Parker Terrace - Drawings March 2026 - Sealed.pdf
PDF 32 MB Posted
- Solicitation number
- GL-2027-09
- Issued by
- Hartford County, Connecticut
About this file
This file consists of sealed bid construction drawings and specifications for the Parker Terrace Wastewater Pumping Station Upgrades project in Glastonbury, Connecticut, prepared by Weston & Sampson Engineers, Inc. The project scope encompasses demolition of existing infrastructure and installation of a new prefabricated concrete controls/electrical building, three wastewater pumps with variable frequency drives, piping systems, valves, fittings, pump controls, an exterior 180-kilowatt natural gas generator, electrical systems including a 400-ampere main control panel and network control panel, instrumentation and monitoring systems, site furnishings, erosion and sediment control measures, and related work. The contract is structured in six line items: (1) Parker Terrace Pumping Station complete work as a lump sum; (2) bypass pumping complete work as a lump sum; (3) a $20,000 allowance for contaminated materials abatement; (4) a $5,000 allowance for uniformed officers and traffic control; (5) a $30,000 allowance for utility company work; and (6) mobilization, bonds, and insurance not to exceed 5% of items one through five combined. Bids are due August 4, 2026 at 11:00 a.m. with public opening via Zoom. The project site is located at 30 Parker Terrace, Glastonbury, Connecticut 06033, encompassing approximately 15,663 square feet or 0.36 acres.
The bid documents specify that Connecticut prevailing wage requirements under Connecticut General Statutes Section 31-53 apply, with rates established as of July 7, 2026 and subject to annual adjustments on July 1st. Bidders must self-perform a minimum of 50% of the total contract value with their own organization as a mandatory in-house performance threshold. Each bid must be accompanied by a bid bond in the amount of 10% of the total bid, with original bonds mailed within 24 hours of the virtual opening. The successful bidder will be required to provide 100% performance and payment bonds in the full amount of the contract price. Additional requirements include OSHA 10-hour safety and health certification, submission of certified weekly payroll records, evidence of three similar completed projects with references, compliance with the Town's Code of Ethics, disclosure of litigation or mediation from the previous five years, and certification of compliance with Connecticut ordinances prohibiting natural gas and oil waste from extraction activities. The project engineer is Weston & Sampson Engineers, Inc., located at 712 Brook Street, Suite 103, Rocky Hill, Connecticut 06067, with technical questions directed to Jeff Lemay, Director of Wastewater, Refuse, and Recycling.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-GL-2027-09 Parker Terrace -Bid Document-FINAL.pdf | ||
| GL-2027-09 Parker Terrace -Bid Document-FINAL.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .