NAWCAD-WOLF CIDS LRP 24 Jul - Attachment 1.pdf
PDF 871 KB Posted
- Solicitation number
- N00421-20-S-0116
About this file
This document provides details for a federal construction contract opportunity for the Combat Integration & Identification Systems Lab Revitalization Project. The Naval Air Warfare Center Aircraft Division is seeking to construct a new approximately 13,000 square foot single story office building at the Webster Outlying Field in St. Inigoes, Maryland. Interested parties should respond with their capabilities statement, business size as a small, 8(a), HUBZone, SDVOSB or other type of business, examples of at least three relevant past projects including description, value, customer and duration, as well as bonding levels. Responses are due by August 10, 2020. The contract is estimated between $5-10 million and will be a fixed price design/bid/build contract awarded using sealed bidding procedures. The North American Industry Classification code is 236220 and has a $39.5 million small business size standard.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PreBid 100pct Drawings - Attachment 2 (Part 1).pdf | ||
| LRP Sources Sought.docx | DOCX document | |
| PreBid 100pct Drawings - Attachment 2 (Part 2).pdf | ||
| Settlement Monitoring Specification - Attachment 3.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Combat Integration &
Identification Systems (CI&IDS)
Lab Revitalization Project (LRP)
July 2020 Provided to: Industry
Points of Contact: CAPT Tom Cecil
Ms. Ashley Wingfield
2FOR OFFICIAL USE ONLY CONFIG. MGR: Name, Code, (###) ###-####
FILE NAME: xxx_ddMMMYY.pptx
CI&IDS LRP
• As the Navy's lead engineering activity for Combat Identification systems, the CI&IDS Division requires a suitable, efficiently configured facility to meet mission requirements.
• Basic facility requirements:
Mixed use space for ~ 55 occupants
Approximately 13,000 ft2
Two open lab spaces with raised access flooring
Different classification requirements for the two labs
Offices & cubicles for personnel
Single story, basic rectangular structure (“Butler” style building)
• Site overview
Flat, cleared site located
Near the shoreline
Some soil compaction required
Utilities available on site for hookup
3FOR OFFICIAL USE ONLY CONFIG. MGR: Name, Code, (###) ###-####
Site Location
4FOR OFFICIAL USE ONLY CONFIG. MGR: Name, Code, (###) ###-####
5FOR OFFICIAL USE ONLY CONFIG. MGR: Name, Code, (###) ###-####
Site Overview
6FOR OFFICIAL USE ONLY CONFIG. MGR: Name, Code, (###) ###-####
Exterior View
7FOR OFFICIAL USE ONLY CONFIG. MGR: Name, Code, (###) ###-####
Floor Plan
Approximately 80’ x 160’
8FOR OFFICIAL USE ONLY CONFIG. MGR: Name, Code, (###) ###-####
• Proposed design drawings of the LRP
Produced by Wiley Wilson/Burns McDonnell
Drawings are undergoing final review and may change
• Proposed Settlement Monitoring Specification
• Also available upon request:
Geotechnical Survey Report
Environmental Letter Report
• Site visits may be scheduled at a later date, if determined to be necessary
• Requests for Information can be directed to:
Ms. Ashley Wingfield; Ashley.Wingfield@navy.mil
Information Available mailto:Ashley.Wingfield@navy.mil
This construction project will be done under the DOD LRP Program. Basic background and limitations of the program follow:
Title 10 USC 2805
• The Secretary of Defense may carry out a program for the revitalization of Department of Defense laboratories. Under the program, the Secretary may carry out minor military construction projects ….
• Construction projects conducted under this authority are commonly referred to as “LRPs”
• Authority has been in place for many years
The projects will replace aging temporary buildings and upgrade and expand lab capability to accommodate workload growth and increase efficiency
Regularly renewed in annual appropriation bills
DEPARTMENT OF DEFENSE LABORATORY
REVITALIZATION DEMONSTRATION PROGRAM
LRPs are currently limited to $6M threshold for new construction projects
• LRP ceiling applies to:
All construction costs to produce a useable facility
Materials, labor, contractor management, utilities
Government Supervision, Inspection, and Overhead
(SIOH)
Government management reserve
• Does not include:
Initial Architecture or Engineering costs (already done)
Geotechnical surveys
Initial permitting
Furniture, Fixtures, and Equipment
LRP Financial Limits
11FOR OFFICIAL USE ONLY CONFIG. MGR: Name, Code, (###) ###-####
• Intended Acquisition Strategy
Invitation for Bid (sealed bidding procedures)
Other competitive options being considered
• Naval Air Warfare Center - Aircraft Division (NAWCAD) is participating in a pilot program
NAWCAD has been granted authority to handle contracting and management of facilities related projects up to the LRP threshold
Normally restricted to Navy Facilities Command (NAVFAC)
Awarding activity will be NAWCAD
Construction management will be NAWCAD
• FY21 Award
Contracting
Contracting Organization is NAWCAD (vice NAVFAC)
12FOR OFFICIAL USE ONLY CONFIG. MGR: Name, Code, (###) ###-####
Desired Response
• Request responses include:
Basic Capabilities Statement Cage Code/DUNS Business size (i.e. small business?)
Examples of projects of similar scope and complexity
Three examples desired
Either USN, DOD, State or Local projects
If respondents have suggested modifications or alternatives to the design and/or acquisition strategy, those are welcome
• Requests for Information (RFIs) Please submit separately from the response Responses to RFIs will be provided for the public
13FOR OFFICIAL USE ONLY CONFIG. MGR: Name, Code, (###) ###-####
Backups
14FOR OFFICIAL USE ONLY CONFIG. MGR: Name, Code, (###) ###-####
15FOR OFFICIAL USE ONLY CONFIG. MGR: Name, Code, (###) ###-####
File details come from the government source that posted it. Updated .