Plan-2026_Annual_Guardrail-Dry_Creek_Road_MPM_5.59.pdf

PDF 1 MB Posted

Attached to
2026 Annual Guardrail Repair
Solicitation number
RDS 26-12
Issued by
Napa County, California

About this file

This is a project plan document for guardrail repair work in California County, prepared by MK Engineering. The 2026 Annual Guardrail Repair project encompasses repairs to damaged guardrails at 17 County roads and the Dry Creek Bridge located at Dry Creek Road Mile Post Marker (MPM) 5.59. These two locations comprise the Base Bid for contract award purposes. An Additive Alternate bid includes the replacement of four crash cushions at St. Helena Highway. The contract will be awarded to the lowest Base Bid, with the plan document dated October 8, 2025, and prepared by MK Engineering located at 130 Diamond Creek Place, Suite 130, Roseville, California 95747.

The project plan includes survey datums and site-specific information for the Dry Creek Road location at MPM 5.59, as referenced in the contract opportunity. No specific pricing information, set-asides, funding sources, or contract term details are contained within this planning document. The plan serves as technical reference material supporting the overall guardrail repair initiative, with MK Engineering providing engineering consultation and survey data for project execution.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRY CREEK ROAD MPM 5.59

LA

HH

10/08/2025

AS SHOWN

130 DIAMOND CREEK PLACE

SUITE 130, ROSEVILLE, CA 95747

(916) 788-0100

(916) 788-0159 (FAX)

MK

ENGINEERING

SURVEY DATUMS

1
2
3
4
5

File details come from the government source that posted it. Updated .