Parker Terrace Wastewater Pumping Station Upgrades
Solicitation number
GL-2027-09
Issued by
Hartford County, Connecticut

About this file

This is a final bid document and technical specification for the Town of Glastonbury, Connecticut, for the Parker Terrace Wastewater Pumping Station Upgrades project (Bid #GL-2027-09). The project, located at 30 Parker Terrace in Glastonbury, Connecticut, involves the demolition of existing infrastructure and installation of new prefabricated concrete controls/electrical building, wastewater pumps, piping, valves, fittings, pump controls, exterior generator, electrical systems, site furnishings, and related work. The bid was advertised on July 8, 2026, with bids due on August 4, 2026, at 11:00 a.m. through an online e-Procurement portal (glastonburyct.bonfirehub.com). Bids will be publicly opened and read aloud via Zoom. The bid documents include six line items: the Parker Terrace Pumping Station complete work (lump sum), bypass pumping complete work (lump sum), allowance for contaminated materials abatement ($20,000), allowance for uniformed officers/traffic control ($5,000), allowance for utility company work ($30,000), and mobilization, bonds, and insurance (not to exceed 5% of items 1-5).

Each bid must be accompanied by a bid bond in the amount of 10% of the total bid, with original bonds mailed within 24 hours of the virtual bid opening. The successful bidder will be required to provide 100% performance and payment bonds in the full amount of the contract price. Bidders must comply with Connecticut prevailing wage requirements under Connecticut General Statutes Section 31-53, with wage rates established as of July 7, 2026, subject to annual adjustments on July 1st. All contractors must self-perform a minimum of 50% of the total contract value with their own organization. The project is subject to Connecticut Department of Labor prevailing wage rates for both building construction and heavy/highway construction classifications, OSHA safety and health certification requirements (10-hour course), and certified weekly payroll submissions. Bidders must provide evidence of three similar completed projects with references, comply with the Town's Code of Ethics, disclose any past litigation or mediation cases from the previous five years, and certify compliance with Connecticut ordinances prohibiting natural gas and oil waste from extraction activities. The engineer for the project is Weston & Sampson Engineers, Inc., with technical questions directed to Jeff Lemay, Director of Wastewater, Refuse, and Recycling.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WESTON & SAMPSON ENGINEERS, INC.

712 Brook Street, Suite 103

Rocky Hill, CT 06067 tel: 860.513.1473 Technical

Specification

March 2026

TOWN OF

Glastonbury, CT

Parker Terrace Wastewater Pumping

Station Upgrades

Bid # GL-2027-09

100% Final Design

Advertised on: July 8, 2026

Bid Due Date: August 4, 2026

THIS PAGE LEFT INTENTIONALLY BLANK

PAGE i

Division

TABLE OF CONTENTS

Procurement and Contracting Requirements

Section

Number

00 Procurement and Contracting Requirements

Advertisement for Bid 00100

Instructions for Bidders 00200

Form for General Bid 00410

Connecticut Wage Rates 00500

Notice of Award 00510

Agreement 00520

Notice to Proceed 00550

Performance Bond 00610

Payment Bond 00615

General Conditions 00700

Supplementary Conditions 00800

Town of Glastonbury General Construction Specifications 00810

Town of Glastonbury Special Conditions 00820

Change Orders 00830

Permits 00890

General Requirements Subgroup

01 General Requirements

Measurement and Payment

Control of Work and Materials

01 02 50

01 11 00

Special Provisions 01 14 00

Dust Control 01 14 19.16

Submittals 01 33 23

Submittals for O&M Manuals 01 33 23.13

Health and Safety Plan 01 35 29

Structural Tests and Inspections 01 45 23

Temporary Facilities 01 52 13

Bypass Pumping 01 53 50

Signage (Traffic Control) 01 55 26.13

Temporary Chain Link Fence and Gate 01 56 26

Environmental Protection 01 57 19

Cleaning Up 01 74 13

Startup and Testing 01 75 00

Equipment Checkout and Testing 01 75 13

Project Closeout 01 78 00

Project As-Built Record Drawings 01 78 39

Operations and Maintenance Manuals 01 92 13

PAGE ii

Facility Construction Subgroup

02 Existing Conditions

Abandonment of Existing Sewers 02 41 13

Demolition 02 41 16

Transportation and Disposal of Contaminated Materials 02 61 00.16

03 Concrete

Cast-In-Place Concrete 03 30 00

05 Metals

Structural Steel 05 12 33

Miscellaneous Metals 05 50 00

07 Thermal and Moisture Protection

Vapor Retarders 07 26 00

09 Finishes

Painting 09 90 00

11 Equipment

General 11 00 00

13 Special Construction

Precast Concrete Structures and Appurtenances 13 20 00

Precast Concrete Utility Building 13 34 23.29

22 Plumbing

Plumbing General Conditions 22 05 00

Plumbing General-Duty Valves for Plumbing Piping 22 05 23

Identification for Plumbing Piping and Equipment 22 05 53

Plumbing Piping 22 10 05

Plumbing Piping Specialties 22 10 06

Natural Gas Piping 22 12 50

PAGE iv

23 Heating, Ventilation, Air Conditioning (HVAC)

Mechanical General Conditions 23 05 00

Sleeves and Sleeve Seals for HVAC Piping 23 05 17

Vibration and Seismic Controls for HVAC 23 05 48

Identification for HVAC Piping and Equipment 23 05 53

Testing, Adjusting, and Balancing for HVAC 23 05 93

HVAC Equipment Insulation 23 07 16

HVAC Piping Insulation 23 07 19

Direct-Digital Control System for HVAC 23 09 23

Sequence of Operations for HVAC Controls 23 09 93

Refrigerant Piping 23 23 00

Small-Capacity Split-System Air Conditioners 23 81 26.13

26 Electrical

Electrical General Conditions 26 05 00

Low-Voltage Electrical Power Conductors and Cables 26 05 19

Grounding and Bonding for Electrical Equipment 26 05 26

Hangers and Supports 26 05 29

Conduit for Electrical Equipment 26 05 33.13

Boxes for Electrical Equipment 26 05 33.16

Identification for Electrical

Equipment

26 05 53

Division

PAGE iii iv

Power System Studies 26 05 73

Wiring Connections 26 05 83

Lighting Control Devices 26 09 23

Low-Voltage Electrical Service Entrance 26 21 00

Low-Voltage Transformers 26 22 00

Switchboards 26 24 13

Panelboards 26 24 16

Wiring Devices 26 27 26

Fuses 26 28 13

Enclosed Switches 26 28 16.16

Variable Frequency Motor Controllers 26 29 23

Gas-Engine Genrator 26 32 13

Transfer Switches 26 36 00

Automatic Transfer Switch 26 36 23

Interior Lighting 26 51 00

Exterior Lighting 26 56 00

Site and Infrastructure Subgroup

31 Earthwork

Earthwork 31 00 00

Controlled Density Fill (CDF) 31 05 13.22

Filter Fabric 31 05 19.13

Clearing and Grubbing 31 11 00

Dewatering 31 23 19

Support of Excavation 31 50 00

32 Exterior Improvements

Paving 32 12 00

Curbing 32 16 00

Chain Link Fence 32 31 13.53

Loaming and Seeding 32 91 19

Plantings 32 93 00

33 Utilities

Tracer Tape 33 05 26.13

Ductile Iron Gravity and Force Main Pipe and Fittings for Sewers 33 31 13.19

Valves and Appurtenances for Wastewater Works 33 31 13.37

Connection to Existing Structures 33 31 13.46

Division

PAGE iii v

Process Equipment Subgroup

40 Process Integration

Process Piping and Fittings 40 05 13.53

Valves and Appurtenances (Wastewater Process) 40 05 23

Pipe and Equipment Support Systems 40 06 21

Field Instruments and Equipment 40 91 00

Instrumentation and Control General 40 93 00

Programmable Logic Controllers 40 94 43

Process Control Strategies 40 95 00

Control Panels 40 95 13

41 Material Processing and Handling Equipment

Monorail System with Electrified Hoist 41 22 23.19

43 Process Gas and Liquid Handling, Purification, and Storage

Equipment

Submersible Wastewater Pumping Equipment 43 21 39.16

Appendices:

END OF SECTION

SECTION 00100

ADVERTISEMENT FOR BIDS

TOWN OF GLASTONBURY

Office of the Purchasing Agent

DATE & TIME REQUIREDITEMBID #

Parker Terrace Wastewater Pumping StatioGL-2027-09 n Upgrades: August 4, 2026 at 11:00 A.M.

The Town of Glastonbury will receive on-line Bids for the Parker Terrace Wastewater Pumping Station

Upgrades project located at 30 Parker Terrace in Glastonbury, Connecticut. The modifications generally consist of the demolition of existing and installation of new prefabricated concrete controls/electrical building, wastewater pumps, piping, valves, fittings, pump controls, exterior generator, electrical, site furnishings and related work as indicated on the Contract documents.

Bidders wishing to submit a bid proposal for this solicitation are directed to respond online through a secure e-Procurement portal. Responses can be submitted at the following link:

https://glastonburyct.bonfirehub.com/, under the bid title “Parker Terrace Wastewater Pumping

Station Upgrades Bid# GL-2027-09”. All bids will be publicly opened and read aloud via an online Zoom platform. No late bids will be accepted.

This Invitation to Bid, Instructions to Bidders, Drawings, Specifications and other Bidding Documents (as defined in the Instruction to Bidders) are available for viewing and downloading on the Town of

Glastonbury website www.glastonburyct.gov at no cost.

Each Bid must be accompanied by a bid security in the form of a Bid Bond, certified in an amount not less than 10% of the base bid except as otherwise expressly provided in the Instruction to Bidders. The successful Bidder will be required to provide performance and labor and material payment bonds in the full amount of the agreed contract price.

Bidders are further advised that this project is subject to the prevailing wage requirements of Connecticut

General Statutes Section 31-53.

The Town of Glastonbury is An Affirmative Action/Equal Opportunity Employer. Minority/Women’s

Business Enterprises are encouraged to bid.

The Town reserves the right to amend or withdraw this Invitation to Bid for any reason, to accept or reject any or all Bids, to waive any informalities or non-material deficiencies in any Bid, and to make such award (or make no award) of a contract in connection with this Invitation to Bid all as determined by the Town, in its discretion, to be in the best interest of the Town. A Bid may be rejected for irregularities of any kind, including without limitation, alteration of form, additions not called for, conditional proposals, and incomplete Bids. A Bid may also be rejected if, in the opinion of the Town, the Bid does not meet the standard of quality established by the Bidding

Documents. Any or all Bids may be rejected if there is any reason to believe that collusion exists among two or more Bidders. The foregoing provisions are for illustrative purposes and shall in no way limit the right of the Town to reject any and all Bids, in whole or in part.

Gina Consiglio

Purchasing Agent

00100-1

00200-1

SECTION 00200

INSTRUCTIONS TO BIDDERS

1. Bidders submitting a response for this solicitation are directed to respond online through a secure e-Procurement portal. Bids can be submitted at the following link:

https://glastonburyct.bonfirehub.com/ under the bid title “Parker Terrace Wastewater

Pumping Station Upgrades Bid# GL-2027-09”. Bidders will be required to create a profile before submitting their bid. Step-by-step instructions on how to register as a vendor are available at this website:

https://customer.eunasolutions.com/public/s/article/vendor-registration

Bidders will be required to upload their bid response in one consolidated pdf document in the following location in the bid portal:

• Bid Response & Related Documents

2. Whenever it is deemed to be in the best interest of the Town, the Town Manager, Purchasing Agent or designated representative shall waive informalities in any and all bids.

The right is reserved to reject any bid when such action is deemed to be in the best interest of the Town of Glastonbury.

3. The award will be on the basis of bid total cost of the lowest qualified, responsible, and responsive Bidder unless otherwise specified. The bid total cost shall be arrived at by the mathematical calculation of the unit price multiplied times the number of units specified for each line item, and the total sum of all line items in the bid. In the event that the Town finds computational errors in a Bidder’s bid proposal, the bid total cost shall be recalculated by the Town based on the unit prices contained in the bid proposal.

4. All bids must be made on the required bid form. All blank spaces for prices must be typewritten, and the bid form must be fully completed and executed when submitted. Only one original of the bid form is required.

Bids must be made on the form furnished by the Town and attached hereto. If any unit price is omitted, the blank may be filled with the highest unit price proposed by any other

Bidder for such omitted item or the entire proposal may be rejected. In the event the unit price multiplied by quantity differs from the total cost specified for any given item, the unit cost shall govern.

5. Bids will be carefully evaluated as to conformance with stated specifications.

6. Specifications must be submitted complete in every detail and, when requested, samples shall be provided. If a bid involves any exception from stated specifications, they must be clearly noted as exceptions, underlined, and attached to the bid.

00200-2 clearly noted as exceptions, underlined, and attached to the bid.

7. The Contract Documents contain the provisions required for the requested item.

Information obtained from an officer, agent, or employee of the Town or any other person shall not affect the risks or obligations assumed by the Bidder or relieve him/her from fulfilling any of the conditions of the bid.

8. Each Bidder is held responsible for the examination and/or to have acquainted themselves with any conditions at the job site which would affect their work before submitting a bid.

Failure to meet this criteria shall not relieve the Bidder of the responsibility of completing the bid without extra cost to the Town of Glastonbury.

9. Any bid may be withdrawn prior to the above-scheduled time for the opening of bids or authorized postponement thereof. Any bid received after the time and date specified shall not be considered. No Bidder may withdraw a bid within sixty (60) days after the actual date of the opening thereof. Should there be reasons why a bid cannot be awarded within the specified period, the time may be extended by mutual agreement between the Town and the Bidder.

10. Each electronic bid submission must be accompanied by a COPY of the bid bond payable to the Town for ten percent (10%) of the total amount of the bid. Original bid bonds from all Bidders must be mailed to the attention of the Purchasing Department immediately

(within 24 hours) following the virtual bid opening at the following address: Town of

Glastonbury, PO Box 6523, Glastonbury, CT 06033-6523, Attn: Purchasing Department.

The bid bond of the successful Bidder will be retained until the payment bond and performance bond have been executed and approved, after which it will be returned.

11. A 100% Performance and a 100% Payment bond are required of the successful Bidder.

This bond shall cover all aspects of the specification and shall be delivered to the

Purchasing Agent prior to the issuance of a Contract. The Performance and Payment Bond will be returned upon the delivery and acceptance of the bid items.

12. The Bidder agrees and warrants that in the submission of this sealed Bid, they will not discriminate or permit discrimination against any person or group of persons on the grounds of race, color, religion, national origin, sex, or physical disability including, but not limited to blindness, unless it is shown by such Bidder that such disability prevents performance of that which must be done to successfully fulfill the terms of this sealed Bid or in any manner which is prohibited by the laws of the United States or the State of

Connecticut: and further agrees to provide the Connecticut Human Relations Commission with such information requested by the Commission concerning the employment practices and procedures of the Bidder. An Affirmative Action Statement will be required by the successful Bidder.

13. Bidder agrees to comply with all of the latest Federal and State Safety Standards and

Regulations and certifies that all work required in this bid will conform to and comply with said standards and regulations. Bidder further agrees to indemnify and hold harmless the

Town for all damages assessed against the Town as a result of Bidder’s failure to comply

00200-3 with said standards and/or regulations.

14. All correspondence regarding any purchase made by the Town of Glastonbury shall reference the Town’s purchase order number. Each shipping container shall clearly indicate both Town purchase order number and item number.

15. Bidder is required to review the Town of Glastonbury Code of Ethics adopted July 8, 2003 and effective August 1, 2003 and revised October 29, 2013 and effective November 28, 2013. Bidder shall acknowledge that they have reviewed the document in the area provided on the bid/proposal response page (BP-1). The selected Bidder will also be required to complete and sign an Acknowledgement Form prior to award. The Code of Ethics and the

Acknowledgement Form can be accessed at the Town of Glastonbury website at www.glastonburyct.gov. Upon entering the website scroll down to click on Bids &

Proposals Icon which will bring you to the links for the Code of Ethics and the

Acknowledgement Form.

16. Non-Resident Contractors: (if applicable)

Upon award the Town is required to report names of nonresident (out of state) Contractors to the State of Connecticut, Department of Revenue Services (DRS) to ensure that

Employment Taxes and other applicable taxes are being paid by Contractors. A single surety bond for 5% of the entire contract price is required to be filed with DRS by any unverified nonresident prime or general contractor (if awarded) where the contract price for the project is $250,000 or more. The contractor will be required to promptly furnish to the Town a copy of the Form AU-968 - Certificate of Compliance issued by the State of Connecticut, DRS. See State of Connecticut Notice SN 2012 (2).

17. Bidder shall include on a sheet(s) attached to its proposal a complete disclosure of all past and pending mediation, arbitration and litigation cases that the Bidder or its principals

(regardless of their place of employment) have been involved in for the most recent five years. Please include a statement of the issues in dispute and their resolution. Acceptability of Bidder based upon this disclosure shall lie solely with the Town.

18. Bidder or its principals, regardless of their place of employment, shall not have been convicted of, nor entered any plea of guilty, or nolo contendere, or otherwise have been found civilly liable or criminally responsible for any criminal offense or civil action.

Bidder shall not be in violation of any State or local ethics standards or other offenses arising out of the submission of bids or proposals, or performance of work on public works projects or contracts.

19. State Prevailing Wage Rates:

Bidders shall comply with State Statutes concerning Employment and Labor Practices, if applicable, and Section 31-53 of the Connecticut General Statutes, as amended (Prevailing

Wages). Wage Rate Determination for this project from the State of Connecticut is included in the Bid Documents. Certified payrolls for site labor shall be submitted weekly to the Town’s Representative or his designee on the correct State of Connecticut form (see

RFP). The Town reserves the right to, without prior notice, audit payroll checks given to

00200-4 workers on site in order to ascertain that wages and fringe benefits are being paid as required by the State of Connecticut. Please make special note of the State requirement to adjust wage and fringe benefit rates on each July 1st following the original published rates.

NOTE that Bidder is to include in its proposal all costs required by such annual increases in the PREVAILING RATES. NO escalation clauses are to be included in the Bidder’s proposal and NO escalation clauses will be in the Contract Agreement. Bidder is to anticipate any future increases and include these costs in the proposal response.

Contractor’s invoices will not be paid if certified payrolls are incomplete, incorrect or not received in a timely manner.

All Apprentices must be registered with the State of Connecticut and their number shall not exceed the number allowed by law. Otherwise, all workers must be paid at least the

Journeyman rate listed including benefits.

OSHA SAFETY AND HEALTH CERTIFICATION

Effective July 1, 2009: Any Mechanic, Laborer, or Worker, who performs work in a classification listed on the prevailing wage rate schedule on any public works project covered under C.G.S. Section 31-53, both on site and on or in the public building, must have completed a federal OSHA Safety and Health course within the last 5 years.

20. Each bid shall also include a description of three similar (3) projects completed by the

Bidder with references to demonstrate successful experience with similar projects. Please provide project name, contact information and contract value in Qualifications for Bidders section of Bid Form.

21. Compliance with Town Ordinance Prohibiting Natural Gas Waste & Oil Waste From

Natural Gas Extraction Activities or Oil Extraction Activities: If this bid is for the construction, repair or maintenance of Town owned and/or maintained roads or real property within the Town related to either (a) the purchase or acquisition of materials by the Town to be used to construct, repair or maintain any Town owned and/or maintained road or real property within the Town or (b) the performance of services for the Town to construct, repair or maintain any Town owned and/or maintained road or real property within the Town, the Bidder shall provide the following signed statement to the Town in its bid response, which shall be a certification under penalty of perjury by the Bidder:

“The undersigned Bidder, ____________________________, hereby submits a bid for materials, equipment and/or services for the Town of Glastonbury. The bid is for bid documents titled “Parker Terrace Wastewater Pumping Station Upgrades Bid# GL-2027-

09”.

The undersigned Bidder hereby certifies under penalty of perjury that in connection with the bid and, if it is awarded the purchase order or contract by the Town, in connection with any purchase order or contract: (1) no materials containing natural gas waste or oil waste from natural gas extraction activities or oil extraction activities shall be provided to the

00200-5

Town or shall be used in providing any services to the Town by the undersigned Bidder or any contractor, sub-contractor or agent of the undersigned Bidder; (b) nor will the undersigned Bidder or any contractor, subcontractor or agent of the undersigned Bidder apply any natural gas waste or oil waste from natural gas extraction activities or oil extraction activities to any publicly owned and/or maintained road or real property within the Town of Glastonbury in performing its obligations under the purchase order or contract.

The undersigned Bidder hereby agrees and acknowledges that this requirement shall be a term of the purchase order or contract, if it awarded the purchase order or contract by the

Town, and any breach of this provision shall be a breach of the purchase order or contract.”

22. All Bidders are hereby made aware that the selected contractor shall self-perform a minimum of 50% of the total contract value with its own organization.

23. Engineer

The Engineer for this project is Weston and Sampson Engineers, Inc., 712 Brook Street, Suite 103, Rocky Hill CT 06067. All correspondence and submittals will be directed to the Engineer, who will act as the Owner’s Project Representative for this project, and shall be referenced in these contract documents by the words “ENGINEER”.

NOTE: Any technical questions regarding this bid shall be made in writing (email acceptable) and directed to Jeff Lemay Town of Glastonbury Director of

Wastewater, Refuse, and Recycling 2149 Main Street PO Box 6523

Glastonbury CT 06033-6523, Telephone: (860) 652-7774, e-mail

Jeff.LeMay@Glastonbury-CT.Gov between the hours of 8:00 a.m. – 4:30 p.m.

For administrative questions concerning this bid/proposal, please contact Nicole

Melquist, Purchasing Assistant, at (860) 652-7588 or email the Purchasing

Department at purchasing@glastonbury-ct.gov. All questions, answers, and/or addenda, as applicable, will be posted on the Town’s website at www.glastonbury-ct.gov (Upon entering the website scroll down to click on Bids & Proposals Icon, then scroll down page to see the active bid table. You must click the Bid Title to view all bid details and document links). The request must be received at least five

(5) business days prior to the advertised response deadline identified within the

Invitation to Bid. It is the Bidder’s responsibility to check the website for addenda prior to submission of any bid/proposal.

IMPORTANT:

• Failure to comply with general rules may result in disqualification of the Bidder.

• Municipal projects are exempt from Federal Excise Taxes, as well as, State of Connecticut

Sales, Use and Service Taxes and should not be include in the Bidder’s proposal.

00200-6

END OF SECTION

00410- 1

SECTION 00410

FORM OF GENERAL BID

TOWN OF GLASTONBURY

BID / PROPOSAL GL-2027-09

STATE PROJECT NO.

DATE ADVERTISED 7/8/2026 DATE / TIME DUE 8/4/2026 at

11:00 A.M.

NAME OF PROJECT Parker Terrace Wastewater Pumping Station Upgrades

It is the responsibility of the Bidder to clearly mark the outside of the bid envelope with the Bid

Number, Date and Time of Bid Opening, and it also THE RESPONSIBILITY OF THE BIDDER

TO CHECK THE TOWN’S WEBSITE BEFORE SUBMITTING BID FOR ADDENDA

POSTED PRIOR TO BID OPENING.

The Bidder acknowledges receipt of the following Addenda:

Addendum #1 ________________ (Initial & Date)

Addendum #2 ________________ (Initial & Date)

Addendum #3 ________________ (Initial & Date)

OTHER ITEMS REQUIRED WITH SUBMISSION OF BID PROPOSAL:

The following bid checklist describes items required for inclusion with the above-referenced bid proposal package. It is provided for the convenience of the Bidders and, therefore, should not be assumed to be a complete list.

_____ 1. Included a copy of the Bid Bond as per Section 10 of the Information for Bidders. Original

Bond to be mailed as specified herein.

_____ 2. Included Disclosure of Past and Pending Mediation, Arbitration, and Litigation cases against the Bidder or its Principals as per Section 17 of the Information for Bidders.

_____ 3. Included Qualifications Statement as per Section 20 of the Information for Bidders.

_____ 4. Included Certificate of Compliance with CGS 31-57B as per Section 22of the Information for Bidders.

_____ 5. Provided certification for Compliance with Town Ordinance Prohibiting Natural Gas

Waste & Oil Waste From Natural Gas Extraction Activities or Oil Extraction Activities as per Section 23 of the Information for Bidders

_____ 6. Checked Town web site for Addenda and acknowledged Addenda on page BP-1.

_____ 7. Acknowledged Code of Ethics on page 00410-4.

_____ 8. Prepared ONE consolidated pdf file for on-line bid submission.

BIDDER NAME:

00410- 2

Item

No.

Brief Description, Unit or Lump Sum Price

(In Both Words and Figures)

Parker Terrace Wastewater Pumping Station

Upgrades

Est.

Quantity(1) Unit Total in Figures

Parker Terrace Pumping Station-Complete

1 LS

Unit Price, Dollars and Cents (words)

Unit Price in Figures

By-Pass Pumping - Complete

Allowance for Abatement of Contaminated

Materials

Twenty Thousand 1 Allow.

$20,000.00

Unit Price in Figures

Allowance for Uniformed Officers / Traffic

Control

Ten Thousand 1 Allow.

$5,000.00

Unit Price in Figures

Allowance for Utility Company Work

Thirty Thousand 1 Allow.

Unit Price, Dollars and Cents (words)

$30,000.00

00410- 3

Item

No.

Brief Description, Unit or Lump Sum Price

(In Both Words and Figures)

Parker Terrace Wastewater Pumping

Station Upgrades

Est.

Quantity(1) Unit Total in Figures

Mobilization, Bonds and Insurance (not more than 5% of the total of Items 1 through 5), Lump

Sum

Total Bid in Figures

Contract price for the Project Bid (Items 1 through 6) is:

Total Bid, Dollars and Cents (words)

TOTAL BID AMOUNT: $

(Numeric)

WRITTEN TOTAL BID AMOUNT:

00410-4

CODE OF ETHICS:

I/We have reviewed a copy of the Town of Glastonbury’s Code of Ethics and agree to submit a Consultant Acknowledgement Form if I/We are selected. Yes No *

*Bidder is advised that effective August 1, 2003, the Town of Glastonbury cannot consider any bid or proposal where the Bidder has not agreed to the above statement.

NON-COLLUSION AFFIDAVIT:

By submission of this bid, the Bidder certifies, and in the case of a joint bid each party thereto certifies as to their own organization that this bid has been arrived at independently without consultation, communication, or agreement as to any matter relating to this bid with any other Bidder or with any competitor.

Respectfully submitted:

Type or Print Name of Individual Doing Business as (Trade Name)

Signature of Individual Street Address

Title City, State, Zip Code

Date Telephone Number/Fax Number

E-Mail Address SS# or TIN#

(Seal – If bid is by a Corporation)

Attest

00500 - 1

SECTION 00500

STATE OF CONNECTICUT WAGE RATES

CLASSIFICATION Hourly Rate Benefits

Parker Terrace Wastewater Pumping Station UpgradesProject:

Minimum Rates and Classifications for Building Construction

ID#:

By virtue of the authority vested in the Labor Commissioner under provisions of Section 31-53 of the General Statutes of Connecticut, as amended, the following are declared to be the prevailing rates and welfare payments and will apply only where the contract is advertised for bid within 20 days of the date on which the rates are established. Any contractor or subcontractor not obligated by agreement to pay to the welfare and pension fund shall pay this amount to each employee as part of his/her hourly wages.

Project Number:

State#:

Project:

FAP#:

Project Town:

Parker Terrace Wastewater Pumping Station Upgrades

Glastonbury

Connecticut Department of Labor Wage and Workplace Standards Division

26-6425

1b) Asbestos/Toxic Waste Removal Laborers: Asbestos removal and encapsulation (except its removal from mechanical systems which are not to be scrapped), toxic waste removers, blasters.**See Laborers Group 7**

1c) Asbestos Worker/Heat and Frost Insulator 50.16 35.30

2) Boilermaker 50.21 30.01

3a) Bricklayer, Cement Mason, Concrete Finisher (including caulking), Stone Masons

45.76 38.45 + a

3b) Tile Setter 43.0 34.75

3c) Tile and Stone Finishers 36.0 29.43

3d) Marble & Terrazzo Finishers 35.7 29.73

3e) Plasterer 44.52 29.63

As of: July 7, 2026

3f) Terrazzo Mechanics & Marble Setters 40.6 39.93

------LABORERS------

4) Group 1: General laborers, carpenter tenders, concrete specialists, wrecking laborers and fire watchers.

37.0 30.47

4) Group 1a: Acetylene Burners (Hours worked with a torch) 38.0 30.47

4a) Group 2: Mortar mixers, plaster tender, power buggy operators, powdermen, fireproofer/mixer/nozzleman (Person running mixer and spraying fireproof only).

37.25 30.47

4b) Group 3: Jackhammer operators/pavement breaker, mason tender (brick), mason tender (cement/concrete), forklift operators and forklift operators (masonry).

37.5 30.47

4c) **Group 4: Pipelayers: Licensed P6 -P7 (one or two employees of the total crew who primary task is to perform mating of pipe sections).

38.0 30.47

4d) Group 5: Air track operator, sand blaster and hydraulic drills. 37.75 30.47

4e) Group 6: Blasters, nuclear and toxic waste removal. 40.0 30.47

4f) Group 7: Asbestos/lead removal and encapsulation (except it's removal from mechanical systems which are not to be scrapped).

40.0 30.47

4g) Group 8: Bottom men on open air caisson, cylindrical work and boring crew.

37.5 30.47

4h) Group 9: Top men on open air caisson, cylindrical work and boring crew. 37.0 30.47

4i) Group 10: Traffic Control Signalman 22.2 30.47

4j) Group 11: Toxic Waste Removers A or B With PPE 40.0 30.47

5) Carpenter, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, Metal Stud Installation, Form Work and Scaffold Building, Drywall Hanging, Modular-Furniture Systems Installers, Lathers, Piledrivers, Resilient Floor Layers.

44.48 29.74

5a) Millwrights 45.14 30.24

5b) Carpenter - Welder 44.98 29.74

5c) Carpenter: Working with creosote lumber or acid 45.48 29.74

6) Electrical Worker (including low voltage wiring) (Trade License required:

E1,2 L-5,6 C-5,6 T-1,2 L-1,2 V-1,2,7,8,9)

50.25 37.47+3% of gross wage

7a) Elevator Mechanic (Trade License required: R-1,2,5,6) 69.55 38.985+a+b

-----OUTSIDE LINE CONSTRUCTION----

Groundman 32.1 13.95

Linemen/Cable Splicer 58.37 33.94

8) Glazier (Trade License required: FG-1,2) 44.73 27.65+ a

9) Ironworker, Ornamental, Reinforcing, Structural, and Precast Concrete Erection

45.25 46.62 + a

----OPERATORS----

Group 1: Crane Handling or Erecting Structural Steel or Stone, Hoisting Engineer (2 drums or over), Deep Shaft over 14". (Trade License Required)

60.66 30.95 + a

Group 1a: Front End Loader (7 cubic yards or over); Work Boat 26 ft. and Over

55.6 30.95 + a

Group 2: Cranes (100 ton rate capacity and over). (Trade License Required) 60.24 30.95 + a

Group 2a: Cranes (under 100 ton rated capacity), Magni Type-360 Rotating Forklift.

59.2 30.95 + a

Group 2b: Excavator over 2 cubic yards; Pile Driver ($3.00 premium when operator controls hammer), HF-1 Forklift, Drills with self contained power units, Micropile up to 14 inches helical pile.

55.17 30.95 + a

Group 3: Excavator; Gradall; Master Mechanic; Hoisting Engineer (all types of equipment where a drum and cable are used to hoist or drag material regardless of motive power of operation), Rubber Tire Excavator (Drott-1085 or similar);Grader Operator; Bulldozer Finegrade. (slopes, shaping, laser or GPS, etc.). (Trade License Required)

54.13 30.95 + a

Group 4: Trenching Machines; Lighter Derrick; CMI Machine or Similar;

Koehring Loader (Skooper); Goldhofer.

53.61 30.95 + a

Group 5: Specialty Railroad Equipment; Asphalt Spreader, Asphalt Reclaiming Machine; Line Grinder; Concrete Pumps; Drills with Self Contained Power Units; Boring Machine; Post Hole Digger; Auger; Pounder;

Well Digger; Milling Machine (over 24 mandrel).

52.78 30.95 + a

Group 5 continued: Side Boom; Combination Hoe and Loader; Directional Driller, Geothermal Drill.

52.78 30.95 + a

Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough grade dozer).

52.35 30.95 + a

Group 7: Asphalt Roller; Concrete Saws and Cutters (ride on types);

Vermeer Concrete Cutter; Stump Grinder; Scraper; Snooper; Skidder; Milling Machine (24" and under mandrel).

51.89 30.95 + a

Group 8: Mechanic; Grease Truck Operator; Hydroblaster; Barrier Mover;

Power Stone Spreader; Welding; Work Boat Under 26 ft.; Transfer Machine;

Rigger Foreman.

51.34 30.95 + a

Group 9: Front End Loader (under 3 cubic yards); Skid Steer Loader regardless of attachments; (Bobcat or Similar); Forklift, Power Chipper;

Landscape Equipment (including Hydroseeder); Vacuum Excavation Truck and Hydrovac Excavation Truck (27 HG pressure or greater).

50.74 30.95 + a

Group 10: Vibratory hammer; ice machine; diesel and air, hammer, etc. 47.91 30.95 + a

Group 11: Conveyor, earth roller, power pavement breaker (whiphammer), robot demolition equipment.

47.91 30.95 + a

Group 12: Wellpoint Operator. 47.82 30.95 + a

Group 13: Compressor Battery Operator. 47.04 30.95 + a

Group 14: Elevator Operator; Tow Motor Operator (solid tire no rough terrain). 45.45 30.95 + a

Group 15: Generator Operator; Compressor Operator; Pump Operator;

Welding Machine Operator; Heater Operator.

44.89 30.95 + a

Group 16: Maintenance Engineer and Articulating End Dump. 43.99 30.95 + a

Group 17: Portable Asphalt Plant Operator; Portable Crusher Plant Operator;

Portable Concrete Plant Operator; Portable Grout Plant Operator; Portable Water Filtration Plant Operator.

49.95 30.95 + a

Group 18: Power Safety Boat; Vacuum Truck; Zim Mixer; Sweeper;

(Minimum for any job requiring a CDL license); Rigger; Signalman.

46.6 30.95 + a

Surveyor: Chief of Party 50.21 30.95 + a

Surveyor: Assistant Chief of Party 46.3 30.95 + a

Surveyor: Instrument Man 44.55 30.95 + a

Surveyor: Rodman or Chainman 38.34 30.95 + a

------PAINTERS (Including Drywall Finishing)------

10a) Brush and Roller 41.17 27.65

10b) Taping Only/Drywall Finishing 41.92 27.65

10c) Paperhanger and Red Label 41.67 27.65

10d) Spray 44.17 27.65

10e) Spray Helper 42.17 27.65

10f) Blast 46.17 27.65

10g) Blast Helper 42.17 27.65

11) Plumber (excluding HVAC pipe installation) (Trade License required: P-

1,2,6,7,8,9 J-1,2,3,4 SP-1,2)

52.08 36.80

12) Well Digger, Pile Testing Machine 37.26 24.05 + a

13) Roofer (composition) 45.85 23.99

14) Roofer (slate & tile) 46.35 23.99

15) Sheetmetal Worker (Trade License required for HVAC and Ductwork:

SM-1,SM-2,SM-3,SM-4,SM-5,SM-6)

46.53 45.08

16) Pipefitter (Including HVAC work) (Trade License required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4, G-1, G-2, G-8 & G- 9)

52.08 36.80

------TRUCK DRIVERS------

17) Block Truck 39.98 33.00 + a

17a) 2 Axle 38.66 33.00 + a

17ab) Helpers 36.16 33.00 + a

17b) 3 Axle, 2 Axle Mixer 38.77 33.00 + a

17c) 3 Axle Mixer 38.83 33.00 + a

17d) 4 Axle 38.89 33.00 + a

17e) 4 Axle Mixer 40.69 33.00 + a

17ef) 5 Axle 38.89 33.00 + a

17eg) 5 Axle Mixer 40.69 33.00 + a

17f) Heavy Duty Trailer (40 Tons and Over) 41.16 33.00 + a

17g) Euclids and Semi-Trailer 38.94 33.00 + a

17h) Heavy Duty Trailer up to 40 tons 39.89 33.00 + a

17i) Snorkle Truck 39.04 33.00 + a

17j) Swivel Dump and Tack Truck 38.89 33.00 + a

18) Sprinkler Fitter (Trade License required: F-1,2,3,4) 56.78 35.24 + a

19) Theatrical Stage Journeyman 25.76 7.34

Welders: Rate for craft to which welding is incidental.

Surveyors: Hazardous material removal: $3.00 per hour premium.

*Note: Hazardous waste removal work receives additional $1.25 per hour for truck drivers.

**Note: Hazardous waste premium $3.00 per hour over classified rate.

Truck Drivers: Trainers Premium: $3.00 over wage rate.

Truck Drivers: Night Premium - Mixer Drivers: $2.00 over wage rate.

Crane with 150 ft. boom (including jib) - $1.50 extra

Crane with 200 ft. boom (including jib) - $2.50 extra

Crane with 250 ft. boom (including jib) - $5.00 extra

Crane with 300 ft. boom (including jib) - $7.00 extra

Crane with 400 ft. boom (including jib) - $10.00 extra

All classifications that indicate a percentage of the fringe benefits must be calculated at the percentage rate times the "base hourly rate".

Apprentices duly registered under the Commissioner of Labor's regulations on "Work Training Standards for Apprenticeship and Training Programs" Section 31-51-d-1 to 12, are allowed to be paid the appropriate percentage of the prevailing journeymen hourly base and the full fringe benefit rate, providing the work site ratio shall not be less than one full-time journeyperson instructing and supervising the work of each apprentice in a specific trade.

The Prevailing wage rates applicable to this project are subject to annual adjustments each July 1st for the duration of the project.

Each contractor shall pay the annual adjusted prevailing wage rate that is in effect each July 1st, as posted by the Department of Labor.

It is the contractor's responsibility to obtain the annual adjusted prevailing wage rate increases directly from the Department of Labor's website.

The annual adjustments will be posted on the Department of Labor's Web page:

www.ct.gov/dol. For those without internet access, please contact the division listed below.

The Department of Labor will continue to issue the initial prevailing wage rate schedule to the Contracting Agency for the project.

All subsequent annual adjustments will be posted on our Web Site for contractor access.

Contracting Agencies are under no obligation pursuant to State labor law to pay any increase due to the annual adjustment provision.

Effective October 1, 2005 - Public Act 05-50: any person performing the work of any mechanic, laborer, or worker shall be paid prevailing wage

All Person who perform work ON SITE must be paid prevailing wage for the appropriate mechanic, laborer, or worker classification.

All certified payrolls must list the hours worked and wages paid to All Persons who perform work ON SITE regardless of their ownership i.e.: (Owners, Corporate Officers, LLC Members, Independent Contractors, et.

al)

Reporting and payment of wages is required regardless of any contractual relationship alleged to exist between the contractor and such person.

~~Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clause (29 CFR 5.5 (a) (1) (ii)).

Please direct any questions which you may have pertaining to classification of work and payment of prevailing wages to the Wage and Workplace Standards Division, telephone (860)263-6790.

CLASSIFICATION Hourly Rate Benefits

Parker Terrace Wastewater Pumping Station UpgradesProject:

Minimum Rates and Classifications for Heavy/Highway Construction

ID#:

By virtue of the authority vested in the Labor Commissioner under provisions of Section 31-53 of the General Statutes of Connecticut, as amended, the following are declared to be the prevailing rates and welfare payments and will apply only where the contract is advertised for bid within 20 days of the date on which the rates are established. Any contractor or subcontractor not obligated by agreement to pay to the welfare and pension fund shall pay this amount to each employee as part of his/her hourly wages.

Project Number:

State#:

Project:

FAP#:

Project Town:

Parker Terrace Wastewater Pumping Station Upgrades

Glastonbury

Connecticut Department of Labor Wage and Workplace Standards Division

26-6425

1) Boilermaker 50.21 30.01

1a) Bricklayer, Cement Masons, Cement Finishers, Plasterers, Stone Masons 46.09 36.29

2) Carpenters, Piledrivermen 44.48 29.74

2a) Diver Tenders 44.48 29.74

2b) Divers Effluent 67.52 29.74

3) Divers 52.94 29.74

03a) Millwrights 45.14 30.24

03b) Carpenter-Welder 44.98 29.74

03c) Carpenter: Working with creosote lumber or acid 45.48 29.74

4) Painters: (Bridge Construction) Brush, Roller, Blasting (Sand, Water, etc.), Spray

61.85 27.65

4a) Painters: Brush and Roller 41.17 27.65

4b) Painters: Spray 44.17 27.65

4bc) Painters: Spray Helper 42.17 27.65

4c) Painters: Steel Only 43.17 27.65

4d) Painters: Blast 46.17 27.65

4de) Painter: Blast Helper 42.17 27.65

4e) Painters: Tanks, Tower and Swingstage etc. 43.17 27.65

4f) Elevated Tanks (60 feet and above) 50.17 27.65

5) Electrician (Trade License required: E-1,2 L-5,6 C-5,6 T-1,2 L-1,2 V- 1,2,7,8,9)

50.25 37.47+3% of gross wage

6) Ironworkers: Ornamental, Reinforcing, Structural, and Precast Concrete Erection

45.25 46.62 + a

7) Plumbers (Trade License required: (P-1,2,6,7,8,9 J-1,2,3,4 SP-1,2) and Pipefitters (Including HVAC Work) (Trade License required: S-1,2,3,4,5,6,7,8 B-1,2,3,4 D-1,2,3,4 G-1, G-2, G-8, G-9)

52.08 36.80

----LABORERS---- -

8) Group 1: General Laborers and concrete specialist 37.0 30.47

8) Group 1a: Acetylene Burners (Hours worked with a torch) 38.0 30.47

9) Group 2: Chain saw operators, fence and guard rail erectors, pneumatic tool operators, powdermen

37.25 30.47

10) Group 3: Pipelayers 37.5 30.47

11) Group 4: Jackhammer/Pavement breaker (handheld); mason tenders (cement/concrete), catch basin builders, asphalt rakers, air track operators, block paver, curb setter and forklift operators

37.5 30.47

12) Group 5: Toxic waste removal (non-mechanical systems) 39.0 30.47

13) Group 6: Blasters 38.75 30.47

Group 7: Asbestos/lead removal, non-mechanical systems (does not include leaded joint pipe)

40.0 30.47

Group 8: Traffic control signalmen 22.2 30.47

Group 9: Hydraulic Drills 37.75 30.47

Group 10: Toxic Waste Removers A or B With PPE 40.0 30.47

----LABORERS (TUNNEL CONSTRUCTION, FREE AIR). Shield Drive and Liner Plate Tunnels in Free Air.----

13a) Miners, Motormen, Mucking Machine Operators, Nozzle Men, Grout Men, Shaft & Tunnel Steel & Rodmen, Shield & Erector, Arm Operator, Cable Tenders

39.23 30.47 + a

13b) Brakemen, Trackmen, Miners' Helpers and all other men 38.26 30.47 + a

----CLEANING, CONCRETE AND CAULKING TUNNEL----

14) Concrete Workers, Form Movers, and Strippers 38.26 30.47 + a

15) Form Erectors 38.59 30.47 + a

----ROCK SHAFT LINING, CONCRETE, LINING OF SAME AND TUNNEL IN

FREE AIR:----

16) Brakemen, Trackmen, Tunnel Laborers, Shaft Laborers, Miners Helpers 38.26 30.47 + a

17) Laborers Topside, Cage Tenders, Bellman 38.15 30.47 + a

18) Miners 39.23 30.47 + a

----TUNNELS, CAISSON AND CYLINDER WORK IN COMPRESSED AIR: ---

18a) Blaster 45.72 30.47 + a

19) Brakemen, Trackmen, Groutman, Laborers, Outside Lock Tender, Gauge Tenders

45.52 30.47 + a

20) Change House Attendants, Powder Watchmen, Top on Iron Bolts 43.54 30.47 + a

21) Mucking Machine Operator, Grout Boss, Track Boss 46.31 30.47 + a

----TRUCK DRIVERS----(*see note below)

Block Truck 39.98 33.00 + a

2 Axle 38.66 33.00 + a

Helpers 36.16 33.00 + a

Three Axle Trucks; Two Axle Mixer 38.77 33.00 + a

Three Axle Mixer 38.83 33.00 + a

Four Axle 38.89 33.00 + a

Four Axle Mixer 40.69 33.00 + a

5 Axle 38.89 33.00 + a

5 Axle Mixer 40.69 33.00 + a

Heavy Duty Trailer (40 tons and over) 41.16 33.00 + a

Heavy Duty Trailer (up to 40 tons) 39.89 33.00 + a

Snorkle Truck 39.04 33.00 + a

Swivel Dump and Tack Truck 38.89 33.00 + a

Euclids and Semi Trailer 38.94 33.00 + a

----POWER EQUIPMENT OPERATORS----

Group 1: Crane Handling or Erecting Structural Steel or Stone, Hoisting Engineer (2 drums or over), Caisson Drilled Shaft over 14". (Trade License Required)

60.66 30.95 + a

Group 1a: Front End Loader (7 cubic yards or over); Work Boat 26 ft. and over.

55.6 30.95 + a

Group 2: Cranes (100 ton rate capacity and over). (Trade License Required) 60.24 30.95 + a

Group 2a: Cranes (under 100 ton rated capacity), Magni Type-360 Rotating Forklift.

59.2 30.95 + a

Group 2b: Excavator over 2 cubic yards; Pile Driver ($3.00 premium when operator controls hammer), HF-1 Forklift, Drills with self contained power units, Micropile up to 14 inches helical pile.

55.17 30.95 + a

Group 3: Excavator; Gradall; Master Mechanic; Hoisting Engineer (all types of equipment where a drum and cable are used to hoist or drag material regardless of motive power of operation), Rubber Tire Excavator (Drott-1085 or similar);Grader Operator; Bulldozer Fine Grade (slopes, shaping, laser or GPS, etc.). (Trade License Required)

54.13 30.95 + a

Group 4: Trenching Machines; Lighter Derrick; CMI Machine or Similar;

Koehring Loader (Skooper), Goldhofer.

53.61 30.95 + a

Group 5: Specialty Railroad Equipment; Asphalt Paver; Asphalt Spreader;

Asphalt Reclaiming Machine; Line Grinder; Concrete Pumps; Drills with Self Contained Power Units; Boring Machine; Post Hole Digger; Auger; Pounder;

Well Digger; Milling Machine (over 24" mandrel)

52.78 30.95 + a

Group 5 continued: Side Boom; Combination Hoe and Loader; Directional Driller, Geothermal Drill.

52.78 30.95 + a

Group 6: Front End Loader (3 up to 7 cubic yards); Bulldozer (rough grade dozer).

52.35 30.95 + a

Group 7: Asphalt Roller; Concrete Saws and Cutters (ride on types);

Vermeer Concrete Cutter; Stump Grinder; Scraper; Snooper; Skidder; Milling Machine (24" and under Mandrel)

51.89 30.95 + a

Group 8: Mechanic, Grease Truck Operator, Hydroblaster, Barrier Mover, Power Stone Spreader; Welder; Work Boat under 26 ft.; Transfer Machine, Rigger Foreman.

51.34 30.95 + a

Group 9: Front End Loader (under 3 cubic yards), Skid Steer Loader regardless of attachments (Bobcat or Similar); Fork Lift, Power Chipper;

Landscape Equipment (including hydroseeder), Vacuum Excavation Truck and Hydrovac Excavation Truck (27 HG pressure or greater).

50.74 30.95 + a

Group 10: Vibratory Hammer, Ice Machine, Diesel and Air Hammer, etc. 47.91 30.95 + a

Group 11: Conveyor, Earth Roller; Power Pavement Breaker (whiphammer), Robot Demolition Equipment.

47.91 30.95 + a

Group 12: Wellpoint Operator. 47.82 30.95 + a

Group 13: Compressor Battery Operator. 47.04 30.95 + a

Group 14: Elevator Operator; Tow Motor Operator (Solid Tire No Rough Terrain).

45.45 30.95 + a

Group 15: Generator Operator; Compressor Operator; Pump Operator;

Welding Machine Operator; Heater Operator.

44.89 30.95 + a

Group 16: Maintenance Engineer and Articulating End Dump. 43.99 30.95 + a

Group 17: Portable Asphalt Plant Operator; Portable Crusher Plant Operator;

Portable Concrete Plant Operator., Portable Grout Plant Operator, Portable Water Filtration Plant Operator.

49.95 30.95 + a

Group 18: Power Safety Boat; Vacuum Truck; Zim Mixer; Sweeper;

(minimum for any job requiring CDL license), Rigger, Signalman.

46.6 30.95 + a

Surveyor: Chief of Party 50.21 30.95 + a

Surveyor: Assistant Chief of Party 46.3 30.95 + a

Surveyor: Instrument Man 44.55 30.95 + a

Surveyor: Rodman or Chairman 38.34 30.95 + a

**NOTE: SEE BELOW

----LINE CONSTRUCTION----(Railroad Construction and Maintenance)----

20) Lineman, Cable Splicer, Technician 59.91 34.00

21) Heavy Equipment Operator 53.92 31.88

22) Equipment Operator, Tractor Trailer Driver, Material Men 50.92 30.84

23) Driver Groundmen 44.93 28.47

23a) Groundman Experienced 32.95 13.99

----OUTSIDE LINE CONSTRUCTION----

24) Driver Groundmen 43.78 28.42

25) Groundmen 32.1 13.95

26) Heavy Equipment Operators 52.53 31.83

27) Linemen, Cable Splicers, Dynamite Men 58.37 33.94

28) Material Men, Tractor Trailer Drivers, Equipment Operators 49.61 30.79

29) Technician 56.12 32.85

----COMMUNICATION----

Sales & Service Technician: To include but not limited to: Installation, Repair, Splicing and Maintenance

52.07 20.62

----DREDGING----

Class A1: Mechanical Dredge Operator 48.48 17.32+a+b

Class B1: Maintenance Engineer 41.93 16.87+a+b

Class C1: Mate/Welder 38.38 16.62+a+b

Class D: Deckhand 30.86 16.09+a+b

Welders: Rate for craft to which welding is incidental.

Surveyors: Hazardous material removal: $3.00 per hour premium.

*Note: Hazardous waste removal work receives additional $1.25 per hour for truck drivers.

**Note: Hazardous waste premium $3.00 per hour over classified rate.

Truck Drivers: Trainers Premium: $3.00 over wage rate.

Truck Drivers: Night Premium - Mixer Drivers: $2.00 over wage rate.

Crane with 150 ft. boom (including jib) - $1.50 extra

Crane with 200 ft. boom (including jib) - $2.50 extra

Crane with 250 ft. boom (including jib) - $5.00 extra

Crane with 300 ft. boom (including jib) - $7.00 extra

Crane with 400 ft. boom (including jib) - $10.00 extra

All classifications that indicate a percentage of the fringe benefits must be calculated at the percentage rate times the "base hourly rate".

Apprentices duly registered under the Commissioner of Labor's regulations on "Work Training Standards for Apprenticeship and Training Programs" Section 31-51-d-1 to 12, are allowed to be paid the appropriate percentage of the prevailing journeymen hourly base and the full fringe benefit rate, providing the work site ratio shall not be less than one full-time journeyperson instructing and supervising the work of each apprentice in a specific trade.

~~Connecticut General Statute Section 31-55a: Annual Adjustments to wage rates by contractors doing state work

The Prevailing wage rates applicable to this project are subject to annual adjustments each July 1st for the duration of the project.

Each contractor shall pay the annual adjusted prevailing wage rate that is in effect each July 1st, as posted by the Department of Labor.

It is the contractor's responsibility to obtain the annual adjusted prevailing wage rate increases directly from the Department of Labor's website.

The annual adjustments will be posted on the Department of Labor's Web page:

www.ct.gov/dol. For those without internet access, please contact the division listed below.

The Department of Labor will continue to issue the initial prevailing wage rate schedule to the Contracting Agency for the project.

All subsequent annual adjustments will be posted on our Web Site for contractor access.

Contracting Agencies are under no obligation pursuant to State labor law to pay any increase due to the annual adjustment provision.

Effective October 1, 2005 - Public Act 05-50: any person performing the work of any mechanic, laborer, or worker shall be paid prevailing wage

All Person who perform work ON SITE must be paid prevailing wage for the appropriate mechanic, laborer, or worker classification.

All certified payrolls must list the hours worked and wages paid to All Persons who perform work ON SITE regardless of their ownership i.e.: (Owners, Corporate Officers, LLC Members, Independent Contractors, et.

al)

Reporting and payment of wages is required regardless of any contractual relationship alleged to exist between the contractor and such person.

~~Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clause (29 CFR 5.5 (a) (1) (ii)).

Please direct any questions which you may have pertaining to classification of work and payment of prevailing wages to the Wage and Workplace Standards Division, telephone (860)263-6790.

0024-075-01

CONNECTICUT DEPARTMENT OF LABOR

WAGE AND WORKPLACE STANDARDS DIVISION

Sec. 31-60-1.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .