Previous Relevant Experience Form CONST RFQ-ITB.pdf
PDF 484 KB Posted
- Solicitation number
- APGC2026-2
- Issued by
- Connecticut
About this file
This is a Previous Relevant Experience Form for the University of Connecticut (UConn) Capital Project and Facilities Planning (CPFP) prequalification program for general contractors seeking classification in General Building Construction, Group B or C. The form is designed to document proposed team members and their previous relevant experience on similar projects. Bidders must complete the form according to the specified format without substitution, listing up to six previous relevant experience projects with detailed information including project name, location, owner, contracted role, final construction costs for both the contractor's portion and the entire project, notice to proceed dates, and project completion dates. For each project submitted, contractors must provide a detailed description of work performed and demonstrate how it relates to the scope of work outlined in the solicitation, with the option to include photographs and additional supporting documentation.
The form includes a project key program table that requires contractors to identify key personnel proposed for the prequalifying project and their specific roles, then cross-reference these individuals against the previous relevant experience projects listed to demonstrate continuity of staffing and expertise. Contractors must use the official form without modification and may copy the form to submit additional projects beyond the initial six project spaces if necessary. This prequalification documentation is a prerequisite for contractors to be eligible for Connecticut state and local contract opportunities under the DAS prequalification program, with approval contingent upon meeting the specified requirements and classifications as of the statement of qualifications due date.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UConn CPFP Proposed Team and Previous Relevant Experience Form Rev Jul,2024
PROPOSED TEAM AND PREVIOUS RELEVANT EXPERIENCE
(No substitution of format is permitted.)
PROJECT KEY
1. Fill in the Project Key section below before completing the table.
2. Complete based on the number of previous relevant experience projects being submitted.
3. If necessary, copy form to submit additional projects.
NO. TITLE OF PROJECT NO. TITLE OF PROJECT
1 4
2 5
PROJECT TABLE
NAME OF KEY PERSONNEL
(List the Key Personnel your company is proposing to use on the prequalifying project.)
ROLE IN THIS PROJECT
(List the role of the
Proposed Key Personnel for the prequalifying project.)
PROJECT KEY NUMBER ( Place an “X” under Project Key Number for each
Personnel member that participated in the same or similar role of the Previous Relevant
Experience Projects listed above.)
1 2 3 4 5
PREVIOUS RELEVANT EXPERIENCE FORM
CONST- RFQ/ITB
(Complete a separate sheet for each Project.)
(No substitution of form is permitted.)
1. Project Name:
2. Project Location:
3. Project Owner:
4. Contracted Role:
5. Final Construction Cost for your company's portion of the work:
6. Final Construction Cost for Entire Project:
7. Notice to Proceed Start Date (MM/YYYY):
8. Final/Estimated Construction Completion Date for your company's work (MM/YYYY):
PREVIOUS RELEVANT EXPERIENCE FORM, CONST-RFQ/ITB,Rev July 2024
Company Name:
10. Include a detailed description of the work performed and how it relates to the Scope of Work outlined in the Solicitation Information Sheet. Photos and further project description may be included as additional pages to this form.
9. Final/Estimated Construction Completion Date for Entire Project (MM/YYYY):
| fillable PRE-Matrix-MAR2024-REV1.pdf |
| AREA OF EXPERTISE |
| PROJECT KEY |
| PROGRAM TABLE |
| (FINAL) Previous Relevant Experience, Constr-RFQ-CMr Rev-Mar2024.pdf |
| 002 fillable PRE-Matrix-MAR2024.pdf |
| PROJECT KEY |
| PROGRAM TABLE |
003 fillable Previous Relevant Experience, (Projects) Constr-RFQ-CMr Rev-Mar2024.pdf
| 1: |
| Project Name: |
| 2 Project Location: |
| 3 Project Owner: |
| 4: |
| Contracted Role: [Select One] |
| 7 Notice to Proceed Start Date MMYYYY: |
| 8 Final Completion Date MMYYYY: |
| Company Name: |
| 5 Final Construction Cost for your companys portion of the work: |
| 6: |
| Final Construction Cost: |
| 10 Include a detailed description of the work performed and how it relates to the Scope of Work outlined in the RFQ Photos and further project description may be included as additional pages to this form: |
| 9 Final Construction Completion Date for Entire Project: |
| TITLE OF PROJECT1: |
| TITLE OF PROJECT4: |
| TITLE OF PROJECT2: |
| TITLE OF PROJECT5: |
| TITLE OF PROJECT3: |
| NAME OF KEY PERSONNEL List the Key Personnel your company is proposing to use on the prequalifying projectRow2: |
| ROLE IN THIS PROJECT List the role of the Proposed Key Personnel for the prequalifying projectRow2: |
| 1Row1: |
| 2Row1: |
| 3Row1: |
| 4Row1: |
| 5Row1: |
| NAME OF KEY PERSONNEL List the Key Personnel your company is proposing to use on the prequalifying projectRow3: |
| ROLE IN THIS PROJECT List the role of the Proposed Key Personnel for the prequalifying projectRow3: |
| 1Row2: |
| 2Row2: |
| 3Row2: |
| 4Row2: |
| 5Row2: |
| NAME OF KEY PERSONNEL List the Key Personnel your company is proposing to use on the prequalifying projectRow4: |
| ROLE IN THIS PROJECT List the role of the Proposed Key Personnel for the prequalifying projectRow4: |
| 1Row3: |
| 2Row3: |
| 3Row3: |
| 4Row3: |
| 5Row3: |
| NAME OF KEY PERSONNEL List the Key Personnel your company is proposing to use on the prequalifying projectRow5: |
| ROLE IN THIS PROJECT List the role of the Proposed Key Personnel for the prequalifying projectRow5: |
| 1Row4: |
| 2Row4: |
| 3Row4: |
| 4Row4: |
| 5Row4: |
| NAME OF KEY PERSONNEL List the Key Personnel your company is proposing to use on the prequalifying projectRow6: |
| ROLE IN THIS PROJECT List the role of the Proposed Key Personnel for the prequalifying projectRow6: |
| 1Row5: |
| 2Row5: |
| 3Row5: |
| 4Row5: |
| 5Row5: |
| NAME OF KEY PERSONNEL List the Key Personnel your company is proposing to use on the prequalifying projectRow7: |
| ROLE IN THIS PROJECT List the role of the Proposed Key Personnel for the prequalifying projectRow7: |
| 1Row6: |
| 2Row6: |
| 3Row6: |
| 4Row6: |
| 5Row6: |
| NAME OF KEY PERSONNEL List the Key Personnel your company is proposing to use on the prequalifying projectRow8: |
| ROLE IN THIS PROJECT List the role of the Proposed Key Personnel for the prequalifying projectRow8: |
| 1Row7: |
| 2Row7: |
| 3Row7: |
| 4Row7: |
| 5Row7: |
| NAME OF KEY PERSONNEL List the Key Personnel your company is proposing to use on the prequalifying projectRow9: |
| ROLE IN THIS PROJECT List the role of the Proposed Key Personnel for the prequalifying projectRow9: |
| 1Row8: |
| 2Row8: |
| 3Row8: |
| 4Row8: |
| 5Row8: |
| NAME OF KEY PERSONNEL List the Key Personnel your company is proposing to use on the prequalifying projectRow10: |
| ROLE IN THIS PROJECT List the role of the Proposed Key Personnel for the prequalifying projectRow10: |
| 1Row9: |
| 2Row9: |
| 3Row9: |
| 4Row9: |
| 5Row9: |
| NAME OF KEY PERSONNEL List the Key Personnel your company is proposing to use on the prequalifying projectRow11: |
| ROLE IN THIS PROJECT List the role of the Proposed Key Personnel for the prequalifying projectRow11: |
| 1Row10: |
| 2Row10: |
| 3Row10: |
| 4Row10: |
| 5Row10: |
| NAME OF KEY PERSONNEL List the Key Personnel your company is proposing to use on the prequalifying projectRow12: |
| ROLE IN THIS PROJECT List the role of the Proposed Key Personnel for the prequalifying projectRow12: |
| 1Row11: |
| 2Row11: |
| 3Row11: |
| 4Row11: |
| 5Row11: |
| NAME OF KEY PERSONNEL List the Key Personnel your company is proposing to use on the prequalifying projectRow13: |
| ROLE IN THIS PROJECT List the role of the Proposed Key Personnel for the prequalifying projectRow13: |
| 1Row12: |
| 2Row12: |
| 3Row12: |
| 4Row12: |
| 5Row12: |
| NAME OF KEY PERSONNEL List the Key Personnel your company is proposing to use on the prequalifying projectRow14: |
| ROLE IN THIS PROJECT List the role of the Proposed Key Personnel for the prequalifying projectRow14: |
| 1Row13: |
| 2Row13: |
| 3Row13: |
| 4Row13: |
| 5Row13: |
| NAME OF KEY PERSONNEL List the Key Personnel your company is proposing to use on the prequalifying projectRow15: |
| ROLE IN THIS PROJECT List the role of the Proposed Key Personnel for the prequalifying projectRow15: |
| 1Row14: |
| 2Row14: |
| 3Row14: |
| 4Row14: |
| 5Row14: |
| NAME OF KEY PERSONNEL List the Key Personnel your company is proposing to use on the prequalifying projectRow16: |
| ROLE IN THIS PROJECT List the role of the Proposed Key Personnel for the prequalifying projectRow16: |
| 1Row15: |
| 2Row15: |
| 3Row15: |
| 4Row15: |
| 5Row15: |
| TITLE OF PROJECT6: |
| Text3: |
| Text4: |
| Text5: |
| Text6: |
| Text7: |
| Text8: |
| Text9: |
| Text10: |
| Text11: |
| Text12: |
| Text13: |
| Text14: |
| Text15: |
| Text16: |
| Text17: |
File details come from the government source that posted it. Updated .