NAWCAD-WOLF CIDS LRP 24 Jul - Attachment 1.pdf

PDF 871 KB Posted

Attached to
Combat Integration & Identification Systems (CI&IDS) Lab Revitalization Project
Solicitation number
N00421-20-S-0116
Issued by

About this file

This document provides details for a federal construction contract opportunity for the Combat Integration & Identification Systems Lab Revitalization Project. The Naval Air Warfare Center Aircraft Division is seeking to construct a new approximately 13,000 square foot single story office building at the Webster Outlying Field in St. Inigoes, Maryland. Interested parties should respond with their capabilities statement, business size as a small, 8(a), HUBZone, SDVOSB or other type of business, examples of at least three relevant past projects including description, value, customer and duration, as well as bonding levels. Responses are due by August 10, 2020. The contract is estimated between $5-10 million and will be a fixed price design/bid/build contract awarded using sealed bidding procedures. The North American Industry Classification code is 236220 and has a $39.5 million small business size standard.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Combat Integration &

Identification Systems (CI&IDS)

Lab Revitalization Project (LRP)

July 2020 Provided to: Industry

Points of Contact: CAPT Tom Cecil

Ms. Ashley Wingfield

2FOR OFFICIAL USE ONLY CONFIG. MGR: Name, Code, (###) ###-####

FILE NAME: xxx_ddMMMYY.pptx

CI&IDS LRP

• As the Navy's lead engineering activity for Combat Identification systems, the CI&IDS Division requires a suitable, efficiently configured facility to meet mission requirements.

• Basic facility requirements:

Mixed use space for ~ 55 occupants

Approximately 13,000 ft2

Two open lab spaces with raised access flooring

Different classification requirements for the two labs

Offices & cubicles for personnel

Single story, basic rectangular structure (“Butler” style building)

• Site overview

Flat, cleared site located

Near the shoreline

Some soil compaction required

Utilities available on site for hookup

3FOR OFFICIAL USE ONLY CONFIG. MGR: Name, Code, (###) ###-####

Site Location

4FOR OFFICIAL USE ONLY CONFIG. MGR: Name, Code, (###) ###-####

5FOR OFFICIAL USE ONLY CONFIG. MGR: Name, Code, (###) ###-####

Site Overview

6FOR OFFICIAL USE ONLY CONFIG. MGR: Name, Code, (###) ###-####

Exterior View

7FOR OFFICIAL USE ONLY CONFIG. MGR: Name, Code, (###) ###-####

Floor Plan

Approximately 80’ x 160’

8FOR OFFICIAL USE ONLY CONFIG. MGR: Name, Code, (###) ###-####

• Proposed design drawings of the LRP

Produced by Wiley Wilson/Burns McDonnell

Drawings are undergoing final review and may change

• Proposed Settlement Monitoring Specification

• Also available upon request:

Geotechnical Survey Report

Environmental Letter Report

• Site visits may be scheduled at a later date, if determined to be necessary

• Requests for Information can be directed to:

Ms. Ashley Wingfield; Ashley.Wingfield@navy.mil

Information Available mailto:Ashley.Wingfield@navy.mil

This construction project will be done under the DOD LRP Program. Basic background and limitations of the program follow:

Title 10 USC 2805

• The Secretary of Defense may carry out a program for the revitalization of Department of Defense laboratories. Under the program, the Secretary may carry out minor military construction projects ….

• Construction projects conducted under this authority are commonly referred to as “LRPs”

• Authority has been in place for many years

The projects will replace aging temporary buildings and upgrade and expand lab capability to accommodate workload growth and increase efficiency

Regularly renewed in annual appropriation bills

DEPARTMENT OF DEFENSE LABORATORY

REVITALIZATION DEMONSTRATION PROGRAM

LRPs are currently limited to $6M threshold for new construction projects

• LRP ceiling applies to:

All construction costs to produce a useable facility

Materials, labor, contractor management, utilities

Government Supervision, Inspection, and Overhead

(SIOH)

Government management reserve

• Does not include:

Initial Architecture or Engineering costs (already done)

Geotechnical surveys

Initial permitting

Furniture, Fixtures, and Equipment

LRP Financial Limits

11FOR OFFICIAL USE ONLY CONFIG. MGR: Name, Code, (###) ###-####

• Intended Acquisition Strategy

Invitation for Bid (sealed bidding procedures)

Other competitive options being considered

• Naval Air Warfare Center - Aircraft Division (NAWCAD) is participating in a pilot program

NAWCAD has been granted authority to handle contracting and management of facilities related projects up to the LRP threshold

Normally restricted to Navy Facilities Command (NAVFAC)

Awarding activity will be NAWCAD

Construction management will be NAWCAD

• FY21 Award

Contracting

Contracting Organization is NAWCAD (vice NAVFAC)

12FOR OFFICIAL USE ONLY CONFIG. MGR: Name, Code, (###) ###-####

Desired Response

• Request responses include:

Basic Capabilities Statement Cage Code/DUNS Business size (i.e. small business?)

Examples of projects of similar scope and complexity

Three examples desired

Either USN, DOD, State or Local projects

If respondents have suggested modifications or alternatives to the design and/or acquisition strategy, those are welcome

• Requests for Information (RFIs) Please submit separately from the response Responses to RFIs will be provided for the public

13FOR OFFICIAL USE ONLY CONFIG. MGR: Name, Code, (###) ###-####

Backups

14FOR OFFICIAL USE ONLY CONFIG. MGR: Name, Code, (###) ###-####