRIME/SUBCONTRACTOR FORM
FAILURE TO COMPLETE AND RETURN THIS FORM MAY RESULT IN A NON-RESPONSIVE BID
Bidders are to list ALL Subcontractors that he/she proposed to perform scope of work for this project. The bidder hereby states that he/she proposes, if awarded the contract to hire the following Subcontractor(s) for this project. Prime Contractor is responsible for ensuring that all Subcontractors hold the appropriate license(s). Any change to the Subcontractors during the completion of this project shall receive prior approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not allow change to the total submitted base bid pricing.
TOTAL BID$ - 0This number should match the Total Bid Price

(inclusive of performance/payment bond, if applicable) as listed on Bid Form

PRIME CONTRACTORCompany name and complete addressDollar Value performed by Prime Contractor% of Work performed by Contractor
$ - 00.00%
List appropriate sub contractors to be used for each displine listed below, if prime is self performing note self performing in the box under company name and address and submit $0.00 to equal 0 % as this should be included in the green box above. If additional subcontractors are required and their discipline is not listed below they may be added in the blank rows. This form will also be used to determine local preference in accordance with Section 2.8, D. Local Bid Preference in the solicitation.
Anticipated Subcontractor Disciplines required for this project.Company name and complete addressDollar Value performed by Subcontractor(s)% of Work performed by Subcontractor
Electrical$ - 00.00%
Plumbing$ - 00.00%
Swimming Pools$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
Bidders shall complete the areas shaded in GREEN, which shall be the dollar values assigned to each Contractor (Prime and Subs). All other cells shall be automatically calculated. The total listed in the GREY cell must equal 100%$ - 00%

Sheet2

Sheet3

File details come from the government source that posted it. Updated .