This is a Scope of Work document for Volusia County's Growth and Resource Management Department Environmental Management Division in Florida, detailing a project to remove two existing in-ground bird pools and design, construct, and install two new concrete in-ground bird pools at the Marine Science Center Bird Hospital located at 4965 South Peninsula Drive, Ponce Inlet, Florida 32127. The project requires removal of one small and one large rectangular bird pool, followed by construction of replacement pools with specified plumbing and drainage systems. The small pool must include one surface skimmer box and drain, two floor drains, two return lines, and one fill line, while the large pool must include two surface skimmer boxes and drains, three floor drains, four return lines, and one fill line. Both pools must be constructed from industry-standard concrete suitable for saltwater and chlorinated water with durable concrete coating approved by the owner. The design phase must be completed within 30 days, with construction and installation completed within 60 days. A pre-bid meeting is required to discuss pool goals and verify existing conditions, and contractors must provide engineering drawings for approval before construction begins.

Contractors must demonstrate qualifications by providing examples of previous in-ground saltwater concrete pool projects of similar size, budget, and scope. The project scope includes specific design features such as sloped beach-like entrances, shallow bay areas with varying slopes, and interconnected filtration, heating, and cooling systems between the two pools. The contractor is responsible for installing a small concrete curb bordering each pool with holes for removable safety fencing and ensuring minimal interference with the Marine Science Center's normal operations during construction. Plumbing connections must integrate with the current existing filtration pad and fill lines, with specific floor drains directed as gravity drains to the northeast area. Approximate pool dimensions and detailed profile specifications with measurements are provided in the scope of work documentation.

View the file

Other files for this state and local contract opportunity

Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Growth and Resource Management Department Environmental Management Division

Volusia County is seeking bids to remove two existing in-ground bird pools and to design, construct, and install two new concrete, in-ground bird pools at the Marine Science Center Bird Hospital. Project address is 4965 South Peninsula Dr., Ponce Inlet, FL 32127. The project consists of the following elements:

Scope of Project: Removal of one small existing rectangle in-ground bird pool and removal of one large existing rectangular bird pool (see pictures provided by owner for reference).

* The design, construction and installation of one small rectangular in-ground concrete pool with one surface skimmer box and drain, two floor drains, two return lines, one fill line, and all plumbing to and from the current existing filtration pad and the current existing fill lines.

* The design, construction, and installation of one large rectangular in-ground concrete pool with two surface skimmer boxes and drains, three floor drains, four return lines, one fill line, and all plumbing to and from current existing filtration pad and current existing fill lines.

Design and construction to include a pre-bid meeting to discuss pool goals, verification of existing conditions and space, preparation of engineering drawings by contractor, and construction in compliance with specifications.

Specific project elements (Pool drawings, measurements, and space layout with measurements included for reference):

• Small rectangle pool to be constructed of industry-standard concrete for saltwater and chlorinated water. Use of durable concrete coating (i.e. Diamond Brite) to minimize surface wear and maintenance is required, but must be approved by owner. One side of the pool designed with a sloped, beach-like, entrance into the pool with the surface skimmer box being on the opposing side (see owner-supplied reference drawings for details). A small concrete curb to border the pool with holes to accommodate safety fencing provided by contractor. Safety fencing to be removable. Plumbing from the surface skimmer drain and one of the floor drains to be plumbed to the current existing filtration pad, with the second floor drain to be plumbed as a gravity drain to the northeast area of the pools. Plumbing of two return lines from the current existing filtration pad back to the pool, and plumbing of one fill line from the current existing fill line to pool. Dimensions of the pool are approximate.

• Large rectangle pool to be constructed of industry-standard concrete for saltwater and chlorinated water. Use of durable concrete coating to minimize surface wear and maintenance is required, but must be approved by owner. One side of the pool to have a sloped, beach-like, entrance into a short and flat shallow bay area with a gradual slope into the middle and deep part of the pool. The opposing side of the pool also has a sloped, beach-like, entrance into a longer, flat shallow area with a shorter and steeper slope into the middle, deep part of the pool. Middle of pool to a have flat bottom with a surface skimmer box being on either side of the middle of the pool (see owner supplied reference drawings for details). A small concrete curb installed to border the pool. Plumbing from the surface skimmer drains, and two of the floor drains to be plumbed to the current existing filtration pad. The third floor drain to be plumbed as a gravity drain to the northeast area of the pools. Plumbing of four return lines from current existing filtration pad back to the pool and plumbing of one fill line from current existing fill line to pool. Dimensions of the pool are approximate.

• Contractor to plumb in a method that connects the two pools so they can share the same filtration, heating and cooling.

• Provide engineering drawings to MSC staff for approval before start of construction.

Vendor Qualifications:

Vendor to provide examples of previous in-ground saltwater concrete pool projects of similar size, budget, and scope.

Project Timeline and Parameters:

• Design phase to be completed within 30 days

• Construction and installation to be completed within 60 days.

• The contractor will work closely with the MSC project team to ensure that the pools are built and installed in a manner that has minimal interference with the center’s normal operation, including auditory and olfactory conditions.

46’

23’ 23’

11’

38’

8’

15’

26’

16’

4’ 6’

5’

5’

12’

5’ 5’

36’

13’

10’

19’

Current existing Flight Cage boarders (see additional photos for reference)

New Large Pool

New Small Pool

Radius pool corners

Current existing filtration pad

Current existing large pool

Current existing small pool

Current existing Filtration pad and largest entrance into the flight cage

New Large Pool Profile (not to scale)

4’

Water Level 6”

Radius edge curb for easy access for small birds

Sand 6”

Curb raised about 4” above ground level

6’ shallow bay area 2’ shallow bay area

Steep slope, about 60 degrees

Gradual slope, about 15 degrees

New Small Pool Profile (not to scale)

10’

Water Level 6”

Slope, about 45 degrees

5’ shallow bay area

10’

4’

Sand Sand

Inserts for safety fence

Sloped beach like entrance