Replace windows on historic visitor center, Stehekin WA Federal contract opportunity
Solicitation number
P16PS01997
Issued by
Department of the Interior National Park Service

About this file

P16PS01997

View the file

Other files for this federal contract opportunity

Other files attached to Replace windows on historic visitor center, Stehekin WA, newest first.
File Type Posted
Attachment_6_Product_Cutsheets.pdf PDF
P16PS01997_Amendment_3.pdf PDF
Sol_P16PS01997_Amd_000002.pdf PDF
Attachment_5_Amendment_2_clarifications.pdf PDF
Sol_P16PS01997_Amd_000001.pdf PDF
Attachment_4_Site_Visit_notes.pdf PDF
Attachment_1_Specifications.pdf PDF
Attachment_3_Wage_Determination_WA31.pdf PDF
Attachment_2_Drawings_215.06.01_100__CD_stamped.pdf PDF
forms_to_return_with_offer.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

National Park Service U.S. Department of the Interior

North Cascades National Park Service Complex

810 State Route 20 Sedro-Woolley WA 98284

360-854-7200 phone 360-856-1934 fax

Replace windows in historic visitor center, North Cascades NPS Complex, Stehekin WA

P16PS01997

This document reiterates and emphasizes information in the Request for Proposals (RFP) (SF1442 plus Sections B through M) and is provided solely for the convenience of prospective offerors.

Refer to the RFP for detailed requirements.

Who can participate in this procurement?

This procurement is set-aside for eligible women-owned small business (WOSB) concerns in accordance with FAR Part 19.15. The NAICS code is 236220, Commercial and Institutional Building Construction. To qualify as a small business under this NAICS code, the firm must be organized as for-profit, with average annual gross revenue for the past three years under $36.5 million. The prime WOSB contractor will be subject to the limitations on subcontracting requirements of FAR clause 52.219-30.

What is the estimated value?

In accordance with FAR 36.204, the estimated magnitude of this construction project is between $100,000 and $250,000 for the base items and multiple options (note that if all options are exercised, the value may exceed $250,000). Options may be exercised in any combination, order, or grouping deemed in the judgment of the Contracting Officer to offer the best value based on the availability of funds.

Will there be a pre-proposal site visit?

A site visit will be held on Thursday, July 28, 2016, at 11:15 am. Prospective offerors will need to obtain transportation to and from Stehekin; there are commercial boat (ladyofthelake.com) and plane (chelanairways.com) services. The Lady Express boat arrives at Stehekin at 11:00; if the boat arrives late at Stehekin, we will begin the meeting approximately 15 minutes after arrival. We recommend returning to Chelan on the Lady of the Lake II, which departs Stehekin at 2:00. Attendance at the site visit is strongly encouraged so that prospective offerors gain a good understanding of the logistical challenges of this site.

What types of bonds and insurance will be required?

Bid bond (offer guarantee; FAR clause 52.228-1): 20% of offered price.

Performance bond (FAR clause 52.228-15): 100% of awarded price.

Payment bond (FAR clause 52.228-15): 100% of awarded price.

Liability and worker’s compensation insurance (FAR clause 52.228-5): Refer to RFP Section I.

On what basis will you select the successful Offeror?

NPS will select the offer that represents the best value based on price, technical, and past performance factors. The specific evaluation factors are stated in Section M of the RFP. Review the proposal preparation instructions and list of offer contents in Section L before submitting your proposal.

What type of contract will be issued?

All work will be performed under a single firm-fixed-price construction contract subject to the Construction Wage Rate Requirements in FAR Part 22.4.

System for Award Management (SAM) Registration Requirements The System for Award Management (SAM) is an official U.S. Government database of entities wishing to do business with the federal government. There is NO fee to register at this site. Prior to the solicitation closing date, all offerors must establish and/or maintain an active registration and complete the online representations and certifications at www.SAM.gov.

Where and how do I submit my offer?

Your offer will have three components: technical information, offer and business information, and offer guarantee (bid bond). The technical information and offer must be submitted electronically, while the offer guarantee (bid bond; original, signed, on paper SF-24) must be delivered to the Contracting Officer. Refer to Section L for detailed instructions, including mailing and e-mailing addresses, and acceptable electronic file types and size limitations. Proposals transmitted on paper are not authorized and will not be considered.

When is my offer due?

Unless changed by amendment, your proposal is due by the date and time specified in Item 13 of the Standard Form 1442, Solicitation, Offer, and Award. If the offer due date is extended, the new due date and time will be stated in the associated amendment. Refer to FAR clause 52.215-1. In order for a proposal to be considered timely, all three components listed above must be received prior to the closing date and time.

How will I know if the solicitation has changed?

The official electronic Request for Proposals (RFP) is posted at www.FBO.gov. Prospective offerors will be required to visit this website periodically to check for amendments and other changes to the contract documents; no other notifications will be sent. No hard copies of the solicitation will be mailed or issued. The Government reserves the right to cancel this solicitation.

Information Concerning the Disclosure of Results This acquisition is being conducted under the provisions of FAR Part 15 as a negotiated procurement.

In accordance with FAR 3.104 and FAR 15.207, after receipt of proposals, no information regarding the identity of those submitting offers, the number of offers received, or the information contained in such offers will made available until after award except as provided by FAR 15.503.

How can I get more information?

Read the full Request for Proposals and related attachments first. If you have questions, send an e-mail message to the Contracting Officer at sarah_welch@nps.gov. The Contracting Officer's mailing address is North Cascades NPS Complex, 810 State Route 20, Sedro-Woolley WA 98284. Answers will be provided in writing to the requester (if the answer is within the RFP already) or provided in amendment(s) to the solicitation posted at www.FBO.gov.

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

0040282595

NPS, PWR - OLYM MABO

600 E. Park Avenue

Port Angeles WA 98362-6757

PPY

Submit offers electronically per instructions in Section L.

Sarah Welch (360) 854-7220

157311 x 07/22/2016

P16PS01997

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

Request for Proposals #P16PS01997 is to improve energy efficiency of a historic visitor center of North Cascades NPS Complex, Stehekin WA, in accordance with the attached specifications, drawings, and wage determination. The work includes replacing windows on the second and third floors plus options for additional work on first floor windows and doors. The contractor shall provide all labor, supervision, materials, equipment, insurance, bonds, and transportation required to complete the project.

This is a best value procurement set-aside for eligible women-owned small business concerns in accordance with FAR Part 19.15. The NAICS code for this project is

236220 and the small business size standard is $36.5 million, average annual gross receipts for the past three years. All work will be performed under a single firm-fixed-price construction contract subject to the Davis-Bacon Act. In accordance with FAR 36.204, the estimated magnitude of this construction project is between $100,000 and $250,000 for the base and multiple options (note that if all options are exercised, the value may exceed $250,000).

11. The Contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

10 240 calendar days and complete it within ________________ ________________ calendar days after receiving

Section F.

08/25/2016

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

DOI, NPS, PWR - OLYM MABO - NOCA

810 State Route 20

Sedro-Woolley WA 98284-1263

PY1

Sarah Welch

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

STANDARD FORM 1442 (REV. 4-85) BACK

Continued...

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 26

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

P16PS01997

FOB: Destination

Period of Performance: 09/15/2016 to 05/19/2017

00010 COMPLETE PRICE SCHEDULE IN SECTION B.

This action is for the federal government and is thus exempt from state sales tax (#140001849).

Contracting Officer: sarah_welch@nps.gov;

360-854-7220.

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

RFP #P16PS01997: Replace GWVC windows (157311) North Cascades NPS Complex

SECTION B: Price Schedule

INSTRUCTIONS

On lump-sum-priced line items, provide the total price only. If no specific line item exists for a portion of the work, include the costs in a related item. In case of errors in summations, the total of the corrected amounts govern. Round totals and extended prices to whole dollars.

CONTRACT PRICE SCHEDULE

All work shall be performed in accordance with the attached Statement of Work (SOW), drawings, and wage determination. All lines are “lump sum”.

Refer to Section 012700 of the Specifications for line item definitions.

The Government will award either Line Item 1 or Alternate Item 1, not both.

LINE ITEM 1: Replace windows on second and third floors with manufactured (Loewen) windows

ALTERNATE ITEM 1: Replace windows on second and third floors with custom windows

The Government reserves the right to unilaterally award any or no options at or after time of award. Options may be exercised in any combination, order, or grouping deemed in the judgment of the Contracting Officer to offer the best value based on the availability of funds. The Government has determined that the period for exercising options at the proposed price shall extend 120 calendar days from award of the base contract. Refer to FAR clause 52.217-5, Evaluation of Options.

OPTION A: First floor wood window rehabilitation $__________________

OPTION B: Main entrance door repairs $__________________

OPTION C: Door replacement and automatic door operator $__________________

OPTION D: Custom wood sash interior storm windows for first floor $__________________

OPTION E: Premanufactured vinyl interior storm windows for first floor $__________________

OPTION F: Spring bronze weather stripping for first floor windows $__________________

Business name: _____________________________________ Phone number: ____________________

DUNS number: _____________________________________ and CAGE code: __________________

Point of contact name: ______________________________ and e-mail: __________________________

My business is registered in SAM __yes __no (check one);

we are currently an eligible women-owned small business concern __yes __no (check one); and our VETS reporting is current __yes __no (check one).

Proposal instructions: Complete this page and return with other documents described in Section L.

SECTION C: Description/Specifications Attachments 1, Specifications, and Attachment 2, Construction Drawings, are attached herein and incorporated into this solicitation/contract, as shown in Section J.

SECTION D: Packaging and Marking (not used)

SECTION E: Inspection and Acceptance

52.246-12 Inspection of Construction. (AUG 1996)

52.246-13 Inspection—Dismantling, Demolition, or Removal of Improvements (AUG 1996)

SECTION F: Deliveries or Performance

52.211-18 Variation in Estimated Quantity. (APR 1984)

52.242-14 Suspension of Work. (APR 1984)

52.211-10 Commencement, Prosecution, and Completion of Work. (APR 1984) The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 240 calendar days after receiving the notice to proceed. The time stated for completion shall include final cleanup of the premises.

Seasonal Break in Contract Performance Although we do not intend to suspend work during contract performance, seasonal weather conditions may restrict or prohibit normal contract activities. The Contractor’s construction schedule should take into account historic weather patterns when planning the work sequence. If the Contractor elects to temporarily stop work, they must inform the Contracting Officer and COR at least one week prior to the stoppage and at least one week notice prior to the planned resumption of work. Refer to Construction Schedule section in Statement of Work.

SECTION G: Contract Administration Data

1452.201-70 AUTHORITIES AND DELEGATIONS (SEPT 2011)

(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.

(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award. The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.

(c) The COR is not authorized to perform, formally or informally, any of the following actions:

(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of

52.252-2 Clauses Incorporated By Reference (Feb 1998) This RFP and resulting contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses: https://www.acquisition.gov/?q=browsefar and http://www.ecfr.gov/cgi-bin/text-idx?SID=e3fdab2f32e71039c0f3823dcff65823&tpl=/ecfrbrowse/Title48/48chapter14.tpl https://www.acquisition.gov/?q=browsefar intent that changes or may change this contract;

(2) Waive or agree to modification of the delivery schedule;

(3) Make any final decision on any contract matter subject to the Disputes Clause;

(4) Terminate, for any reason, the Contractor's right to proceed;

(5) Obligate in any way, the payment of money by the Government.

(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum.

The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.

(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.

(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR.

(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.

G.1 APPOINTMENT OF CONTRACTOR REPRESENTATIVE / SUPERINTENDENT

Prior to commencement of work on this contract, the contractor shall provide to the Contracting Officer and COR the name and telephone number of at least one responsible individual who will serve to respond to operational problems and/or emergencies on a daily basis. The contractor agrees that notice to the designated representative shall constitute notice to the contractor and agrees to be bound by any commitments or representations made by the representative.

G.2 ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS - INTERNET PAYMENT

PLATFORM (IPP) (April 2013) Payment requests must be submitted electronically through the U.S. Department of the Treasury's Internet Payment Platform System (IPP; https://www.ipp.gov).

"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions- Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.

Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice (upload your business invoice as an attachment to the IPP invoice before you click “submit” in IPP):

1. Contractor’s standard business invoice,

2. Signed certification required by FAR clause 52.232-5,

3. Schedule of values for work being invoiced, and

4. If submitting a final invoice, also attach a signed copy of the Release of Claims form.

Contractor’s failure to attach the required documentation as specified above will result in the IPP invoice being rejected, and cause a delay in payment.

The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in www.SAM.gov record) will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) prior to contract award or within 3 - 5 business days after the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email ippgroup@bos.frb.org or phone (866) 973-3131.

If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.

G.3 CONTRACTOR PERFORMANCE ASSESSMENT

The Contracting Officer may enter a formal evaluation of the contractor’s performance in the Contractor Performance Assessment Reporting System (CPARS) although the expected value of the contract is below the mandatory reporting threshold. If a CPARS report is created, the Contractor will have the opportunity to review and comment on the Government’s performance ratings before they are finalized and used in future government source selections.

SECTION H: SPECIAL CONTRACT REQUIREMENTS

H.1 Wage Determination Attachment 3, U.S. Department of Labor General Wage Decision no. WA160031 (Chelan County, WA), is incorporated into this solicitation/contract, as shown in Section J.

H.2 Personnel and Subcontracting Requirements In connection with this contract, any in-house key personnel, subcontractors, associates, and consultants will be limited to individuals or firms that were specifically identified in the Contractor's accepted proposal. The Contractor shall obtain the Contracting Officer's written consent before making any substitution for these designated in-house key personnel, subcontractors, associates, or consultants. If the Contractor proposes a substitution, it shall submit the same type of information that was submitted in the accepted proposal to the Contracting Officer for evaluation and approval. The level of qualifications and experience submitted in the accepted proposal or that required by the Solicitation, whichever is greater, is the minimum standard for any substitution.

In accordance with FAR clause 52.219-30, Notice of Set-Aside for, or Sole Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program, the small business prime contractor is required to perform a minimum percentage of the cost of contract performance incurred for personnel/labor. A worksheet is provided for the contractor to document their and their subcontractors' labor costs. This worksheet must be completed and provided with the proposal showing anticipated figures, and resubmitted with actual figures as part of contract close-out.

H.3 Site-Specific Accident Prevention Plan A site-specific Accident Prevention Plan (APP) covering on-site work to be performed by the contractor and all subcontractors is required. The prime contractor shall be responsible for development, implementation, and oversight of the plan. The plan shall address site-specific safety and health requirements and procedures based upon specific anticipated conditions, and address anticipated tasks, their related hazards, and anticipated control measures. In addition, work performed under this contract shall comply with applicable federal, state, and local safety and occupational health laws and regulations. This includes, but is not limited to, Occupational Safety and Health Administration (OSHA) standards, 29 CFR, and FAR clause 52.236-13, Alt 1.

As work proceeds, the APP shall be adapted to new situations and new conditions. Changes and modifications to the accepted APP shall be made with the knowledge and concurrence of the safety office, site superintendent and Contracting Officer's Representative (COR).

Should any unforeseen hazards become evident during the performance of work, the contractor shall bring such hazard to the attention of the COR, both verbally and in writing for resolution as soon as possible. In the interim necessary action shall be taken to re-establish and maintain safe working conditions in order to safeguard on-site personnel, visitors, the public, and the environment.

H.4 Preconstruction Conference The Contracting Officer will conduct a preconstruction conference; the successful offeror will be notified and will be required to attend in person or by phone. The Contracting Officer’s notification will include specific details regarding the date, time, and location of the conference, any need for attendance by subcontractors, and information regarding the items to be discussed.

H.5 Notice of Required Performance and Payment Bonds

The successful offeror shall furnish performance and payment bonds, using Standard Forms 25 and 25A, within 10 days after contract award. The penal sum of the bonds shall equal 100% of the contract price.

H.6 Interpretations of Contract: Notice of Ambiguities

(a) This written contract and any and all identified writings or documents incorporated by reference herein or physically attached hereto constitute the parties' complete agreement and no other prior or contemporaneous agreements either written or oral shall be considered to change, modify, or contradict it. Any ambiguity in the contract will not be strictly construed against the drafter of the contract language but shall be resolved by applying the most reasonable interpretation under the circumstances, giving full consideration to the intentions of the parties at the time of contracting.

(b) It shall be the obligation of the Contractor to exercise due diligence to discover and to bring to the attention of the Contracting Officer at the earliest possible time any ambiguities, discrepancies, inconsistencies, or conflicts in or between the specifications and the applicable drawings or other documents incorporated. Failure to comply with such obligation shall be deemed a waiver and release of any and all claims for extra costs or delay arising out of such ambiguities, discrepancies, inconsistencies, and conflicts.

SECTION I: Contract Clauses

52.202-1 Definitions. (NOV 2013)

52.203-3 Gratuities. (APR 1984)

52.203-5 Covenant Against Contingent Fees. (MAY 2014)

52.203-6 Restrictions on Subcontractor Sales to the Government. (SEP 2006)

52.203-7 Anti-Kickback Procedures. (MAY 2014)

52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity. (MAY 2014)

52.203-10 Price or Fee Adjustment for Illegal or Improper Activity. (MAY 2014)

52.203-12 Limitation on Payments to Influence Certain Federal Transactions. (OCT 2010)

52.203-17 Contractor Employee Whistleblower Rights and Requirement to Inform Employees of Whistleblower Rights (APR 2014)

52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper. (MAY 2011)

52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards. (OCT 2015)

52.204-13 System for Award Management Maintenance. (JUL 2013)

52.204-14 Service Contract Reporting Requirements (JAN 2014)

52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (OCT 2015)

52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015)

52.215-2 Audit and Records—Negotiation (OCT 2010)

52.215-8 Order of Precedence - Uniform Contract Format. (OCT 1997)

52.219-8 Utilization of Small Business Concerns. (OCT 2014)

52.219-28 Post-Award Small Business Program Rerepresentation. (JUL 2013)

52.222-3 Convict Labor. (JUN 2003)

52.222-4 Contract Work Hours and Safety Standards Act - Overtime Compensation. (MAY 2014)

52.222-6 Construction Wage Rate Requirements (MAY 2014)

52.222-7 Withholding of Funds. (MAY 2014)

52.222-8 Payrolls and Basic Records. (MAY 2014)

52.222-9 Apprentices and Trainees. (JUL 2005)

52.222-10 Compliance with Copeland Act Requirements. (FEB 1988)

52.222-11 Subcontracts (Labor Standards). (MAY 2014)

52.222-12 Contract Termination - Debarment. (MAY 2014)

52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations. (MAY 2014)

52.222-14 Disputes Concerning Labor Standards. (FEB 1988)

52.222-15 Certification of Eligibility. (MAY 2014)

52.222-21 Prohibition of Segregated Facilities. (APR 2015)

52.222-26 Equal Opportunity. (APR 2015)

52.222-27 Affirmative Action Compliance Requirements for Construction. (APR 2015)

52.222-37 Employment Reports on Veterans. (FEB 2016)

52.222-40 Notification of Employee Rights Under the National Labor Relations Act. (DEC 2010)

52.222-50 Combating Trafficking in Persons. (MAR 2015)

52.222-54 Employment Eligibility Verification. (OCT 2015)

52.222-55 Minimum Wages Under Executive Order 13658 (DEC 2015)

52.223-3, Alt. 1 Hazardous Material Identification and Material Safety Data (JAN 1997)

52.223-5 Pollution Prevention and Right-to-Know Information. (MAY 2011)

52.223-6 Drug-Free Workplace. (MAY 2001)

52.223-9 Estimate of Percentage of Recovered Material Content for EPA-Designated Items. (MAY 2008)

52.223-15 Energy Efficiency in Energy-Consuming Products (DEC 2007)

52.223-17 Affirmative Procurement of EPA-designated Items in Service and Construction Contracts. (MAY 2008)

52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving. (AUG 2011)

52.225-13 Restrictions on Certain Foreign Purchases. (JUN 2008)

52.227-1 Authorization and Consent (DEC 2007)

52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (DEC 2007)

52.227-4 Patent Indemnity--Construction Contracts. (DEC 2007)

52.228-2 Additional Bond Security. (OCT 1997)

52.228-5 Insurance - Work on a Government Installation. (JAN 1997)

52.228-11 Pledges of Assets. (JAN 2012)

52.228-12 Prospective Subcontractor Requests for Bonds. (MAY 2014)

52.228-14 Irrevocable Letter of Credit (NOV 2014)

52.228-15 Performance and Payment Bonds - Construction. (OCT 2010)

52.229-3 Federal, State, and Local Taxes. (FEB 2013)

52.232-5 Payments under Fixed-Price Construction Contracts. (MAY 2014)

52.232-17 Interest (MAY 2014)

52.232-23 Assignment of Claims. (MAY 2014)

52.232-27 Prompt Payment for Construction Contracts. (MAY 2014)

52.232-33 Payment by Electronic Funds Transfer-System for Award Management (JUL 2013)

52.232-39 Unenforceability of Unauthorized Obligations (JUN 2013)

52.232-40 Providing Accelerated Payments to Small Business Subcontractors (DEC 2013)

52.233-1 Disputes, Alt. 1. (MAY 2014, DEC 1991)

52.233-3 Protest after Award. (AUG 1996)

52.233-4 Applicable Law for Breach of Contract Claim. (OCT 2004)

52.236-2 Differing Site Conditions. (APR 1984)

52.236-3 Site Investigation and Conditions Affecting the Work. (APR 1984)

52.236-4 Physical Data (APR 1984)

52.236-5 Material and Workmanship. (APR 1984)

52.236-6 Superintendence by the Contractor. (APR 1984)

52.236-7 Permits and Responsibilities. (NOV 1991)

52.236-8 Other Contracts. (APR 1984)

52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements. (APR 1984)

52.236-10 Operations and Storage Areas. (APR 1984)

52.236-11 Use and Possession Prior to Completion. (APR 1984)

52.236-12 Cleaning Up. (APR 1984)

52.236-14 Availability and Use of Utility Services. (APR 1984)

52.236-15 Schedules for Construction Contracts (APR 1984)

52.236-17 Layout of Work. (APR 1984)

52.236-21 Specifications and Drawings for Construction. (FEB 1997)

52.242-13 Bankruptcy. (JUL 1995)

52.243-4 Changes. (JUN 2007)

52.244-6 Subcontracts for Commercial Items. (FEB 2016)

52.246-21 Warranty of Construction. (MAR 1994) - Alternate I (APR 1984)

52.248-3 Value Engineering - Construction. (OCT 2015)

52.249-2 Termination for Convenience of the Government (Fixed-Price). (APR 2012) - Alternate I (SEP 1996)

52.249-10 Default (Fixed-Price Construction). (APR 1984)

52.253-1 Computer Generated Forms. (JAN 1991)

1452.215-70 Examination of Records by the Department of the Interior (APR 1984)

52.203-99, Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements (DEVIATION 2015-02) (FEB 2015)

(a) The contractor shall not require employees or subcontractors seeking to report fraud, waste, or abuse to sign or comply with internal confidentiality agreements or statements prohibiting or otherwise restricting such employees or subcontractors from lawfully reporting such fraud, waste, or abuse to a designated investigative or law enforcement representative of a Federal department or agency authorized to receive such information.

(b) The contractor shall notify employees that the prohibition and restrictions of any internal confidentiality agreements covered by this clause are no longer in effect.

(c) The prohibition in paragraph (a) of this clause does not contravene requirements applicable to Standard Form 312, Form 4414, or any other form issued by a Federal department or agency governing the nondisclosure of classified information.

(d)(1) In accordance with section 743 of Division E, Title VII, of the Consolidated and Further Continuing Resolution Appropriations Act, 2015 (Pub. L. 113-235), use of funds appropriated (or otherwise made available) under that or any other Act may be prohibited, if the Government determines that the contractor is not in compliance with the provisions of this clause.

(2) The Government may seek any available remedies in the event the contractor fails to comply with the provisions of this clause.

52.219-30 Notice of Set-Aside for, or Sole Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program. (Dec 2015)

(a) Definitions. “Women-owned small business (WOSB) concern eligible under the WOSB Program” (in accordance with 13 CFR 127), means a small business concern that is at least 51 percent directly and unconditionally owned by, and the management and daily business operations of which are controlled by, one or more women who are citizens of the United States.

“WOSB Program Repository” means a secure, Web-based application that collects, stores, and disseminates documents to the contracting community and SBA, which verify the eligibility of a business concern for a contract to be awarded under the WOSB Program.

(b) Applicability. This clause applies only to—

(1) Contracts that have been set aside or reserved for, or awarded on a sole source basis to, WOSB concerns eligible under the WOSB Program;

(2) Part or parts of a multiple-award contract that have been set aside for WOSB concerns eligible under the

WOSB Program; and

(3) Orders set aside for WOSB concerns eligible under the WOSB Program, under multiple-award contracts as described in8.405-5 and 16.505(b)(2)(i)(F).

(c) General.

(1) Offers are solicited only from WOSB concerns eligible under the WOSB Program. Offers received from concerns that are not WOSB concerns eligible under the WOSB program shall not be considered.

(2) Any award resulting from this solicitation will be made to a WOSB concern eligible under the WOSB Program.

(3) The Contracting Officer will ensure that the apparent successful offeror has provided the required documents to the WOSB Program Repository. The contract shall not be awarded until all required documents are received.

(d) Agreement. A WOSB concern eligible under the WOSB Program agrees that in the performance of the contract for—

(1) Services (except construction), the concern will perform at least 50 percent of the cost of the contract incurred for personnel with its own employees;

(2) Supplies or products (other than procurement from a non-manufacturer in such supplies or products), the concern will perform at least 50 percent of the cost of manufacturing the supplies or products (not including the costs of materials);

(3) General construction, the concern will perform at least 15 percent of the cost of the contract with its own employees (not including the costs of materials); and

(4) Construction by special trade contractors, the concern will perform at least 25 percent of the cost of the contract with its own employees (not including cost of materials).

(e) Joint Venture. A joint venture may be considered a WOSB concern eligible under the WOSB Program if—

(1) It meets the applicable size standard corresponding to the NAICS code assigned to the contract, unless an exception to affiliation applies pursuant to 13 CFR 121.103(h)(3);

(2) The WOSB participant of the joint venture is designated in the System for Award Management as a

WOSB concern;

(3) The parties to the joint venture have entered into a written joint venture agreement that contains provisions

(i) Setting forth the purpose of the joint venture;

(ii) Designating a WOSB concern eligible under the WOSB Program as the managing venturer of the joint venture, and an employee of the managing venturer as the project manager responsible for the performance of the contract;

(iii) Stating that not less than 51 percent of the net profits earned by the joint venture will be distributed to the WOSB;

(iv) Specifying the responsibilities of the parties with regard to contract performance, sources of labor, and negotiation of the WOSB contract; and

(v) Requiring the final original records be retained by the managing venturer upon completion of the WOSB contract performed by the joint venture.

(4) The joint venture must perform the applicable percentage of work required in accordance with paragraph

(d) above; and https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%208_4.html#wp1096389 https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%2016_5.html#wp1095799

(5) The procuring activity executes the contract in the name of the WOSB concern eligible under the WOSB Program or joint venture.

(f) Nonmanufacturer. A WOSB concern eligible under the WOSB Program that is a non-manufacturer, as defined in 13 CFR 121.406(b) or 19.102(f), may submit an offer on a WOSB requirement with a NAICS code for supplies, if it meets the requirements under the non-manufacturer rule set forth in those regulations.

52.222-35 Equal Opportunity for Veterans. (OCT 2015)

(a) Definitions. As used in this clause— “Active duty wartime or campaign badge veteran,” “Armed Forces service medal veteran,” “disabled veteran,”

“protected veteran,” “qualified disabled veteran,” and “recently separated veteran” have the meanings given at

FAR 22.1301.

(b) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR 60-300.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified protected veterans, and requires affirmative action by the Contractor to employ and advance in employment qualified protected veterans.

(c) Subcontracts. The Contractor shall insert the terms of this clause in subcontracts of $150,000 or more unless exempted by rules, regulations, or orders of the Secretary of Labor. The Contractor shall act as specified by the Director, Office of Federal Contract Compliance Programs, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate to identify properly the parties and their undertakings.

52.222-36 Affirmative Action for Workers With Disabilities. (JUL 2014)

(a) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41

CFR 60-741.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified individuals on the basis of disability, and requires affirmative action by the Contractor to employ and advance in employment qualified individuals with disabilities.

(b) Subcontracts. The Contractor shall include the terms of this clause in every subcontract or purchase order in excess of $15,000 unless exempted by rules, regulations, or orders of the Secretary, so that such provisions will be binding upon each subcontractor or vendor. The Contractor shall act as specified by the Director, Office of Federal Contract Compliance Programs of the U.S. Department of Labor, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate to identify properly the parties and their undertakings.

52.225-9 Buy American - Construction Materials. (MAY 2014)

(a) Definitions. As used in this clause— “Commercially available off-the-shelf (COTS) item”—

(1) Means any item of supply (including construction material) that is—

(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.

“Component” means an article, material, or supply incorporated directly into a construction material.

“Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site.

Materials purchased directly by the Government are supplies, not construction material.

“Cost of components” means—

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%2019_1.html#wp1101837 https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%2022_13.html#wp1085590 component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

“Domestic construction material” means—

(1) An unmanufactured construction material mined or produced in the United States;

(2) A construction material manufactured in the United States, if—

(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or

(ii) The construction material is a COTS item.

“Foreign construction material” means a construction material other than a domestic construction material.

“United States” means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference.

(1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows: [Contracting Officer to list applicable excepted materials or indicate “none”] None; however all COTS items are considered domestic regardless of their place of manufacture (see definition above).

(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that—

(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;

(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American statute.

(1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including—

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).

(iv) Any Contractor request for a determination submitted after contract award shall explain why the

Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.

(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.

(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.

(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:

FOREIGN AND DOMESTIC CONSTRUCTION MATERIALS PRICE COMPARISON

Construction Material Description Unit of Measure Quantity Price (Dollars)* Item 1:

Foreign construction material _______ _______ _______ Domestic construction material _______ _______ _______

Item 2: _______ _______ _______ Foreign construction material _______ _______ _______ Domestic construction material

[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.] [Include other applicable supporting information.] [* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).]

52.228-1 Bid Guarantee. (SEP 1996) *Note that this clause applies even though it is a Request for Proposal; substitute the word “offer” for “bid”.

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier’s check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.

The Contracting Officer will return bid guarantees, other than bid bonds—

(1) To unsuccessful bidders as soon as practicable after the opening of bids; and

(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or…