Specs_7-18-17.pdf

PDF 6 MB Posted

Attached to
FLNI_200729_Tower_of_Voices Federal contract opportunity
Solicitation number
P17PS00501
Issued by
Department of the Interior National Park Service National Office

About this file

Specs 7-18-17.pdf

View the file

Other files for this federal contract opportunity

Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FLIGHT 93 NATIONAL MEMORIAL

SOMERSET COUNTY, PA

SOLICITATION No. P17PS00501

TOWER OF VOICES

FLNI

PMIS NO. 200729B

PROJECT SPECIFICATIONS

NATIONAL PARK SERVICE

DENVER SERVICE CENTER

July, 2017

FLNI 200729B 00 10 10 - 1

TABLE OF CONTENTS

Section Section Title Pages

00 01 01 COVER

00 10 10 TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 SUMMARY OF WORK

01 26 01 CONTRACT MODIFICATION PROCEDURES

01 27 00 DEFINITION OF CONTRACT LINE ITEMS

01 31 00 PROJECT MANAGEMENT AND COORDINATION

01 32 16 CONSTRUCTION SCHEDULE

01 32 33 PHOTO DOCUMENTATION

01 33 23 SUBMITTAL PROCEDURES

01 33 23A SUBMITTAL LIST

01 35 23 SAFETY REQUIREMENTS

01 40 00 QUALITY REQUIREMENTS

STATEMENT OF STRUCTURAL TESTS AND SPECIAL INSPECTION

CMR DAILY DIARY 6

CONTRACTOR’S QUALITY CONTROL (CQC) DAILY REPORT 4

DAILY TEST REPORT INFORMATION SHEET 1

CQC ACCESSIBILITY INSPECTION REPORT 6

01 42 00 REFERENCES

01 50 00 TEMPORARY FACILITIES AND CONTROLS

01 57 19.12 NOISE AND ACOUSTICS MANAGEMENT

01 57 23 TEMPORARY STORM WATER POLLUTION PREVENTION

01 67 00 PRODUCT REQUIREMENTS

01 73 40 EXECUTION

01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

01 74 19A PROJECT WASTE MANAGEMENT PLAN WORKSHEET –

APPENDIX A

01 74 19B STANDARD SOLID WASTE CONVERSIONS

01 77 00 CLOSEOUT PROCEDURES

01 78 23 OPERATION AND MAINTENANCE DATA

01 79 00 DEMONSTRATION AND TRAINING

01 81 13 SUSTAINABLE DESIGN REQUIREMENTS FOR NON LEED

PROJECTS

01 95 00 CLOSEOUT AND OPERATION AND MAINTENANCE REQUIREMENT .. 1

DIVISION 02 - EXISTING CONDITIONS

NOT APPLICABLE

DIVISION 03 – CONCRETE

03 30 00 CAST-IN-PLACE CONCRETE

03 45 00 PRECAST ARCHITECTURAL CONCRETE

DIVISION 04 – MASONRY

NOT APPLICABLE

FLNI 200729B 00 10 10 - 2

DIVISION 05 – METALS

05 05 16 POWDER COATINGS

05 70 00 DECORATIVE METAL

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 20 13 EXTERIOR FINISH CARPENTRY

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 19 00 WATER-REPELLENT COATING

07 92 00 JOINT SEALERS

DIVISION 08

NOT APPLICABLE

DIVISION 09 - FINISHES

09 96 23 GRAFFITI-RESISTANT COATING

DIVISION 10 – SPECIALTIES

10 43 00 EXTERIOR SIGNAGE

DIVISION 11 – EQUIPMENT

11 62 16 WIND CHIMES

DIVISION 12 – FURNISHINGS

12 93 00 SITE FURNISHINGS

DIVISIONS 13 - 25

NOT APPLICABLE

DIVISION 26 – ELECTRICAL

26 05 19 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES

26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

26 05 33 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS

26 05 43 UNDERGROUND DUCTS AND RACEWAYS FOR ELECTRICAL

SYSTEMS

26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS

26 06 50.16 LIGHTING FIXTURE SCHEDULE

26 09 23 LIGHTING CONTROL DEVICES

26 24 16 PANELBOARDS

26 27 26 WIRING DEVICES

26 41 13 LIGHTNING PROTECTION FOR STRUCTURES

26 50 00 ARCHITECTURAL LIGHTING

DIVISION 27 – COMMUNICATIONS

27 01 01 VOICE AND DATA COMMUNICATIONS

DIVISIONS 28 - 30

NOT APPLICABLE

FLNI 200729B 00 10 10 - 3

DIVISION 31 – EARTHWORK

31 10 00 SITE CLEARING

31 20 00 EARTH MOVING

31 23 19 DEWATERING

31 63 33 DRILLED MICROPILES

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 12 16 ASPHALT PAVING

32 13 13 CONCRETE PAVING

32 13 73 CONCRETE PAVING JOINT SEALANTS

32 15 40 CRUSHED STONE SURFACING

32 17 23 PAVEMENT MARKINGS

32 91 13 SOIL PREPARATION

32 92 19 SEEDING

32 93 00 PLANTS

DIVISION 33 – UTILITIES

33 41 00 STORM UTILITY DRAINAGE PIPING

END OF TABLE OF CONTENTS

FLNI 200729B 01 11 00 - 1

SUMMARY OF WORK

SECTION 01 11 00 - SUMMARY OF WORK

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes the following:

1. Work covered by the Contract Documents.

2. Government Furnished Materials.

3. Contractor use of premises.

4. Public use of site.

5. Occupancy requirements for buildings.

6. Work Restrictions.

7. Special Construction Requirements.

8. Soils Investigation Report.

9. Additional Reports.

1.2 WORK COVERED BY CONTRACT DOCUMENTS

A. Project Location: The project is located within the Flight 93 National Memorial, which is in Somerset County, Pennsylvania, 20 miles northeast of Somerset and 15 miles west of Johnstown, off Highway 30. The project site is located adjacent to the park entrance.

B. The Work consists of the following:

1. The Work includes the construction of a new entry feature, a tower supporting wind chimes with associated landscape development.

2. The initial phase of this Project will be the construction of the Tower mound. Contractor is required to prepare the affected site area and construct the Tower mound fill as the first phase of the project. Construction of the Tower mound fill area will be required to be completed in the Fall of 2017 to allow the fill mound surcharge load to rest for several months prior to the construction of the remaining site improvements and tower construction to commence in the Spring of 2018. The time period for mound settlement monitoring is undetermined and will depend on measurements taken of settlement monitoring monuments and the apparent completion of settlement of the subgrade, as delineated via evaluation by the Contracting Officer. Prior to initiating any earth disturbance activities on the site, the required erosion and sedimentation control measures must be installed and properly maintained, refer to Erosion and Sedimentation Control Plan and Details.

a. Proper preparation of the subgrade and placement of the mound fill is critical and will be closely monitored. Refer to the attached "Geotechnical Engineering Investigation" report prepared by Garvin Boward Beitko dated September 9, 2016.

Contractor will have the option to utilize available stockpiled fill material located on the Flight 93 National Memorial site, or provide their own suitable fill/backfill material from an approved borrow site. The on-site soil stockpile is located near the Headquarters Building, approximately one mile from the Tower of Voices site.

Preliminary testing of the stockpile fill materials has revealed that it is suitable for use as fill, however, due to the fact that these soils contain concentrations of silts

FLNI 200729B 01 11 00 - 2

and clays, they are sensitive to moisture increases making them difficult or impossible to properly compact. Further, as the preliminary testing of the stockpiled materials was based on relatively surficial samples and is not considered conclusive or applicable to the entire volume of the stockpiles, the type, composition, character, water content, and suitability of the stockpiled materials will likely vary with excavation of them. Some stockpiled material may be deemed, classified or specified as unsuitable and shall not be used as fill or backfill by the Contractor. Use of the available stockpiled fill material is solely at the Contractor's risk, and shall be undertaken at no additional cost to NPS.

C. Project will be constructed under a single prime contract.

1.3 GOVERNMENT-FURNISHED MATERIALS

A. Government will furnish products indicated.

1. Government will arrange and pay for delivery of Government-furnished items according to Contractor’s Construction Schedule, unless noted.

2. After delivery, Government will inspect delivered items for damage. Contractor shall be present for and assist in Government’s inspection.

3. If Government-furnished items are damaged, defective or missing, Government will arrange for replacement.

4. Contractor is responsible for receiving, unloading and handling Government-furnished items at Project site.

5. Contractor shall be responsible for protecting Government-furnished items from damage during storage and handling, including damage from exposure to the elements.

6. If Government-furnished items are damaged as a result of Contractor’s operations, Contractor shall repair or replace them at his expense.

7. Contractor shall install and otherwise incorporate Government-furnished items into the

Work.

B. Government-Furnished Products:

1. Bollard and Tower light fixtures will be produced and delivered to the site by Musco

Lighting at no cost to the project. Immediately upon receipt of the fixtures, the Contractor will conduct a thorough inspection of the fixtures to verify their condition.

Damaged fixtures will be replaced by Musco Lighting at no cost to the project. Once satisfied that all fixtures are in good condition, the Contractor shall assume full responsibility for the fixtures including coordinating the timely delivery of the fixtures to the project site and the installation of all fixtures in the work.

2. Chime assemblies.

3. Topsoil where stockpiled in the Park. Contractor is responsible for transporting to the

Project site.

4. Fill where stockpiled in the Park. Contractor is responsible for transporting to the Project site.

1.4 CONTRACTOR USE OF SITE

A. General: Contractor shall have full use of the site for construction operations during the construction period. Contractor's use of the site is limited only by the Government's right to perform work or to retain other contractors on portions of Project.

FLNI 200729B 01 11 00 - 3

B. Storage of Materials: Confine storage of materials within construction area designated by the Contracting Officer and as indicated on site staging drawings.

C. Preservation of Natural Features:

1. Prevent damage to natural surroundings. Restore damaged areas, repairing or replacing damaged trees and plants, at no additional expense to the Government.

2. Provide temporary barriers to protect existing trees and plants and root zones.

3. Do not remove, injure, or destroy trees or other plants without prior approval. Consult with Contracting Officer and remove agreed-on roots and branches that interfere with construction. Tree removal is seasonally restricted between June 1 and July 31.

4. Do not fasten ropes, cables, or guys to existing trees.

5. Carefully supervise excavating, grading, filling, and other construction operations near trees to prevent damage.

6. Protect existing delineated wetlands from damage.

D. Driveways and Entrances: Keep driveways, access roads and entrances serving the site, clear and available to Government, Government's employees, designated Government consultants and emergency vehicles at all times. Do not use these areas for parking or storage of materials.

1. Schedule deliveries to minimize use of driveways and entrances.

2. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.

E. Construction Camp: Establishment of a camp within the park will not be permitted.

F. Hauling Restrictions: Comply with all legal load restrictions in the hauling of materials. Load restrictions on park roads are identical to the State of Pennsylvania Department of Transportation’s load restrictions with such additional regulations as may be imposed by the Park Superintendent. Information regarding rules and regulations for vehicular traffic on park roads may be obtained from the Office of the Park Superintendent. A special permit will not relieve Contractor of liability for damage which may result from moving of equipment.

G. Bonding: Contractor shall be responsible for obtaining all necessary bonds for state and local roads to cover any damage related to the use of these resulting from Contractor use. Bond shall comply with PA DOT requirements. Bond amount shall be $12,500/mile for paved roads.

Contractor shall determine any load restrictions on roadways anticipated to be used for the delivery of materials to the site and shall adhere to these load restrictions. Contractor shall video and document the condition of all anticipated delivery routes prior to the beginning of any work and provide a copy of this documentation to the governing agencies. Contractor shall be responsible for repair or damages resulting from use by construction equipment/vehicles during the project. Repairs will be performed to meet or exceed pre-construction conditions and completed to the satisfaction of the governing agency.

1.5 PUBLIC USE OF SITE

A. Contractor shall at all times conduct his operations to ensure the least inconvenience to the public. Road closures will be permitted, when required, upon specific approval of Contracting Officer. Submit request to Contracting Officer a minimum of 2 days prior to closure and specify location and duration of closure, after hours work, utility connections, noisy or otherwise Work that maybe potentially disruptive to the public and/or park operations.

FLNI 200729B 01 11 00 - 4

B. The Flight 93 National Memorial is and shall remain open and accessible to the public throughout construction.

1.6 WORK RESTRICTIONS

A. On-Site Work Hours: Work shall be generally performed during normal business working hours of 7:00 a.m. to 5:00 p.m., Monday through Friday, except when otherwise indicated.

1. Weekend Hours: Contractor shall coordinate with the Contracting Officer for required weekend work.

2. Early Morning Hours: Contractor shall coordinate with the Contracting Officer and Park

Superintendent for restrictions on early morning and noisy work.

3. Hours for core drilling and noisy activities: Contractor to coordinate with the

Contracting Officer for Park restrictions on noisy work.

B. Delivery hours: Contractor access to the site for both personal and delivery vehicles shall occur from Route 30 and the Park entry into the site. Delivery shall occur only between 7:00 a.m. to 9:00 a.m. or as otherwise approved in advance by the Contracting Officer.

C. Existing Utilities:

1. Notify Contracting Officer and utility companies of proposed locations and times for excavation.

2. Contractor shall be responsible for locating and preventing damage to known utilities. If damage occurs, repair utility at no additional expense to the Government.

3. If damage occurs to an unknown utility, repair utility. An equitable adjustment will be made in accordance with the Changes clause of the contract.

D. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Government or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated:

1. Notify Contracting Officer not less than 5 days in advance of proposed utility interruptions.

2. Do not proceed with utility interruptions without Contracting Officer’s written permission.

3. Hours for Utility Shutdowns: Coordinate with the Contracting Officer for Government’s restrictions when outages are allowed and the maximum length of time of outages.

4. Contractor shall contact PA One Call prior to all excavation or grading operations to identify any known underground utilities.

E. Non-smoking: Smoking is not permitted within the project site.

1.7 SPECIAL CONSTRUCTION REQUIREMENTS

A. Project Website: A project website administered by the NPS will be used for purposes of managing communication and documents during the construction stage.

1. See Section 01 31 00 “Project Management and Coordination” for requirements on using the Project Website.

FLNI 200729B 01 11 00 - 5

B. 9/11 Anniversary Events: Construction during these events will not be allowed 5 days prior and 2 days after the events. A groundbreaking ceremony is planned for September 10, 2017 and public access to the site and ceremony will be required.

1.8 SOILS INVESTIGATION REPORT

A. Copies of each of the following reports are included in the Contract Documents.

1. A soils investigation report entitled “Final Geotechnical Engineering Investigation, Proposed Tower of Voices Structure, Flight 93 National Memorial Improvements, Stoneycreek Township, Somerset County, Pennsylvania”, date September 9, 2016 has been prepared by Garvin Boward Bietko Engineering, Inc.

B. If conflicts occur between the report and Drawings or Specifications, the Drawings and Specifications govern.

1.9 ADDITIONAL REPORTS

A. Copies of each of the following reports are included in the Contract Documents.

1. “Post Construction Stormwater Management Report” as part of Chapter 102 NPDES

Permit Modification.

B. If conflicts occur between the report and Drawings or Specifications, the Drawings and Specifications govern.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 01 11 00

FLNI 200729B 01 26 01 - 1

CONTRACT MODIFICATION PROCEDURES

SECTION 01 26 01 - CONTRACT MODIFICATION PROCEDURES

PART 1 - GENERAL

1.1 SUMMARY

A. The work of this section consists of administrative and procedural requirements for contract modifications.

1.2 DEFINITIONS AND ALLOWANCES

A. Home Office Overhead: Those costs incurred in support of all of a contractor’s projects and not attributable to a specific job. The cost for home office overhead is only allowed as a percentage of all direct work excluding profit. The following items represent allowable home office overhead costs identified in Part 31 of the Federal Acquisition Regulation (FAR):

1. Rent.

2. Utilities.

3. Furnishings.

4. Office equipment.

5. Executive and management staff not exclusively assigned to the project.

6. Support, accounting, and administrative staff.

7. Preparation of cost proposals, estimating, and schedule analyses connected with

Modifications.

8. Estimating and preconstruction services.

9. Mortgage costs.

10. Real estate and corporate taxes.

11. Automobile maintenance and travel costs for home office personnel.

12. Home office insurances i.e. structure, automotive, umbrella, flood, etc.

13. Depreciation of equipment and other assets.

14. Home office supplies (paper, staples, etc.).

15. Legal services.

16. Accounting and data processing.

17. Professional fees/registration.

B. General Conditions (Field Office Overhead): Management and administrative costs incurred on site for the designated project. Costs associated with the preparation of modifications will not be allowed. The costs for these items are to be included only in the general conditions of the modification estimate. Only in the case of a contract time extension are additional general conditions included in modifications. The following items, if applicable, are considered allowable costs for calculating General Conditions:

1. Project Manager, Assistant Project Manager.

2. Superintendent, Assistant Superintendent.

3. Quality Control, Safety Officer, Environmental Manager, etc.

4. Engineers.

5. Travel, lodging, and per diem (as established by Federal Travel Regulations).

6. Scheduling.

7. Field Office Trailers and associated temporary utilities.

FLNI 200729B 01 26 01 - 2

8. Field office supplies.

a. Mailing and couriers.

b. Reproduction costs.

c. Storage.

d. Phones.

e. Computers.

f. Copiers.

9. Personal vehicles i.e. Superintendent Pickup trucks.

C. General Requirements: These are costs directly associated with the project and are necessary to perform the actual work of the modification. These costs shall be shown as direct costs in the estimate. The following items, if applicable, are considered allowable costs for calculating General Requirements:

1. Hoisting.

2. Material handling.

3. Temporary fencing.

4. Port-a-lets.

5. Trash removal, dumpsters.

6. Barricades.

7. Small tools.

8. Safety supplies.

9. Scaffolding.

10. Daily cleaning.

11. Traffic control.

12. Temporary signage.

13. Temporary heating and power.

D. Personnel Costs: Costs included in the modification must only be for General Conditions staff and workers actually present and working on the project site. Modification costs for salaried workers are only allowed within the structure of a 40 hour week and no overtime or holiday pay will be allowed.

1. Worker Hourly Rates are costs directly associated with the individual worker and consist of the following:

a. Base Rate: This is the hourly rate paid directly to the worker

b. Labor Burden: Employer payments of all applicable burdens, this includes insurance and taxes that the business must pay on behalf of the worker to government entities and educational forums , such as:

1) Social Security.

2) Medicare.

3) Workers Compensation– Policy and company calculation to be made available.

4) FUTA– Cap Rate and percentage to be proportionally allocated over one year.

5) SUTA– Cap Rate and percentage to be proportionally allocated over one year.

6) Union agreement costs – Other costs required under an enforceable collective bargaining agreement.

c. Fringe Benefits: Various non-wage compensations provided to employees such as:

1) Health Care Insurance Premiums.

2) Cell Phone.

3) Clothing.

FLNI 200729B 01 26 01 - 3

4) 401K and Pensions.

5) Vehicle allowances.

6) Gas allowance.

7) Life insurance premiums.

8) Disability insurance.

9) Other Fringe Benefits required under an enforceable collective bargaining agreement.

E. Bonuses or Deferred Compensation: No Bonus or Deferred Compensation will be allowed within any components of pricing including Home Office Overhead, General Conditions, General Requirements, Hourly Worker Rates, or the direct costs of work.

F. General Liability Insurance: An insurance policy that protects the contractor from claims resulting from bodily injury or property damage to a third party. Include this as a separate line item within all modification proposals and provide a current insurance quote upon request.

G. Performance and Payment Bonds: A performance bond is a surety bond issued by an insurance company or bank to guarantee satisfactory completion of a project. The Payment Bond guarantees that the contractor will pay the labor and material costs they have incurred. Banks and Insurance companies charge a premium for each individual project based on a sliding scale which relates to the size of the project. Include this as a separate line item in modification proposals and provide current company bonding rates upon request.

H. Builder’s Risk Insurance: This covers the contractor’s loss due to fire, high winds, or other natural forces. This is not reimbursed by the National Park Service (NPS) and shall not be included in modification proposals.

1.3 MODIFICATION PROPOSAL PRICING REQUIREMENTS

A. General:

1. Your proposal must be received in the format and within the time frame specified in the

Request for Proposal letter. Costs or delays resulting from failure of contractor to submit within the time frame specified will not be compensable.

2. The proposal must be detailed with itemized lists of equipment, materials, labor, production rates, overhead, profit, and bond markup for each item. Labor costs must be itemized by craft and hourly rate, including Fringe Benefits and Labor Burden. If the costs of Fringe Benefits and Labor Burden are not itemized, it is assumed that that they are included in the hourly rate shown, or contractor is not requesting reimbursement.

Contractor may utilize the government provided Contractor Estimate Form, or their own form, provided that it contains the same information and level of detail as the Gov’t provided form.

3. Requests for extensions of contract time as a result of this change must be justified with a Time Impact Analysis (TIA). Refer to Division 01 Specification, “Construction Schedule”, for time impact analysis requirements. TIA and associated costs must be received with the proposal by the date shown within the Request for Proposal letter.

Contractor’s failure to submit within the specified time frame will be construed as the Contractor waiving the right for additional time and no time extension will be allowed.

4. All supporting documentation used to justify the proposed modification will be made available to the Contracting Officer upon request.

FLNI 200729B 01 26 01 - 4

5. Contractor must review and approve all subcontractor/supplier pricing in detail for proper format, scope, production rates, and pricing prior to submission to the NPS. All delay costs associated with not reviewing and approving subcontractor/supplier pricing will be borne by the Contractor.

6. All pricing and production rates within the estimate must be based on fair and reasonable pricing and cannot include built-in contingency.

B. Labor:

1. Contractor shall estimate the cost of labor by itemizing each craft involved, indicating worker hourly rate (base rate + labor burden + fringe benefits) for each and itemizing the hours required for each craft that will be directly engaged in modification work. Any work proposed that will require overtime work or premium pay shall be itemized separately. All rates shall be in accordance with the Davis-Bacon Act as incorporated herein. Labor Burden may include payroll taxes, Social Security, unemployment insurances, workers compensation insurance, FICA, FUTA, and other direct costs resulting from Federal, State or local laws.

2. Itemize labor costs for equipment operators separate from equipment costs.

3. The labor cost for foremen shall only be costs for related work required for the modification.

C. Materials:

1. The estimated cost for materials shall include quotes from multiple sources. Material prices must include all applicable fees and credits, including but not limited to, sales tax, freight and delivery charges, and tax rebates.

2. No markup shall be applied to any material provided by the NPS.

D. Equipment:

1. Equipment used for the project must be appropriately sized for the work being performed.

2. Do not include costs for “miscellaneous tools and equipment”, in your proposal for a replacement value of $500 or less. Costs shown in excess of $500 must be broken out separately.

3. Regardless of ownership, the rates to be used in determining equipment rental costs shall be the lowest cost from one of the following sources:

a. U.S. Army Corps of Engineers , Ownership and Operating Expense Schedule (use latest edition and applicable region)

b. Construction Blue Book

c. Local equipment rental rates, documented by actual invoice charges, or itemized vendor quotes.

4. The estimated equipment rates shall include the operating costs of all fuel, oil, lubrication, supplies, small tools, necessary attachments, ground engaging components, tires & tracks, routine repairs and maintenance (cost of major repair and overhaul is not allowed per FAR 31.105(d)(2)), depreciation, storage, insurance, and all incidentals.

Mobilization, if applicable, may be included for equipment solely used on the modification work but must be listed separately.

5. Estimate the full rate for equipment only for the duration that the equipment will be utilized to accomplish the work of the modification.

6. Standby unit rates used are to be in accordance with paragraph 1.3, D, 2, above. If the US Army Corp of Engineers is utilized then their standby rates prevail. If Bluebook or local equipment pricing is accepted, then ½ of the equipment costs minus any operating costs, major repair and overhaul will be accepted.

FLNI 200729B 01 26 01 - 5

7. If equipment is in standby mode due solely to a documented NPS delay, the established standby rate shall apply from the first day of the delay.

8. Equipment that is not used and on the jobsite for up to five consecutive days may be classified at standby rates, provided that the equipment is or has been used solely to perform work on the modification and will be necessary to complete additional modification work. Equipment that is still on the jobsite but not in use after five consecutive days will not be considered in the modification pricing.

9. Requests for compensation for equipment stand by time must be justified, documented and itemized separately.

10. The estimated timeframe (daily, weekly, monthly) for use of the equipment must reflect the lowest cost to the Government.

E. Establishment and Application of Overhead and Profit Percentages:

1. Home Office Overhead and Profit (OH&P) shall be applied to direct costs only. Profit shall not be applied to overhead amounts; and overhead shall not be applied to profit.

Home office overhead shall contain only allowable, allocable, and reasonable costs per the contract documents and FAR Part 31. Profit percentages are based on risk factors found in FAR Part 31which have been applied to the specific type of work included in this project. Negotiated rates shall not exceed the following percentages for OH&P for Contractor self-performed work:

Overhead………………10%

Profit…………………6.75%

2. Total aggregate limit of markup (OH&P) for contractor and subcontractors on modification work shall not exceed 25%. The NPS will not be responsible for allocation of percentages between contractor and subcontractors at any tier.

3. If contractors form a partnership, than the partnership may only receive home office overhead and profit in the same amount as an individual contractor (refer to par 1.3,E,1 above). It is the responsibility of the partners to decide on the division of revenue.

4. Combined Increases and Decreases: On proposals involving both increases and decreases in the Contract Price, the overhead and profit mark-ups are required on the net increases and deducted on net decreases.

5. At no time can profit be calculated on Overhead or itself, it must be calculated on direct costs of work only.

PART 2 - PRODUCTS - NOT USED

PART 3 - EXECUTION - NOT USED

END OF SECTION 01 26 01

FLNI 200729B 01 27 00 - 1

DEFINITION OF CONTRACT LINE ITEMS

SECTION 01 27 00 – DEFINITION OF CONTRACT LINE ITEMS

PART 1 - GENERAL

1.1 SUMMARY

A. The intent of this section is to explain, in general, what is and what is not included in a contract line item, and the limits or cut-off points where one item ends and another begins.

B. If no contract line item exists for a portion of the work, include the costs in a related item.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION

3.1 LIST OF CONTRACT LINE ITEMS

A. CONTRACT LINE ITEM NO. 0001: Tower of Voices and Sitework exclusive of Government furnished light fixtures and chime assembly.

1. This item consists of all earthwork, and site improvement within the Limit of Work as shown.

2. This item consists of the construction of site infrastructure including site electrical and storm utilities drainage piping.

3. This item consists of all planting and seeding required for erosion and sediment control.

4. This item includes obtaining and paying for all utility permits, fees, and inspections, whether temporary or permanent. General Contractor is responsible to include in the bid amount any costs associated with work by Utility Companies. Coordinate as required with the designated utility company scope of work.

5. No separate measurement of quantities shall be made. Payment shall be made at the contract lump sum price.

B. CONTRACT LINE ITEM NO. 0002: Option 1, Crushed stone path.

1. This item consists of the construction of the pedestrian trail as indicated.

2. No separate measurement of quantities shall be made. Payment shall be made at the contract unit price.

C. CONTRACT LINE ITEM NO. 0003: Option 2A, Additional Plants - Pinus Strobus.

1. This item consists of the incorporation of shrubs as indicated.

2. This item consists of plant warranty, maintenance, and temporary watering for the landscaping within this Bid Option.

3. No separate measurement of quantities shall be made. Payment shall be made at the contract unit price.

D. CONTRACT LINE ITEM NO. 0004: Option 2B, Additional Plants - Crataegus Cirus-Galli.

1. This item consists of the incorporation of shrubs as indicated.

FLNI 200729B 01 27 00 - 2

DEFINITION OF CONTRACT LINE ITEMS

2. This item consists of plant warranty, maintenance, and temporary watering for the landscaping within this Bid Option.

3. No separate measurement of quantities shall be made. Payment shall be made at the contract unit price.

E. CONTRACT LINE ITEM NO. 0005: Option 2C, Additional Plants - Cercis Canadensis, Multi.

1. This item consists of the incorporation of shrubs as indicated.

2. This item consists of plant warranty, maintenance, and temporary watering for the landscaping within this Bid Option.

3. No separate measurement of quantities shall be made. Payment shall be made at the contract unit price.

F. CONTRACT LINE ITEM NO. 0006: Option 2D, Additional Plants - Amelanchier Laevis, Multi.

1. This item consists of the incorporation of shrubs as indicated.

2. This item consists of plant warranty, maintenance, and temporary watering for the landscaping within this Bid Option.

3. No separate measurement of quantities shall be made. Payment shall be made at the contract lump sum price.

G. CONTRACT LINE ITEM NO. 0007: Option 3, Security camera system and fiber optic line in trench to the Park Headquarters.

1. This item consists of the installation of the security camera system and buried fiber optic line and equipment.

2. No separate measurement of quantities shall be made. Payment shall be made at the contract lump sum price.

END OF SECTION 01 27 00

FLNI 200729B 01 31 00 - 1

PROJECT MANAGEMENT AND COORDINATION

SECTION 01 31 00 – PROJECT MANAGEMENT AND COORDINATION

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

1. Construction Coordination.

2. Coordination Drawings.

3. Requests for Information (RFIs).

4. NPS/DSC SharePoint Project Website.

5. Project meetings.

6. Environmental Coordination.

B. Related Requirements:

1. Section 01 32 16 “Construction Schedule” for preparing and submitting Contractor’s construction schedule.

2. Section 01 73 40 “Execution” for procedures for coordinating general installation and field-engineering services, including establishment of benchmarks and control points.

3. Section 01 77 00 “Closeout Procedures” for coordinating closeout of the Contract.

1.2 CONSTRUCTION COORDINATION

A. Coordination: Coordinate construction operations included in different Sections of the Specifications to ensure efficient and orderly installation of each part of the Work. Coordinate construction operations, included in different Sections, which depend on each other for proper installation, connection, and operation.

1. Schedule construction operations in sequence required to obtain the best results where installation of one part of the Work depends on installation of other components, before or after its own installation.

2. Coordinate installation of different components with other Contractors to ensure maximum accessibility for required maintenance, service, and repair.

3. Make adequate provisions to accommodate items scheduled for later installation.

4. Where availability of space is limited, coordinate installation of different components to ensure maximum performance and accessibility for required maintenance, service, and repair of all components, including mechanical and electrical.

B. Prepare memoranda for distribution to each party involved, outlining special procedures required for coordination. Include such items as required notices, reports, and list of attendees at meetings.

C. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities and activities of other contractors to avoid conflicts and to ensure orderly progress of the Work. Such administrative activities include, but are not limited to, the following:

1. Preparation of Contractor's Construction Schedule.

FLNI 200729B 01 31 00 - 2

2. Preparation of the Schedule of Values.

3. Installation and removal of temporary facilities and controls.

4. Delivery and processing of submittals.

5. Progress meetings.

6. Pre-installation conferences.

7. Project closeout activities.

8. Commissioning activities.

1.3 ACTION SUBMITTALS

A. Coordination Drawings: Prepare Coordination Drawings if limited space availability necessitates maximum utilization of space for efficient installation of different components or if coordination is required for installation of products and materials fabricated by separate entities.

1. Content: Project-specific information, drawn accurately to scale. Do not base

Coordination Drawings on reproductions of the Contract Documents or standard printed data. Include the following information, as applicable:

a. Indicate functional and spatial relationships of components of architectural, structural, civil, mechanical, and electrical systems.

b. Indicate dimensions shown on the Contract Drawings and make specific note of dimensions that appear to be in conflict with submitted equipment and minimum clearance requirements. Provide alternate sketches to the Contracting Officer (CO) for resolution of such conflicts.

c. Indicate space requirements for routine maintenance and for anticipated replacement of components during the life of the installation.

d. Show location and size of access doors required for access to concealed dampers, valves, and other controls.

e. Indicate required installation sequences.

2. Sheet Size: At least 11 in. x 17 in. but no larger than 30 by 40 inches.

3. Number of Copies: Submit 5 opaque copies of each submittal. Contracting Officer will return 2.

4. Refer to individual Sections for Coordination Drawing requirements for Work in those

Section

B. Coordination Drawing Organization: Organize coordination drawings as follows:

1. Floor Plans: Show architectural and structural elements, plumbing, and electrical Work.

Supplement plan drawings with section drawings where required to adequately represent the Work.

2. Structural Penetrations: Indicate penetrations and openings required.

3. Embedded Items: Indicate locations of embedded items for precast concrete units, sleeves, anchor bolts, bearing platesand similar items.

4. Plumbing Work:

a. Show the following:

1) Sizes of piping, and conduit runs.

2) Dimensions of major components, such as valves and other equipment.

5. Electrical Work:

a. Show the following:

1) Runs of vertical and horizontal conduit 1-1/4 inches in diameter and larger.

2) Light fixture locations.

FLNI 200729B 01 31 00 - 3

3) Panel board, switch board, switchgear, transformer, busway, generator, and motor control center locations.

4) Location of junction boxes, dimensioned from column center lines.

6. Review: Contracting Officer (CO) will review coordination drawings to confirm that the

Work is being coordinated, but not for the details of the coordination, which are Contractor's responsibility. If CO determines that coordination drawings are not being prepared in sufficient scope or detail, or are otherwise deficient, CO will so inform Contractor, who shall make changes as directed and resubmit.

7. Coordination Drawing Prints: Prepare coordination drawing prints according to requirements in Section 01 33 23 "Submittal Procedures."

C. Coordination Digital Data Files: Prepare coordination digital data files according to the following requirements:

1. File Preparation Format: Same digital data software program, version, and operating system as original Drawings.

2. File Preparation Format: AutoCad.dwg, Version 14 or higher, operating in Microsoft

Windows operating system.

3. File Submittal Format: Submit or post coordination drawing files using Portable

Document Format (PDF) file format.

4. Contracting Officer (CO) will furnish Contractor one set of digital data files

(AutoCad.dwg) of Drawings for use in preparing coordination digital data files.

a. CO makes no representations as to the accuracy or completeness of digital data files as they relate to Drawings.

b. Digital Data Software Program: Drawings are available in AutoCad.dwg.

D. Division 01 documents: The following items shall be submitted a minimum of one week prior to the Preconstruction Conference. Contracting Officer will notify Contractor of tentative date for the Pre-Construction Conference.

1. Letter designating Project Superintendent.

2. Construction Schedule.

3. A comprehensive breakdown of the Schedule of Values.

4. Accident Prevention Plan.

5. A list of Subcontractors for this project.

6. Written statements from subcontractors certifying compliance with applicable labor standard clauses.

7. Satisfactory evidence of liability insurance coverage and workman’s compensation for the Contactor and all subcontractors.

8. Waste Management Plan.

9. Quality Control Plan.

10. Storm Water Pollution Prevention Plan.

11. Contractors Commissioning Plan.

E. All items listed must be provided to the Contracting Officer before the Pre-Construction Conference is held. If all of these documents have not been received one week prior to the scheduled Pre-Construction Conference date, the conference will be cancelled, Notice to Proceed will not be issued, and the Contracting Officer will consider other contractual remedies.

Work shall not commence until written Notice to Proceed has been issued.

FLNI 200729B 01 31 00 - 4

1.4 REQUESTS FOR INFORMATION (RFIs)

A. General: Immediately on discovery of the need for additional information or interpretation of the Contract Documents, Contractor shall prepare and submit an RFI utilizing the form created on the NPS/DSC SharePoint Project website.

1. CO will not respond to RFIs submitted by other entities controlled by Contractor.

2. Coordinate and submit RFIs in a prompt manner to avoid delays in the work.

B. Content of the RFI: Include a detailed, legible description of item needing information or interpretation and the following:

1. RFI number, numbered sequentially.

2. Date.

3. RFI subject.

4. Specification Section number and title and related paragraphs, as appropriate.

5. Drawing number and detail references, as appropriate.

6. Field dimensions and conditions, as appropriate.

7. Contractor's suggested resolution. If Contractor's suggested resolution impacts the

Contract Time or the Contract Sum, Contractor shall state impact in the RFI.

8. Contractor's signature.

9. Requested date for response.

10. Attachments: Include sketches, descriptions, measurements, photos, Product Data, Shop

Drawings, coordination drawings, and other information necessary to fully describe items needing interpretation.

a. Include dimensions, thicknesses, structural grid references, and details of affected materials, assemblies, and attachments on attached sketches.

C. RFI Form:

1. Complete the RFI Form on the NPS/DSC SharePoint website as follows:

a. Enter the general information at the top of the form.

b. Under the “Action” section at the bottom of the form, select “Question” then select

“CMR” in the drop-down of the “Send to” box.

c. Enter the details of the question and attach related documents.

d. Select “Submit Form” at the bottom of the page.

D. Contracting Officer’s Action: CO will review each RFI, determine action required, and respond. CO will determine the critical nature of each RFI and issue a response accordingly.

1. The following are not considered to be RFIs and will receive no action:

a. Requests for approval of submittals.

b. Requests for approval of substitutions.

c. Requests for approval of Contractor's means and methods.

d. Requests for coordination information already indicated in the Contract

Documents.

e. Requests for adjustments in the Contract Time or the Contract Sum.

f. Incomplete RFIs or inaccurately prepared RFIs.

2. CO's action may include a request for additional information, in which case time for response will date from time of receipt of additional information.

3. CO's action on RFIs may result in the need for a change to the Contract Time or the Contract Sum. All contract changes will be processed following the terms and conditions of the contract.

FLNI 200729B 01 31 00 - 5

1.5 PROJECT WEB SITE

A. Use the NPS/DSC SharePoint Project website for communication throughout the contract period. The NPS/DSC SharePoint Project website will be used for the following functions:

1. Project directory.

2. Project correspondence.

3. Meeting agendas and minutes.

4. Contract modifications forms and logs.

5. RFI form and processing.

6. Task and issue management.

7. Photo documentation.

8. Baseline schedule, schedule updates and calendar management.

9. Submittal form and processing.

10. Payment coordination documentation.

11. Drawing and specification document hosting, viewing, and updating.

12. Online document collaboration.

13. Reminder and tracking functions.

14. Archiving functions.

15. Notification of submittal and RFI statuses and current responsible party.

B. Some documents however are not suitable to be shared using the NPS/DSC SharePoint Project website. Documents containing Personal Identifying Information (PII) (i.e. certified payrolls) shall not be shared using the NPS/DSC SharePoint Project website and shall be coordinated with the SharePoint Project team as appropriate.

C. Submit to the CO a list of all employees who will need access to the website. The users will receive an invitation to register from the Department of Interior (DOI). Once the user is registered on the DOI website, they will be given access to the NPS/DSC SharePoint Project website. For login procedures and other SharePoint information, refer to the Workflows website at http://www.nps.gov/dscw/precon_spproj.htm.

D. All users will be required to have the following software packages:

1. Internet Explorer version 7 or later.

2. Adobe Acrobat Professional (Pro) version 9 or later

1.6 PROJECT MEETINGS

A. Preconstruction Conference: Before start of construction, Contracting Officer will arrange an on-site meeting with Contractor. The meeting agenda will include the following as a minimum:

1. Roles & Responsibilities/ Lines of Authority.

2. Park rules and regulations.

3. Jobsite Safety.

4. Resolution of comments on required Division 01 documents.

5. Coordination of Subcontractors.

6. Labor law application.

7. Modifications.

8. Payments to Contractor.

9. Payroll reports.

10. Contract time.

http://www.nps.gov/dscw/precon_spproj.htm

FLNI 200729B 01 31 00 - 6

11. Display of Hotline posters.

12. Notice to proceed.

13. Correspondence procedures.

14. NPS/DSC SharePoint Project website.

15. Acceptance/rejection of work.

16. Progress meetings.

17. Submittal procedures.

18. NPS Final Accessibility Inspection.

19. Environmental requirements.

20. As-constructed drawings/operation and maintenance (O&M) manuals.

21. Saturday, Sunday, holiday and night work.

22. Reference materials.

23. Value engineering.

24. CQC accessibility inspection of work segments.

25. Schedule of Values.

B. Progress Meetings: The Contracting Officer will schedule weekly meetings with the Contractor.

1. Attendees: In addition to Government Representatives, each Contractor, Subcontractor, supplier, and other entity concerned with current progress or involved in planning, coordination, or performance of future activities shall be represented at these meetings.

All participants at the meeting shall be familiar with the Project and authorized to conclude matters relating to the Work.

2. Agenda: Review and correct or approve minutes of previous progress meeting. Review other items of significance that could affect progress. The meeting agenda will include the following:

a. Approval of minutes of previous meetings.

b. Submittal status.

c. Review of off-site fabrication and delivery schedules.

d. Requests for information (RFI) and other issues.

e. Modifications.

f. Work in progress and projected.

1) Status of required inspections (Special Inspections, Accessibility, etc.)

g. Inspections of work in progress and projected (Special inspections,

h. Construction Schedule update (provide updated CPM).

i. Status of Project Record Drawings and O&M manuals.

j. Other business relating to work.

3. Construction Manager Representative will be responsible for creating accurate minutes and distributing to all members.

C. Preinstallation Conferences: Contractor shall conduct and record the preinstallation conference at Project site before each construction activity that requires coordination with other construction.

1. Attendees: Installer and representatives of manufacturers and fabricators involved in or affected by the installation and its coordination or integration with other materials and installations that have preceded or will follow, shall attend the meeting. Advise Contracting Officer of scheduled meeting dates.

2. Agenda: Review progress of other construction activities and preparations for the particular activity under consideration, including requirements for the following:

a. Contract Documents.

FLNI 200729B 01 31 00 - 7

b. Options.

c. Related RFIs.

d. Related Change Orders.

e. Purchases.

f. Deliveries.

g. Submittals.

h. Review of mockups.

i. Possible conflicts.

j. Compatibility requirements.

k. Time schedules.

l. Weather limitations.

m. Manufacturer's written instructions.

n. Warranty requirements.

o. Compatibility of materials.

p. Acceptability of substrates.

q. Temporary facilities and controls.

r. Space and access limitations.

s. Regulations of authorities having jurisdiction.

t. Testing and inspecting requirements.

u. Installation procedures.

v. Coordination with other work.

w. Required performance results.

x. Protection of adjacent work.

y. Protection of construction and personnel.

z. Accessibility Inspection Report Responsibility.

3. Contractor shall record significant conference discussions, agreements, and disagreements, including required corrective measures and actions.

4. Reporting: Distribute and post on SharePoint, minutes of the meeting to each party present and to other parties requiring information.

5. Do not proceed with installation if the conference cannot be successfully concluded.

Initiate whatever actions are necessary to resolve impediments to performance of the Work and reconvene the conference at earliest feasible date.

1.7 ENVIRONMENTAL COORDINATION

A. Contractor’s Environmental Manager: Designate an on-site party responsible for overseeing the Contractor’s conformance to environmental goals for the project and implementing procedures for environmental protection.

1. Qualifications: Construction experience on projects of similar size and scope; with environmental procedures similar to those of this project; familiarity with Environmental Management Systems (EMSs) such as ISO 14001; familiar with Pennsylvania Department of Environmental Protection requirements and the local conservation district;

must be familiar with environmental regulations applicable to construction operations.

2. Responsibilities: Responsibilities shall include:

a. Compliance with applicable Federal, State, and local environmental regulations, including maintaining required documentation.

b. Implementation of the Waste Management Plan (WMP).

c. Implementation of the Storm Water Pollution Prevention Plan (SWPPP).

d. Present an overview of environmental issues and summarize site specific procedures relating to management plans at the Preconstruction conference.

FLNI 200729B 01 31 00 - 8

e. Training for Contractor personnel in accordance with their position requirements.

f. Monitoring and documentation of environmental procedures.

B. Perform project quality control in accordance with requirements specified in Related Sections, including:

1. Quality…