PreBid 100pct Drawings - Attachment 2 (Part 2).pdf
PDF 10 MB Posted
- Solicitation number
- N00421-20-S-0116
About this file
This sources sought notice provides details for a construction project to build a single story office building at the Naval Air Warfare Center - Aircraft Division in Patuxent River, Maryland. The project is estimated between $5 million to $10 million with a 365 calendar day performance period. Interested parties must be registered in SAM and capable of bonding for similar construction projects. Responses are due by August 10th and should include company information, interest in bidding, and descriptions of at least three similar past projects with values and durations. The notice is seeking information from all business sizes but may be set aside for small businesses including 8(a), HUBZone, SDVOSB, or woman-owned small businesses given eligible responses. The Naval Air Systems Command and Naval Air Warfare Center are the agencies involved.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PreBid 100pct Drawings - Attachment 2 (Part 1).pdf | ||
| LRP Sources Sought.docx | DOCX document | |
| NAWCAD-WOLF CIDS LRP 24 Jul - Attachment 1.pdf | ||
| Settlement Monitoring Specification - Attachment 3.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REF.REF.
C
D
S-2
WATER METER
ASSEMBLY IN THE
VERTICAL.
2" DOMESTIC WATER
SERVICE, SEE CIVIL
FOR CONTINUATION.
H-1
1 1/2" DCW
1" DCW
DWH-1
STORAGE
MECH
MOTHER'S
BREAK
JAN
WOMEN
MEN
CORRIDOR
ELEC
TR
3/4" DCW
1 1/4" DHW
WHD-1
2" DCW
1" DCW
1 1/4" DCW
3/4" DHC
BALANCING
VALVE (1 GPM)
BALANCING
VALVE (1 GPM)
DHWP-1
DET-1
SPACE RESERVED FOR
INCOMING FIRE PROTECTION
SERVICE TO BUILDING, SEE
FIRE PROTECTION SHEETS.
PROVIDE A MINIMUM 3FT
CLEARANCE IN FRONT OF
ALL COMPONENTS.
1" DCW
MIXING VALVE
1 1/4" DHW
1 1/4" DCW
DDC PANELS
PROVIDE ISOLATION
VALVE IN 1" DCW
PROVIDE LEAD FREE
DUAL CHECK VALVE
1/2" DCW TO
VB-1 SERVING
COFFEE MAKER
1/2" DCW TO
VB-1 SERVING
REFRIGERATOR
1 1/2" DCW
1/2" DHC1/2" DHC
3/4" DHW
WC-1A WC-1A
WC-1 WC-1
WC-1U-1A
S-1
1 1/4" DCW
1" DCW
3/4" DCW
1/2" DHW
1 1/4" DCW
1" DCW
3/4" DCW
1" DHW
1/2" DHW
1/2" DCW
3/4" DCW
1/2" DCW
MS-1
EWC-1
L-1 (TYP 3)
L-1 (TYP 3)
PROVIDE PRESSURE
ACTIVATED TRAP PRIMER
ON DCW LINE IN CHASE.
C
D
FD-1
S-2
FD-1
DWH-1
4" SAN DROP
BELOW GRADE
3" VTR
STORAGE
MECH
MOTHER'S
BREAK
JAN
WOMEN
MEN
CORRIDOR
ELEC
TR
WCO
FD-1
FD-1
2" V
FCO
SPACE RESERVED FOR
INCOMING FIRE PROTECTION
SERVICE TO BUILDING, SEE
FIRE PROTECTION SHEETS.
PROVIDE A MINIMUM 3FT
CLEARANCE IN FRONT OF
ALL COMPONENTS.
6" CONCRETE PAD
DET-1
3" SAN
3" SAN
2" V
4" SAN
4" SAN
3" SAN
4" SAN
DDC PANELS
FCO
2" SAN
2" V
4" SAN
HUMIDIFIER. SEE
MECHANICAL
WC-1A
WC-1A
WC-1
WC-1
WC-1U-1A
L-1 (TYP 3)L-1 (TYP 3)
2" V
FD-1
MS-1
EWC-1
S-1
3" SAN
3" SAN
3" SAN
1 1/2" V
2" V
3" V3" V
1 1/2" V
2" V
2" V
1 1/2" V
3" SAN
3" SANWCO
2" V
2" V
4" SAN DROP
BELOW GRADE
3" SAN
N O
T F
O R
C O
N S
T R
U C
T
IO
N
P R
E L
IM
IN
A
R Y
SATISFACTORY TO
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
W
A S
H
IN
G T
O N
P A
T U
X E
N T
R
IV
E R
M
D
AS NOTED
2850 EISENHOWER AVENUE
SUITE 200
ALEXANDRIA, VA 22314
N A
V F
A C
L R
P F
A C
IL
IT
Y I D
S
.1
.2
W E
B S
T E
R F
IE
L D
N A
V A
L S
T A
T
IO
N P
A T
U X
E N
T R
IV
E
R
PRE-BID FINAL
(100%) DESIGN
SUBMITTAL
07/02/20
R E
V D
A T
E
F
IL
E N
A M
E
U N
C
LA
S S
IF
IE
D
DRAWFORM REVISION: 12 APRIL 2018
CHIEF ENG/ARCH
IPT TECH. BRANCH HEAD
PROJECT MANAGER
A/E INFO
APPROVED
/2
/2
:1
:2
P M
C U s e rs \z a b a lo s \D o c u m e n ts \2
R
M
C
E N
ID
S b im m e c h
.r v t
P-401
FI
R
S T
FL
O
O R
E N
LA
R
G E
D P
LU
M
B
IN
G P
LA
N
S
AEBSWL ZMA
1/4" = 1'-0" A1
FIRST FLOOR ENLARGED DOMESTIC WATER PIPING PLAN
1/4" = 1'-0"
A4
FIRST FLOOR ENLARGED SANITARY PIPING PLAN
2' 4' 8'0'2' 4' 8'0'
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
SEAL
2850 EISENHOWER AVENUE
SUITE 200
ALEXANDRIA, VA 22314
PRE-FINAL
100% DESIGN
SUBMITTAL
06 / 03 / 20
PRE - BID
07 / 02 / 20
WATER HAMMER ARRESTOR
INSTALLATION DETAIL
WATER HAMMER ARRESTOR DETAIL ELECTRIC WATER HEATER DETAIL
TRAP SEAL PRIMER DETAIL
SECURE
SIDE
NON-SECURE
SIDE
HOSE
NO SCALE
3" P-TRAP
HOSE
30" LONG
AND PAILHOOK
SPOUT WITH HOSE END
VACUUM BREAKER
SERVICE FAUCET WITH
SPOUT BRACE
BRACKET
TRAP PRIMER CONNECTION
NO SCALE
NO SCALE
NO SCALE
NO SCALE
C1 C4
A2
MOP SINK DETAIL
DCW BUILDING ENTRY DETAIL
SECURE PIPE PENETRATION DETAIL
PIPE SLEEVE THRU INTERIOR WALL DETAIL
DOMESTIC HOT WATER PUMP DETAIL
H C
A5
C2
PIPE
PIPE CLAMP
NO. 4 WIRE
PROVIDE ACOUSTICAL
SEALANT AT ALL GYPSUM
BOARD PENETRATIONS
PIPE INSULATION
AS SPECIFIED
GROUND PIPE WITHIN
6" OF PERIMETER
CONNECT TO
BUILDING GROUND
A3
NOTES:
1. PREFERRED INSTALL WATER HAMMER
ARRESTORS AT THE END OF BRANCH LINE
BETWEEN THE LAST TWO FIXTURES SERVED.
2. ONE WATER HAMMER ARRESTOR PER 20' LINE,
AND ANOTHER FOR BRANCHES OVER 20' IN
LENGTH.
3. THE SUM OF FIXTURE UNIT RATING OF UNITS OVER
20' IN LENGTH SHALL BE EQUAL TO OR GREATER
THAN THE DEMAND OF THE BRANCHES.
WATER HAMMER ARRESTOR
SCHEDULE
PDI SYMBOL A B C D E F
FIXTURE UNIT
RATING
1-11 12-32 33-60 61-113 114-154 155-330
WATER HAMMER
ARRESTOR
TYPICAL BRANCH LINE
SUPPLY RISER
PDI "A"
PDI
SYMBOL
SCALE: NONE
BUILDING
DCW SUPPLY
WATER METER ASSEMBLY
DCW SUPPLY
TO BUILDING
CONNECT TO REMOTE REGISTER
ON EXTERIOR AND BAS
STRAINER
SET SLEEVE IN WALL
AND ANCHOR DURING
WALL CONSTRUCTION
PACK WITH FIBERGLASS
AND SEAL BOTH SIDES
PIPE
INSULATION ESCUTCHEON PLATES
( BOTH SIDES WHERE
EXPOSED )
PIPE SLEEVE
WALL
B2
SUPPORT PIPING ON
BOTH SIDES OF
WATER METER
ASSEMBLY
4" HOUSEKEEPING PAD
PIPE TO
6" AFF
COMBINATION
TEMPERATURE AND
PRESSURE RELIEF
(T&P) VALVE
SCALE: NONE
WATER SHALL BE
STORED AT 140
DEG F
TANK DRAIN VALVE
DI-ELECTRIC UNION, TYPICAL
EXPANSION
TANK
COLD WATER
SUPPLY
VACUUM RELIEF VALVE TYP
HOT WATER
SUPPLY
THERMOMETER (TYPICAL)
CHECK VALVE
(TYPICAL)
ISOLATION VALVE
(TYP)
THERMOSTATIC VALVE SET
TO DELIVER 120°F WATER
3/4" UNLESS NOTED
OTHERWISE
4. CONCENTRIC REDUCER
1. IN-LINE CIRCULATOR PUMP
3. BALL VALVE
2. MOTOR
5. BALANCING VALVE
6. SPRING CHECK VALVE
7. PRESSURE GAUGES
NOTE:
1. EXTERNAL GAGE TAPS ON PIPES SHALL NOT BE REQUIRED
WHEN PUMP IS PROVIDED WITH FLANGE GAGE CONNECTOR.
A1
HOT WATER RETURN
STRAP-ON AQUASTAT
IN LINE RE-CIRCULATING PUMP.
SEE DETAIL THIS SHEET
FLOOR DRAIN
FLOOR SLAB
AVAILABLE FOR
1/2" TRAP PRIMER SUPPLY
1/2" TRAP PRIMER LINE
TRAP PRIMER VALVE
SLEEVE THRU
SLAB
TO MAIN BUILDING
WASTE DRAIN
DOMESTIC COLD WATER
WATERPROOF
SEALANT
MATERIAL
BACKING
SEALANT
DISTRIBUTION UNIT
5 ADDITIONAL LINES)
(DCW) LINE
SCALE: NONE
BALL VALVE
SCALE: NONE
10 DIA. MIN.
CLEARANCE
5 DIA. MIN.
CLEARANCE
1\4" PIPE OR TUBING
1\4" PET COCK (TYP)
N O
T F
O R
C O
N S
T R
U C
T
IO
N
P R
E L
IM
IN
A
R Y
SATISFACTORY TO
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
W
A S
H
IN
G T
O N
P A
T U
X E
N T
R
IV
E R
M
D
AS NOTED
2850 EISENHOWER AVENUE
SUITE 200
ALEXANDRIA, VA 22314
N A
V F
A C
L R
P F
A C
IL
IT
Y I D
S
.1
.2
W E
B S
T E
R F
IE
L D
N A
V A
L S
T A
T
IO
N P
A T
U X
E N
T R
IV
E
R
PRE-BID FINAL
(100%) DESIGN
SUBMITTAL
07/02/20
R E
V D
A T
E
F
IL
E N
A M
E
U N
C
LA
S S
IF
IE
D
DRAWFORM REVISION: 12 APRIL 2018
CHIEF ENG/ARCH
IPT TECH. BRANCH HEAD
PROJECT MANAGER
A/E INFO
APPROVED
/2
/2
:1
:2
P M
C U s e rs \z a b a lo s \D o c u m e n ts \2
R
M
C
E N
ID
S b im m e c h
.r v t
P-501
D E
TA
IL
S
AEBSWL ZMA
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
SEAL
2850 EISENHOWER AVENUE
SUITE 200
ALEXANDRIA, VA 22314
PRE-FINAL
100% DESIGN
SUBMITTAL
06 / 03 / 20
PLUMBING FIXTURES
DESIGNATION FIXTURE ACCESSIBILITY MATERIAL
FLUSH
VALVE
SUPPLY
FITTINGS AND
STOPS
TRAP CARRIER
CONNECTION SIZES
NOTES
WASTE VENT HOT COLD
WC-1 WATER CLOSET - - VITREOUS CHINA
1" SUPPLY,
1.28 GPF
1 1/2" TOP
SPUD ANGLE
STOP
INTEGRAL WALL 4" 2" - - 1"
LOW FLOW 1.28 GPF WATER CLOSET WITH
MANUAL FLUSH VALVE
WC-1A WATER CLOSET ADA VITREOUS CHINA
1" SUPPLY,
1.28 GPF
1 1/2" TOP
SPUD ANGLE
STOP
INTEGRAL WALL 4" 2" - - 1"
LOW FLOW 1.28 GPF WATER CLOSET WITH
MANUAL FLUSH VALVE. RIM HEIGHT AT 17"
AFF.
U-1A URINAL ADA VITREOUS CHINA
3/4"
SUPPLY,
0.125 GPF
3/4" TOP
SPUD ANGLE
STOP
INTEGRAL WALL 2" 1 1/2" - - 3/4"
LOW FLOW 0.125 GPF URINAL WITH MANUAL
FLUSH VALVE. RIM HEIGHT AT 17" AFF.
MS-1 MOP SINK - -
STAINLESS
STEEL
- - - - 3" FLOOR 3" 1 1/2" 1/2" 1/2"
STAINLESS STEEL 36x30x12 MINIMUM BOWL
SIZE WITH STAINLESS STEEL GUARDS TO
PROTECT THE SURROUNDING WALLS,
STRAINER GRATE. PROVIDE TRAP PRIMER
CONNECTION ON P-TRAP.
L-1 LAVATORY ADA VITREOUS CHINA - - ANGLE STOPS 1 1/2" UNDERMOUNT 1 1/2" 1 1/2" 1/2" 1/2"
MAXIMUM 0.5 GPM FAUCET WITH MANUAL
CONTROL. PROVIDE ASSE 1070 VALVE TO
LIMIT WATER 110 DEG F.
S-1
BREAK ROOM
SINK
STAINLESS
STEEL
- - ANGLE STOPS 1 1/2" UNDERMOUNT 1 1/2" 1 1/2" 1/2" 1/2"
28" X 18" X 9" SS BOWL WITH REAR CENTER
DRAIN. KITCHEN FAUCET WITH BRUSHED
NICKEL FINISH, SINGLE LEVEL CONTROL ON
SIDE, AND PULL DOWN 2 PATTERN SPRAY
HEAD. PROVIDE ASSE 1070 VALVE TO LIMIT
WATER TO 110 DEG F.
S-2
MOTHERS ROOM
SINK
STAINLESS
STEEL
- - ANGLE STOPS 1 1/2" UNDERMOUNT 1 1/2" 1 1/2" 1/2" 1/2"
20" X 18" X 9" SS BOWL WITH REAR CENTER
DRAIN. KITCHEN FAUCET WITH BRUSHED
NICKEL FINISH, SINGLE LEVER CONTROL ON
SIDE, AND PULL DOWN 2 PATTERN SPRAY
HEAD. PROVIDE ASSE 1070 VALVE TO LIMIT
WATER TO 110 DEG F.
EWC-1
BI-LEVEL
ELECTRIC
WATER COOLER
ADA
STAINLESS
STEEL
- - ANGLE STOPS 1 1/4"
WALL
MOUNTED
1 1/2" 1 1/2" - - 1/2"
BI-LEVEL, BUBBLER STYLE, AIR-COOLED
CONDENSING UNIT WITH PORTABLE BOTTLE
REFILL STATION.
VB-1 VALVE BOX - - ABS PLASTIC - -
QUARTER
TURN
WALL
MOUNTED
- - - - - - 1/2"
VALVE BOX WITH INTEGRAL WATER
HAMMER ARRESTOR.
WALL HYDRANT
DESIGNATION FIXTURE TYPE CONNECTION SIZE (IN) DESCRIPTION
WHD-1
ENCASED WALL
HYDRANT
3/4"
ENCASED, ANTI-SIPHON, AUTOMATIC DRAINING WALL
HYDRANT WITH 3/4" HOSE CONNECTION, FLUSH
INSTALLATION, NON-FREEZE TYPE INTEGRAL BACKFLOW
PREVENTER
FLOOR DRAIN
DESIGNATION
AREA
SERVED
TYPE DESCRIPTION
FD-1 VARIOUS FLOOR DRAIN
3" CAST IRON FLOOR DRAIN, NO HUB CONNECTION, NICKEL
BRONZE TOP. PROVIDE P-TRAP WITH TRAP PRIMER
CONNECTION.
FD-2
LAB
SPACES
FLOOR DRAIN
3" CAST IRON FLOOR DRAIN, NO HUB CONNECTION, NICKEL
BRONZE TOP. PROVIDE RIM EXTENSION OR FUNNEL TO
ELEVATION OF TOP OF RAISED FLOOR. COORDINATE WITH
RAISED FLOOR MANUFACTURER. PROVIDE P-TRAP WITH
TRAP PRIMER CONNECTION.
WATER HEATER
DESIGNATION DWH-1
TYPE ELECTRIC
LOCATION MECHANICAL
STORAGE (GAL) 80
STORAGE TEMPERATURE (F) 140
INPUT (kW) 4.5
GPH AT 90 DEG F RISE 20
ELECTRICAL DATA - -
VOLTS 120
PHASE 1
HZ 60
REMARKS 1
REMARKS LEGEND:
1. RECOVERY RATE FOR NON-SIMULTANEOUS ELEMENT
OPERATION.
DW EXPANSION TANK
DESIGNATION DET-1
SERVICE DOMESTIC HOT WATER
LOCATION MECHANICAL
TYPE DIAPHRAGM
FILL PRESSURE (PSI) 50
RELIEF VALVE PRESSURE SETTING (PSI) 80
MINIMUM ACCEPTANCE VOLUME (GAL) 3.2
DOMESTIC HOT WATER
RECIRCULATION PUMP
DESIGNATION DHWP-1
FLOW RATE (GPM) 2
HEAD (FT-H2O) 15
TYPE IN-LINE CENTRIFUGAL
RPM 1,800
VOLTS 120
PHASE 1
FREQUENCY (Hz) 60
REMARKS 1
REMARKS LEGEND:
1. SEE SHEET MECHANICAL FOR PUMP CONTROLS
N O
T F
O R
C O
N S
T R
U C
T
IO
N
P R
E L
IM
IN
A
R Y
SATISFACTORY TO
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
W
A S
H
IN
G T
O N
P A
T U
X E
N T
R
IV
E R
M
D
AS NOTED
2850 EISENHOWER AVENUE
SUITE 200
ALEXANDRIA, VA 22314
N A
V F
A C
L R
P F
A C
IL
IT
Y I D
S
.1
.2
W E
B S
T E
R F
IE
L D
N A
V A
L S
T A
T
IO
N P
A T
U X
E N
T R
IV
E
R
PRE-BID FINAL
(100%) DESIGN
SUBMITTAL
07/02/20
R E
V D
A T
E
F
IL
E N
A M
E
U N
C
LA
S S
IF
IE
D
DRAWFORM REVISION: 12 APRIL 2018
CHIEF ENG/ARCH
IPT TECH. BRANCH HEAD
PROJECT MANAGER
A/E INFO
APPROVED
/2
/2
:1
:2
P M
C U s e rs \z a b a lo s \D o c u m e n ts \2
R
M
C
E N
ID
S b im m e c h
.r v t
P-601
S C
H E
D U
LE
S
AEBSWL ZMA
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
SEAL
2850 EISENHOWER AVENUE
SUITE 200
ALEXANDRIA, VA 22314
PRE-FINAL
100% DESIGN
SUBMITTAL
06 / 03 / 20
FCO
FD-1
FD-1
FD-1
FD-1
FD-2
FD-2
WC-1A
WC-1A
U-1A
WC-1
MS-1
EWC-1
FD-1
S-1
S-2
4" SAN WITH INVERT AT 3'-6"
BELOW FINISHED FLOOR. SEE
CIVIL FOR CONTINUATION.
3" SAN
3" SAN
2" VTR
3" SAN
FCO
2" V
2" V
4" SAN
WCO
4" SAN
3" SAN
3" SAN
2" SAN 3" SAN
FCO
WC-1
WCO
L-1
L-1
L-1
1 1/2" SAN
2" SAN
4" SAN
L-1 L-1
L-1
1 1/2" SAN
WC-1
2" SAN
4" SAN
FD-1
4" SAN
3" SAN
3" SAN
FCO
2" V
3" V
2" V 1 1/2" V
1 1/2" V
2" V
1 1/2" V
2" V 1 1/2" V
1 1/2" V 2" V
2" V
1 1/2" V
2" V
1 1/2" V
2" V
3" V
3" VTR
2" SAN
3" SAN
3" SAN
4" SAN
4" SAN
1 1/2" V
1 1/2" V
2" V
2" V
2" V
3" SAN
N O
T F
O R
C O
N S
T R
U C
T
IO
N
P R
E L
IM
IN
A
R Y
SATISFACTORY TO
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
W
A S
H
IN
G T
O N
P A
T U
X E
N T
R
IV
E R
M
D
AS NOTED
2850 EISENHOWER AVENUE
SUITE 200
ALEXANDRIA, VA 22314
N A
V F
A C
L R
P F
A C
IL
IT
Y I D
S
.1
.2
W E
B S
T E
R F
IE
L D
N A
V A
L S
T A
T
IO
N P
A T
U X
E N
T R
IV
E
R
PRE-BID FINAL
(100%) DESIGN
SUBMITTAL
07/02/20
R E
V D
A T
E
F
IL
E N
A M
E
U N
C
LA
S S
IF
IE
D
DRAWFORM REVISION: 12 APRIL 2018
CHIEF ENG/ARCH
IPT TECH. BRANCH HEAD
PROJECT MANAGER
A/E INFO
APPROVED
/2
/2
:1
:2
P M
C U s e rs \z a b a lo s \D o c u m e n ts \2
R
M
C
E N
ID
S b im m e c h
.r v t
P-801
S A
N
IT
A R
Y P
IP
IN
G R
IS
E
R
AEBSWL ZMA
A1
SANITARY PIPING RISER DIAGRAM
SCALE: NONE
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
SEAL
2850 EISENHOWER AVENUE
SUITE 200
ALEXANDRIA, VA 22314
PRE-FINAL
100% DESIGN
SUBMITTAL
06 / 03 / 20
1" DCW
TO H-1
U-1A
WC-1
L-1
L-1
WC-1A
S-1
S-2
MS-1
EWC-1
2" DOMESTIC WATER
SERVICE, SEE CIVIL
FOR CONTINUATION
WHD-1
WHD-1
WHD-1
WHD-1
3/4" DCW
3/4" DCW
1 1/4" DHW
2" DCW
1" DCW
1/2" DCW TO HUMIDIFIER.
SEE MECHANICAL PLANS.
1/2" DCW TO HUMIDIFIER.
SEE MECHANICAL PLANS.
TO DHW-1
1" DCW
BALANCING
VALVE (1 GPM)
BALANCING
VALVE (1 GPM)
DHWP-1
TO DET-1
TO MIXING VALVE
FROM MIXING VALVE
1" DCW
ISOLATION
VALVE
3/4" DHC
1 1/4" DCW
1/2" DCW TO VB-1 SERVING
REFRIGERATOR 1/2" DCW TO VB-1
SERVING COFFEE
MAKER
3/4" DCW
WATER METER
WC-1A
WC-1
L-1
L-1
WC-1
L-1
L-1
1 1/2" DCW
1 1/4" DCW
1" DCW
3/4" DCW
3/4" DCW
3/4" DHW
1/2" DHW
1/2" DHC
1 1/2" DCW
1 1/4" DCW
1" DCW
3/4" DCW
1/2" DHW
1/2" DCW
3/4" DCW
1/2" DCW
N O
T F
O R
C O
N S
T R
U C
T
IO
N
P R
E L
IM
IN
A
R Y
SATISFACTORY TO
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
W
A S
H
IN
G T
O N
P A
T U
X E
N T
R
IV
E R
M
D
AS NOTED
2850 EISENHOWER AVENUE
SUITE 200
ALEXANDRIA, VA 22314
N A
V F
A C
L R
P F
A C
IL
IT
Y I D
S
.1
.2
W E
B S
T E
R F
IE
L D
N A
V A
L S
T A
T
IO
N P
A T
U X
E N
T R
IV
E
R
PRE-BID FINAL
(100%) DESIGN
SUBMITTAL
07/02/20
R E
V D
A T
E
F
IL
E N
A M
E
U N
C
LA
S S
IF
IE
D
DRAWFORM REVISION: 12 APRIL 2018
CHIEF ENG/ARCH
IPT TECH. BRANCH HEAD
PROJECT MANAGER
A/E INFO
APPROVED
/2
/2
:1
:2
P M
C U s e rs \z a b a lo s \D o c u m e n ts \2
R
M
C
E N
ID
S b im m e c h
.r v t
P-802
D O
M E
S
TI
C W
A
TE
R P
IP
IN
G R
IS
E
R
AEBSWL ZMA
A1
DOMESTIC PIPING RISER DIAGRAM
SCALE: NONE
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
SEAL
2850 EISENHOWER AVENUE
SUITE 200
ALEXANDRIA, VA 22314
PRE-FINAL
100% DESIGN
SUBMITTAL
06 / 03 / 20
MECHANICAL GENERAL NOTES
INTENT
1. THESE DRAWINGS ARE SCHEMATIC IN NATURE AND INDICATE THE GENERAL AND APPROXIMATE LOCATION OF EQUIPMENT, PIPING AND DUCTWORK. THEY ARE
NOT INTENDED TO SHOW ALL POSSIBLE CONDITIONS. IT IS INTENDED THAT A COMPLETE HEATING, VENTILATING AND AIR CONDITIONING SYSTEM (HVAC) BE PROVIDED WITH ALL NECESSARY EQUIPMENT, APPURTENANCES AND CONTROLS. THE CONTRACTOR SHALL CAREFULLY REVIEW ALL THE CONTRACT DOCUMENTS AND COORDINATE BETWEEN ALL TRADES PRIOR TO SUBMITTING SHOP DRAWINGS. THE CONTRACTOR SHALL VERIFY ALL SIZES, MATERIALS, TEMPERATURE AND PRESSURE RATINGS BEFORE ORDERING OR INSTALLING ANY MATERIALS OR EQUIPMENT. THE CONTRACTOR SHALL PREPARE INSTALLATION INSTRUCTIONS AND
FABRICATION DRAWINGS PRIOR TO ACTUAL INSTALLATION.
2. REFER TO EACH DRAWING FOR NOTES SPECIFIC TO THAT DRAWING SHEET.
3. DO NOT SCALE FOR DUCT, PIPE OR EQUIPMENT LOCATIONS.
WORK SAFETY AND QUALITY
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE SAFETY OF CONTRACTOR'S PERSONNEL EMPLOYED ON THIS PROJECT AND IN PARTICULAR, WHEN WORKING
IN CONFINED SPACES. THE CONTRACTOR SHALL COMPLY WITH ALL OCCUPATIONAL SAFETY HEALTH ADMINISTRATION (OSHA) REQUIREMENTS.
2. ALL MISCELLANEOUS MATERIAL REQUIRED TO ENSURE PROPER INSTALLATION AND IS SHOWN IN DETAILS FOR PIPING, DUCTS, AND EQUIPMENT (UNLESS
OTHERWISE NOTED) SHALL BE FURNISHED AND INSTALLED BY THE MECHANICAL CONTRACTOR.
3. ALL MECHANICAL EQUIPMENT AND SYSTEMS SHALL BE INSTALLED IN A MANNER WHICH MINIMIZES NOISE AND VIBRATION.
COORDINATION WITH OTHER TRADES
1. THE CONTRACTOR SHALL COORDINATE THE INSTALLATION OF WORK WITH THE WORK OF OTHER TRADES. MINOR DEVIATIONS FROM THE PLANS MAY BE MADE TO
AVOID CONFLICTS.
2. COORDINATE DUCTWORK AND PIPING WITH ELECTRICAL, STRUCTURE, AND PLUMBING. MAKE OFFSETS AND TRANSITIONS TO COORDINATE WITH OTHER TRADES
WITHOUT ADDITIONAL EXPENSE TO THE OWNER.
3. COORDINATE MECHANICAL EQUIPMENT AND MATERIAL LOCATIONS WITH ELECTRICAL, PLUMBING, FIRE PROTECTION, STRUCTURAL AND ARCHITECTURAL PLANS
TO AVOID CONFLICTS.
4. COORDINATE THE VOLTAGE AND PHASE OF EACH PIECE OF EQUIPMENT WITH DIVISION 26 (ELECTRICAL CONTRACT DOCUMENTS) PRIOR TO ORDERING. PROVIDE WRITTEN VERIFICATION OF COORDINATION WITH DIVISION 26 PRIOR TO INSTALLATION OF EQUIPMENT.
5. REFER TO THE ARCHITECTURAL PLANS FOR EXACT LOCATION OF ALL LOUVERS, VENTS, DUCTS, AND PIPING THAT PENETRATE EXTERIOR WALLS.
6. PROVIDE OPENINGS IN BUILDING CONSTRUCTION FOR PASSAGE OF PIPING AND DUCTWORK. DO NOT PENETRATE STRUCTURAL MEMBERS WITHOUT PRIOR
APPROVAL.
7. ALL NECESSARY ALLOWANCES AND PROVISIONS SHALL BE MADE BY THIS CONTRACTOR FOR BEAMS, COLUMNS, TRUSSES OR OTHER OBSTRUCTIONS OF THE BUILDING OR THE WORK OF OTHER CONTRACTORS, WHETHER OR NOT SAME IS INDICATED. WHERE NECESSARY TO AVOID OBSTRUCTIONS, THE DUCTS SHALL BE TRANSFORMED, DIVIDED, OFFSET, RAISED OR LOWERED WITH THE REQUIRED FREE AREA BEING MAINTAINED.
DUCTWORK
1. DUCT SIZES ARE SHOWN AS INSIDE CLEAR DIMENSIONS. WHERE INTERNAL INSULATION IS CALLED FOR, DIMENSIONS SHALL BE INCREASED FOR THE THICKNESS
OF THE INSULATION. SEE SPECIFICATION FOR THICKNESS.
2. ALL BRANCH DUCTWORK SHALL BE SIZED TO MATCH THE TERMINAL CONNECTION SERVED UNLESS NOTED OTHERWISE. FLEXIBLE DUCT TO DIFFUSERS SHALL BE INSTALLED FREE OF KINKS AND SAGS. MAXIMUM LENGTH OF FLEXIBLE DUCT SHALL BE 6'-0". ALL RUNOUT AND BRANCH DUCTS SHALL CONTAIN A MANUAL
VOLUME DAMPER FOR BALANCING.
3. ALL DUCT TRANSITIONS FROM SQUARE TO ROUND SHALL BE SMOOTH SQUARE TO ROUND TRANSITIONS.
4. ALL DIFFUSERS SHALL HAVE FOUR-WAY BLOW UNLESS NOTED OTHERWISE.
5. SEE REFLECTED CEILING PLANS FOR EXACT LOCATION OF AIR DEVICES.
6. ALL DAMPERS, DAMPER OPERATORS, AND FANS SHALL BE ACCESSIBLE. LOCATE ALL EQUIPMENT OR APPURTENANCES IN AREAS WITH ACCESSIBLE CEILINGS.
THE CONTRACTOR MAY UTILIZE ACCESS PANELS FOR THOSE AREAS NOT EASILY ACCESSIBLE. ALL ACCESS PANEL LOCATIONS SHALL BE COORDINATED WITH THE CONTRACT DOCUMENTS AND APPROVED BY THE OWNER PRIOR TO INSTALLATION OF EQUIPMENT.
7. ALL OPEN ENDED DUCTS SHALL BE REINFORCED WITH STEEL ANGLES (1-1/2" X 1-1/2" X 1/8") BOLTED OR RIVETED 6" ON CENTER (MAXIMUM) ALL AROUND THE
PERIMETER OF THE DUCT MINIMUM 2 PER SIDE.
8. ALL DUCTWORK SHALL BE SLEEVED THROUGH WALL PENETRATIONS.
9. PROVIDE AIR TURNING DEVICES IN DUCTWORK AT ANY CHANGES IN DIRECTION OF GREATER THAN 60 DEGREES.
10. PROVIDE CONICAL TEES FOR ROUND AND FLAT OVAL DUCT TAKE-OFFS.
PIPING
1. SLOPE CONDENSATE DRAINS AT 1/8 INCHES FALL PER FOOT MINIMUM IN THE DIRECTION OF FLOW.
2. ALL PIPING SHALL BE SLEEVED THROUGH WALL PENETRATIONS.
3. SIZE AND ROUTE REFRIGERANT PIPING PER EQUIPMENT MANUFACTURER'S RECOMMENDATIONS.
EQUIPMENT
1. INSTALL ALL MECHANICAL EQUIPMENT AND APPURTENANCES IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS, CONTRACT DOCUMENTS, AND
APPLICABLE CODES AND REGULATIONS.
2. ALL MECHANICAL EQUIPMENT SHALL BE INSTALLED IN SUCH A MANNER SO THAT ALL FILTERS, VALVES, MOTORS, DAMPERS, ETC., ARE COMPLETELY ACCESSIBLE
AND SERVICEABLE, INCLUDING ACCESS DOORS IF REQUIRED.
3. COMPLETE AND PROPER INSTALLATION OF THERMOSTATS AND ALL OTHER NECESSARY FIELD MOUNTED CONTROL COMPONENTS SHALL BE THE RESPONSIBILITY OF THE MECHANICAL CONTRACTOR. THE EQUIPMENT MANUFACTURERS SHALL FURNISH COMPLETE WIRING CONTROLS.
4. PROVIDE FLEXIBLE CONNECTIONS BETWEEN HVAC EQUIPMENT AND SHEET METAL DUCTWORK.
CONTROLS
1. PROVIDE THERMOSTATS OR HUMIDISTATS WHERE SHOWN ON THE DRAWINGS.
HVAC AND MECHANICAL PIPING LEGEND
PHASES
EXISTING TO REMAIN
DEMOLITION WORK
TEMPORARY WORK
NEW WORK
DUCT SYSTEM - SUPPLY
AIR
DUCT SYSTEMS
DUCT SYSTEM - RETURN AIR
DUCT SYSTEM - EXHAUST AIR
AIR TERMINALS
CEILING DIFFUSER - SUPPLY AIR
CEILING GRILLE - RETURN AIR
CEILING GRILLE - EXHAUST AIR
AIR TERMINAL TAGS
S2C S=SUPPLY,R=RETURN,E=EXHAUST
NUMBER = UNIT DESIGNATION
A=6", B=8", C=10"
NUMBER = AIRFLOW
R-1
WxH
S2C
S=SUPPLY,R=RETURN,E=EXHAUST
NUMBER = UNIT DESIGNATION
SIZE: WIDTH x HEIGHT
NUMBER = AIRFLOW
SS
FSFS
MM
DUCT ACCESSORIES & FITTINGS
DAMPER, MANUAL BALANCING
DAMPER, MOTORIZED CONTROL
DAMPER, SMOKE
DAMPER, FIRE
DAMPER, COMBINATION
FIRE & SMOKE
DAMPER, BACKDRAFT
DUCT ELBOW, RECTANGULAR,
MITERED WITH TURNING VANES
DUCT ELBOW,
ROUND / RECTANGULAR,
RADIUS BEND.
DUCT ELBOW, FLAT OVAL,
GORED / MITERED BEND.
FLEXIBLE DUCT,
ROUND / RECTANGULAR
RECTANGLE OVAL
ROUND
DUCT TRANSITIONS: RECTANGLE TO
RECTANGLE; RECTANGLE TO ROUND;
ROUND TO OVAL.
T
H
S
CO
CO2
SENSORS
SENSOR - TEMPERATURE
SENSOR - HUMIDITY
SENSOR - SMOKE
SENSOR - CARBON MONOXIDE
SENSOR - CARBON DIOXIDE
POINT OF DISCONNECTION
POINT OF CONNECTION
PIPE SYSTEM - CHILLED WATER RETURN
PIPING SYSTEMS
PIPE ACCESSORIES & FITTINGS
CHR
CHS
CD
CWR
CWS
FOR
FOS
HWR
HWS
NG
RBP
RL
RS
DCR
WCR
HPS
LPS
MPS
PIPE SYSTEM - CHILLED WATER SUPPLY
PIPE SYSTEM - CONDENSATE DRAIN
PIPE SYSTEM - CONDENSER WATER RETURN
PIPE SYSTEM - CONDENSER WATER SUPPLY
PIPE SYSTEM - FUEL OIL RETURN
PIPE SYSTEM - FUEL OIL SUPPLY
PIPE SYSTEM - HOT WATER RETURN
PIPE SYSTEM - HOT WATER SUPPLY
PIPE SYSTEM - NATURAL GAS
PIPE SYSTEM - REFRIGERATION, BYPASS
PIPE SYSTEM - REFRIGERATION, LIQUID
PIPE SYSTEM - REFRIGERATION, SUCTION
PIPE SYSTEM - STEAM CONDENSATE RETURN, DRY
PIPE SYSTEM - STEAM CONDENSATE RETURN, WET
PIPE SYSTEM - HIGH PRESSURE STEAM
PIPE SYSTEM - LOW PRESSURE STEAM
PIPE SYSTEM - MEDIUM PRESSURE STEAM
HWC PIPE SYSTEM - HOT WATER RECIRCULATION
CHECK VALVE
BALL VALVE
GLOBE VALVE
Y STRAINER
GATE VALVE
BUTTERFLY VALVE
CONTROL VALVE, THREE WAY
MOTORIZED CONTROL VALVE
BALANCING VALVE
PLUG VALVE
PIPE TURN UP
PIPE TURN DOWN
PIPE CONCENTRIC REDUCER
PIPE FLANGE & UNION
N O
T F
O R
C O
N S
T R
U C
T
IO
N
P R
E L
IM
IN
A
R Y
SATISFACTORY TO
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
W
A S
H
IN
G T
O N
P A
T U
X E
N T
R
IV
E R
M
D
AS NOTED
2850 EISENHOWER AVENUE
SUITE 200
ALEXANDRIA, VA 22314
N A
V F
A C
L R
P F
A C
IL
IT
Y I D
S
.1
.2
W E
B S
T E
R F
IE
L D
N A
V A
L S
T A
T
IO
N P
A T
U X
E N
T R
IV
E
R
PRE-BID FINAL
(100%) DESIGN
SUBMITTAL
07/02/20
R E
V D
A T
E
F
IL
E N
A M
E
U N
C
LA
S S
IF
IE
D
DRAWFORM REVISION: 12 APRIL 2018
CHIEF ENG/ARCH
IPT TECH. BRANCH HEAD
PROJECT MANAGER
A/E INFO
APPROVED
/2
/2
:0
:4
P M
C U s e rs \z a b a lo s \D o c u m e n ts \2
R
M
C
E N
ID
S b im m e c h
.r v t
M-001
LE
G
E N
D , A
B B
R E
V
IA
TI
O
N S
G
E N
E R
A L
N O
TE
S
AEBSWL ZMA
MECHANICAL ABBREVIATIONS
(E) EXISTING ELEMENT TO REMAIN
ACC AIR COOLED CHILLER
ACU AIR CONDITIONING UNIT
AD ACCESS DOOR
AFF ABOVE FINISHED FLOOR
AFMS AIR FLOW MEASUREMENT STATION
AHU AIR HANDLING UNIT
AI ANALOG INPUT
AO ANALOG OUTPUT
APD AIR PRESSURE DROP
APPROX APPROXIMATELY
ARCH ARCHITECTURE
BEL BELLMOUTH FITTING
BT BUFFER TANK
CD CONDENSATE DRAIN
CDW CONDENSER WATER
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CHP CHILLED WATER PUMP
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
CLG COOLING OR CEILING
CO CLEANOUT
COND CONDENSATE OR CONDENSER
CT COOLING TOWER
CWR CONDENSER WATER RETURN
CWS CONDENSER WATER SUPPLY
DDC DIRECT DIGITAL CONTROL
DEG DEGREES
DI DIGITAL INPUT
DN DOWN
DO DIGITAL OUTPUT
DOAS DEDICATED OUTDOOR AIR SYSTEM
DP DIFFERENTIAL PRESSURE
EA EXHAUST AIR OR EACH
EF EXHAUST FAN
EL OR ELEV ELEVATION
EXH EXHAUST
F OR °F DEGREES FARENHEIT
FCU FAN COIL UNIT
FD FIRE DAMPER
FPM FEET PER MINUTE
FS FLOW SWITCH
FT FOOT OR FEET
FZ FREEZESTAT
GA GAUGE
GAL GALLON (U.S.)
GALV GALVANIZED
HGI HOODED GRAVITY INTAKE
HGR HOODED GRAVITY RELIEF
HWB HOT WATER BOILER
HWP HOT WATER PUMP
HWR HEATING HOT WATER RETURN
HWS HEATING HOT WATER SUPPLY
L LOUVER
NC NOISE CRITERIA OR NORMALLY CLOSED
NO NUMBER OR NORMALLY OPEN
NPSH NET POSITIVE SUCTION HEAD
NTS NOT TO SCALE
OA OUTSIDE AIR
PSI POUNDS PER SQUARE INCH
QTY QUANTITY
RA RETURN AIR
RH RELATIVE HUMIDITY
RLF RELIEF AIR
SA SUPPLY AIR
SD SMOKE DAMPER
SF SQUARE FEET
SFD COMBINATION FIRE & SMOKE DAMPER
STD STANDARD
STL STEEL
TB TERMINAL BOX
TSTAT THERMOSTAT
TUC TERMINAL UNIT CONTROLLER
TYP TYPICAL
UH UNIT HEATER
VAV VARIABLE AIR VOLUME
VFD VARIABLE FREQUENCY DRIVE
VLV VALVE
W/ WITH
W/O WITHOUT
WG WATER GAUGE
XFER TRANSFER
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
SEAL
2850 EISENHOWER AVENUE
SUITE 200
ALEXANDRIA, VA 22314
PRE-FINAL
100% DESIGN
SUBMITTAL
06 / 03 / 20
M
M
M
M
M
M
M
M M
M
M
18 7 6 5 4 3 2
A
B
C
D
E
CONFERENCE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
MOTHER'S
STORAGE
OFFICE
S3D
(TYP 8)
ACCU-1
OFFICE
LAB (TOP
SEC)
LAB
(SECRET)
SZVAV-1
SZVAV-2
S3D
S3E
SZVAV-1
SZVAV-2
R3
36"x16"
R3
36"x16"
28"x18"
28"x18"
28"x18"
28"x18"
A1
M-401
A1
M-402
24"x16"
T
T
H-2
H-3
S3E
S3E
S3E
S3E
S3E
28"x18" 22"x16"
R3
36"x16"
(TYP 2)
TR
ELEC
MECH
WOMEN
MEN
VEST
CORRIDOR
JAN
BREAK
ENGINEERING
28"x18"
"ø
"ø
"ø
"ø 14
"ø
"ø
"x
"ø6
N O
T F
O R
C O
N S
T R
U C
T
IO
N
P R
E L
IM
IN
A
R Y
SATISFACTORY TO
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
W
A S
H
IN
G T
O N
P A
T U
X E
N T
R
IV
E R
M
D
AS NOTED
2850 EISENHOWER AVENUE
SUITE 200
ALEXANDRIA, VA 22314
N A
V F
A C
L R
P F
A C
IL
IT
Y I D
S
.1
.2
W E
B S
T E
R F
IE
L D
N A
V A
L S
T A
T
IO
N P
A T
U X
E N
T R
IV
E
R
PRE-BID FINAL
(100%) DESIGN
SUBMITTAL
07/02/20
R E
V D
A T
E
F
IL
E N
A M
E
U N
C
LA
S S
IF
IE
D
DRAWFORM REVISION: 12 APRIL 2018
CHIEF ENG/ARCH
IPT TECH. BRANCH HEAD
PROJECT MANAGER
A/E INFO
APPROVED
/2
/2
:0
:5
P M
C U s e rs \z a b a lo s \D o c u m e n ts \2
R
M
C
E N
ID
S b im m e c h
.r v t
M-101
FI
R
S T
FL
O
O R
M E
C H
A N
IC
A
L P
LA
N
AEBSWL ZMA
1/8" = 1'-0" A1
FIRST FLOOR MECHANICAL PLAN
PLAN
NORTH
4' 8' 16'0'
WORK NOTES
1 PROVIDE SECURE DUCT PENETRATION. SEE DETAIL B3/A-504.
2 ROUTE OUTSIDE AIR INTAKE DUCT UP ALONG WALL AND PROVIDE
28X28 WEATHER HOOD BIRD SCREEN FACING AWAY FROM
BUILDING. BOTTOM OF OPENING MUST BE AT LEAST 10' ABOVE
GRADE. ROUTE SUPPLY AND RETURN AIR DUCTS UP ALONG WALL
AND PENETRATE WALL HIGH ENOUGH TO MAINTAIN 10' CLEAR IN
LAB. SEE DETAIL C4/M-502.
3 6" CONCRETE PAD.
4 EQUIPMENT CLEARANCE (TYPICAL)
5 PROVIDE ATFP CONTROL DAMPER.
6 DIFFUSERS SHALL BE AT LEAST 10' AFF. MAINTAIN A CLEAR HEIGHT
OF 10' AFF IN LAB SPACE.
7 ROUTE DUCT UNDER BEAM.
8 ROUTE CONDENSATE TO DRYWELL. SEE DETAIL C1/M-502.
GENERAL MECHANICAL NOTES
1 THE LOCATION OF ALL DUCT, PIPING, AND EQUIPMENT SHALL BE
ADJUSTED TO ACCOMMODATE ANTICIPATED OR ENCOUNTERED
INTERFERENCES.
2 PROVIDE BALANCING DAMPER FOR EACH SUPPLY, RETURN, AND
EXHAUST RUNOUT.
3 ALL RUNOUTS TO TERMINALS ARE NECK SIZE UNLESS OTHERWISE
NOTED.
4 MAINTAIN MANUFACTURER RECOMMENDED CLEARANCE AROUND
ALL EQUIPMENT.
5 DUCT SIZES SHOWN REFER TO AIR SIZE.
6 ALL DUCT TAPS SHALL HAVE 45 DEGREE DUCT HEELS.
7 DUCT SIZES SHOWN AS XX"/XX" REFER TO OVAL DUCT. ALL MEDIUM
PRESSURE DUCTWORK MUST BE EITHER ROUND OR OVAL.
8 A MINIMUM OF 6 DUCT DIAMETERS OF STRAIGHT DUCT DIRECTLY
UPSTREAM OF VAV CONNECTION IS REQUIRED.
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
SEAL
2850 EISENHOWER AVENUE
SUITE 200
ALEXANDRIA, VA 22314
PRE-FINAL
100% DESIGN
SUBMITTAL
06 / 03 / 20
18 7 6 5 4 3 2
A
B
C
D
E
HGR-1
HGI-1
N O
T F
O R
C O
N S
T R
U C
T
IO
N
P R
E L
IM
IN
A
R Y
SATISFACTORY TO
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
W
A S
H
IN
G T
O N
P A
T U
X E
N T
R
IV
E R
M
D
AS NOTED
2850 EISENHOWER AVENUE
SUITE 200
ALEXANDRIA, VA 22314
N A
V F
A C
L R
P F
A C
IL
IT
Y I D
S
.1
.2
W E
B S
T E
R F
IE
L D
N A
V A
L S
T A
T
IO
N P
A T
U X
E N
T R
IV
E
R
PRE-BID FINAL
(100%) DESIGN
SUBMITTAL
07/02/20
R E
V D
A T
E
F
IL
E N
A M
E
U N
C
LA
S S
IF
IE
D
DRAWFORM REVISION: 12 APRIL 2018
CHIEF ENG/ARCH
IPT TECH. BRANCH HEAD
PROJECT MANAGER
A/E INFO
APPROVED
/2
/2
:0
:5
P M
C U s e rs \z a b a lo s \D o c u m e n ts \2
R
M
C
E N
ID
S b im m e c h
.r v t
M-102
R O
O F
M E
C H
A N
IC
A
L P
LA
N
AEBSWL ZMA
PLAN
NORTH
4' 8' 16'0' 1/8" = 1'-0"
A1
ROOF MECHANICAL PLAN
WORK NOTES
GENERAL MECHANICAL NOTES
1 MAINTAIN MANUFACTURER RECOMMENDED CLEARANCE AROUND
ALL EQUIPMENT.
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
SEAL
2850 EISENHOWER AVENUE
SUITE 200
ALEXANDRIA, VA 22314
PRE-FINAL
100% DESIGN
SUBMITTAL
06 / 03 / 20
FIRST FLOOR
0' - 0"
FIRST FLOOR
0' - 0"
EAVE HT
13' - 6"
EAVE HT
13' - 6"
AHU-1
REFRIGERANT PIPING
TO DX COIL
L-1
28"x30" RA
DH-1
6" CONCRETE PAD
30"x60" EXH
30"x60" OA
22"x38" OA
30"x28" EXH
40"x40" OA
HGI-1
UH-1
18"x24" OA
10"x10" EXH
MECH
STORAGE
26"/22" SA
28"x30" RA
26"x30" RA
6"ø
26"/22" SA
30"x28" EXH
22"x38" OA
MOTORIZED
DAMPER
ROOF CURB
N O
T F
O R
C O
N S
T R
U C
T
IO
N
P R
E L
IM
IN
A
R Y
SATISFACTORY TO
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
W
A S
H
IN
G T
O N
P A
T U
X E
N T
R
IV
E R
M
D
AS NOTED
2850 EISENHOWER AVENUE
SUITE 200
ALEXANDRIA, VA 22314
N A
V F
A C
L R
P F
A C
IL
IT
Y I D
S
.1
.2
W E
B S
T E
R F
IE
L D
N A
V A
L S
T A
T
IO
N P
A T
U X
E N
T R
IV
E
R
PRE-BID FINAL
(100%) DESIGN
SUBMITTAL
07/02/20
R E
V D
A T
E
F
IL
E N
A M
E
U N
C
LA
S S
IF
IE
D
DRAWFORM REVISION: 12 APRIL 2018
CHIEF ENG/ARCH
IPT TECH. BRANCH HEAD
PROJECT MANAGER
A/E INFO
APPROVED
/2
/2
:0
:5
P M
C U s e rs \z a b a lo s \D o c u m e n ts \2
R
M
C
E N
ID
S b im m e c h
.r v t
M-301
M E
C H
A N
IC
A
L R
O O
M S
E C
TI
O
N
AEBSWL ZMA
1/2" = 1'-0" A2
MECHANICAL ROOM SECTION
1' 2' 4'0'
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
SEAL
2850 EISENHOWER AVENUE
SUITE 200
ALEXANDRIA, VA 22314
PRE-FINAL
100% DESIGN
SUBMITTAL
06 / 03 / 20
M
M
M
M M
16 5 4 3 2
C
D
E
A2
M-301
TR
MECH
MEN
WOMEN
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
BREAK
MOTHER'S
STORAGE
OFFICE
VAV-03
VAV-02
VAV-01
T
T
T VAV-03
TT
VAV-01
VAV-02
OFFICE
A1
M-403
R1
R2
R1
R1
R2
R1
R2
R2
S1B
S1B
S1B
S1B
8"ø
R2
R1
R2
R1
R1
R2
R1
R2
S1B
S1B
S1B
S1B
8"x8" 8"x8"
8"ø
8"x8"8"x8"
8"x8"
14"x14"
R2
"ø
S1B
S1B
S1B
S1B
S1B
S1B
S1B
S1B
S1B
S1B
R1
22"x16"16"x10" 105
S1A 10"x10"
10"x8"
30"x28"
6"x6"
E1
E1
10"x6"
8"x8"
18"x18"
ENGINEERING
12"ø
14"ø 10"x10"
10"x10"10"x10"
8"x8" 8"x10" 10"x10" 12"x12"
8" x8
8" x8
8" x8
8" x8
8" x8
8" x8
8"x8"
12"x10"12"x10"
10"x10"10"x10"8"x8"
8" x8
8" x8
"x
"x
18"ø
"ø
16"ø
"x
6"ø
12"x10"
6"ø
12"ø
10"ø
10"ø
R1
20"x20"
"x
"x
"x
"x
10"ø12"x10"
20"x20"
22"/26"
30"x26"
ELEC
T T
T
VAV-01 VAV-01
VAV-01
T VAV-02TVAV-02
TVAV-02
H
N O
T F
O R
C O
N S
T R
U C
T
IO
N
P R
E L
IM
IN
A
R Y
SATISFACTORY TO
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
W
A S
H
IN
G T
O N
P A
T U
X E
N T
R
IV
E R
M
D
AS NOTED
2850 EISENHOWER AVENUE
SUITE 200
ALEXANDRIA, VA 22314
N A
V F
A C
L R
P F
A C
IL
IT
Y I D
S
.1
.2
W E
B S
T E
R F
IE
L D
N A
V A
L S
T A
T
IO
N P
A T
U X
E N
T R
IV
E
R
PRE-BID FINAL
(100%) DESIGN
SUBMITTAL
07/02/20
R E
V D
A T
E
F
IL
E N
A M
E
U N
C
LA
S S
IF
IE
D
DRAWFORM REVISION: 12 APRIL 2018
CHIEF ENG/ARCH
IPT TECH. BRANCH HEAD
PROJECT MANAGER
A/E INFO
APPROVED
/2
/2
:0
:5
P M
C U s e rs \z a b a lo s \D o c u m e n ts \2
R
M
C
E N
ID
S b im m e c h
.r v t
M-401
FI
R
S T
FL
O
O R
M E
C H
A N
IC
A
L P
LA
N
N
O R
TH
AEBSWL ZMA
3/16" = 1'-0" A1
FIRST FLOOR MECHANICAL PLAN - NORTH
WORK NOTES
GENERAL MECHANICAL NOTES
1 THE LOCATION OF ALL DUCT, PIPING, AND EQUIPMENT SHALL BE
ADJUSTED TO ACCOMMODATE ANTICIPATED OR ENCOUNTERED
INTERFERENCES.
2 PROVIDE BALANCING DAMPER FOR EACH SUPPLY, RETURN, AND
EXHAUST RUNOUT.
3 ALL RUNOUTS TO TERMINALS ARE NECK SIZE UNLESS OTHERWISE
NOTED.
4 MAINTAIN MANUFACTURER RECOMMENDED CLEARANCE AROUND
ALL EQUIPMENT.
5 DUCT SIZES SHOWN REFER TO AIR SIZE.
6 ALL DUCT TAPS SHALL HAVE 45 DEGREE DUCT HEELS.
7 DUCT SIZES SHOWN AS XX"/XX" REFER TO OVAL DUCT. ALL MEDIUM
PRESSURE DUCTWORK MUST BE EITHER ROUND OR OVAL.
8 A MINIMUM OF 6 DUCT DIAMETERS OF STRAIGHT DUCT DIRECTLY
UPSTREAM OF VAV CONNECTION IS REQUIRED.
PLAN
NORTH
0' 4' 8' 12'
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
SEAL
2850 EISENHOWER AVENUE
SUITE 200
ALEXANDRIA, VA 22314
PRE-FINAL
100% DESIGN
SUBMITTAL
06 / 03 / 20
16 5 4 3 2
A
B
C
CONFERENCE
WOMEN
OFFICE
JA
N
VAV-04
VAV-05
TT
T
T VAV-09
T
AV
110A
S2B
R1
OFFICE
VAV-06
VAV-09
CUH-1
R2 18"x18"
24"x24"
"ø
20"x20"
18"x18"
R2
20"ø
S1B
S1B
S1B
S1B
S1B
S1B
S1B
S1B
S1B
20"x14"
R1
T VAV-08
R1
R2
S1B
R1 420
R2
S1A
S1A
S1A
S1A
S1A
S1A
R1
R2
R1
S1A
S2B
8"x8"
10"x10"
12"x10"
E2
30"x28"
MEN
CORRIDOR
VEST
BREAK
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
"x
"ø
14"ø
"ø
12"ø
14"ø14"ø
"ø
12"ø
8"ø
10"ø 8"ø
10"x10" 16"x10"
"ø
8"ø
20"x16" 20"x20"
16"ø14"ø
12"ø
"ø
22"ø
"ø6" ø
8"x8"
8"ø
8" ø
"x
8"
"ø
6"ø
8" x8
"x
10"x10"
6"ø 10"x10"
14"x12"
VAV-08
14"x10"
8" ø
R1
18"x16"
"x
14"x14"
14"x14"
R1
20"x20"
6"x6"
10"x10"
10"x10"
12"x12"
S4
S4
VAV-07
ENGINEERING
12"x10"14"x10"
20"x20"
12"ø
6"x6"
VAV-04
N O
T F
O R
C O
N S
T R
U C
T
IO
N
P R
E L
IM
IN
A
R Y
SATISFACTORY TO
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
W
A S
H
IN
G T
O N
P A
T U
X E
N T
R
IV
E R
M
D
AS NOTED
2850 EISENHOWER AVENUE
SUITE 200
ALEXANDRIA, VA 22314
N A
V F
A C
L R
P F
A C
IL
IT
Y I D
S
.1
.2
W E
B S
T E
R F
IE
L D
N A
V A
L S
T A
T
IO
N P
A T
U X
E N
T R
IV
E
R
PRE-BID FINAL
(100%) DESIGN
SUBMITTAL
07/02/20
R E
V D
A T
E
F
IL
E N
A M
E
U N
C
LA
S S
IF
IE
D
DRAWFORM REVISION: 12 APRIL 2018
CHIEF ENG/ARCH
IPT TECH. BRANCH HEAD
PROJECT MANAGER
A/E INFO
APPROVED
/2
/2
:0
:5
P M
C U s e rs \z a b a lo s \D o c u m e n ts \2
R
M
C
E N
ID
S b im m e c h
.r v t
M-402
FI
R
S T
FL
O
O R
M E
C H
A N
IC
A
L P
LA
N
S
O U
TH
AEBSWL ZMA
3/16" = 1'-0" A1
FIRST FLOOR MECHANICAL PLAN - SOUTH
WORK NOTES
1 40"X40" EXHAUST DUCT UP TO HGR-1.
2 ATFP EMERGENCY SHUTDOWN SWITCH LOCATION. PROVIDE ATFP
SWITCH WITH COVER.
3 DUCT STATIC PRESSURE SENSOR LOCATION.
GENERAL MECHANICAL NOTES
1 THE LOCATION OF ALL DUCT, PIPING, AND EQUIPMENT SHALL BE
ADJUSTED TO ACCOMMODATE ANTICIPATED OR ENCOUNTERED
INTERFERENCES.
2 PROVIDE BALANCING DAMPER FOR EACH SUPPLY, RETURN, AND
EXHAUST RUNOUT.
3 ALL RUNOUTS TO TERMINALS ARE NECK SIZE UNLESS OTHERWISE
NOTED.
4 MAINTAIN MANUFACTURER RECOMMENDED CLEARANCE AROUND
ALL EQUIPMENT.
5 DUCT SIZES SHOWN REFER TO AIR SIZE.
6 ALL DUCT TAPS SHALL HAVE 45 DEGREE DUCT HEELS.
7 DUCT SIZES SHOWN AS XX"/XX" REFER TO OVAL DUCT. ALL MEDIUM
PRESSURE DUCTWORK MUST BE EITHER ROUND OR OVAL.
8 A MINIMUM OF 6 DUCT DIAMETERS OF STRAIGHT DUCT DIRECTLY
UPSTREAM OF VAV CONNECTION IS REQUIRED.
PLAN
NORTH
0' 4' 8' 12'
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
SEAL
2850 EISENHOWER AVENUE
SUITE 200
ALEXANDRIA, VA 22314
PRE-FINAL
100% DESIGN
SUBMITTAL
06 / 03 / 20
M
M
M
M
M
D
E
A2
M-301
L-1
BEL
H-1
AHU-1
EF-2
DDC PANELS
MECH
DH-1
TUH-1
L-3
20"x18" EXH
12"x10" EXH
L-2
DSS-1A
DSS-1
TR
ELEC
UH-2
24"x18" EXH
EF-3
BEL
14"x12" EXH 12"x12" EXH
30"x28" EXH
24"x18" OA
30"x28" RA
38"x22" OA
60"x30" EXH
60"x30" OA
L-4
EF-1
S1A
S1A
R2
DWH-1
PIPING TO DH-1
MOTHER'S
STORAGE
3/4" CD
6"x6" RA
14"x14" RA
22"/26" SA
R2
REFRIGERANT
PIPING
6"x6" RA
T
10"x10" EXH
T
30"x26" RA
12"x12"
36"x18"
"x
"x
"x
6"ø
AHU CLEARANCE
N O
T F
O R
C O
N S
T R
U C
T
IO
N
P R
E L
IM
IN
A
R Y
SATISFACTORY TO
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
W
A S
H
IN
G T
O N
P A
T U
X E
N T
R
IV
E R
M
D
AS NOTED
2850 EISENHOWER AVENUE
SUITE 200
ALEXANDRIA, VA 22314
N A
V F
A C
L R
P F
A C
IL
IT
Y I D
S
.1
.2
W E
B S
T E
R F
IE
L D
N A
V A
L S
T A
T
IO
N P
A T
U X
E N
T R
IV
E
R
PRE-BID FINAL
(100%) DESIGN
SUBMITTAL
07/02/20
R E
V D
A T
E
F
IL
E N
A M
E
U N
C
LA
S S
IF
IE
D
DRAWFORM REVISION: 12 APRIL 2018
CHIEF ENG/ARCH
IPT TECH. BRANCH HEAD
PROJECT MANAGER
A/E INFO
APPROVED
/2
/2
:0
:5
P M
C U s e rs \z a b a lo s \D o c u m e n ts \2
R
M
C
E N
ID
S b im m e c h
.r v t
M-403
M E
C H
A N
IC
A
L R
O O
M E
N
LA
R G
E D
P
LA
N
AEBSWL ZMA
1/2" = 1'-0" A1
MECHANICAL ROOM ENLARGED PLAN
WORK NOTES
1 PROVIDE BELLMOUTH FITTING AND BIRDSCREEN AT INLET.
2 6" CONCRETE PAD.
3 SPACE RESERVED FOR INCOMING FIRE PROTECTION SERVICE TO
BUILDING, SEE FIRE PROTECTION. MAINTAIN CLEAR SPACE ABOVE
AS SHOWN. PROVIDE A MINIMUM 3FT CLEARANCE IN FRONT OF ALL
COMPONENTS.
4 40"X40" OUTSIDE AIR DUCT UP TO HGI-1.
5 PROVIDE CONCRETE PAD FOR CONDENSING UNIT. COORDINATE
EXACT LOCATION WITH CIVIL. SEE STRUCTURAL FOR DETAIL.
6 REFRIGERANT PIPING. SIZE PER MANUFACTURER'S
RECOMMENDATIONS. PROVIDE ALUMINUM JACKET FOR OUTDOOR
EXPOSED PIPING INSULATION.
7 ROUTE CONDENSATE TO SPLASHBLOCK AWAY FROM OUTDOOR
UNIT.
8 PROVIDE ATFP CONTROL DAMPER.
1' 2' 4'0'
GENERAL MECHANICAL NOTES
1 THE LOCATION OF ALL DUCT, PIPING, AND EQUIPMENT SHALL BE
ADJUSTED TO ACCOMMODATE ANTICIPATED OR ENCOUNTERED
INTERFERENCES.
2 PROVIDE BALANCING DAMPER FOR EACH SUPPLY, RETURN, AND
EXHAUST RUNOUT.
3 ALL RUNOUTS TO TERMINALS ARE NECK SIZE UNLESS OTHERWISE
NOTED.
4 MAINTAIN MANUFACTURER RECOMMENDED CLEARANCE AROUND
ALL EQUIPMENT.
5 DUCT SIZES SHOWN REFER TO AIR SIZE.
6 ALL DUCT TAPS SHALL HAVE 45 DEGREE DUCT HEELS.
7 DUCT SIZES SHOWN AS XX"/XX" REFER TO OVAL DUCT. ALL MEDIUM
PRESSURE DUCTWORK MUST BE EITHER ROUND OR OVAL.
8 A MINIMUM OF 6 DUCT DIAMETERS OF STRAIGHT DUCT DIRECTLY
UPSTREAM OF VAV CONNECTION IS REQUIRED.
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
SEAL
2850 EISENHOWER AVENUE
SUITE 200
ALEXANDRIA, VA 22314
PRE-FINAL
100% DESIGN
SUBMITTAL
06 / 03 / 20
TYPICAL CEILING SUPPLY
DIFFUSER CONNECTION
DUCTLESS SPLIT SYSTEM DETAIL
SERIES FAN-POWERED VAV TERMINAL
WITH ELECTRIC REHEAT
CEILING RETURN GRILLE WITH FILTER
CEILING RETURN/EXHAUST GRILLE
WITHOUT FILTER
ELECTRIC HEATING COIL
CONNECTIONS SHALL BE LEFT
OR RIGHT HAND AS SPACE
REQUIREMENTS DICTATE
(MIN. 4" EXTENSION ALL SIDES)
4" THICK CONCRETE PAD
OUTDOOR UNIT
FURNISHED BY FCU MFGR.
WALL SLEEVE WITH CAPS
TO INDOOR UNIT
VOLTAGE CONTROL
POWER & HIGH
RL REFRIGERANT
INSULATED RS,
AIRFLOW
LINES
AIRFLOW
TO THERMOSTAT
CONNECTION CABLE
INDOOR UNIT
FURNISHED BY FCU MFGR.
WALL MOUNTING BRACKET
CABLE
SEE PLANS FOR ROUTING
3/4"∅ DRAIN LINE
THERMISTOR
SECURE TO CONCRETE PAD
SA
C1
C3
C1
A4
A1
SCALE: NONE
INSULATION
ACOUSTICAL CEILING TILE
SUPPLY AIR DUCT
VOLUME DAMPER
DIAMETER = "A"
INSULATED ACOUSTIC FLEX DUCT - LENGTH MINIMUM 3
FEET, NOT TO EXCEED 5 FEET. LIMIT ANY OFFSET, SAG,
AND MISALIGNMENT TO 4" IN ANY DIRECTION. DO NOT USE
FLEX DUCT FOR OFFSETS GREATER THAN 45 DEGREES
OR CONNECTION TO DIFFUSERS GREATER THAN 45
DEGREES.
SCALE: NONE
EXTERNALLY INSULATED
RIGID DUCT AND TOP OF
DIFFUSER
R = 1.5A
"A"
45° ENTRY SQUARE TO ROUND.
45° ENTRY
24x24 LAY IN GRILLE
RETURN OR EXHAUST DUCT
(SEE PLANS FOR SIZES)
VOLUME DAMPER
RETURN OR EXHAUST DUCT
2"
TRANSITION IF REQUIRED
SCALE: NONE
DISCHARGE DUCT
ELECTRIC HEATING COIL
ATTACH TO STRUCTURE
SCALE: NONE
PROVIDE 6 DIA OF
STRAIGHT NECK-SIZE DUCT
NOTES:
1. SEE AT/FP CONSTRAINT DETAILS ON SHEET M-503. FIXTURES WEIGHING 31 LBS OR MORE SHALL BE
BRACED TO RESIST FORCES OF 0.5 TIMES THE EQUIPMENT WEIGHT IN ANY HORIZONTAL DIRECTION
AND 1.5 TIMES THE EQUIPMENT WEIGHT IN THE DOWNWARD DIRECTION.
VOLUME DAMPER
MEDIUM PRESSURE SUPPLY
SEE PLANS FOR SIZES
RETURN CONNECTION.
SEE PLANS FOR ROUTING.
FURNISH TERMINAL UNIT
WITH SINGLE POINT
ELECTRICAL CONNECTION
AND FACTORY MOUNTED
FUSED DISCONNECT.
EXTERNALLY INSULATE
INLET COLLAR AND
SECURE TO TERMINAL
WITH METAL FOIL TAPETYPICAL TERMINAL
HANGER CONNECTION
CONTROLS SHALL BE
EITHER RIGHT OR LEFT
HAND AS SPACE REQUIRE-
MENTS DICTATE
PROVIDE RUBBER
ISOLATION GROMMET (TYP)
LONG RADIUS RIGID
90 DEG ELBOW
SUPPLY DIFFUSER WITH NECK
TRANSITION AS REQUIRED
SCALE: NONE
45 DEG HEEL
RETURN DUCT (SEE
PLANS FOR SIZES)
VOLUME DAMPER
RETURN DUCT
VARIOUS
24x24 FILTER GRILLE WITH 20x20
FILTER AND DUCT CONNECTION
20x20 PLENUM
WITH END CAP
45 DEG HEEL
CEILING
N O
T F
O R
C O
N S
T R
U C
T
IO
N
P R
E L
IM
IN
A
R Y
SATISFACTORY TO
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
W
A S
H
IN
G T
O N
P A
T U
X E
N T
R
IV
E R
M
D
AS NOTED
2850 EISENHOWER AVENUE
SUITE 200
ALEXANDRIA, VA 22314
N A
V F
A C
L R
P F
A C
IL
IT
Y I D
S
.1
.2
W E
B S
T E
R F
IE
L D
N A
V A
L S
T A
T
IO
N P
A T
U X
E N
T R
IV
E
R
PRE-BID FINAL
(100%) DESIGN
SUBMITTAL
07/02/20
R E
V D
A T
E
F
IL
E N
A M
E
U N
C
LA
S S
IF
IE
D
DRAWFORM REVISION: 12 APRIL 2018
CHIEF ENG/ARCH
IPT TECH. BRANCH HEAD
PROJECT MANAGER
A/E INFO
APPROVED
/2
/2
:0
:5
P M
C U s e rs \z a b a lo s \D o c u m e n ts \2
R
M
C
E N
ID
S b im m e c h
.r v t
M-501
D E
TA
IL
S
AEBSWL ZMA
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
SEAL
2850 EISENHOWER AVENUE
SUITE 200
ALEXANDRIA, VA 22314
PRE-FINAL
100% DESIGN
SUBMITTAL
06 / 03 / 20
SECURE
SIDE
NON-SECURE
SIDE
SECURE PIPE PENETRATION DETAIL
INLINE EXHAUST FAN DETAIL
AIR HANDLING UNIT DRAIN FOR
NEGATIVE PRESSURE DRAIN PAN
BELLMOUTH FITTING DETAIL
GRADE MOUNTED AIR CONDITIONER UNIT
DRAIN FOR NEGATIVE PRESSURE DRAIN PAN
PLAN VIEW SIDE ELEVEATION
EXTERIOR WALL DUCT RISER SUPPORT DETAIL
B3
A3
A1
A4
C1 C4
PIPE
PIPE CLAMP
NO. 4 WIRE
PROVIDE ACOUSTICAL
SEALANT AT ALL GYPSUM
BOARD PENETRATIONS
PIPE INSULATION
AS SPECIFIED
GROUND PIPE WITHIN
6" OF PERIMETER
CONNECT TO
BUILDING GROUND
SCALE: NONE
1.
SEE PLANS FOR
DUCT SIZE
PROVIDE DOUBLE NUT
ARRANGEMENT BELOW
SUPPORT BRACKET
(TYPICAL)
SUPPORT BRACKET
NOTES:
SUPPORT FAN PER MANUFACTURER'S RECOMMENDATIONS.
SCALE: NONE
FLEXIBLE CONNECTION
(TYPICAL)
SEE PLANS FOR
DUCT SIZE
SUPPORT RODS
(TYPICAL)INLINE
EXHAUST
FAN
VIBRATION ISOLATORS
NOTE: CONDENSATE DRAIN PIPE SIZE SHALL BE UNIT
DRAIN CONNECTION SIZE (MINUMUM 1").
"A" = SYSTEM STATIC PRESSURE IN INCHES, AT DRAIN POINT + 1"
SCALE: NONE
MOP SINK OR FLOOR DRAIN
2" AIR GAP
45 DEGREE CUT
UNIT DRAIN CONNECTION
ON FAN INLET
UNIT DRAIN PAN
(0.5 x A)in
A
SQUARE HEAD PLUGS
SLOPE MINIMUM 1/8" PER
FOOT DOWN TOWARD DRAIN
INSULATE WITH
VAPOR BARRIER
6"
DUCT WIDTH
6"
DUCT HEIGHT
HEIGHT + 12"
WIDTH + 12"
6"
6"
DUCT DIAMETER
DIAMETER + 12"
R6"
SCALE: NONE
PROVIDE
BIRDSCREEN
PROVIDE
BIRDSCREEN
UNIT DRAIN PAN
UNIT DRAIN CONNECTION
"A" = SYSTEM STATIC PRESSURE IN INCHES, AT DRAIN POINT (1.5" MIN).
(0.5 x A)in
A SLOPE 1/8" PER FOOT
NOTES:
1. CONDENSATE DRAIN PIPE SIZE SHALL BE UNIT DRAIN CONNECTION
SIZE (MINIMUM 3/4")
2. THIS DETAIL IS PROVIDED FOR REFERENCE. INSTALL PER
MANUFACTURER INSTALLATION INSTRUCTIONS.
THREADED CAP
CONCRETE PIPE
12" DIA. x 24" LONG
PEA GRAVEL
CLEAN LOOSE
DRY WELL NEXT TO EQUIPMENT PAD
SCALE: NONE
SCALE: NONE
SECURE METAL BUILDING
WALL, TYP. 4 PLACES.
COORDINATE WITH METAL
BUILDING MANUFACTURER
2"x2"x1/4" ANGLE
CLIP WITH BOLTS
& HEX NUTS
DUCT RISER WITH
INSULATION. SEE
PLANS FOR SIZES
1-1/2"x1-1/2"x1/4"
(TYP.)
TO SUIT
STANDARD DUCT
RISER SUPPORT
W/BOLTS AND
HEX NUTS
THRU BOLT STANDARD
RISER SUPPORT TO ANGLE
CLIP, TYP.
VARIES
1/4"
TYP.
1-1/2"x1-1/2"x1/4" ALL
WELDED CONSTRUCTION
TO SUIT
DUCT RISER WITH
INSULATION. SEE
PLANS FOR SIZES
STANDARD DUCT
RISER SUPPORT
W/BOLTS AND HEX
NUTS
SECURE METAL BUILDING
WALL, TYP. 4 PLACES.
COORDINATE WITH METAL
BUILDING MANUFACTURER
N O
T F
O R
C O
N S
T R
U C
T
IO
N
P R
E L
IM
IN
A
R Y
SATISFACTORY TO
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
W
A S
H
IN
G T
O N
P A
T U
X E
N T
R
IV
E R
M
D
AS NOTED
2850 EISENHOWER AVENUE
SUITE 200
ALEXANDRIA, VA 22314
N A
V F
A C
L R
P F
A C
IL
IT
Y I D
S
.1
.2
W E
B S
T E
R F
IE
L D
N A
V A
L S
T A
T
IO
N P
A T
U X
E N
T R
IV
E
R
PRE-BID FINAL
(100%) DESIGN
SUBMITTAL
07/02/20
R E
V D
A T
E
F
IL
E N
A M
E
U N
C
LA
S S
IF
IE
D
DRAWFORM REVISION: 12 APRIL 2018
CHIEF ENG/ARCH
IPT TECH. BRANCH HEAD
PROJECT MANAGER
A/E INFO
APPROVED
/2
/2
:0
:5
P M
C U s e rs \z a b a lo s \D o c u m e n ts \2
R
M
C
E N
ID
S b im m e c h
.r v t
M-502
D E
TA
IL
S
AEBSWL ZMA
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
SEAL
2850 EISENHOWER AVENUE
SUITE 200
ALEXANDRIA, VA 22314
PRE-FINAL
100% DESIGN
SUBMITTAL
06 / 03 / 20
ATFP BRACING DETAIL FOR SUSPENDED
MECHANICAL EQUIPMENT WITH EXTERNAL
VIBRATION ISOLATORS
ATFP BRACING DETAIL FOR SUSPENDED
MECHANICAL EQUIPMENT WITH INTERNAL
VIBRATION ISOLATORS
PLAN VIEW
HANGER ROD
EQUIPMENT
MECHANICAL
(TYP)
VIBRATION ISOLATION
45°
TRANSVERSE AND
LONGITUDINAL
(TYP.)
CABLE BRACE
WITH 1/2" SLACK
CABLES INSTALLED
ON BOTH SIDES
30° TO 90°
ELEVATION
30° TO 90°
SUPPORT
TYP.
45°
MEMBER
PLAN VIEW
ELEVATION
WITH 1/2" SLACK
CABLES INSTALLED
ON BOTH SIDES
SUPPORT ANGLE
DOUBLE NUT (TYP)
SEE ATFP CABLE
ASSEMBLY DETAIL
SUSPENDED
MECHANICAL
EQUIPMENT
SUPPORT ANGLE
DOUBLE NUT (TYP)
ASSEMBLY DETAIL
SEE ATFP CABLE
CABLES INSTALLED
TIGHT (TYP.)
(TYP.)
(TYP.)
CABLE BRACE
LONGITUDINAL
TRANSVERSE AND
HANGER ROD (TYP)
SUSPENDED
MECHANICAL
EQUIPMENT
SUSPENDED
SUSPENDED
MECHANICAL
EQUIPMENT
> 31 LBS
> 31 LBS
> 31 LBS
> 31 LBS
HANGER ROD (TYP)
B2
B3
SCALE: NONE
N O
T F
O R
C O
N S
T R
U C
T
IO
N
P R
E L
IM
IN
A
R Y
SATISFACTORY TO
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
W
A S
H
IN
G T
O N
P A
T U
X E
N T
R
IV
E R
M
D
AS NOTED
2850 EISENHOWER AVENUE
SUITE 200
ALEXANDRIA, VA 22314
N A
V F
A C
L R
P F
A C
IL
IT
Y I D
S
.1
.2
W E
B S
T E
R F
IE
L D
N A
V A
L S
T A
T
IO
N P
A T
U X
E N
T R
IV
E
R
PRE-BID FINAL
(100%) DESIGN
SUBMITTAL
07/02/20
R E
V D
A T
E
F
IL
E N
A M
E
U N
C
LA
S S
IF
IE
D
DRAWFORM REVISION: 12 APRIL 2018
CHIEF ENG/ARCH
IPT TECH. BRANCH HEAD
PROJECT MANAGER
A/E INFO
APPROVED
/2
/2
:0
:5
P M
C U s e rs \z a b a lo s \D o c u m e n ts \2
R
M
C
E N
ID
S b im m e c h
.r v t
M-503
D E
TA
IL
S
AEBSWL ZMA
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
SEAL
2850 EISENHOWER AVENUE
SUITE 200
ALEXANDRIA, VA 22314
PRE-FINAL
100% DESIGN
SUBMITTAL
06 / 03 / 20
DUCTLESS SPLIT SYSTEM SCHEDULE
OUTDOOR UNIT DESIGNATION DSS-1
INDOOR UNIT DESIGNATION DSS-1A
ROOM SERVED TR-202
IN
D
O O
R U
N
IT EVAPORATOR
AIRFLOW (H/L) 500/400
RATED TOTAL COOLING CAPACITY (MBH) 18
ELECTRICAL
VOLTAGE (V) 208
PHASE 1
FREQUENCY (Hz) 60
REFRIGERANT R-410A
O U
T D
O O
R U
N
IT
ELECTRICAL
AMBIENT DESIGN TEMPERATURE (DEG F) 95
RATED TOTAL COOLING CAPACITY (MBH) 18
MINIMUM CIRCUIT AMPACITY (A) 16.5
RECOMMENDED FUSE SIZE (A) 20
VOLTAGE (V) 208
PHASE 1
FREQUENCY (Hz) 60
REMARKS 1, 2, 3, & 4
REMARKS LEGEND:
1. POWER FROM OUTDOOR UNIT, OUTDOOR UNIT POWER INCLUDES EVAPORATOR POWER.
INSTALL PER MANUFACTURER'S INSTRUCTIONS, ADJUST CHARGE AS NEEDED FOR
REFRIGERANT PIPE LENGTH.
2. PROVIDE 3/4" CONDUIT BETWEEN INDOOR AND OUTDOOR UNIT.
3. PROVIDE LOW AMBIENT OPERATION DOWN TO 0 DEG F OUTSIDE AIR.
4. PROVIDE CORROSION RESISTANT COATING ON CONDENSER COIL.
AIR COOLED CONDENSING UNIT
SCHEDULE
DESIGNATION ACCU-1
MINIMUM COOLING CAPACITY (MBH) 345
EER AT AHRI (CONDENSER ONLY) 11.4
DESIGN COOLING OUTDOOR TEMP DB (DEG F) 95
COMPRESSOR
TYPE SCROLL
QUANTITY 2
ELECTRICAL
VOLTAGE (V) 480
PHASE 3
FREQUENCY (Hz) 60
TOTAL POWER (Kw) 33.8
MINIMUM CIRCUIT AMPACITY (A) 63
MAXIMUM OVERCURRENT PROTECTION 80
REMARKS 1 & 2
REMARKS LEGEND:
1. PROVIDE A DIGITAL SCROLL COMPRESSOR. UNIT MUST BE CAPABLE OF
REDUCING CAPACITY TO 10% OF TOTAL CAPACITY WITH THE ABILITY TO
MODULATAE CAPACITY UP TO FULL LOAD.
2. PROVIDE LOW AMBIENT CONTROL.
VAV AIR HANDLING UNIT SCHEDULE
DESIGNATION AHU-1
LOCATION 200 - MECH
AREA SERVED VARIOUS
MINIMUM OUTSIDE AIR (CFM) 1,600
S
U P
P L Y
F A
N
MAXIMUM FAN AIRFLOW (CFM) 7,000
MINIMUM FAN AIRFLOW (CFM) 2,400
CONTROL TYPE VFD
EXTERNAL STATIC PRESSURE (IN. WG) 2
MOTOR (HP) 10
SUPPLY FAN MOTOR SPEED (RPM) 1,800
DRIVE TYPE DIRECT
R E
T U
R N
F A
N
MAXIMUM FAN AIRFLOW (CFM) 7,000
MINIMUM FAN AIRFLOW (CFM) 2,400
CONTROL TYPE VFD
EXTERNAL STATIC PRESSURE (IN. WG) 1
MOTOR (HP) 5
RETURN FAN MOTOR SPEED (RPM) 1,800
DRIVE TYPE DIRECT
C O
O L
IN
G
C O
IL
COIL TYPE DX
AIR FLOW (CFM) 7,000
ENTERING AIR TEMPERATURE DB / WB (DEG F) 79.1 / 68.1
LEAVING AIR TEMPERATURE DB / WB (DEG F) 53.0 / 52.0
TOTAL CAPACITY (MBH) 345
SENSIBLE CAPACITY (MBH) 200
FACE VELOCITY (FPM) 521
AIR PRESSURE DROP (IN W.G.) 0.544
REFRIGERANT TYPE R410A
H E
A T
IN
G
C O
IL
HEATING TYPE ELECTRIC
HEATING AIRFLOW (CFM) 2,400
TOTAL CAPACITY (kW) 17
ENTERING AIR TEMPERATURE DB (DEG F) 35.7
LEAVING AIR TEMPERATURE DB (DEG F) 58.0
AIR PRESSURE DROP (IN W.G.) 0.147
FILTERS PRE-FILTER / FINAL FILTER (MERV) 8 / 13
ELECTRICAL
CIRCUIT 1
VOLTS / PH / HZ 480 / 3 / 60
FLA (A) 22.85
MCA (A) 26.35
MAX FUSE SIZE (A) 40
ELECTRICAL
CIRCUIT 2
(ELEC HEAT)
VOLTS / PH / HZ 480 / 3 / 60
FLA (A) 21.56
MCA (A) 26.89
MAX FUSE SIZE (A) 30
REMARKS 1 & 2
REMARKS LEGEND:
1. PROVIDE SINGLE POINT POWER CONNECTION FOR CIRCUIT 1 AND A SEPARATE
POWER CONNECTION FOR CIRCUIT 2 FOR ELECTRIC HEATER.
2. EXTERNAL STATIC PRESSURES SHOWN DO NOT INCLUDE DIRTY FILTER LOSS.
ASSUME MEDIUM LOADED FILTER.
FAN POWERED BOX SCHEDULE
UNIT DESIGNATION VAV-01 VAV-02 VAV-03 VAV-04 VAV-05 VAV-06 VAV-07 VAV-08 VAV-09
TYPE SERIES SERIES SERIES SERIES SERIES SERIES SERIES SERIES SERIES
INLET DIAMETER (IN) 8 8 14 4 6 4 8 14 12
PRIMARY
AIRFLOW
(CFM)
MAX 460 460 2,100 100 415 90 440 2,150 1,670
MIN 140 140 630 40 170 40 130 650 500
UNIT FAN
CFM 460 460 2,100 190 415 190 440 2,150 1,670
ESP (IN-WC) 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4
REHEAT TYPE ELECTRIC ELECTRIC ELECTRIC ELECTRIC ELECTRIC ELECTRIC ELECTRIC ELECTRIC ELECTRIC
REHEAT CAPACITY (KW) 2.5 2.5 9.5 1.0 2.5 1.0 2.5 11.0 7.5
EAT (DEG F) 64.0 64.0 64.1 65.3 62.7 65.3 64.2 64.1 64.1
LAT (DEG F) 81.2 81.2 79.1 81.8 81.6 81.8 81.2 80.2 78.2
ELECTRICAL
MOTOR QUANTITY 1 1 1 1 1 1 1 1 1
MOTOR POWER (HP) 1/3 1/3 1/2 1/8 1/3 1/8 1/3 1/2 1/2
VOLTAGE 277 277 277 277 277 277 277 277 277
PHASE 1 1 1 1 1 1 1 1 1
FREQUENCE (Hz) 60 60 60 60 60 60 60 60 60
FLA 11.43 11.43 41.2 4.31 11.43 4.31 11.43 44.81 32.18
MCA 14.28 14.28 51.5 5.39 14.28 5.39 14.28 56.01 40.22
MSCP 15 15 50 15 15 15 15 60 40
MAX RATED SOUND PWL (NC) 31 31 46 29 31 29 31 46 42
MAX DISCHARGE SOUND PWL (NC) 19 19 32 22 19 22 19 34 30
REMARKS 1, 2, 3, 4, 6, & 7 1, 2, 3, 4, 6, & 7 1, 2, 3, 4, 6, & 7 1, 2, 3, 5, 6, & 7 1, 2, 3, 4, 6, & 7 1, 2, 3, 5, 6, & 7 1, 2, 3, 4, 6, & 7 1, 2, 3, 4, 6, & 7 1, 2, 3, 4, 6, & 7
REMARKS LEGEND:
1. PROVIDE FILTER IN RETURN GRILLE. ESP LISTED INCLUDES FILTER PRESSURE DROP.
2. PROVIDE 0.5 INCH NON FIBEROUS INSULATION LINER.
3. PROVIDE INTEGRAL DISCONNECT.
4. PROVIDE ELECTRONICALLY COMMUTATED MOTOR.
5. PROVIDE PSC MOTOR WITH SCR CONTROL.
6. PROVIDE 24V CONTROL POWER TRANSFORMER AS REQUIRED.
7. PROVIDE ELECTRIC REHEAT WITH SCR CONTROL.
N O
T F
O R
C O
N S
T R
U C
T
IO
N
P R
E L
IM
IN
A
R Y
SATISFACTORY TO
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
W
A S
H
IN
G T
O N
P A
T U
X E
N T
R
IV
E R
M
D
AS NOTED
2850 EISENHOWER AVENUE
SUITE 200
ALEXANDRIA, VA 22314
N A
V F
A C
L R
P F
A C
IL
IT
Y I D
S
.1
.2
W E
B S
T E
R F
IE
L D
N A
V A
L S
T A
T
IO
N P
A T
U X
E N
T R
IV
E
R
PRE-BID FINAL
(100%) DESIGN
SUBMITTAL
07/02/20
R E
V D
A T
E
F
IL
E N
A M
E
U N
C
LA
S S
IF
IE
D
DRAWFORM REVISION: 12 APRIL 2018
CHIEF ENG/ARCH
IPT TECH. BRANCH HEAD
PROJECT MANAGER
A/E INFO
APPROVED
/2
/2
:0
:5
P M
C U s e rs \z a b a lo s \D o c u m e n ts \2
R
M
C
E N
ID
S b im m e c h
.r v t
M-601
S C
H E
D U
LE
S
AEBSWL ZMA
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
SEAL
2850 EISENHOWER AVENUE
SUITE 200
ALEXANDRIA, VA 22314
PRE-FINAL
100% DESIGN
SUBMITTAL
06 / 03 / 20
HUMIDIFIER SCHEDULE
UNIT NUMBER H-1 H-2 H-3
UNIT TYPE
ELECTRIC STEAM
WITH DUCT
MOUNTED
JACKETED TUBES
ELECTRIC STEAM
WITH BLOWER
PACK
ELECTRIC STEAM
WITH BLOWER
PACK
ASSOCIATED EQUIPMENT DH-1 - - - -
NOMINAL CAPACITY (LB/H) 20 10 10
RATED CAPACITY (LB/H) 22 11 11
FILL RATE (GPM) 0.2 0.2 0.2
DRAIN RATE (GPM) 1.60 1.60 1.60
TYPE ELECTRODE ELECTRODE ELECTRODE
MAXIMUM WATER PRESSURE
(PSIG)
80 80 80
MINIMUM WATER PRESSURE
(PSIG)
30 30 30
DRAIN WATER OD (IN) 1.18 1.18 1.18
E L E
C T
R
IC
A L
VOLTS (V) 480 277 277
PHASE 3 1 1
HERTZ 60 60 60
RATED POWER (KW) 7.5 3.9 3.9
MCA (A) 9.0 14.0 14.0
MOCP (A) 15 20 20
REMARKS 1, 3, 4, & 5 2, 3, 4, & 5 2, 3, 4, & 5
REMARKS LEGEND:
1. PROVIDE DUCT-MOUNTED STEAM DISTRIBUTOR IN 26"x20" OVAL SUPPLY DUCTWORK
WHERE SHOWN ON PLANS. ABSORPTION DISTANCE SHALL BE NO MORE THAN 1-FT.
2. PROVIDE UNIT MOUNTED BLOWER PACK FOR ROOM DIRECT HUMIDIFICATION.
3. PROVIDE WALL MOUNTING BRACKET.
4. PROVIDE DRAIN COOLER TO LIMIT DRAIN WATER TO 135 F BEFORE IT IS DISCHARGED TO
THE DRAIN.
5. PROVIDE BACNET COMMUNICATION TIE-IN.
FAN SCHEDULE
DESIGNATION EF-1 EF-2 EF-3
USAGE EXHAUST EXHAUST EXHAUST
SERVES ROOM(S)
MEN, WOMEN,
JAN
MECH ELEC
DESCRIPTION INLINE INLINE INLINE
FAN DATA - - - - - -
AIRFLOW (SCFM) 350 500 800
TOTAL SP (IN-H2O) 0.25 0.25 0.25
RPM 1,517 1,452 1,659
DRIVE TYPE DIRECT DIRECT DIRECT
MOTOR DATA - - - - - -
HORSEPOWER 1/10 1/10 1/6
RPM 1,725 1,725 1,725
VOLTS 115 115 115
PHASE 1 1 1
HERTZ 60 60 60
MAXIMUM dBA AT 5 FEET 50 52 56
REMARKS 1 & 2 1 & 2 1 & 2
REMARKS LEGEND:
1. PROVIDE FAN WITH UNIT MOUNTED DISCONNECT.
2. PROVIDE ELECTRONICALLY COMMUTATED MOTOR FOR BALANCING.
SINGLE ZONE VARIABLE AIR VOLUME UNIT
SCHEDULE
DESIGNATION SZVAV-1 SZVAV-2
AREA SERVED
134 - LAB
(SECRET)
135 - LAB (TOP
SECRET)
LOCATION
OUTSIDE ON
GRADE
OUTSIDE ON
GRADE
S U
P P
L Y
F A
N
SUPPLY FAN AIRFLOW (CFM) 3,800 3,800
MINIMUM SUPPLY…
This is the start of the file's text. The full file is on GovTribe.