DHS IFB EMHC Lighting Project
Active Open Market Competitive Sealed Bidding Illinois Awarded
- Contract number
- 26-444DHS-MENTH-P-94785
- Awardee
- GreenMile EV LLC
- Contracting organization
- Mental Health
- Contract amount
- $911,891
Award facts
- Completion date
- NIGP code
Award details come from bidbuy.illinois.gov. Updated .
About this award
The State of Illinois Department of Human Services Mental Health division awarded a lighting upgrade contract to GreenMile EV LLC on April 27, 2026, through an open market competitive sealed bidding process. The contract, identified as 26-444DHS-MENTH-P-94785, covers a comprehensive lighting retrofit project at Elgin Mental Health Center located at 750 South State Street in Elgin, Illinois. The total contract amount is $911,890.59, with a completion deadline of December 31, 2026. GreenMile EV LLC was selected as the lowest responsive and responsible bidder, outbidding competing vendors Reicher Industries at $1,287,600.15 and TILES IN STYLE at $1,296,240.00.
The contract scope involves the upgrade of facility interior and exterior lighting systems using DesignLights Consortium Qualified Products List Solid State Lighting version 5.1 products, including replacement and retrofit of existing fixtures with light-emitting diode (LED) technology, installation of networked lighting control systems, and installation of photocells. The project encompasses approximately 4,768 individual lighting fixtures distributed across multiple facility areas including offices, patient rooms, gymnasiums, mechanical rooms, warehouses, hallways, and exterior spaces. Notably, the contract is structured as a concessions agreement with a net project cost of zero dollars to Elgin Mental Health Center, with all project costs funded entirely through the ComEd Energy Efficiency Program Incentive and Instant Discount Program. The vendor must be an Illinois Commerce Commission Certified Energy Efficiency Service Provider and is responsible for completing all pre-applications and ensuring compliance with all incentive program requirements and deadlines.
Line items
| Item | Total |
|---|---|
| Upgrade facility interior and exterior lighting at Elgin Mental Health Center using DesignLightsTM Consortium Qualified Products List Solid State Lighting (SSL) version 5.1 available at designlights.org/qpl, including but not limited to: -Replacement of existing interior and exterior lighting system… | — |
| These items represent a sample of the products which may be required. It is not a guarantee of the actual products required. These numbers are for award purposes only. Indoor Offices-T8 4-ft 32W 4L. Wattage of equipment to be replaced is 114 vs. DesignLights Consortium reported wattage of new… | $51,693.30 |
| These items represent a sample of the products which may be required. It is not a guarantee of the actual products required. These numbers are for award purposes only. Patient Rooms. T12 4-ft 40W 4L. Wattage of equipment to be replaced is 147 vs. DesignLights Consortium reported wattage of new… | $113,242.50 |
| These items represent a sample of the products which may be required. It is not a guarantee of the actual products required. These numbers are for award purposes only. Gymnasium, Sally Port-T8 4-ft 32W 3L. Wattage of equipment to be replaced is 88 vs. DesignLights Consortium reported wattage of… | $2,364.60 |
| These items represent a sample of the products which may be required. It is not a guarantee of the actual products required. These numbers are for award purposes only. Entrance Lobby, Hallways-T8 4-ft 32W 2L. Wattage of equipment to be replaced is 59 vs. DesignLights Consortium reported wattage of… | $102,227.00 |
| These items represent a sample of the products which may be required. It is not a guarantee of the actual products required. These numbers are for award purposes only. Unit Rooms, Stairwell-T12 4-ft 40W 2L. Wattage of equipment to be replaced is 94 vs. DesignLights Consortium reported wattage of new… | $94,689.54 |
| These items represent a sample of the products which may be required. It is not a guarantee of the actual products required. These numbers are for award purposes only. Killborn Mechanical Room-HID Metal Halide 175W. Wattage of equipment to be replaced is 215 vs. DesignLights Consortium reported… | $7,393.40 |
| These items represent a sample of the products which may be required. It is not a guarantee of the actual products required. These numbers are for award purposes only. Warehouse-400W MH Highbay. Wattage of equipment to be replaced is 455 vs. DesignLights Consortium reported wattage of new… | $1,055.61 |
| These items represent a sample of the products which may be required. It is not a guarantee of the actual products required. These numbers are for award purposes only. Office-Various locations-T8 4-ft 32W 4L. Wattage of equipment to be replaced is 114 vs. DesignLights Consortium reported wattage… | $176,835.19 |
| These items represent a sample of the products which may be required. It is not a guarantee of the actual products required. These numbers are for award purposes only. Gym-400W HPS. Wattage of equipment to be replaced is 465 vs. DesignLights Consortium reported wattage of new equipment is 300.18.… | $14,245.32 |
| These items represent a sample of the products which may be required. It is not a guarantee of the actual products required. These numbers are for award purposes only. Hall, Clinics, Offices-T8 4-ft 32W 3L. Wattage of equipment to be replaced is 88 vs. DesignLights Consortium reported wattage of new… | $31,531.62 |
| These items represent a sample of the products which may be required. It is not a guarantee of the actual products required. These numbers are for award purposes only. Lobby, Hall, TV Room-T8 4-ft 32W 2L. Wattage of equipment to be replaced is 59 vs. DesignLights Consortium reported wattage of new… | $171,027.60 |
| These items represent a sample of the products which may be required. It is not a guarantee of the actual products required. These numbers are for award purposes only. Unit Rooms-T12 4-ft 40W 4L. Wattage of equipment to be replaced is 182 vs. DesignLights Consortium reported wattage of new equipment… | $62,529.80 |
| These items represent a sample of the products which may be required. It is not a guarantee of the actual products required. These numbers are for award purposes only. Workshop, Lobby-T12 4-ft 40W 2L. Wattage of equipment to be replaced is 94 vs. DesignLights Consortium reported wattage of new… | $6,775.36 |
| These items represent a sample of the products which may be required. It is not a guarantee of the actual products required. These numbers are for award purposes only. Laundry, Hallway-T8 4-ft 32W 2L. Wattage of equipment to be replaced is 59 vs. DesignLights Consortium reported wattage of new… | $68,342.03 |
| These items represent a sample of the products which may be required. It is not a guarantee of the actual products required. These numbers are for award purposes only. Outdoor Exterior Lights-HID MH 100W. Wattage of equipment to be replaced is 114 vs. DesignLights Consortium reported wattage of… | $7,937.72 |
Show all 16
Files
| File | Type | Posted |
|---|---|---|
| DHS IFB Elgin Lighting Project-B-50857~1.docx | DOCX document | |
| Elgin - Lighting Project.xlsx | XLSX spreadsheet | |
| Elgin Map 04202026.docx | DOCX document | |
| FTP Bldg Record Drawing.pdf | ||
| FTP Building.pdf | ||
| FTP Pinel.pdf | ||
| Goldman.pdf | ||
| New Map EMHC.docx | DOCX document | |
| Powerhouse.pdf | ||
| RehabBldg.pdf | ||
| ipg-active-registered-vendor-disclosure-formerly-forms-b-v-26-1-8-26-2025-1~22.docx | DOCX document | |
| B50857 NOA.pdf | ||
| Goldman Bldg Record Drawing V2.pdf | ||
| Kilbourne.pdf | ||
| Elgin Central Stores New Dietary.pdf | ||
| FTP Hartman.pdf | ||
| FTP White.pdf | ||
| invitation-for-bid-offer-to-the-state-of-illinois-B-50857.pdf | ||
| CentralStores and Dietary.pdf | ||
| Elgin Lighting Project - invitation-for-bid-vendor-instructions-and-requirements-B-50857.docx | DOCX document | |
| FTP Program.pdf |
Show all 21
Quick answers
Who was awarded contract 26-444DHS-MENTH-P-94785?
Contract 26-444DHS-MENTH-P-94785 was awarded to GreenMile EV LLC by Mental Health in Illinois on April 27, 2026.
How much is contract 26-444DHS-MENTH-P-94785 worth?
Its contract amount is $911,891.
On GovTribe
See this award's full record
- Every line item and file
- The contract it was ordered under and its other orders
- Similar state and local awards and opportunities
- Ask GovTribe AI about this award