About this file

This is a technical plan document prepared for the State of California related to a guardrail and crash cushion replacement project. The plan provides detailed construction specifications for two sites located on St. Helena Highway in St. Helena, California, specifically at address 3358 St. Helena Highway. Site #1 involves the removal of an existing crash cushion and concrete barrier, with construction of 25 linear feet of transition concrete barrier, installation of a new CALTRANS MASH-approved Delta Intelligent crash cushion with vertical shape transitions, and sawcutting to create a 48-inch-wide concrete pad with 6-inch-deep reinforced concrete. Site #2 requires removal of an existing crash cushion and concrete barrier, removal of 71 linear feet of existing concrete barrier, installation of 25 linear feet of double thrie beam with 37.5 linear feet of additional double thrie beam (posts at 3.125-foot on-center spacing), installation of a new Delta Intelligent crash cushion with a 48-inch-wide by 23-foot-long concrete pad, and removal of 3 sections of 12.5-foot existing guardrail with buffer terminal installation. All work must conform to 2024 CALTRANS Standard Plans, and temporary traffic control measures including R3-2 no-left-turn signage are required during construction.

The document is drawn to scale and includes detailed construction notes and specifications per manufacturer requirements. The project is part of the 2026 Annual Guardrail Repair initiative, which combines guardrail repairs at 17 county roads and Dry Creek Bridge as a Base Bid, with the St. Helena Highway crash cushion replacements offered as an Additive Alternate bid. The contract award will be determined by the lowest Base Bid submission. The plan was designed, drawn, and checked by DP, GW, and DP respectively, with final approval dated July 13, 2026, and is presented as Sheet 2 of 3 and Sheet 3 of 3 of the complete project documentation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATENo.

DRAWING:SCALE:

0 1"

NOTE: VERIFY SCALE.

BAR IS ONE INCH ON

ORIGINAL DRAWING.

ADJUST SCALES

ACCORDINGLY IF BAR

IS NOT ONE INCH.

PROJECT NUMBER:

FEDERAL PROJECT:

DESIGNED BY:

DRAWN BY:

CHECKED BY:

DATE:

SHEET OF

APPDBYREVISION

DP GW

DP 7/13/2026 2 3

NOT TO SCALE

CRASH CUSHION REPLACEMENT PLAN

ST. HELENA HIGHWAY

3358 ST. HELENA HIGHWAY,

ST. HELENA, CA 94574

REMOVE EXISTING CRASH CUSHION AND DELIVER TO COUNTY'S CORP. YARD.

REMOVE AND DISPOSE OF CONCRETE PAD, AND 33.5 LF OF EXISTING CONCRETE

BARRIER

CONSTRUCT 25 LF OF TRANSITION CONCRETE BARRIER TO CONCRETE BARRIER

TYPE 60MS PER CALTRANS 2024 STANDARD PLANS A76B

CONSTRUCT 13 LF OF TRANSITION CONCRETE BARRIER TYPE 60MS TO CRASH

CUSHION PER 2024 CALTRANS STANDARD PLANS A76HA

INSTALL NEW CALTRANS MASH APPROVED 'DELTA INTELLIGENT' CRASH CUSHION

AND TWO 'VERTICAL SHAPE TRANSITIONS" PER MANUFACTURER'S SPECIFICATIONS

SAWCUT EXISTING PAVEMENT TO CONSTRUCT NEW 48" WIDE CONCRETE PAD WITH

6" DEEP REINFORCED CONCRETE OVER COMPACTED BASE PER MANUFACTER'S

SPECIFICATION.

MAINTAIN MINIMUM 51" CLEARANCE BETWEEN NEW 'DELTA INTELLIGENT' CRASH

CUSHION AND EXISTING DETECTABLE WARNING SURFACE

CORE DRILL FOUR INCH HOLES AT 10 FEET O.C. FOR 300 FEET SOUTH OF BARRIER

TRANSITION

CONSTRUCTION NOTES

BALE GRIST M

I

LOCATION #2

SEE DETAIL 1B AND 1C ON SHEET 3

LOCATION #1

SEE DETAIL 1A THIS SHEET

DETAIL 1A

ST. HELENAHIGHWAY

2 3 4

TEMPORARY R3-2 (NO LEFT TURN) AT DRIVEWAY

DURING CONSTRUCTION

RDS 26-12

SITE #2 - 3358 ST.HELENA HIGHWAY, ST. HELENA CA

DATENo.

DRAWING:SCALE:

0 1"

NOTE: VERIFY SCALE.

BAR IS ONE INCH ON

ORIGINAL DRAWING.

ADJUST SCALES

ACCORDINGLY IF BAR

IS NOT ONE INCH.

PROJECT NUMBER:

FEDERAL PROJECT:

DESIGNED BY:

DRAWN BY:

CHECKED BY:

DATE:

SHEET OF

APPDBYREVISION

DP GW

DP 7/13/2026 3 3

NOT TO SCALE

CRASH CUSHION REPLACEMENT PLAN

REMOVE EXISTING CRASH CUSHION AND DELIVER TO COUNTY'S COPR. YARD.

REMOVE AND DISPOSE OF CONCRETE PAD.

AREA OF NEW HOT MIX ASPHALT (TYPE A) WITH 3" AC OVER 8" CLASS II AB. SAW

CUT 1" OF THE EXISTING AC PAVEMENT

ALIGN DOUBLE THRIE BEAM AND CRASH CUSHION/PAD ALONG THE REFERENCE

LINE TO PROVIDE A MINIMUM OF 8 FEET FOR THE TRAIL WIDTH

REMOVE 71 LF OF EXISTING CONCRETE BARRIER

CONSTRUCT 13 LF OF TRANSITION CONCRETE BARRIER TYPE 60MS TO THRIE BEAM

PER 2024 CALTRANS STANDARD PLANS A76HA

INSTALL 25 LF OF DOUBLE THRIE BEAM TRANSITION PER CALTRANS 2024 STANDARD

PLAN A78P1

INSTALL 37.5 LF OF DOUBLE THRIE BEAM (POSTS @ 3.125' O.C.) PER CALTRANS 2024

STANDARD PLAN A78P1

INSTALL NEW CALTRANS MASH APPROVED 'DELTA INTELLIGENT' CRASH CUSHION

AND 48" WIDE BY 23' LONG CONCRETE WITH 6" DEEP REINFORCED CONCRETE PAD

OVER COMPACTED BASE PER MANUFACTURER'S SPECIFICATIONS

REMOVE 3X12.5' OF EXISTING GUARDRAIL AND POSTS. INSTALL BUFFER/ROUNDED

END TERMINAL AT THE NEW END OF THE GUARDRAIL

CONSTRUCTION NOTES

RDS 26-12

SITE #2 - 3358 ST.HELENA HIGHWAY, ST. HELENA CA

ST. HELENA

HIGHWAY

DETAIL 1C

DETAIL 1B

ST. HELENA HIGHWAY

AutoCAD SHX Text

8' MIN (TRAIL WIDTH)

AutoCAD SHX Text

REFERENCE LINE

AutoCAD SHX Text

SAWCUT