Plans-_CCWWTP-Lift_Station_Pump_Addition_(IFB).pdf
PDF 18 MB Posted
- Attached to
- Conroe Central WWTP - Lift Station Pump Addition
- Solicitation number
- 2026-18
- Issued by
- Montgomery County, Texas
About this file
This document consists of engineering plans for the Conroe Central Wastewater Treatment Plant (CCWWTP) Lift Station Pump Addition project in Texas, prepared in support of an Invitation for Bid (IFB) solicitation. The project scope includes installation of one 85-horsepower additional pump with 14-inch discharge piping, valves, and related appurtenances for the existing influent lift station. The work also encompasses installation of a 100-horsepower variable frequency drive and associated electrical infrastructure. The engineering plans provide detailed technical specifications, drawings, and construction requirements necessary for contractors to develop accurate bids and execute the project work.
The engineering estimated budget for this project is $408,000.00. The plans document serves as the technical basis for the IFB process, establishing the required specifications and standards that bidders must follow. These plans are essential reference materials for potential contractors to understand the project requirements, site conditions, equipment specifications, and installation procedures prior to submitting their bids for the lift station pump addition work.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
L A K E
SAN
JACINTO
R
IVER
C O N R O E
SH 105 45
G:\DYNAMIC\PROJECTS\SANITARY SEWER\2026-18 CCWWTP LIFT STATION PUMP ADDITION\DWG
PROJECT LOCATION
SHEET 1
CONROE CENTRAL WWTP - LIFT STATION PUMP ADDITION
PROJECT NO.: 2026-18
MAYOR:
DU.E :� COON
COUNCIL MEMBERS:
-O+N SELLARS� MAYOR PRO TEM
DA9ID +AIREL
S+ANA R� ART+UR
.RISTIN +OISIN*TON
.EN BLE9INS
CITY ADMINISTRATOR:
DA9ID :ILLARD
ENGINEERING
SHEET INDEX
SHEET
NO. SHEET TITLE
1 COVER SHEET
2 GENERAL NOTES - SHEET 1
3 GENERAL NOTES - SHEET 2
4 SITE LAYOUT & LOCATION MAP
5 LIFT STATION - PLAN
6 LIFT STATION - BOTTOM PLAN
7 LIFT STATION - SECTION
8 PIPE SUPPORT DETAILS
9 MISC DETAILS
N
S
EW
ELECTRICAL PLANS10-16
THE SEAL APPEARING ON THIS
DOCUMENT WAS AUTHORIZED BY
TARA B. GAHA, P.E. 114274
ON 08/13/2026
GENERAL CONSTRUCTION NOTES
PROJECT CONSTRUCTION NOTES
1. THE CONTRACTOR SHALL USE A MINIMUM OF SIX INCHES (6") OF CLEAN TOP SOIL TO FILL BEHIND CURBS TO RIGHT-OF-WAY TO
RE-ESTABLISH THE GRASS COVER.
2. ALL EXISTING DITCH AND/OR WET AREAS THAT WILL BE UNDER ANY PROPOSED PAVEMENT SHALL BE MUCKED OUT, DRIED, AND REPLACED WITH 2 SACK PER TON CEMENT STABILIZED SAND, TO TWENTY FOUR (24) INCHES BELOW PROPOSED SUBGRADE OR BASE MATERIAL OF PAVEMENT AND COMPACTED TO 95% LAB TESTED DENSITY IN SIX INCH (6") LAYERS TO THE BOTTOM OF THE PROPOSED
PAVEMENT.
3. VEGETATION SHALL BE ESTABLISHED FROM R.O.W. TO THE EDGE OF BACK OF CURB. CONSTRUCTION PROJECTS IN URBAN AND COMMERCIAL AREAS, SOLID SOD SHALL BE PLACED WHERE SLOPES ARE LESS THAN 2H:1V, AND WATER UNTIL GRASS IS ESTABLISHED.
IN RURAL AREAS AND/OR OPEN AREAS HYDRO MULCH SHALL BE PLACED WHERE SLOPES ARE LESS THAN 4H:1V, SOLID SOD TO BE PLACED IN SLOPES BETWEEN 2H:1V TO 4H:1V, AND WATER UNTIL GRASS IS ESTABLISHED. IF GRASS DIES DUE TO THE CONTRACTOR NOT WATERING CONSECUTIVE UNTIL GRASS IS ESTABLISHED, THE THE CONTRACTOR SHALL BE RESPONSIBLE FOR RE-SODDING AND
HYDRO MULCHING UNTIL GRASS IS ESTABLISHED.
4. DETERMINATION OF GRASS IS ESTABLISHED WHEN GRASS HAS GROWN 24 INCHES IN HEIGHT AND CONTRACTOR HAS PERFORMED TWO (2) CONSECUTIVE MOWINGS WITHIN THE R.O.W. FOURTEEN (14) CALENDAR DAYS APART WITHIN A MONTH.
EXCAVATION, BEDDING AND BACKFILL PROCEDURES
1. DURING ALL CONSTRUCTION, IT IS REQUIRED TO USE STEEL PLATES AND/OR TRENCH BOXES
TO CONFINE THE LIMITS OF EXCAVATION. IF STORM SEWER OR CULVERTS ARE REQUIRED
UNDER PROPOSED PAVEMENT, THEN THE STORM SEWER OR CULVERTS MUST BE BACKFILLED
WITH 2SK/TON CEMENT STABILIZED SAND, (24") TWENTY-FOUR INCHES ALL AROUND STORM
SEWER OR CULVERT. HOWEVER, THE REMAINING BACKFILL MUST BE SELECT FILL (10 < PI < 20 ) UP TO THE BOTTOM OF THE PROPOSED PAVEMENT IN (6") SIX INCH LIFTS AND COMPACTED TO 95% + STANDARD PROCTOR DENSITY. THE TOP NINE (9") INCHES OF SELECT FILL (10 < PI < 20)
DIRECTLY BELOW THE CONCRETE PAVING IS NOTED AS THE SUBGRADE AND SHALL BE
STABILIZED PER A GEOTECHNICAL REPORT OR ENGINEER'S RECOMMENDATION.
PAVEMENT CONSTRUCTION NOTESSIDEWALK CONSTRUCTION NOTES
1. SIDEWALKS MUST BE INSTALLED IN ACCORDANCE WITH THE CITY'S APPROVED
STANDARDS AND SPECIFICATIONS AS WELL AS STANDARDS APPLICABLE UNDER
THE TEXAS ARCHITECTURAL BARRIERS REMOVAL ACT, TEXAS ACCESSIBILITY
STANDARDS (TAS), THE FEDERAL PUBLIC RIGHTS-OF-WAY ACCESSIBILITY
GUIDELINES (PROWAG) AND THE AMERICANS WITH DISABILITIES ACT (ADA).
2. WHEN A SIDEWALK INSIDE A PUBLIC RIGHTS-OF-WAY IS INSTALLED ADJACENT TO
CURB, A ONE-INCH FIBER BOARD MUST BE PLACE BETWEEN SIDEWALK AND THE
BACK OF CURB. THE SIDEWALK MAY FOLLOW THE SLOPE / GRADE OF THE
PARALLEL ROAD. WHERE A CONTINUOUS SLOPE / GRADE GREATER THAN 5%
HANDRAILS MAY BE DESIRABLE TO IMPROVE ACCESSIBILITY AND PROTECT
PEDESTRIANS FROM POTENTIALLY HAZARDOUS CONDITIONS.
3. IF HANDRAILS ARE USED THE HANDRAIL EXTENSION SHALL NOT PROTRUDE INTO
LANDING AREAS OR INTERSECTING PEDESTRIAN ROUTES.
4. ALL RUNNING SLOPES / GRADES OF AN ACCESSIBLE ROUTE SHALL NOT EXCEED
5% (1V:20H) EXCEPT FOR RAMPS. NOWHERE SHALL THE CROSS SLOPE / GRADE OF
AN ACCESSIBLE ROUTE SHALL EXCEED 2% (1V:50H) [TAS 4.3.7].
5. AT ALL SIGNALIZED INTERSECTIONS, SIDEWALKS MUST AVOID TRAFFIC SIGNALS,
ILLUMINATION POLES, GROUND BOXES, CONTROLLER BOXES, SIGNS, DRAINAGE
STRUCTURES AND OTHER ITEMS SO AS TO NOT OBSTRUCT THE PEDESTRIAN
ACCESS ROUTE UNLESS SAFE MEASURES ARE TAKEN TO PROTECT THE ROUTE.
6. UNIT PRICE BID FOR SIDEWALKS SHALL INCLUDE SURFACE PREPARATION OF
SIDEWALK FOUNDATION: MATERIALS; REMOVAL AND DISPOSAL OF EXISTING
CONCRETE; EXCAVATION, HAULING AND DISPOSAL OF EXCAVATED MATERIAL;
DRILLING AND DOWELING INTO EXISTING CONCRETE CURB, SIDEWALK, AND
PAVEMENT; REPAIR OF ADJACENT STREET OR PAVEMENT STRUCTURE DAMAGE
BY THESE OPERATIONS; AND EQUIPMENT, LABOR, MATERIALS, TOOLS AND
INCIDENTALS.
CURB RAMP CONSTRUCTION NOTES
1. ALL CURB RAMPS SHALL BE INSTALLED AT ALL PEDESTRIAN ROAD CROSSINGS
AND SHALL BE IN ACCORDANCE WITH THE CITY'S APPROVED STANDARDS AND
SPECIFICATIONS AS WELL AS STANDARDS APPLICABLE UNDER THE TEXAS
ARCHITECTURAL BARRIERS REMOVAL ACT, TEXAS ACCESSIBILITY STANDARDS
(TAS), THE PUBLIC RIGHTS-OF-WAY ACCESSIBILITY GUIDELINES (PROWAG) AND
THE AMERICANS WITH DISABILITIES ACT (ADA).
2. ALL CURB RAMPS SHALL BE REQUIRED TO HAVE (MAROON COLORED)
DETECTABLE WARNING SURFACE NEAR THE BOTTOM OF THE RAMP. THE
REMAINDER OF THE RAMP AND/OR WINGS MUST BE A CONTRASTING COLOR WITH
THE ADJACENT WALKING SURFACE.
3. ALL CURB RAMPS SHALL HAVE A MAXIMUM CROSS SLOPE OF 2% AND A RUNNING
SLOPE OF 5% OR LESS.
4. FLARED SIDES SHALL BE PROVIDED WHEN THE PEDESTRIAN ACCESS ROUTE
CROSSES THE CURB RAMP. THE FLARED SIDES SHALL BE SLOPED AT 10% OR
LESS AND PARALLEL TO THE CURB.
5. ALL CURB RAMPS AND LANDINGS SHALL HAVE No. 3 REINFORCING STEEL BARS AT
18" O.C.E.W. UNLESS OTHERWISE DIRECTED.
6. ALL LANDINGS SHALL BE 5 FOOT BY 5 FOOT AND HAVE A CROSS SLOPE OF 2%
7. ALL CURB RAMPS SHALL HAVE A SMOOTH TRANSITION WHERE THE RAMP
CONNECTS TO THE ROAD.
DETECTABLE WARNING SURFACE CONSTRUCTION NOTES
1. ALL DETECTABLE WARNING SURFACES SHALL CONSIST OF RAISED TRUNCATED
DOMES AND SHALL COMPLY WITH TEXAS ACCESSIBILITY STANDARDS (TAS), THE
FEDERAL PUBLIC RIGHTS-OF-WAY ACCESSIBILITY GUIDELINES (PROWAG) AND THE
AMERICANS WITH DISABILITIES ACT (ADA).
2. ALL DETECTABLE WARNING SURFACES SHALL BE FIRM, STABLE AND SLIP
RESISTANT.
3. ALL DETECTABLE WARNING SURFACES SHALL BE A MINIMUM OF 2 FOOT BY 4
FOOT.
4. IF PAVERS WITH TRUNCATED DOMES ARE USED THEY MUST COMPLY WITH ALL
THE REQUIREMENTS OF ASTM C-936, C-33. LAYED IN A 2 BY 2 UNIT BASKET
WEAVE PATTERN OR AS DIRECTED, WITH FULL SIZE UNITS FIRST FOLLOWED BY
CLOSURE UNITS CONSISTING OF AT LEAST 25% OF A FULL UNIT.
1. MATERIALS, CONSTRUCTION AND TESTING TO BE IN ACCORDANCE WITH THE CITY OF CONROE
ORDINANCES AND SPECIFICATIONS, LATEST PRINTING AND AMENDMENTS THERETO.
2. ALL EXISTING UNDERGROUND UTILITIES ARE NOT GUARANTEED TO BE COMPLETED OR
DEFINITE, BUT WERE OBTAINED FROM THE BEST INFORMATION AVAILABLE. CONTRACTOR HAS
SOLE RESPONSIBILITY FOR FIELD VERIFICATION OF ALL EXISTING FACILITIES AS SHOWN ON
DRAWINGS. CONTRACTOR SHALL COORDINATE ALL CONFLICTS WITH THE APPROPRIATE
GOVERNING AGENCY.
3. THE LOCATION OF ALL UNDERGROUND UTILITIES, ARE SHOWN IN AN APPROXIMATE WAY ONLY.
THE CONTRACTOR SHALL REQUEST THE EXACT LOCATION OF THESE FACILITIES BY CALLING
THE PERSPECTIVE UTILITY COMPANY, AT LEAST 48 HOURS BEFORE COMMENCING WORK. A) THE
CONTRACTOR IS FULLY RESPONSIBLE FOR ANY AND ALL DAMAGE WHICH OCCURS DUE TO HIS
FAILURE TO REQUEST THE LOCATION AND PRESERVATION OF THESE UNDERGROUND
FACILITIES. B) ANY DAMAGE TO EXISTING FACILITIES INCURRED AS A RESULT OF
CONSTRUCTION OPERATIONS WILL BE REPAIRED BY THE CONTRACTOR AT HIS OWN EXPENSE.
4. TEXAS LAW ARTICLE 1436C, PROHIBITS ALL ACTIVITIES IN WHICH PERSONS OR EQUIPMENT MAY COME WITHIN 6 FEET OF ENERGIZED OVERHEAD POWER LINES. FEDERAL REGULATION, TITLE 29, PART 1910.130(1) AND PART 1926.440 (A) (15) REQUIRE A MINIMUM CLEARANCE OF 10 FEET FROM
THESE FACILITIES. THE ABOVE LAWS CARRY BOTH CRIMINAL AND CIVIL LIABILITIES, WITH
CONTRACTORS AND OWNERS BEING LEGALLY RESPONSIBLE FOR THE SAFETY OF WORKERS
UNDER THESE LAWS. IF EITHER THE CONTRACTOR OR THE OWNER MUST WORK NEAR
ENERGIZED OVERHEAD POWER LINES, CALL THE POWER COMPANY FOR THE LINES TO BE
DE-ENERGIZED AND/OR MOVED AT THEIR EXPENSE.
5. CONSTRUCTION SHALL COMPLY WITH THE LATEST OSHA REGULATIONS AND STATE OF TEXAS
LAW CONCERNING TRENCHING AND SHORING. CONTRACTOR SHALL PROVIDE A TRENCH
SAFETY SYSTEM TO MEET, AS A MINIMUM, THE REQUIREMENTS OF OSHA SAFETY AND HEALTH
REGULATION, PART 1926, SUB-PART P AS PUBLISHED IN THE FEDERAL REGISTER, VOLUME 54, NO. 209, DATED OCTOBER 31, 1989, AND CITY OF CONROE ORDINANCE NUMBER 1033-87, AND
LATEST REVISIONS.
6. DETAILS PREPARED BY THE CITY OF CONROE DO NOT EXTEND TO OR INCLUDE DESIGNS OR
SYSTEMS PERTAINING TO THE SAFETY OF THE CONTRACTOR OR ITS EMPLOYEES, AGENTS, OR
REPRESENTATIVES IN THE PERFORMANCE OF THE WORK. THE CONTRACTOR SHALL PREPARE
OR OBTAIN THE APPROPRIATE SAFETY SYSTEMS, INCLUDING THE PLANS AND SPECIFICATIONS
REQUIRED BY CHAPTER 756, SUBCHAPTER "C" OF THE TEXAS HEALTH AND SAFETY CODE.
7. ADEQUATE DRAINAGE SHALL BE MAINTAINED AT ALL TIMES DURING CONSTRUCTION AND ANY
DRAINAGE DITCH OR STRUCTURE DISTURBED DURING CONSTRUCTION SHALL BE RESTORED
TO THE SATISFACTION OF THE PROJECT ENGINEER. ALL CONSTRUCTION RUNOFF SHALL
COMPLY WITH STORM WATER MANAGEMENT FOR CONSTRUCTION ACTIVITIES AND THE
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) REQUIREMENTS.
8. EXISTING PAVEMENT, CURBS, SIDEWALKS AND DRIVEWAYS DAMAGED OR REMOVED DURING
CONSTRUCTION SHALL BE REPLACED TO CITY OF CONROE STANDARDS. ALL ASPHALT AND
CONCRETE DRIVEWAYS EXCAVATED DURING CONSTRUCTION SHALL BE BACKFILLED WITH
CEMENT STABILIZED SAND (CSS) AND RETURNED TO EXISTING CONDITIONS. ALL STATE AND
COUNTY HIGHWAY PAVEMENT AND RAILROAD RIGHT-OF-WAYS TO BE BORED ACCORDING TO
THE RULES, REGULATIONS AND REQUIREMENTS FOR APPROVAL AND ACCEPTANCE BY SAID
AGENCIES. SEE CITY OF CONROE "DESIGN MANUAL FOR WATER MAINS, SANITARY SEWERS,
STORM DRAINAGE AND STREET PAVING".
9. EXISTING ROADS AND/OR RIGHT-OF-WAYS DISTURBED DURING CONSTRUCTION SHALL BE AS
GOOD OR BETTER THAN THE CONDITION PRIOR TO STARTING THE WORK, UPON COMPLETION OF
THE PROJECT.
10. ALL SAWCUTS OF EXISTING PAVED SURFACES SHALL BE FULL DEPTH SAWCUTS.
11. AFTER ALL DISTURBED AREAS WITHIN THE CONSTRUCTION LIMITS HAVE BEEN COMPLETED TO
THE LINES, GRADES, AND CROSS-SECTIONS SHOWN ON THE PLANS, HYDROMULCHING AND OR
SOLID SODDING SHALL BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF THE
PLANS AND SPECIFICATIONS IN ORDER TO ESTABLISH ADEQUATE VEGETATION COVERAGE TO
ELIMINATE EROSION. IF NO ACTIVITY HAS BEEN PERFORMED WITHIN THE DISTURBED
CONSTRUCTION AREAS FOR 14 DAYS, THESE AREAS MUST BE HYDROMULCHED TO AVOID
EROSION. IF NO PROVISION FOR PLANTING GRASS IS INCLUDED IN THE PLANS OR
SPECIFICATIONS, THE MINIMUM REQUIREMENT FOR THIS ITEM WILL BE IN ACCORDANCE WITH
THE TEXAS DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS FOR "SODDING OR
SEEDING FOR EROSION CONTROL."
12. THE CONTRACTOR SHALL OBTAIN ALL APPLICABLE PERMITS REQUIRED BY GOVERNING
AUTHORITIES AT THEIR EXPENSE PRIOR TO COMMENCEMENT OF WORK.
13. THE CONTRACTOR SHALL GIVE 48 HOURS NOTICE TO ALL AUTHORIZED AGENCIES IN CHARGE OF
PRIVATE AND PUBLIC UTILITIES PRIOR TO COMMENCEMENT OF WORK WITHIN THE CITY OR
AUTHORIZED AGENCIES RIGHT-OF-WAYS OR EASEMENTS.
14. THE CONTRACTOR SHALL COVER ANY OPEN EXCAVATIONS WITH
ANCHORED STEEL PLATES DURING NON-WORKING HOURS, ALONG
EXISTING ROADWAYS AND TRAFFIC AREAS.
15. THE CONTRACTOR SHALL PROVIDE ADEQUATE FLAGMEN, SIGNING,
STRIPING AND WARNING TRAFFIC CONTROL DEVICES, DURING
CONSTRUCTION IN ACCORDANCE WITH THE "TEXAS MANUAL ON
UNIFORM TRAFFIC CONTROL". CONTRACTOR SHALL MAINTAIN AT
LEAST ONE LANE OF TRAFFIC OPEN IN EACH DIRECTION DURING
WORKING HOURS OR PROVIDE ALL-WEATHER DETOURS AROUND
CONSTRUCTION SITE, PROVIDE PUBLIC NOTIFICATION, AND USE
UNIFORMED POLICE OFFICERS TO CONTROL TRAFFIC, ESPECIALLY
IN HEAVY TRAFFIC LOCATIONS.
16. THE CONTRACTOR SHALL ERECT AND MAINTAIN BARRICADES TO
ADEQUATELY PROTECT THE PAVEMENT, SIDEWALKS, DRIVEWAY,
ROADWAY, AND PARKING LOTS FROM DAMAGED CAUSED BY
ANIMALS OR FOOT TRAFFIC.THE CONTRACTOR SHALL HAVE
PERSONNEL ON SITE UNTIL THE PAVEMENT HAS REACHED
SUFFICIENT STRENGTH WHILE PAVEMENT IS CURING AND UNTIL
REACHED 75% STRENGTH.
17. THE CONTRACTOR SHALL BE RESPONSIBLE ON A DAILY BASIS FOR
REMOVING MUD, DIRT, AND DEBRIS DEPOSITED ON EXISTING
PAVEMENT DUE TO CONSTRUCTION ACTIVITY. ALL EXISTING
STREETS AND ADJACENT PAVEMENT AREAS IMPACTED BY
CONSTRUCTION ACTIVITY SHALL BE CLEANED USING A STREET
SWEEPER. THIS ACTIVITY SHALL BE INCIDENTAL TO ALL OTHER
ITEMS.
18. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE
COORDINATION OF THEIR CONSTRUCTION ACTIVITIES WITH THE
UTILITY COMPANIES AS TO THE RELOCATION OF THEIR FACILITIES,
IF NEEDED.
19. THE CONTRACTOR SHALL REMOVE ALL NON-PERMANENT SIGNS
FROM THE R.O.W. AND/OR EASEMENT LIMITS, AND RETURN THEM
TO THE SIGN OWNER FOR THEM TO HAVE PLACED AT THEIR
EXPENSE ON PROPERTY OTHER THAN THAT STATED ABOVE
UNLESS OTHERWISE SPECIFIED.
20. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION AND
DEPTHS OF ALL EXISTING UTILITIES BEFORE COMMENCING ANY
WORK, AND SHALL BE RESPONSIBLE FOR ANY AND ALL DAMAGES
CAUSED BY THEIR FAILURE TO EXACTLY LOCATE AND PRESERVE
ALL UNDERGROUND UTILITIES. THE LOCATION OF EXISTING
UTILITIES ON THESE PLANS ARE SHOWN IN AN APPROXIMATE
LOCATION ONLY.
21. THE CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING OR
REPLACING ALL EXISTING FENCES INSIDE THE WORK ZONE, TO
EXISTING OR BETTER CONDITION, EXCEPT FOR THOSE THAT FALL
WITHIN A ROAD RIGHT-OF-WAY, IN WHICH THE FENCE SHALL BE BE
RELOCATED OR REPLACED TO A DISTANCE OF ONE (1) FOOT
OUTSIDE THAT RIGHT-OF-WAY.
22. THE CONTRACTOR IS RESPONSIBLE FOR RELOCATING ALL
EXISTING IRRIGATION OUTSIDE OF THE RIGHT-OF-WAY AND/OR
EASEMENT UNLESS OTHERWISE SPECIFIED ON THE PLANS.
23. ALL EQUIPMENT SHALL BE REMOVED FROM THE PROJECT SITE
ONCE THE PROJECT IS COMPLETED, AS WELL AS, ALL REMAINING
DEBRIS WITHIN PROJECT SHALL BE REMOVED AND PROPERLY
DISPOSED OF AT AN APPROVED DISPOSAL SITE.
1. EXPOSE 15 INCHES OF REINFORCING STEEL AT ALL PROPOSED
SAWED JOINTS. IF NO REINFORCING STEEL EXISTS, USE
HORIZONTAL DOWELS PER NOTE #4.
2. REQUIRE A ONE (1) INCH REDWOOD EXPANSION BOARD OR
PRE-MOLDED NON-EXTRUDING JOINT BETWEEN SIDEWALK AND
BACK OF CURB.
3. HORIZONTAL DOWELS SHALL BE NO. 6 BARS, 24 INCHES LONG,
DRILLED AND EMBEDDED 8 INCHES INTO THE CENTER OF THE
EXISTING SLAB WITH "PO ROC" OR EQUAL. DOWELS SHALL BE 24
INCHES CENTER TO CENTER UNLESS OTHERWISE SPECIFIED.
4. WHEN PROPOSED PAVEMENT ENDS AT A CONSTRUCTION JOINT
LEAVE 15 INCHES OF REINFORCING STEEL EXPOSED BEYOND
PAVEMENT, COAT WITH ASPHALT, AND WRAP WITH BURLAP FOR
FUTURE PAVEMENT TIE-IN. AT EXPANSION JOINTS, EXTEND
DOWELS 5 INCHES; COAT AND WRAP SAME AS CONSTRUCTION
JOINTS.
5. CONTINUOUS REINFORCED CONCRETE PAVEMENT, WHEN
SPECIFIED SHALL BE PER TXDOT STANDARD DETAILS.
6. WHEREVER A SIDEWALK IS REQUIRED BY CITY ORDINANCE ,
PROVIDE WHEELCHAIR RAMP AND/OR SIDEWALKS IN
ACCORDANCE WITH THE "TEXAS DEPARTMENT OF
TRANSPORTATION STANDARD WHEELCHAIR RAMP AND SIDEWALK
DETAILS".
7. ADJUST EXISTING MANHOLE FRAMES AND COVERS TO FIT NEW
GRADE AND PLACE CONCRETE BLOCK-OUT AROUND MANHOLE
PER CITY DETAILS.
8. ADJUST EXISTING WATER VALVE BOXES TO NEW PAVING GRADE
AND PLACE CONCRETE BLOCK-OUT AROUND VALVE BOXES PER
CITY DETAILS. REPLACE ALL MISSING OR DAMAGED VALVE BOXES
AND COVERS.
9. ALL PAVEMENT MARKINGS SHALL BE SHOWN ON THE PLANS, PER
(TMUTCD) TEXAS MANUAL UNIFORM TRAFFIC CONTROL DEVICES.
10. GUIDELINES SET FORTH IN THE "TEXAS MANUAL OF UNIFORM
TRAFFIC CONTROL DEVICES" WILL BE OBSERVED.
11. PROVIDE A CONCRETE PAVING HEADER AT THE END OF ALL
CONCRETE PAVEMENT AS SHOWN BY CITY DETAILS.
12. T. C. INDICATES TOP OF CURB ELEVATION AND T. P. INDICATES TOP
OF PAVEMENT ELEVATION.
13. CURB RADII AT STREET INTERSECTIONS TO BE 24.50 FEET TO BACK
OF CURB WITH A MINIMUM OF ONE (1) PERCENT GRADE UNLESS
OTHERWISE NOTED.
14. TRANSVERSE EXPANSION JOINTS SHALL BE INSTALLED AT ALL
RADIUS RETURNS AND AT A MAXIMUM SPACING OF 60 FOOT
INTERVALS.
15. CONTRACTOR WILL USE CONTINUOUS LONGITUDINAL
REINFORCING BARS IN CURBS.
16. CYLINDER COMPRESSION TEST OR BEAM FLEXURAL TEST SHALL
BE REQUIRED. TWO SAMPLES SHALL BE TAKEN FOR EACH 100
CUBIC YARDS OF CONCRETE POURED. FOR SMALLER QUANTITIES,
TWO SAMPLES SHALL BE TAKEN REGARDLESS OF THE AMOUNT OF
CONCRETE POURED EACH DAY. CONCRETE SHALL HAVE 5 SACKS
CEMENT PER CUBIC YARD AND A MINIMUM COMPRESSIVE
STRENGTH OF 4,000 PSI IN 28 DAYS OR A MINIMUM FLEXURAL
STRENGTH OF 600 PSI IN 28 DAYS. NO TRAFFIC SHALL BE
ALLOWED ON CONCRETE FOR 28 DAYS. IF EXTRA TESTS ARE
MADE 75% OF THE 28 DAY STRENGTH IS ACHIEVED THE CITY
ENGINEER MAY ALLOW TRAFFIC ON THE PAVEMENT IF IT DEEMS
NECESSARY.
17. PRIOR TO PLAN APPROVAL, A CERTIFIED LAB SHALL DETERMINE
THE PERCENTAGE OF CEMENT CONTENT FOR SUBGRADE
STABILIZATION IN SANDY SOILS WITH P.I. LESS THAN 10 TO OBTAIN
A COMPRESSIVE STRENGTH OF 400 PSI IN 28 DAYS. THE LAB
SHALL ALSO DETERMINE THE PERCENTAGE OF LIME CONTENT FOR
SUBGRADE STABILIZATION IN CLAY SOILS WITH A P.I. GREATER
THAN 20.
18. A CONCRETE MIX DESIGN BY THE CERTIFIED LAB SHALL BE
SUBMITTED TO AND APPROVED BY THE CITY ENGINEER BEFORE
ANY CONCRETE IS POURED.
19. A MINIMUM OF TWO (2) COMPACTION TESTS SHALL BE PERFORMED
A MAXIMUM DISTANCE OF 500 FEET, AND FOR EACH 2'-6" MAXIMUM
THICK LAYERS OF FILL. IN AREAS WHERE NO FILL IS REQUIRED,
TWO (2) SAMPLES SHALL BE TAKEN AT A MAXIMUM DISTANCE OF
500 FEET. ADDITIONAL TESTING SHALL BE PERFORMED IF SEEN
NECESSARY BY THE ENGINEER. NO ADDITIONAL LAYERS OF FILL
SHALL BE MADE WITHOUT HAVING THE LAB'S WRITTEN APPROVAL
OF COMPLETED LAYERS. PROOF ROLLING SHALL BE REQUIRED BY
THE INSPECTOR ON EACH LAYER PLACED AND ANY "PUMPING"
AREAS SHALL BE REMOVED IMMEDIATELY AND REPLACED OR
STABILIZED AND RE-COMPACTED TO A PASSING DENSITY.
20. CONSTRUCTION OF ITEMS THAT ARE NOT SPECIFICALLY
ADDRESSED TO BE IN ACCORDANCE WITH THE TxDOT
SPECIFICATIONS (LATEST REVISION).
21. RIGHT-OF-WAY SHALL BE SLOPED FROM THE PROPERTY TO THE
TOP OF CURB AND HYDROMULCHED OR SODDED BEFORE FINAL
ACCEPTANCE BY THE CITY TO CONTROL EROSION INTO THE
STREET AND STORM SEWER.
22. MEMBRANE CURING TYPE 2, WHITE PIGMENTED CONFORMING TO
DMS-4650, SHALL BE USED FOR CURING ALL CONCRETE SURFACES
IMMEDIATELY AFTER FINISHING OF SURFACES AND SHALL BE IN
ACCORDANCE WITH TxDOT ITEM 360.
23. MATERIAL USED FOR FILL SHALL BE CERTIFIED BY A LAB TO HAVE
A PLASTICITY INDEX BETWEEN 10 AND 20. FORMS SHALL BE SET
TO THE PROPER GRADE AND PROPERLY SUPPORTED SO THAT NO
DISPLACEMENT OCCURS WITH THE PAVING ACTIVITIES.
24. ALL CONCRETE SHALL BE VIBRATED BY MECHANICAL MEANS TO
INSURE PROPER COMPACTION AND NO HONEY COMBS.
CONCRETE SHALL NOT BE PLACED WHEN THE TEMPERATURE IS
BELOW 40° FAHRENHEIT FALLING, BUT MAY BE PLACED WHEN
TEMPERATURE IS ABOVE 35° F AND RISING. THE TEMPERATURE
SHALL BE TAKEN IN THE SHADE AND AWAY FROM ARTIFICIAL HEAT.
25. THE CONTRACTOR SHALL ERECT AND MAINTAIN BARRICADES TO
ADEQUATELY PROTECT THE PAVEMENT. THE CONTRACTOR SHALL
HAVE PERSONNEL ON SITE UNTIL THE PAVEMENT HAS REACHED
SUFFICIENT STRENGTH AS NOT TO BE DAMAGED BY ANIMALS OR
FOOT TRAFFIC.
26. JOINT SEALING MATERIAL SHALL BE GRAY COLORED, LOW
MODULUS SILICONE (SELF-LEVELING TYPE), CONFORMING TO THE
REQUIREMENTS OF TXDOT DMS-6310 TYPE 5.
27. JOINTS SHALL BE CLEANED OF ALL SCALE, DIRT, DUST, CURING
COMPOUND, AND CONCRETE TO THE WIDTH AND DEPTH OF THE
JOINT AND SHALL BE DRY BEFORE SEALING IS PERFORMED.
28. REINFORCING STEEL SHALL BE DEFORMED BARS CONFORMING TO
ASTM 615 GRADE 60 (GRADE 40 ONLY FOR BARS REQUIRING
BENDING). REINFORCING STEEL SHALL BE SUPPORTED ON CHAIRS
STRONG ENOUGH TO HOLD IT IN PLACE AND BE TIED.
PROJECT NO: 2026-18
Sheet No: 2
CONROE CENTRAL WWTP - LIFT STATION
PUMP ADDITION
GENERAL NOTES - SHEET 1
DRAWN BY: Design By:
ADMIN. APPROVAL:
REVIEWED BY: TBG
xxxxxx
DATE: May 12, 2026
SCALE: NTS
ENGINEERING
PATH = G:\Dynamic\PROJECTS\Sanitary Sewer\2026-18 CCWWTP Lift Station Pump Addition\DWG
SCALE: NA
DRAWING NAME:
THE SEAL APPEARING ON THIS
DOCUMENT WAS AUTHORIZED BY
STORM SEWER CONSTRUCTION NOTES
CENTERPOINT GAS NOTE
SANITARY SEWER CONSTRUCTION NOTES WATERLINE CONSTRUCTION NOTES ENTERGY CONSTRUCTION NOTES
KINDER MORGAN CONSTRUCTION NOTES
CAUTION: UNDERGROUND GAS FACILITIES
THE CONTRACTOR SHALL CONTACT THE UTILITY COORDINATING COMMITTEE AT 1-800-545-6005 OR 811 A MINIMUM OF 48 HOURS PRIOR TO CONSTRUCTION TO HAVE MAIN AND SERVICE LINES
FIELD LOCATED.
· WHEN CENTERPOINT ENERGY PIPELINE MARKINGS ARE NOT VISIBLE, CALL (713)-207-5463
OR (713)-945-8037 (7:00 A.M TO 4:30 P.M.) FOR STATUS OF LINE LOCATION REQUEST BEFORE
EXCAVATION BEGINS.
· WHEN EXCAVATING WITHIN EIGHTEEN INCHES (18") OF THE INDICATED LOCATION OF
CENTERPOINT ENERGY FACILITIES, ALL EXCAVATION MUST BE ACCOMPLISHED USING
NON-MECHANIZED EXCAVATION PROCEDURES.
· WHEN CENTERPOINT ENERGY FACILITIES ARE EXPOSED, SUFFICIENT SUPPORT MUST BE
PROVIDED TO THE FACILITIES TO PREVENT EXCESSIVE STRESS ON THE PIPING.
· FOR EMERGENCIES REGARDING GAS LINES CALL (713)-659-2111 OR (713)-207-4200.
THE CONTRACTOR IS FULLY RESPONSIBLE FOR ANY DAMAGES CAUSED BY THE CONTRACTOR'S
FAILURE TO EXACTLY LOCATE AND PRESERVE THESE UNDERGROUND FACILITIES.
1. IF OVERHEAD LINES EXIST WITHIN THE PROJECT LIMITS IT IS THE RESPONSIBILITY OF
THE THE CONTRACTOR OF THE PROJECT TO HAVE THEM LOCATED PRIOR TO THE
BEGINNING OF ANY CONSTRUCTION, ENTERGY WILL NOT BE RESPONSIBLE FOR THE
LOCATION OF THOSE LINES SINCE THEY ARE CLEARLY VISIBLE.
2. TEXAS HEALTH AND SAFETY CODE LAW, CHAPTER 752 SECTION 003 STATES THAT IT IS
THE RESPONSIBILITY OF THE THE CONTRACTOR OF THE PROJECT TO NOTIFY ENTERGY
WITHIN 48 HOURS PRIOR TO WORK BEGINNING IN THE VICINITY OF ANY EXISTING
OVERHEAD LINES, AS WELL AS, THE PROTECTION AND SAFETY OF ALL WORKERS WITHIN
THE VICINITY OF THOSE LINES.
3. TEXAS HEALTH AND SAFETY CODE LAW, CHAPTER 752 SECTION 004 FORBIDS ANY AND
ALL ACTIVITIES OF A PERSON, THING OR MACHINE THAT MAY COME WITHIN (6') SIX FEET
OF LIVE OVERHEAD HIGH VOLTAGE LINES.
4. TEXAS HEALTH AND SAFETY CODE LAW, CHAPTER 752 SECTION 008 ALLOWS FOR THE
THE CONTRACTOR OF THE PROJECT TO BE HELD FINANCIAL RESPONSIBLE FOR
DAMAGES TO ANY AND ALL OVERHEAD POWER LINES AND FACILITIES WITHIN THE
PROJECT.
5. FOR UNDERGROUND ENTERGY LINES TO BE LOCATED IT IS THE RESPONSIBILITY OF THE
PROJECT THE CONTRACTOR TO CALL TEXAS 811 TO PROCESS THE UTILITY REQUEST A
MINIMUM OF 48 HOURS PRIOR TO ANY WORK BEGINNING IN THE VICINITY OF THE
PROJECT.
6. A MINIMUM OF (15') FIFTEEN FEET OF UNDISTURBED SOIL SHALL BE MAINTAINED AT ALL
TIMES FROM ANY TRANSMISSION STRUCTURE (TOWERS) ON A TRANSMISSION LINE. IT IS
THE RESPONSIBILITY OF THE PROJECT THE CONTRACTOR TO CONTACT THE ENTERGY
TRANSMISSION MAINTENANCE DEPARTMENT AT (936)-525-2059 AND THE ENTERGY
DISTRIBUTION ROW DEPARTMENT AT (281)-362-4040, 48 HOURS PRIOR AND AFTER ANY
WORK ACTIVITY WITHIN AN ENTERGY TRANSMISSION ROW OR EASEMENT.
7. ENTERGY WILL NOT BE HELD RESPONSIBLE FOR THE LOCATION OF PRIVATE
UNDERGROUND ELECTRICAL SERVICES AND WILL NOT LOCATE THEM PRIOR TO
CONSTRUCTION, IT WILL BE THE RESPONSIBILITY OF THE THE CONTRACTOR OF THE
PROJECT TO HAVE THOSE SERVICES LOCATED.
1. THE CONSTRUCTION OF ANY PERMANENT STRUCTURES WITHIN ANY EASEMENT OWNED
AND OPERATED BY KINDER MORGAN' IS PROHIBITED.
2. NO REMOVAL OF DIRT WILL BE ALLOWED WITHIN ANY EASEMENT OWNED AND
OPERATED BY KINDER MORGAN AT ANYTIME. ANY DIRT TO BE FILLED WILL BE DUMPED
OFFSITE OF THE EASEMENT AND SPREAD BY A CAT D3 DOZER OR EQUIVALENT SIZE
DOZER AND SPREAD EQUALLY ACROSS THE EASEMENT.
3. ALL EQUIPMENT AND FACILITIES PROPOSED TO CROSS ANY EASEMENT OWNED AND
OPERATED BY KINDER MORGAN MUST BE APPROVED BY A KINDER MORGAN
REPRESENTATIVE.
4. ALL UTILITIES AND FOREIGN LINES TO BE INSTALLED ACROSS ANY AND ALL EASEMENTS
AND PIPELINES OWNED AND OPERATED BY KINDER MORGAN ARE TO HAVE A MINIMUM
CLEARANCE OF TWO (2) FEET BENEATH THAT PIPELINE.
5. ALL UTILITIES AND FOREIGN LINES TO BE INSTALLED CROSS ANY AND ALL EASEMENTS
AND PIPELINES OWNED AND OPERATED BY KINDER MORGAN, THE PIPELINE WITHIN THE
EASEMENT SHALL BE 100% EXPOSED BY HAND DIGGING OR HYDROEXCAVATING ONLY.
6. ANY EXCAVATION WORK WITHIN 25 FEET OF ANY PIPELINE OWNED AND OPERATED BY
KINDER MORGAN SHALL BE MONITORED BY A KINDER MORGAN REPRESENTATIVE.
7. ALL EXCAVATION EQUIPMENT BEING USED WITHIN THE 25 FEET OF ANY PIPELINE OWNED
AND OPERATED BY KINDER MORGAN SHALL HAVE PLATE GUARDS INSTALLED OVER THE
BUCKET TEETH OF THAT EQUIPMENT TO PROTECT THE PIPELINE.
8. WHEN BORING OR AUGURING ACROSS A PIPELINE OWNED AND OPERATED BY KINDER
MORGAN THE BORE PITS SHALL BE A MINIMUM OF TEN (10) FEET FROM THE PIPELINE
WITH THE SIDE OF KINDER MORGAN'S PIPELINE FACING THE BORE OR AUGUR, BEING
EXPOSED AND EXTENDED TO TWO (2) FEET BELOW THE PIPELINE TO ENSURE PROPER
CLEARANCE OF THE PIPELINE UNDER THE MONITORING OF A KINDER MORGAN
REPRESENTATIVE.
9. WHEN OPEN TRENCH METHOD IS USED TO CROSS A PIPELINE OWNED AND OPERATED
BY KINDER MORGAN, THE MAXIMUM LENGTH TO BE EXPOSED IS TWELVE (12) FEET. ALL
CURRENT OSHA AND SPECIFICATIONS BY KINDER MORGAN ARE TO BE HELD DURING
ANY EXCAVATION AROUND SAID PIPELINE AND IF TEMPORARY SUPPORTS ARE
REQUIRED THEN SPECIFICATIONS BY KINDER MORGAN ARE TO BE FOLLOWED.
10. ANY AND ALL CONSTRUCTION ACTIVITY WILL BE PERFORMED UNDER THE SUPERVISION
OF A KINDER MORGAN INSPECTOR.
11. KINDER MORGAN SHALL BE GIVEN 72 HOUR NOTICE PRIOR TO ANY AND ALL
CONSTRUCTION ACTIVITY NEAR ANY AND ALL EASEMENTS AND PIPELINES OWNED AND
OPERATED BY KINDER MORGAN.
12. KINDER MORGAN HAS THE RIGHT TO REVOKE APPROVAL AND REQUIRE ADJUSTMENT AT
THE EXPENSE OF THE THE CONTRACTOR OF ANY CONSTRUCTION THAT DOES NOT MEET
THE FOLLOWING REQUIREMENTS.
1. CONSTRUCTION AND TESTING OF SANITARY SEWER
SHALL BE IN ACCORDANCE WITH THE LATEST CITY OF
CONROE SPECIFICATIONS AND TCEQ REQUIREMENTS;
THE MOST STRINGENT SHALL GOVERN.
2. BACKFILL AND BEDDING FOR SANITARY SEWERS MUST
MEET ALL MINIMUM REQUIREMENTS OF ASTM D-2321
AND MUST BE IN ACCORDANCE WITH CITY OF CONROE
STANDARD DETAILS.
3. ALL SANITARY SEWER MANHOLES SHALL BE PRE-CAST
CONCRETE MANHOLES CONFORMING TO ASTM C478.
PROVIDE A FLEXIBLE JOINT SEALANT COMPOUND
MEETING ASTM C990 REQUIREMENTS. NO BRICK
MANHOLES SHALL BE ALLOWED. FOR PVC PIPE, USE
WATER-TIGHT PIPE-TO-MANHOLE CONNECTOR
CONFORMING TO ASTM C923.
4. SANITARY SEWER MANHOLE RIMS SHALL BE 3-INCHES
ABOVE NATURAL GROUND. BACKFILL SHALL BE ADDED
AND SLOPED AWAY FROM THE MANHOLE RIM FOR
ADEQUATE DRAINAGE.
5. ALL NEW PRECAST CONCRETE MANHOLES SHALL BE
COATED WITH AN APPROVED HIGH BUILD EPOXY.
THICKNESS OF PROTECTIVE COATING SHALL BE AS
RECOMMENDED BY THE PRODUCT MANUFACTURER.
6. SANITARY SEWER PIPE SHALL BE GREEN PVC, SDR 26
(HEAVY WALL) CONFORMING TO MATERIAL
REQUIREMENTS OF ASTM D3034 AND ASTM F679 IN
ACCORDANCE WITH ASTM D1784. PIPE SHALL HAVE
INTEGRAL BELL JOINT THAT MEETS THE
REQUIREMENTS OF ASTM D3212 AND USES
WATER-TIGHT GASKET SEALING SYSTEM MEETING THE
REQUIREMENTS OF ASTM F477.
7. MANHOLES SHALL HAVE A DIAMETER OF 4 FT FOR
DEPTHS UP TO 10-FT AND A DIAMETER OF 5 FT FOR
DEPTHS GREATER THAN 10 FT BUT LESS THAN 20 FT
8. NO SEWER PIPE SHALL BE INSTALLED ON AN
UNSTABLE FOUNDATION. PROVIDE SELECT MATERIAL
AND/OR USE WET SAND CONSTRUCTION PER THE CITY
STANDARD DETAILS. NO PIPE SHALL BE COVERED
WITHOUT CITY INSPECTION.
9. A MANHOLE LOCATED WITHIN THE 100-YEAR FLOOD
PLAIN MUST HAVE SEALED COVER TO PREVENT
INFLOW, CONSTRUCTED PER CITY OF CONROE
STANDARD DETAIL. IF VENTS ARE PROVIDED, THE
VENT OPENING MUST BE ABOVE A 100-YEAR FLOOD
ELEVATION.
10. DEFLECTION TESTING IS REQUIRED FOR ALL PVC
SEWER PIPES WITH INSIDE DIAMETER LESS THAN 27
INCHES. DEFLECTION TEST SHALL BE DONE BY
PULLING A MANDREL FROM MANHOLE TO MANHOLE
AND WITHOUT USING A MECHANICAL PULLING DEVICE.
IF THE MANDREL SIZING IS NOT SPECIFIED, THE
MANDREL MUST HAVE AN OD EQUAL TO 95% OF THE ID
OF A PIPE. MANDREL SHALL HAVE A MINIMUM OF NINE
OR MORE ODD NUMBER OF RUNNERS OR LEGS PER
TCEQ §217.57 (b) (1) (B) MANDREL DESIGN. ANY PIPE
NOT MEETING TEST REQUIREMENTS SHALL BE
REMOVED AND REPLACED AT THE CONTRACTOR'S
EXPENSE.
11. GRAVITY SANITARY SEWER SHALL BE TESTED FOR
LEAKAGE BY USING A LOW PRESSURE AIR TEST,
UNLESS OTHERWISE SPECIFIED. LOW PRESSURE AIR
TEST MUST FOLLOW THE PROCEDURES REQUIRED BY
TCEQ § 217.57(A) (1) AND CONFORMING TO ASTM
F1417.
12. MANHOLE FRAME AND COVER SHALL BE 32" EAST
JORDAN IRONWORKS V-1420-1 FRAME AND COVER (OR
APPROVED EQUAL) WITH THE CITY OF CONROE
SANITARY SEWER LOGO EMBEDDED IN LID UNLESS
OTHERWISE SPECIFIED.
13. CONTRACTOR SHALL KEEP RECORD OF LOCATION OF
ALL STACKS, STUBS AND SEWER LEADS THROUGHOUT
THE PROJECT. UPON COMPLETION OF THE PROJECT, A
RECORD DRAWING MUST BE SUBMITTED TO THE CITY
THAT SHOWS EXACT LOCATIONS OF ALL
APPURTENANCES.
14. SANITARY SERVICE LEADS SHALL BE INSTALLED AT A
SLOPE OF 0.70% OR GREATER. ALL SERVICE LEADS
SHALL BE PVC SDR 26 WITH A PRESSURE RATING OF
150 PSI OR GREATER. ALL DOUBLE SERVICE LEADS
SHALL HAVE A WYE LOCATED AT THE END OF THE
LEAD. ALL SINGLE SERVICE LEADS SHALL BE 4 INCH
MINIMUM AND ALL DOUBLE SERVICE LEADS SHALL BE 6
INCH MINIMUM.
15. ALL SANITARY SEWER LINES MUST HAVE A MINIMUM
SEPARATION OF NINE FEET (9') HORIZONTAL
SEPARATION FROM EXISTING AND PROPOSED
WATERLINES. IF THE NINE FOOT (9') CANNOT BE
MAINTAINED, THE SANITARY SEWER LINES SHALL BE
LAID IN A SEPARATE TRENCH WITH A MINIMUM FOUR
FOOT (4') HORIZONTAL SEPARATION AND A TWO FOOT
(2') VERTICAL SEPARATION FROM OUTSIDE WALL TO
OUTSIDE WALL. MINIMUM SEPARATION DISTANCE
MUST BE IN ACCORDANCE WITH TCEQ §217.53 (d)
REQUIREMENTS.
16. SANITARY SEWER FORCE MAIN SHALL BE PRESSURE
RATED CLASS 150 GREEN PVC CONFORMING TO AWWA
C-900. JOINTS SHALL BE PUSH ON TYPE WITH GASKETS
CONFORMING TO ASTM F477 OR RESTRAINED TYPES
WHERE SPECIFIED. ALL FITTINGS ON FORCE MAIN
SHALL BE MECHANICALLY RESTRAINED. HDPE FORCE
MAINS SHALL BE PE4710 DR17 (125 PSI MINIMUM) WITH
FUSION JOINTS AND CONFORMING TO AWWA C906.
17. INSTALL #14 AWG TRACER WIRE FOR ALL FORCE MAIN
PIPES. ATTACH TRACER WIRE TO THE PIPE AT
3'OCLOCK POSITION USING TAPE OR WIRES.
18. SANITARY SEWER FORCE MAIN SHALL BE
HYDROSTATICALLY TESTED FOR LEAKAGE PER TCEQ
REQUIREMENTS.
19. WHEN FORCE MAINS ARE INSTALLED BY TRENCHLESS
METHOD, DEPTH SHALL NOT EXCEED 7 FEET AND
MUST HAVE MINIMUM 4' COVER.
20. STEEL CASING FOR SEWER LINES, SHOWN
ELSEWHERE IN THE PLANS, SHALL HAVE A MINIMUM
WALL THICKNESS OF 0.375 INCHES, ROLLED STEEL
TYPE; SPIRAL WILL NOT BE ALLOWED.
WARNING: OVERHEAD ELECTRICAL LINES
OVERHEAD LINES MAY EXIST ON THE PROPERTY. THE LOCATION OF OVERHEAD LINES HAS
NOT BEEN SHOWN ON THESE DRAWINGS AS THE LINES ARE CLEARLY VISIBLE, BUT YOU
SHOULD LOCATE THEM PRIOR TO BEGINNING ANY CONSTRUCTION. TEXAS LAW, SECTION
752, HEALTH & SAFETY CODE FORBIDS ACTIVITIES THAT OCCUR IN CLOSE PROXIMITY TO
HIGH VOLTAGE LINES, SPECIFICALLY:
· ANY ACTIVITY WHERE PERSON OR THINGS MAY COME WITHIN SIX (6) FEET OF LIVE
OVERHEAD VOLTAGE LINES; AND
· OPERATING A CRANE, DERRICK, POWER SHOVEL, DRILLING RIG, PILE DRIVER, HOISTING
EQUIPMENT, OR SIMILAR APPARATUS WITHIN 10 FEET OF LIVE OVERHEAD HIGH
VOLTAGE LINES.
PARTIES RESPONSIBLE FOR THE WORK, INCLUDING CONTRACTORS ARE LEGALLY
RESPONSIBLE FOR THE SAFETY OF CONSTRUCTION WORKERS UNDER THIS LAW. THIS LAW
CARIES BOTH CRIMINAL AND CIVIL LIABILITY. TO ARRANGE FOR LINES TO BE TURNED OFF OR
REMOVED CALL CENTERPOINT ENERGY AT (713)-207-2222.
ACTIVITIES ON OR ACROSS CENTERPOINT ENERGY FEE OR EASEMENT PROPERTY:
NO APPROVAL TO USE, CROSS OR OCCUPY CENTERPOINT FEE OR EASEMENT PROPERTY IS
GIVEN. IF YOU NEED TO USE CENTERPOINT PROPERTY, PLEASE CONTACT OUR SURVEYING &
RIGHT OF WAY DIVISION AT (713)-207-6348 OR (713)-207-5769.
1. STORM SEWER AND LEADS SHALL BE REINFORCED CONCRETE PIPE, ASTM C-76, CLASS III, WITH O-RING RUBBER GASKET JOINTS, AND SHALL BE INSTALLED, BEDDED AND BACKFILLED IN ACCORDANCE WITH CITY OF CONROE, EXCAVATION, BEDDING
AND BACKFILL PROCEDURES, UNLESS OTHERWISE SPECIFIED.
2. FOR BOX CULVERT INSTALLATION:
A.) ALL BOX CULVERTS INSTALLED SHALL BE PLACED ON A MINIMUM OF 6 INCHES OF CEMENT STABILIZED SAND
(CEMENT STABILIZED SAND SHALL BE 2 SACKS CEMENT PER TON).
B.) FOR INSTALLATION OF MONOLITHIC REINFORCED CONCRETE BOX CULVERTS IN POOR SOIL CONDITIONS, A 4 INCH THICK CLASS "C" REINFORCED CONCRETE SEAL SLAB SHALL BE INSTALLED, PRIOR TO INSTALLATION OF THE BOX
CULVERT.
3. ALL STORM SEWER MANHOLES, INLETS AND JUNCTION BOXES SHALL BE STANDARD PRE-CAST, UNLESS OTHERWISE SPECIFIED.
4. ALL INLETS TO BE A MINIMUM OF 5' X 5' STANDARD SIZE AND DEPTH TYPE "C", "C-1" OR "C-2" WITH MANHOLE ACCESS PER THE CITY OF CONROE'S "DESIGN MANUAL FOR WATER MAINS, SANITARY SEWERS, STORM DRAINAGE AND STREET PAVING" UNLESS
OTHERWISE SPECIFIED.
5. ALL STORM SEWER LEADS SHALL HAVE AN INTERNAL DIAMETER OF (18") EIGHTEEN INCH MINIMUM, STORM SEWER SMALLER
THAN THIS MUST BE REMOVED AND REPLACED, UNLESS OTHERWISE SPECIFIED.
6. GRADE DROP ON LEADS BETWEEN INLETS TO BE A MINIMUM OF 0.20 FOOT. GRADE DROP BETWEEN INLET AND MANHOLES TO BE
0.20 FOOT UNLESS OTHERWISE SHOWN.
7. MANHOLE FRAME AND COVER SHALL BE A 32" EAST JORDAN IRON WORKS V-1418 FRAME AND COVER OR APPROVED EQUAL
WITH THE CITY OF CONROE STORM SEWER LOGO EMBEDDED IN LID.
8. FOR ADJUSTMENT OF MANHOLE LIDS USE STANDARD CONCRETE RING, NOT TO EXCEED TWELVE (12) INCHES.
9. ALL CONCRETE USED FOR ALL POURED-IN-PLACE MANHOLES, INLETS, WINGWALLS, HEADWALLS AND OTHER APPURTENANCES
TO BE 4,000 P.S.I. STRENGTH AT 28 DAYS.
10. ALL EXPOSED CORNERS SHALL BE CHAMFERED TO 3/4".
11. ALL FIRST STAGE INLET CONSTRUCTION SHALL BE PROTECTED WITH 3 INCH THICK BOARDS AT ALL TIMES UNTIL FINAL
COMPLETION OF INLET.
1. ALL CONSTRUCTION SHALL BE PERFORMED IN ACCORDANCE WITH TCEQ REGULATIONS
IN TEXAS ADMINISTRATIVE CODE TITLE 30, PART 1, CHAPTER 290.
2. THE CONTRACTOR SHALL PROVIDE ADEQUATE THRUST BLOCKING, AND ALL-THREAD
SECURED OR MEGALUG OR APPROVED EQUAL TO WITHSTAND TEST PRESSURE AS
SPECIFIED IN CITY OF CONROE STANDARD DRAWINGS AND REQUIREMENTS FOR WATER
MAIN CONSTRUCTION AND MATERIALS.
3. THE CONTRACTOR ARE RESPONSIBLE FOR AND SHALL CONTACT THE CITY OF CONROE
PERMITS BEFORE THE INSTALLATION OF THE SERVICE LINES, WATER METERS AND
BOXES, FIRE SPRINKLER AND / OR IRRIGATION LINES.
4. THE CONTRACTOR SHALL CONTACT THE CITY OF CONROE TO SCHEDULE THE
INSTALLATION OF THE WATER METER'S AND WATER METER ASSEMBLIES ON LARGE
METER CONNECTIONS WHEN IT IS READY TO BE DONE.
5. PRIOR TO WATER MAIN CONSTRUCTION, THE CONTRACTOR SHALL CONTACT THE CITY
ENGINEER, NO LESS THAN 48 HOURS IN ADVANCE, AND COMPLY WITH ALL
REQUIREMENTS NECESSARY FOR APPROVAL OF THE WATER MAIN CONSTRUCTION.
6. SEPARATION DISTANCES BETWEEN ALL WATER MAINS AND SANITARY SEWER LINES
SHALL BE GOVERNED BY (TCEQ) "TEXAS COMMISSION OF ENVIRONMENTAL QUALITY"
CHAPTER 290
7. ALL WATER MAINS SHALL HAVE A MINIMUM COVER OF (5') FIVE FEET FROM THE BOTTOM
OF SUBGRADE OF THE PAVEMENT AND/OR (5') FIVE FEET BELOW THE DITCH FLOWLINE,
OR NATURAL GROUND, WHICHEVER IS LOWER, UNLESS OTHERWISE SPECIFIED.
8. ALL WATERLINES SHALL BE INSTALLED AND HYDROSTATICALLY TESTED PER AWWA
C-605 FOR PVC OR AWWA C600 FOR DI PIPE AS REQUIRED IN 30 TAC § 290-44 (A) (5)
BEFORE BACTERIOLOGICAL TESTING. ALL WATER PIPING SHALL BE DISINFECTED AND
BACTERIOLOGICAL TESTED PER AWWA STANDARD C-651 AND APPROVED PRIOR TO USE.
9. PIPE BENDING WILL NOT BE PERMITTED. ALLOWABLE LONGITUDINAL BENDING FOR
GASKET-JOINED PVC AND PVCO PRESSURE PIPES 10 INCHES AND SMALLER DIAMETER
SHALL BE PER AWWA C-605 TABLE-2. THE CURVED ALIGNMENT OF PIPELINE LARGER
THAN 10 INCHES DIAMETER SHALL BE AS DETERMINED BY THE PIPE MANUFACTURE'S
PUBLISHED JOINT OFFSET AND PER AWWA C-605. LONGITUDINAL BENDING OF
FUSED-JOINED PVC PRESSURE PIPES SHALL NOT EXCEED THE LIMITS ALLOWED BY
AWWA C-605 TABLE-3.
10. ALL PVC WATER MAINS 4" DIAMETER AND LARGER SHALL BE PRESSURE RATED CLASS
150 DR-18 BLUE CONFORMING TO AWWA C-900.
11. THE INSTALLATION OF ALL WATER LINES SHALL EXTEND ALONG THE ENTIRE LENGTH OF
THE PROPERTY TO BE SERVED. WATER LINES THAT DEAD END SHALL EXTEND TO THE
PROJECT LIMITS WITH A GATE VALVE AND FIRE HYDRANT AT THE END FOR FUTURE
EXTENSIONS.
12. ALL FITTINGS FOR FIRE HYDRANTS SHALL HAVE RESTRAINED MECHANICAL JOINTS AND
MUST BE ANCHORED TO RIGID FITTINGS USING TWO (2) 5/8" X 7" STAINLESS STEEL
"ALL-THREAD RODS", NUTS AND WASHERS.
UTILITY COMPANY CONTACTS
AT&T
1407 Jefferson Street Houston, TX 77002 Attention: Socorro Hernandez, Manager Network Services Phone: 713-943-5600 Cell:
713-775-3281
AT&T NETWORK OPERATIONS -
CONSTRUCTION &
ENGINEERING - SW
7602 Spring Cypress Road Spring, TX 77379 Attention: Brad Pruett Outside Plant Engineer Phone: 281-379-7505 Attention: Jeff Lucas Outside Plant Engineer Phone: 281-379-7506
CENTERPOINT ENERGY
Engineering Department 1111 Louisiana Street, Suite 2258C Houston, TX 77002 Phone: 713-207-4624 or 713-207-4622 Fax: 713-207-0877
Gas Emergency: 713-659-3552 or 713-207-4200 Locates: 1-800-545-6005 or 811
CITY OF CONROE - PUBLIC
WORKS
936-522-3885 Mailing Address P.O. Box 3066 Conroe, Texas 77305 Physical Address 401 Sgt Ed Holcomb Blvd. S Conroe, Texas 77304
Daniel Wade - Master Electrician Phone: 936-522-3809
Daniel Roberts - Water and Sewer Superintendent Public Works Phone: 936-522-3808
Joel Pickering - Streets and Drainage Superintendent Public Works Phone: 936-522-3839
WWTP OPERATIONS
Steven Huhn, WWTP Superintendent Public Works Phone: 936-522-3783
Attention: Steve Frank General Manager Phone: 713-341-4000
CONOCO PHILLIPS
600 North Dairy Ashford
2WL-8002A
Houston, TX 77079-1175 Attention: Ryan K. Thompson Phone: 832-486-3338 Fax:
832-486-2166 Email:
ryan.k.thompson@conocopillips.com
CP Pipeline Emergency:
877-267-2290
CONSOLIDATED
COMMUNICATIONS
508 Old Magnolia Road Conroe, TX 77301 Attention: Isaac Medina, OSP Engineering Phone: 936-521-0036 Cell: 936-697-3627
ENTERGY - TEXAS INC.
2802 North Frazier Conroe, TX 77303 Attention: Sebastian Grippo, Engineer Phone: 936-760-7422
SOUTHCROSS ENERGY
1717 Main Street, Suite 5200 Dallas, TX 75201 Phone: 214-979-3700
SPECTRA ENERGY
3700 North Frazier Conroe, TX 77303 Attention: Bryan Shannon, Area Supervisor Phone: 936-539-6535 Cell: 281-381-7344 Fax: 936-539-6536
OPTIMUM (ALTICE)
903 North Loop 336 West Conroe, TX 77301 Attention: Melton Prestwood, Construction Operations Supervisor Phone: 936-672-5739 Email:
Mel.Prestwood@AlticeUSA.com Attention: Jeremy Sawyer, Construction Operations Lead Phone: 936-225-6246 Email:
Jeremy.Sawyer@AlticeUSA.com
TEXAS 811 (UTILITY LOCATES)
Phone: 800-344-8377
TEXAS ONE CALL (UTILITY
LOCATES)
Phone: 800-245-4545
FRONTIER COMMUNICATIONS
(FORMERLY VERIZON
COMMUNICATIONS)
Attention: Tommie Jackson 8304 North Main Baytown, TX 77521 Phone: 281-229-0848 Attention: Darren Albrecht 2611 45th Street Dickinson, TX 77359 Phone: 281-338-2221
WARNING: UNDERGROUND ELECTRICAL UTILITIES
THE CONTRACTOR SHALL CONTACT THE UTILITY COORDINATING COMMITTEE AT 1-800-545-6005 OR 811 A MINIMUM OF 48 HOURS
PRIOR TO CONSTRUCTION TO HAVE MAIN AND SERVICE LINES FIELD LOCATED.
· ALL INFORMATION CONCERNING TYPE AND LOCATION OF UNDERGROUND UTILITIES IS NOT GUARANTEED TO BE ACCURATE OR ALL INCLUSIVE. THE CONTRACTORS ARE RESPONSIBLE BY MAKING THEIR OWN DETERMINATIONS AS TO TYPE AND LOCATION OF UNDERGROUND UTILITIES AS MAY BE NECESSARY TO AVOID DAMAGE THERETO. THE CONTRACTOR SHALL VERIFY LOCATION OF UNDERGROUND PIPELINES, CONDUITS, AND STRUCTURES BY CONTACTING OWNERS OF
UNDERGROUND UTILITIES OR BY EXCAVATING IN ADVANCE OF CONSTRUCTION.
· THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING THE EXACT LOCATION OF ALL UTILITIES WHEN AND WHERE THEY
FALL IN THE PATH OF CONSTRUCTION.
· THE CONTRACTOR IS ALSO RESPONSIBLE FOR CONTACTING THE UTILITY COORDINATING COMMITTEE AT (713) 223-4567 AND TEXAS ONE CALL AT 1-800-245-4545, FORTY-EIGHT (48) HOURS PRIOR TO ANY CONSTRUCTION.
· THE LOCATION OF ANY CENTERPOINT ENERGY UTILITIES ARE SHOWN IN APPROXIMATE WAY ONLY. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION BEFORE COMMENCING WORK, THEY AGREE TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH OCCASIONED BY THIS FAILURE TO EXACTLY LOCATE AND PRESERVE THESE UNDERGROUND UTILITIES.
· ALL PROPOSED FACILITIES SHALL MAINTAIN 12" CLEAR FROM ALL EXISTING UTILITIES.
CONROE CENTRAL WWTP - LIFT STATION
PUMP ADDITION
GENERAL NOTES - SHEET 2
PROJECT NO: 2026-18
Sheet No: 3
DRAWN BY: Design By:
ADMIN. APPROVAL:
REVIEWED BY: TBG
xxxxxx
DATE: May 12, 2026
SCALE: NTS
ENGINEERING
PATH = G:\Dynamic\PROJECTS\Sanitary Sewer\2026-18 CCWWTP Lift Station Pump Addition\DWG
SCALE: NA
DRAWING NAME:
THE SEAL APPEARING ON THIS
DOCUMENT WAS AUTHORIZED BY
TARA B. GAHA, P.E. 114274
ON 08/13/2026
KINDER MORGAN INC.
1001 Louisiana Street, Suite 1000 Houston, TX 77002 Phone: 713-369-9000
KOCH PIPELINE
8606 Interstate Highway 37 Corpus Christi, TX 78409 Attention: Audri Quintero Phone: 361-241-5624
LEVEL 3 COMMUNICATIONS, LLC
7060 Empire Central Houston, Texas 77040
PROPERTY BND.
EXIST.
GAS
METER
EXIST.
GENERATOR
EXIST.
X-FRMR
EXIST. LIFT STATION
EXIST. BOLLARDS (TYP.)
EXIST. FENCE
EXIST. 60" INFLUENT
SEWER MAIN
EXIST. 30" FM TO WWTP
EXIST. WATER SERVICE
EXIST. GRAVEL DRIVE
PROP. PUMP &
PIPING ADDITION
EXIST.
CONTROL
BLDG
DATE: June 11, 2026
PATH = G:\Dynamic\PROJECTS\sanitary sewer\2026-18 ccwwtp lift station pump addition\DWG
SCALE: 1"=20'
DRAWN BY: Design By:
ADMIN. APPROVAL:
SCALE: NA
DRAWING NAME:
REVIEWED BY: TBGCONROE CENTRAL WWTP - LIFT STATION
PUMP ADDITION
SITE LAYOUT & LOCATION MAP
Project No: 2026-18
Sheet No: 4 xxxxxx
N
SITE LAYOUT - EXIST. LIFT STATION
(SCALE: 1" = 30')
2000 ft
N
N
CONROE
CENTRAL
WWTP
PROJET LOCATION
LOCATION MAP
ENGINEERING
THE SEAL APPEARING ON THIS
DOCUMENT WAS AUTHORIZED BY
S
N
W
E
30" FM TO HEADWORKS
30" HEADER PIPE (DI-FE)
EXIST. 24"
HEADER PIPE
EXIST. CONC. SLAB
60" INFLUENT PIPE
Ø42.0'
EXIST. 20"
DISCHARGE
PIPING (TYP.)
APPROX. 13'-31
4"
A (SHEET-7)
DATE: June 11, 2026
PATH = G:\Dynamic\PROJECTS\sanitary sewer\2026-18 ccwwtp lift station pump addition\DWG
SCALE: 1"=20'
DRAWN BY: Design By:
ADMIN. APPROVAL:
SCALE: NA
DRAWING NAME:
REVIEWED BY: TBG
Project No: 2026-18
Sheet No: 5 xxxxxx
PROP. DISCHARGE
PIPING & VALVES
(SEE DETAIL-A)
DETAIL-A: PROP. DISCHARGE PIPING
(SCALE: 1" = 4')PUMP
ACCESS
HATCH
KEYED NOTES:
1. EXIST. 24"X24" TEE (DI-FE)
2. EXIST. 24" SPOOL (DI-FE)
3. EXIST. PIPE SUPPORT
4. EXIST. 24" BLIND FLANGE (DI)
5. EXIST. PUMP ACCESS HATCH
6. EXIST. MAINTENANCE ACCESS HATCH
7. EXIST. SLIDE GATE BOX
8. EXIST. GATE ACCESS HATCH
9. EXIST. 6" DUCT WORK (TO BE USED
FOR PROP. JUNCTION BOX)
10. PROP. 24"X20" ECC. REDUCER (DI-FE)
11. PROP. 20" ECC. PLUG VALVE
W/HANDWHEEL (DI-FE)
12. PROP. 20" SWING CHECK VALVE W/
WT.&LEVER (DI-FE)
13. PROP. PRESSURE GAUGE ASSY.
W/ISOLATION RING (SEE SHEET-9 FOR
DETAILS)
14. PROP. CONC. PIPE SUPPORT (SEE
SHEET-8 FOR DETAILS)
15. PROP. 3" WW COMOB. ARV & VACUUM
VALVE ASSEMBLY W/ 3" 403L SS DRAIN
PIPE TO WET WELL (SEE SHEET-9 FOR
DETAILS)
16. PROP. 20"X14" 90° REDUCING BEND
(DI-FE)
PLAN: EXISTING LIFT STATION
(SCALE: 1" = 10')
A
CONROE CENTRAL WWTP - LIFT STATION
PUMP ADDITION
LIFT STATION - PLANENGINEERING
THE SEAL APPEARING ON THIS
DOCUMENT WAS AUTHORIZED BY
FL
O
W
FL
O
W
FLOW FLOW
FLOW FLOW
FLOW FLOW
S
W
E
10'-07 8"
℄ DISCHARGE PIPE
4'-6"
5'-6"
5'-6"
2'-6"
R19'-0"
60" INFLUENT PIPE
DATE: August 12, 2026
PATH = G:\Dynamic\PROJECTS\Sanitary Sewer\2026-18 CCWWTP Lift Station Pump Addition\DWG
SCALE: 1"=20'
DRAWN BY: Design By:
ADMIN. APPROVAL:
GRAPHIC SCALE:
DRAWING NAME:
REVIEWED BY: TBG
Project No: 2026-18
Sheet No: 6 xxxxxx
KEYED NOTES:
1. EXIST. JOCKEY PUMP
2. EXIST. FULL SIZE PUMP
3. EXIST. SLIDE GATE
4. EXIST. DISCHARGE PIPE SUPPORT (SEE SHEET-8
FOR DETAILS)
5. PROP. SUBMERSIBLE SEWAGE PUMP (JOCKEY
PUMP) (FLYGT MODEL NP3301, 85-HP OR APPROVED
EQUAL W/ 10" DISCHARGE BASE ELBOW)
WET WELL - LOWER PLAN
(SCALE: 1" = 5')
3 3
CONROE CENTRAL WWTP - LIFT STATION
PUMP ADDITION
LIFT STATION - BOTTOM PLAN
GENERAL NOTES:
1. CONTRACTOR TO PREPARE SHOP DRAWINGS FOR THE
DISCHARGE PIPING USING THE FIELD MEASUREMENTS,
PRIOR TO PIPE FABRICATION. SUBMIT SHOP DRAWINGS
FOR REVIEW & APPROVAL.
2. PUBLIC WORKS - WWTP OPERATIONS WILL PERFORM
DEWATERING OF THE WET WELL CHAMBER FOR FIELD
MEASUREMENTS AND PUMP & PIPING INSTALLATION.
COORDINATE WITH THE WWTP SUPERINTENDENT FOR
FLOW CONTROL, SLIDE GATE OPERATIONS AND WET
WELL DEWATERING.
THE SEAL APPEARING ON THIS
DOCUMENT WAS AUTHORIZED BY
ON 08/13/2026 ENGINEERING
LS BTM ELEV= 127.50'
13'-41 2"
1'-53 4"
4'-37 8"
DATE: August 12, 2026
PATH = G:\Dynamic\PROJECTS\Sanitary Sewer\2026-18 CCWWTP Lift Station Pump Addition\DWG
SCALE: 1"=20'
DRAWN BY: Design By:
ADMIN. APPROVAL:
GRAPHIC SCALE:
DRAWING NAME:
REVIEWED BY: TBG
Project No: 2026-18
Sheet No: 7 xxxxxx
KEYED NOTES: (CONTD.)
9. PROP. SUBMERSIBLE SEWAGE PUMP (JOCKEY PUMP)
(FLYGT MODEL NP3301, 85-HP OR APPROVED EQUAL
10. PROP. 10"X14" ECC. RED. (DI-FE)
11. PROP. PIPE SUPPORT (TYP.), SEE SHEET-8 FOR DETAILS
12. PROP. 14" DISCHARGE PIPING (DI-FE), (FIELD VERIFY THE
DIMENSIONS; SUBMIT SHOP DRAWINGS FOR REVIEW AND
APPROVAL PRIOR TO FABRICATION).
13. SS GUIDE RAIL SUPPORT (TYP.), PER PUMP MANUFACTURER
14. PROP. 14" - 45° BEND (DI-FE)
15. PROP. 14" SPOOL PIECE (DI-FE)
16. PUMP GUIDE RAIL BRACKET & CABLE HANGERS, PER PUMP
MANUFACTURER'S SPECIFICATIONS.
17. EXIST. 20" DI PIPE SLEEVE. REMOVE EXIST. BLIND FLANGES
(BOTH ENDS) AND INSTALL NEW RISER PIPE.
18. PROP. 14" PIPE SPOOL (DI-FE)
19. PROP. 20" X14" - 90° REDUCING BEND (DI-FE)
20. PROP. 3" WW COMB. ARV & VACUUM VALVE ASSEMBLY W/
316 SS DRAIN PIPE TO WET WELL (SEE SHEET-9 FOR
DETAILS)
21. PROP. 20" SPOOL PIECE (DI-FE)
22. PROP. PRESSURE GAUGE (SEE SHEET-9 FOR DETAILS)
23. PROP. 20" SWING CHECK VALVE (DI-FE) W/ WT & LEVER
24. PROP. 20" PLUG VALVE (DI-FE)
25. PROP. 24"X20" ECC. REDUCER (DI-FE)
26. PROP. CONC. PIPE SUPPORT (SEE SHEET-9 FOR DETAILS)
27. PROP. PIPE FLANGE SUPPORT (SEE SHEE-8 FOR DETAILS)EXISTING WET WELL - SECTION A-A
(SCALE: 1" = 5')
KEYED NOTES:
1. EXIST. JOCKEY PUMP
2. EXIST. 14" DISCHARGE
PIPING (DI-FE)
3. EXIST. GUIDE RAIL
4. EXIST. 6" PVC STILLING
WELL W/ LEVEL
TRANSDUCER
5. EXIST. 10" VENT
6. EXIST. ARV DRAIN PIPE
7. EXIST. 24"X24" TEE (DI-FE)
8. EXIST. 2" WW COMBO. ARV
& VACUUM VALVE
22 23 24
TOP SLAB
ELEV = 157.00
CONROE CENTRAL WWTP - LIFT STATION
PUMP ADDITION
LIFT STATION - SECTION
NOTE:
1. CONTRACTOR SHALL PROVIDE
SUFFICIENT AIR SUPPLY, VENTILATION
AND EQUIPMENT NECESSARY TO WORK
INSIDE THE WET WELL ALL COMPLIANCE
WITH THE OSHA CONFINED SPACE ENTRY
REQUIREMENTS.
ENGINEERING
THE SEAL APPEARING ON THIS
DOCUMENT WAS AUTHORIZED BY
6" THRU 36"
PIPE OD
ADJUSTABLE PIPE SUPPORT
(SCALE: 1" = 2')
6" THRU 36" PIPE OR
FLANGE OD PIPE STRAP
PIPE SADDLE
PIPE COLUMN &
BASE PLATE
PER MFR
ADJUSTMENT
COUPLING
GALV PIPE
C
ADJUSTABLE FLANGE SUPPORT
(SCALE: 1" = 2')
B
PIPE COLUMN &
BASE PLATE PER
MFR
C
ADJUSTMENT
COUPLING
GALV PIPE
PIPE FLANGE
B
BOLTS THROUGH FLANGE
MOUNT AND PIPE FLANGE
JOINT
FLANGE SADDLE
C
ADJUSTABLE VALVE SUPPORT
(SCALE: 1" = 2')
PIPE COLUMN &
BASE PLATE PER
MFR
VALVE SADDLEADJUSTMENT
COUPLING
GALV PIPE
PIPE SIZE
(INCH)
DIMENSIONS (IN.)
A B C
6 3 5 7/16 7 1/2 8 3 6 15/16 7 1/2
10 3 8 7/16 7 1/2 12 3 9 15/16 7 1/2 14 4 10 15/16 9 16 4 12 3/8 9 18 4 13 7/8 9 20 6 15 3/8 11 24 6 17 15/16 11 30 6 19 1/8 11 36 8 24 1/2 13 1/2
NOTES:
1. PROVIDE BASE PLATES WITH 4-SLOTTED HOLES WITH STAINLESS STEEL ANCHOR
BOLTS (SIZE PER FLANGE).
2. PROVIDE NEOPRENE PAD FOR PIPE SUPPORTS.
1 1/2"
GROUT
1 1/2"
GROUT
1 1/2"
GROUT
ADJUSTABLE SUPPORT DETAILS
(SCALE: NTS)
A
4"
L4 x 3 x 1/4" 316 SS
45°
DETAIL-A
(THIS SHEET)
DISCHARGE
PIPE
L3 x 3 x 1/4"
316 SS
C6
SEE NOTE 1 (TYP.)
NOTE:
1. INSTALL 2 - 3/4"Ø x 8-1/2" L, 316 SS ANCHOR BOLTS, MIN. 6"
EMBEDMENT (HILTI HIT-Z ANCHOR ROD WITH HY 200-A OR HY
200-R INJECTION SYSTEM OR APPROVED EQUAL)
SEE NOTE 1 (TYP.)
C6
AS REQD.
AS REQD. AS REQD.
OUTSIDE RADIUS OF
DISCHARGE PIPE +
REQUIRED THICKNESS OF
GASKET
PL 3/8" 316 SS
LATERAL PIPE SUPPORT
ANGLE FRAME NOT SHOWN
FOR CLARITY. PROVIDE
NEOPRENE GASKET
BETWEEN DISCHARGE
PIPING AND METAL
SURFACES
CLEARANCE HOLES
FOR 1/2" Ø 316SS
BOLTS
PL 3/8" 316 SS
7"
3"
3"
8"
PL 1/2" 316 SS
3/16
3/16
SECTION - 1
(SCALE: 1" = 1')
CL CLEARANCE HOLE
FOR 2-3/4" Ø CONC.
ANCHOR BOLTS
PL 1/2" 316 SS
4"
4"
2"
2"
2" 11
2"31 2" 31
2"
10"
8"
SECTION - 2
(SCALE: 1" = 1')
L4 x 3 x 1/4"
316 SS
CL CLEARANCE HOLE
FOR 2-3/4" Ø CONC.
ANCHOR BOLTS
L4 x 3 x 1/4"
316 SS
4"
4"
8"
2" 11
2"31 2" 31
2"
10"
3"
1"
DATE: June 11, 2026
PATH = G:\Dynamic\PROJECTS\sanitary sewer\2026-18 ccwwtp lift station pump addition\DWG
SCALE: 1"=20'
DRAWN BY: Design By:
ADMIN. APPROVAL:
SCALE: AS SHOWN
DRAWING NAME:
REVIEWED BY: TBG
Project No: 2026-18
Sheet No: 8 xxxxxx
1/2
5/16 2"
3/16
L4 x 3
4" 3/8"x7"x10" 316 SS
GUSSET PL
WORK
POINT
CONT C6 CHANNEL
316 SS
PL 3/8"
1 1/2"
5"
1 1/2"
X
X = CL CLEARANCE HOLES FOR 1/2"Ø 316 SS BOLTS &
HARDWARE (4 REQD. PER PIPE CLAMP)
DISCHARGE PIPE SUPPORT
(SCALE: 1" = 2')
DISCHARGE
PIPE
3/8" 316 SS PIPE
CLAMP ROLL TO
PIPE O.D.
1/4
DETAIL-A: FRAME CONNECTION
(SCALE: 1" = 1')
PIPE CLAMP DETAIL
(SCALE: NTS)
CONROE CENTRAL WWTP - LIFT STATION
PUMP ADDITION
PIPE SUPPORT DETAILSENGINEERING
THE SEAL APPEARING ON THIS
DOCUMENT WAS AUTHORIZED BY
EXIST. 3" DISCHARGE
PIPE TO WET WELL
REDUCING
BUSHING & NIPPLE,
AS REQ'D.
UNION
90° BEND (TYP.)
BACKFLUSH KIT W/ QUICK
DISCONNECT
3" SINGLE BODY COMBINATION
AIR VALVE (APCO ASC OR
APPROVED EQUAL)
BLOW-OFF VALVE
INLET VALVE
COMBINATION AIR RELEASE & VACUUM VALVE ASSEMBLY
(SCALE: NTS)
DISCHARGE PIPE
3"Ø 316 SS PIPE
(FIELD VERIFY
REQD. LENGTH)
CONNECT NEW DISCHARGE
PIPE TO EXISTING ARV
DISCHARGE PIPE; PROVIDE A
TEE & NECESSARY FITTINGS
UNION
RISER PIPE THRU WET WELL TOP SLAB
(SCALE: NTS)
14" ROMAC STYLE FC400
FLANGE ADAPTOR OR
APPROVED EQUAL, FOR
CONNECTION TO 20"x14" -
90° REDUCING BEND (DI-FE)
TAPPED FLANGE
(EXIST. PIPE SLEEVE)
MODULAR PIPE SEALING
SYSTEM (LINK-SEAL MODEL
S-313, OR APPROVED EQUAL)
EXIST. 20" CL 53 DI FLxFL CAST-IN-PLACE WALL
SLEEVE W/ BLIND FLANGES BOTH ENDS
(REMOVE EXIST. BLIND FLANGES TO INSTALL
NEW PIPING)
14" CL 53 DI FLxPE
DISCHARGE PIPE
THRU 20" WALL
SLEEVE
TOP OF
WET WELL CONC.
2' -1
/8
(F
IE
LD
V
ER
IF
Y)
PRESSURE GAUGE ON PUMP DISCHARGE PIPING
(SCALE: NTS)
ISOLATION RING
3/4" SS BALL VALVE,
FULL PORT, FNPT x
FNPT
1/2" BLOCK-AND-BLEED
VALVE, MNPT x MNPT
1/2" DIAPHRAM
SEAL, FNPT x
FNPT (TYP)
PRESSURE
GAUGE (1-100
PSIG), SEE
SPECIFICATIONS
ISOLATION RING
3/4" SS BALL VALVE,
FULL PORT (FNPT x
FNPT)
3/4" x 1/2" SS REDUCER, (FNPT x
FNPT)
1/2" SS
THREADED
PIPING (TYP.)
ORIENT GAUGE
AS SHOWN ON
PLANS
3/4" SS PIPE NIPPLE (MNPT)
SECTION PLAN 3" GUIDE BAR
PROVIDE 4 x Ø7
8" BOLTS
(PER PUMP MFG.)
Ø10" DISCH. ELBOW
(PER PUMP MFG.)
JOCKEY PUMP
(FLYGT NP3101, 85 HP)
PROVIDE MIN. 50-FT OF 7
CONDUCTOR SPC CABLE (PER
PUMP MFG.)
2'-73 4"
14" x 10" ECC. RED.
(DI-FE)
1'-11
2" (MIN. 7 1/8")
14" DISCH.
PIPE (DI-FE)
LS BTM ELEV = 127.50'
PIPE SUPPORT & CLAMP
(SEE SHEET-8 FOR DETAILS)
CONC. PIPE SUPPORT ON CONCRETE SURFACE
(SCALE: NTS)
MIN. 2" CLR
1" GROUT BED
VARIES
(SEE NOTE 1)
SS PIPE STRAP
(SEE NOTE 2 )
#4 TIES @ 12" O.C.
(2 MIN.)
5/8" Ø x 14" SS BOLT W/HEX
NUT & 1/2" CT WASHER BOTH
SIDES (TYP.)
EXIST. CONC. FF
DRILL & EPOXY GROUT IN #5 BAR
(4 TYP.), MIN. 7 12" EMBEDMENT,
HILTI C-100 SYSTEM OR
APPROVED EQUAL
1/2 OD + 6"
120°
NOTES:
1. CONTRACTOR TO FIELD VERIFY AND DETERMINE REQD. SUPPORT HEIGHT.
2. PROVIDE SS PIPE STRAP W/ FULL CIRCUMFERENCE NEOPRENE GASKET. BOLTS
TIGHTENED TO SECURE PIPE.
3. PROVIDE 3/4" CHAMFER ON ALL EXPOSED EDGES.
ELEVATIONPLAN - 12" AND LARGER PIPES
SS PIPE STRAP
(NTS)
#5 BARS @ 10" O.C.
/ EACH FACE
SS PIPE STRAP
(SEE NOTE 2 )
SECTION VIEW SIDE ELEVATION
CARRIER PIPE
5/8" Ø x 14" SS BOLT W/HEX
NUT & 1/2" CT WASHER BOTH
SIDES (TYP.)
1'-0"
8" GUSSET PLATE
WELDED TO STRAP
4 x 1-7/16" x 2"
SLOTS
1 1/2"
6 3/4"
GUSSET PLATE FOR
12"…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .