This is an architectural floor plan document for a new power plant construction project at Elgin Mental Health Center located at 750 South State Street in Elgin, Kane County, Illinois. The project is under the jurisdiction of the State of Illinois Capital Development Board. The design team includes LCM Architects, Affiliated Engineers Inc., Terra Engineering Ltd., Clark Construction, and David Mason + Associates. The document was issued for construction on October 6, 2023, with project number 321-055-138 and AEI project number 22329-00.

The overall floor plan depicts a multi-functional facility totaling approximately 23,000 square feet across two levels. The layout includes a boiler room (5,237 SF), generator room (2,262 SF), electrical room (2,067 SF), corridor (2,443 SF), and multiple trade shops and support spaces including vehicle bays, machine shop, carpentry, electrical, plumbing, and pipe trades areas. The facility features 10-inch and 8-inch concrete masonry unit exterior walls with designated 2-hour fire-rated interior walls. Overall building dimensions are approximately 209 feet by 192 feet. The plan includes detailed room numbering, rough opening dimensions for windows and doors, and reference notes directing contractors to partial floor plans and exterior elevations for complete specification details.

View the file

Other files

File Type Posted
FTP Pinel.pdf PDF
Elgin Lighting Project - invitation-for-bid-vendor-instructions-and-requirements-B-50857.docx DOCX document
RehabBldg.pdf PDF
FTP Hartman.pdf PDF
FTP White.pdf PDF
Goldman Bldg Record Drawing V2.pdf PDF
invitation-for-bid-offer-to-the-state-of-illinois-B-50857.pdf PDF
Kilbourne.pdf PDF
B50857 NOA.pdf PDF
FTP Program.pdf PDF
Elgin Central Stores New Dietary.pdf PDF
CentralStores and Dietary.pdf PDF
New Map EMHC.docx DOCX document
FTP Bldg Record Drawing.pdf PDF
Elgin Map 04202026.docx DOCX document
ipg-active-registered-vendor-disclosure-formerly-forms-b-v-26-1-8-26-2025-1~22.docx DOCX document
Elgin - Lighting Project.xlsx XLSX spreadsheet
FTP Building.pdf PDF
DHS IFB Elgin Lighting Project-B-50857~1.docx DOCX document
Goldman.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R E

F

6037 SF

VEHICLE BAYS

678 SF

GROUNDS/TRANSPORT

TRADES

1639 SF

MACHINE SHOP

TRADES

875 SF

ELECTRICAL TRADES

1370 SF

CARPENTRY TRADES

445 SF

PLUMBING TRADES

454 SF

BREAK ROOM

1172 SF

PIPE TRADES

158 SF

STORAGE

266 SF

UTILITES

JANITOR

838 SF

PAINT TRADES

A-3.0 2

A-3.0

A-3.03

A-3.0

A-3.1

/2

R .O

R .O

R .O

A-3.1

3.2

3.2

K K

J J

H H

G G

E E

C C

B B

A A

5.3

5.3

6.3

6.3 7

6.4

6.4

F F

A-3.1

A-3.1

D D

A-3.1

2067 SF

ELECTRICAL

2262 SF

GENERATOR

5237 SF

BOILER ROOM

154 SF

OFFICE

147 SF

STORAGE

187 SF

OPERATOR'S AREA

2443 SF

CORRIDOR

299 SF

WOMEN'S ROOM

309 SF

MEN'S ROOM

A-3.1

A-3.1

G.8

H.6

6.6

6.6

6.7

6.7

6.8

6.8

UP

A

B

B.8

C.4

G.3

4.8

4.6

4.6

126' - 10 1/2" 82' - 4"

/2

209' - 2 1/2"

/2

87' - 1" 122' - 2"

209' - 2 1/2"

A-3.1

UP

A-3.1

A-3.1

115.1114.1112 111.1

113 116

115.2114.2

.1

.2

100.0102

120.0

111.2

009 008

120.2120.3 120.1

120.7

120.5

120.4

108 107

120.6

158 SF

TELECOM

R.O.

6' - 5" 26' - 6 1/2"

R.O.

6' - 4" 31' - 5"

R.O.

6' - 4" 4' - 0"

9' - 4 1/2"

R.O.

16' - 0" 14' - 8 1/2"

R.O.

16' - 0" 14' - 8 1/2"

R.O.

16' - 0" 14' - 8 1/2"

R.O.

16' - 0" 9' - 4"

R .O

R .O

R .O

R .O

2' - 0 1/2"

22' - 0"

R.O.

3' - 5" 10' - 7 1/2"

R.O.

6' - 4"

30' - 2" R.O.

6' - 4"

R .O

R .O

R .O

/2

R .O

/2

2' - 5"

6' - 3 1/2"

R.O.

10' - 0" 3' - 11"

R.O.

10' - 0" 3' - 11 1/2"

R.O.

10' - 0" 4' - 1 1/2"

R.O.

3' - 4" 28' - 8"

R.O.

6' - 4" 6' - 2"

R.O.

6' - 4" 6' - 2"

R.O.

6' - 4" 10' - 7"

2' - 1 1/2"

R .O

R .O

R .O

/2

R .O

/2

R .O

CCL1L1 L1

C

C

C

C

/2

EXT. WALLS

10" CMU

EXT. WALLS

8" CMU

EXT. WALLS

10" CMU

EXT. WALLS

8" CMU

WALL FIRE RATING LEGEND

2-HR RATED WALL

NON-RATED WALL

SCALE:

N

1/8" = 1'-0"1 OVERALL FLOOR PLAN

4'0 8' 16'

OVERALL FLOOR PLAN GENERAL NOTES:

1. REFER TO PARTIAL FLOOR PLANS FOR INTERIOR DIMENSIONS.

2. EXTERIOR DIMENSIONS ARE TO FACE OF BRICK, ROUGH OPENINGS, OR COLUMN

LINES.

3. ALL WINDOWS NOT SHOWN ON OVERALL PLANS. REFER TO EXTERIOR ELEVATIONS

FOR ALL LOCATIONS.

State of Illinois

JB PRITZKER, GOVERNOR

Illinois Capital Development Board

DATE

PROJECT NO.

SHEET NO.

REVISIONS

REMARKSDATENO.

NOTE: CONTRACTOR SHALL OBTAIN AND VERIFY ALL DIMENSIONS AND CONDITIONS AT JOB SITE AND BE FULLY RESPONSIBLE FOR SAME.

CHECKED APPROVED

APPROVED

PREPARED

TRACED

DRAWN

LCM ARCHITECTS

819 S. Wabash Ave., 5th Floor Chicago, IL 60605 Phone: 312-913-1717

Affiliated

AEI Project Number: 22329-00 Affiliated Engineers, Inc.

10 S. La Salle Street, Suite 2700 Chicago, IL 60603 Phone: 312-977-2800

Engineers

Terra Engineering, Ltd.

225 W. Ohio St., 4th Floor Chicago, IL 60654 Phone: 312-467-0123

SHEET NOTES:

Clark Construction 216 South Jefferson St., Suite 502 Chicago, IL 60611 Phone: 312-474-5500

David Mason + Associates 333 S. Desplaines St., Suite 200 Chicago, IL 60611 Phone: 312-884-5100

321-055-138

NEW POWER PLANT

ELGIN MENTAL HEALTH CENTER

750 SOUTH STATE STREET

ELGIN, KANE COUNTY, ILLINOIS

KEY PLAN

A

BC

ISSUED FOR CONSTRUCTION - 10/6/2023

/5

/2

2:

:1

PM

C :\U se rs

\E Re ns in k\ Do cu m en ts

\1 2-

_E

LG

IN

M

HC

_A

RC

H

_v

C en t ra l

_e re ns in k6

TS

VN

.rv t

OVERALL FLOOR PLAN

A-1.1

10/6/23

File details come from the government source that posted it. Updated .