P01 - Bid Set Drawings FINAL.pdf
PDF 17 MB Posted
- Solicitation number
- 36C25222B0013
About this file
This document provides details for a federal contract opportunity for water main replacement work. The solicitation number is 36C25222B0013 and concerns water main replacement between Building 43 and Building 102 at project number 695-21-108. The related file is a set of bid drawings. The contracting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10. The opportunity type is a solicitation for water main replacement work between the specified buildings.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER:CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects
Foresite Group, LLC 2128 Moores Mill Rd.
Suite C Auburn, AL 36830 o | 334.887.6064 f | 334.887.6024 w | www.foresitegroup.net
ACG Project Number 21-024
DECEMBER 1, 2021
WATER MAIN REPLACEMENT
BETWEEN BUILDING 43 AND
BUILDING 102
695-21-108
CLEMENT J. ZABLOCKI VAMC,
5000 W. NATIONAL AVENUE,
MILWAUKEE, WI 53295 FCM ZLR
43, 45, 102, & 112
BID SET
COVER SHEET
G-001
WATER MAIN REPLACEMENT BETWEEN
BUILDING 43 AND BUILDING 102
CLEMENT J. ZABLOCKI VAMC, MILWAUKEE, WI
5000 W. NATIONAL AVENUE MILWAUKEE, WI 53295
VA PROJECT #: 695-21-108
PROJECT SITE MAP PROJECT LOCATION MAP
PROJECT IMAGE
DWG OF DWG
G-001 COVER SHEET 1 10
CD101 CIVIL DEMOLITION PLAN 2 10
CU101 OVERALL WATER LAYOUT PLAN 3 10
CU201 WATER LINE PLAN & PROFILE (1 OF 2) 4 10
CU202 WATER LINE PLAN & PROFILE (2 OF 2) 5 10
CU501 WATER LINE DETAILS 6 10
CS501 CIVIL PAVING AND CONSTRUCTION DETAILS (1 OF 2) 7 10
CS502 CIVIL PAVING AND CONSTRUCTION DETAILS (2 OF 2) 8 10
CJ101 TRAFFIC CONTROL PLAN 9 10
CJ102 PROJECT CONFLICT PLAN 10 10
NOTE: IN THE CASE OF CONFLICTS OR DISCREPANCIES WITHIN OR AMONG THE CONTRACT
DRAWINGS, THE BETTER QUALITY, MORE STRINGENT REQUIREMENTS, OR GREATER QUANTITY
OF WORK, AS DETERMINED BY THE GOVERNMENT, SHALL BE PROVIDED.
BUILDING 43
BUILDING 102
RIM 652.54
12"E 650.34
RIM 641.23
IE. 636.23
TO SUMP
(NO VIS. PIPES)
RIM 634.82
IE. 633.08
FILLED W/ DIRT RIM 633.97
BOTTOM 627.42
FILLED W/ WATER
RIM 633.29
10"N 625.54 12"W 627.76
RIM 635.39
10"NE 628.4±
10"SE 628.4±
RIM 637.41
N 632.44 S 632.44 W 632.71
RIM 650.00
E 640.46 W 640.46
SE 640.46
RIM 639.44
6"E 634.28 6"W 634.28
RIM 651.03
ABANDONED
RIM 646.72
N 639.6± S 639.6±
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SSSSSSSSSSSSSSSSSSSSSSSSSS
CHAIN LINK FENCE
CONCRETE WALL
C H
A
IN
L
IN
K F
E N
C
E CONCRETE WALL
GUARD RAIL
CONC STEPS
VENT
CONCRETE
TUNNEL
ACCESS
TRANS.
CONCRETE
CONCRETE WALK
CHAIN
LINK
FENCE
C O
N C
. W A
LK
C
O N
C R
E
TE
W A
LK
C O
N C
R E
TE
W
A
LK
ASPHALT
ASPHALT
CONCRET
E
W
AL
K
AS
PH
AL
T
AS
PH
AL
T
ASPHALT
ASPHALT C
H
A
IN
LIN
K
FE
N
C E
VAULT
PIPES
CONC.
STEPS
CHAIN LINK FENCE
HANDRAIL
C H
A
IN
LIN
K
FE
N
C E
ASPHALT
CHAIN LINK FENCE
CONC.
WINDOW WELL
CONCRETE
ASPHALT WALK
ASPHALT WALK
CONC. WALK
CONC.
FAN
CONC.
CHAIN LINK
FENCE
CHAIN LINK FENCE
ASPHALT
P O
R C
H
WOOD
STEPS
CONC.
CONCRETE
METAL
CAP
CONC. CONC.
CONCRETE WALK
C O
N C
R E
TE
W
A
LK
CONCRETE WALK
EXISTING
BUILDING
PUMP
SIGN
EXISTING
BUILDING
EXISTING
BUILDING
EXISTING
BUILDING
FO
C
FO
C
GAS
UG/T
UG/T
W
W
W
W
W
W
W
W
W
W
FOC FOC FOC FOC
RIM 640.17
S 634.2±
RIM 637.20
8"W 632.9± 12"S 632.0±
12"SE 632.8±
RIM 638.86
8"E 634.9±
APPROX.
LOCATION
STEAM
TUNNEL
W A
TE
R
P E
R P
LA
N
RIM 648.42
6"E 643.2± 6"N 643.32 6"W 643.42
SS
SS
SS
SS
SS
SS
SS
SSSS
SS
SS
SS
SS
SS
SS
SS
RIM 648.38
E 642.4± W 642.5± N 642.9±
FOCFOC
UG/E
SSSSSSSSSSSSSSSS
ASPHALT
ASPHALT
ASPHALT
ASPHALT
GASGASGAS
GAS GAS GAS
UG
/E
UG
/E
UG
/E
UG
/E
BENCH
M
ET
AL
F
EN
CE
BLO
CK W
ALL
STONE WALL
CONCRETE
CONCRETE WALL
CONCRETE
CONCRETE
VENT
BENCH
WOOD FENCE
TRANSFORMER
GAS
TRANSFORMER
C O
N C
R E
TE
W
A
LL
CONCRETE
C O
N
C TRENCH DRAIN
GRAVEL
CONCRETE
CHAIN LINK FENCE
UG
/E
UG
/E
TIMBER WALL
CONCRETE
TI
M
B E
R W
A
LL
CONCRETE
ASPHALT
CONCRETE
TR
AN
SF
ORM
ER
CONC WALLCONC
STONE WALL
CONC WALL
ST
AI
RS
ST
ONE
W
AL
L
C O
N C
R E
TE
W
A
LK
GAS
TRANSFORMER
TRANSFORMER
C O
N C
R E
TE
WOOD
STEPS
P O
R C
H
3 STORY
FRAME
BUILDING
3 STORY
FRAME
BUILDING
FRAME
GARAGE
TR
AN
SFO
R
M
ER
S
BRICK
BUILDING
2 STORY
BRICK
BUILDING
2 STORY
MASONRY
BUILDING
2 STORY
BRICK
BUILDING
BUILDING 102
SPS
WOOD STEPS
VAULT
METAL CAP
TYPICAL
HANDRAIL
SI
G
N
TRENCH DRAIN
RIM 631.55
6"N. 627.5
RIM 631.74
12"SW. 623.73
20"NE. 623.70
RIM 638.47
8"N. 629.36
8"SW. 629.26
RIM 652.58
6"S. 658.78
NW. 649.78
TRENCH DRAIN
RIM 650.62
6"N. 647.52 8"W. 647.72
RIM 646.51
NW. 636.05
S. 634.11
RIM 641.42
6"S. 639.17
FUNNEL 638.46
RIM 652.40
12"N&NW. 643.21
12"S. 642.85
RIM 652.49
12"W. 643.99 12"N. 644.09
RIM 637.53
FUNNEL 634.48
RIM 644.59
8"N. 634.55
8"NW. 637.62
8"SE. 633.69
RIM 646.22
8"S. 640.67 8"W. 670.72
RIM 647.22
8"SE. 642.57
RIM 651.82
W&E. 644.42
SS
SS
SSW
W
UG/E
UG/E
UG/EFOC
FOC
FOC
UG
/E
UG
/E
UG
/E
FO
C
FO
C
FO
C
UG
/E
FO
C
FO
C
FO
C
FO
C
FO
C
FOC
FOC
FOC
FOC
FOC
FOC
UTILITY
COMPOST
CAPPED PIPE
METAL PIPE
2' ABV GRD
UG/E
UG/E
PIPE
MARKED
WATERMAIN
SIGN
RIM 630.70
12"NW. 625.65
CONCRETE
ASPHALT
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
GRASS
GRASS
GRASS
CONC CURB & GUTTER
TYPICAL
GRASS
GRASS
P
LA
N
TE
R P
LA
N
TE
R
C O
N C
R E
TE
ASPHALT
CONCRETE
GRASS
GRASS
GRASS
GRASS
GRASS
CONCRETE
PLA
NTE
R
PLA
NTE
R
PLA
NTE
R
PLA
NTE
R
OVERHANG
OVERHANG
OVERHANG
OVERHANG
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPHALT
CONC CURB & GUTTER
TYPICAL
GRASS
GRASS
GRASS
OUTLET
12" RCP
IE. 650.39
WATER
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
FOC
FOC
UG/E
UG/E
UG/E
GASGASGASGASGAS
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GAS
GAS
GAS
FOCFOCFOCFOCFOCFOC
ST
ST
UG/EUG/EUG/E
ST
ST
ST
ST
ST
W
ST
ST
ST
ST
ST
ST
ST
ST
UG/T UG/T UG/T UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG
/T
UG
/T
UG
/T
UG
/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
GAS GAS GAS GAS GAS GAS GAS
GAS
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E UG/E UG/E UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG
/E
UG/E
UG/E
UG/E
UG
/E
UG/E
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
UG/EUG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG
/T
UG
/T
UG
/T
UG
/T
UG
/T
UG
/T
UG
/T
UG
/T
UG
/T
UG
/T
UG
/T
UG
/T
UG
/T
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E UG/E
W
W W
W W
W W
W W
W W
W W
W W
W
WWWWWWWWWW
W W
W W
W W
GAS
FOC
FOC
FOC
FOC
FOC
FOC
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
UG/T
UG/T
UG/T
UG/T
UG/T
UG/E
UG/E
UG/E
UG/E UG/E UG/E UG/E
FO
C
FO
C
FO
C
FOC
FOC FOC FOC FOC
UG/T
UG/T
UG/T
UG/TUG/TUG/TUG/TUG/TUG/TUG/TUG/TUG/T
W W
W W
W
W W
W W
W W
W
UG/TUG/E
UG/E
UG
/T
UG
/T
UG
/T
UG
/T
UG
/T
UG
/T
UG
/T
UG
/T
UG/T UG/T UG/T UG/T UG/T UG/T UG/T UG/T UG/T UG/T UG/T UG/T
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E
W
GA
S
GA
S
GA
S
GA
S
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
W
W W
W W
W W
W W
W W
W W
W
W W W W
GASGAS
GAS
GAS GAS GAS GAS GAS GAS GAS
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E UG/E
UG/E
UG
/E
UG
/E
UG/E
UG/E
UG/E
UG/E
UG/E UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/EUG/E
UG
/E
W
UG/E
UG/E
W W
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/T
UG/T
UG/T
UG/T
W
W W
W
W
W W
W
W
W
W
W
W
W
W
W
W
WW
W
W
W
W
W
W
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E UG/E
UG/E
GAS
GAS
GAS
GAS
W
UG
/E
UG/E
UG
/E
UG
/E
FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC
FOC
FOC
FOC
FOC
FOC
FOC
W
W
W
W W
W W
W W W
W
W
W
W
W
W
W
W W
W
UG/E
UG/E UG/E
UG/E
UG/T
UG/T
UG/T
UG/T
GAS
WUG/E
UG/E
UG/E
UG/T UG/T UG/T UG/T UG/T UG/T UG/T
UG/E
UG/E
UG/E
UG/E
FOC
FOC
FOC
FOC
UG/E
UG/E
UG/EUG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/T
UG/TUG/TUG/TUG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
GAS GAS GAS GAS GAS GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
W
W W W W W W
W W W W W W W W
W W
W W
W
W
W
UG/T
UG/T
UG
/T
UG
/T
UG
/T
UG
/T
UG
/T
UG
/T
UG
/T
UG/T FOC
FOC
FOC FOC
UG
/E
GAS
GAS
GAS GA
S
GA
S UG/E
UG
/E
UG
/E
UG
/E
UG/T
UG/T
UG
/T
UG
/T
UG
/T
UG
/T
UG
/T
UG
/T
UG/T
W W
W W
W
GAS
GAS
GAS
GAS
GAS
GAS
GASGASGASGASGASGASW W W W W W
W
WWW
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E UG
/E
UG
/E
UG
/E
UG
/E
UG/E
UG/E
UG/TUG/TUG/T
UG/T
UG/T
UG/T
GAS
GASGAS
GASGASGAS
W
W
W
UG/E
UG
/T
UG
/T
UG/T
UG/T
UG/T
UG
/T
UG
/T
UG
/T
UG
/E
UG
/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG
/T
UG
/T
UG/TUG/TFOCFOC
UG/E
UG/E
UG
/E
UG
/E
UG/E
UG/E
UG/E
UG/E
UG/E
GAS
GAS
GAS
FOC FOC FOC
FOC
FOCFOCFOCFOCFOCFOCFOCFOCFOCFOC
UG/E
UG/EUG/EUG/EUG/EUG/EUG/EUG/EUG/EUG/E
UG/E
UG/EUG/E
UG/E
UG/E
UG/E
GAS
GAS
GAS
GAS
GAS
GAS
GAS
0 64
655 653654
64264
651652
W W
UG/TUG/TUG/TUG/T
UG
/T
UG/T
UG/E
UG/E
UG/E
UG/E
FOC
FOC
FOC
FOC
GAS
UG/E
UG/E
UG/E
UG/E
UG/T
UG/T
UG/T
UG/T
UG/T
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG
/E
UG
/E
UG
/E
UG/T
UG/T
UG/T
UG/T
UG/T
W
W
W
W
W
W
W
W
W W
W W
W W
W W
W W
WWWWWWWWWWWWWWW
W W
W W
W
W
W
W W W W W W
W W
W W
W W
W
W
W W
W W
W W
W W
W W
W W
W W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
W W
W
W
W
W
W
W
W
W W
ABANDONED
STEAM PER PLAN
BRINE TANK
(TO BE REMOVED)
BUILDING 43
BUILDING 45
BUILDING 112
BUILDING 49
BUILDING 50
RESEARCH
BUILDING
W
W
W
W
W
W
W
W
W
W
BUILDING 150
FISHER HOUSE
WATER PER PLAN
WATER PER PLAN
FLAGPOLE
EXISTING MECHANICAL
EQUIPMENT AT BASEMENT LEVEL
BM: 655.62'
NW BOLT
ON HYDRANT
BM: 641.53'
BW BOLT
ON HYDRANT
STORAGE AND
STAGING AREA
LOD
LOD LO
D
LO
D
LOD LOD
LO
D
LODLODLO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LODLOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LODLO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LODLOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LOD
LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LODLODLODLODLODLODLODLODLODLODLODLODLOD
LOD
LO
D LOD LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LO
D
LO
D
LO
D
LO
D
LOD
LO
D
LO
D LOD
LO
D
LO
D
LO
D
LOD
LO
D
LOD LOD LOD LOD LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LO
D
H
IN
ES
B
LV
D
GENERAL WOLCOTT BLVD
FLOWER DR
HIN
ES B
LV
D
PNL 49
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER:CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects
Foresite Group, LLC 2128 Moores Mill Rd.
Suite C Auburn, AL 36830 o | 334.887.6064 f | 334.887.6024 w | www.foresitegroup.net
ACG Project Number 21-024
DECEMBER 1, 2021
WATER MAIN REPLACEMENT
BETWEEN BUILDING 43 AND
BUILDING 102
695-21-108
CLEMENT J. ZABLOCKI VAMC,
5000 W. NATIONAL AVENUE,
MILWAUKEE, WI 53295 FCM ZLR
43, 45, 102, & 112
BID SET
CIVIL DEMOLITION PLAN
CD101
KEY PLAN
1" = 30'
SCALE IN FEET
30 15 30 60
SITE
LEGEND
EXISTING UNDERGROUND WATER LINE
EXISTING UNDERGROUND FIBER OPTIC
EXISTING UNDERGROUND GAS
EXISTING STORM
EXISTING UNDERGROUND TELEPHONE
EXISTING UNDERGROUND POWER
EXISTING SANITARY SEWER
LIMITS OF DISTURBANCE
TREE PROTECTION FENCING
EXISTING CONTOURS
EXISTING WATER MAIN TO BE REMOVED
EXISTING ASPHALT OR CONCTETE PAVING AND/OR
CONCRETE CURB AND GUTTER TO BE SAWCUT AND
REMOVED
EXISTING WATER MAIN TO BE CUT, CAPPED, AND
ABANDONED IN PLACE
XXXX
LOD LOD LOD
W W
1) ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE
INSTALLED PRIOR TO ANY WORK INCLUDING DEMOLITION.
2) ALL NEW WORK SHOWN IN THESE SHEETS SHALL COMPLY WITH
APPLICABLE STATE, FEDERAL, AND LOCAL BUILDING AND UTILITY
INSTALLATION CODES.
3) ALL MATERIALS AND CONSTRUCTION METHODS SHALL BE IN
ACCORDANCE WITH VA STANDARD SPECIFICATIONS.
4) THERE MAY BE ADDITIONAL UTILITIES NOT SHOWN ON THESE
PLANS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO
FIELD VERIFY THE LOCATIONS OF ALL UTILITIES WITHIN THE LIMITS
OF CONSTRUCTION AND TO NOTIFY THE COR IN CASE OF
DISCREPANCIES THAT AFFECT THE CONSTRUCTION PROJECT.
5) CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE THAT MAY
OCCUR TO ANY ADJACENT STRUCTURES OR PROPERTY, OR ANY
EXISTING STRUCTURES WITHIN LIMITS OF CONSTRUCTION THAT ARE
DESIGNATED ON THE PLANS TO REMAIN, AND SHALL REPAIR OR
REPLACE SUCH DAMAGED PROPERTY TO THE VA SATISFACTION AT
NO COST TO THE VA.
6) THE CONTRACTOR SHALL NOT DEVIATE FROM THESE PLANS AND
SPECIFICATIONS WITHOUT THE PRIOR WRITTEN CONSENT OF THE VA
COR.
7) THE CONTRACTOR SHALL SEQUENCE THE WORK AND PROVIDE
TEMPORARY MEASURES AS NECESSARY TO MAINTAIN ACCESS TO
THE SITE THROUGH ALL ENTRANCES AT ALL TIMES DURING
CONSTRUCTION. TEMPORARY PROVISIONS MAY INCLUDE, BUT ARE
NOT LIMITED TO: BARRICADES, FLASHING LIGHTS, FLAGMAN,
TEMPORARY PAVEMENT, AND DIRECTIONAL SIGNAGE AS NECESSARY
TO ACCOMPLISH THE WORK.
8) CONTRACTOR SHALL CONSIDER COORDINATION ASPECTS OF
CONSTRUCTION EQUIPMENT OPERATIONS DURING DEMOLITION
ACTIVITY.
9) THE CONTRACTOR SHALL DISPOSE OF ANY HAZARDOUS
MATERIALS IN STRICT ACCORDANCE WITH ALL APPLICABLE LOCAL,
STATE, AND FEDERAL LAWS.
10) ALL ITEMS DESIGNATED FOR REMOVAL SHALL BE LEGALLY
DISPOSED OF, OFF SITE.
11) CONTRACTOR TO CONTACT UTILITIES PROTECTION CENTER
PRIOR TO ANY EXCAVATION.
12) CONTRACTOR IS RESPONSIBLE FOR CONTACTING VETERANS
AFFAIRS AND ALL EXISTING UTILITY PROVIDERS BEFORE REMOVING
ANY/ALL UTILITIES FROM THEIR EXISTING LOCATION ON THE SITE.
THE CONTRACTOR SHALL PERFORM ALL UTILITY DEMOLITION OR
RELOCATION ACTIVITIES IN ACCORDANCE WITH THE EXISTING
UTILITIES SPECIFICATIONS, MATERIALS, AND REQUIREMENTS.
13) EROSION CONTROL DEVICES ARE TO BE INSTALLED PRIOR TO
ANY CLEARING OR EARTHWORK OPERATIONS AND SHALL BE
MAINTAINED THROUGHOUT CONSTRUCTION AND UNTIL PERMANENT
GROUND COVER IS ESTABLISHED IN ALL DISTURBED AREAS.
14) THE CONTRACTOR SHALL PROVIDE DUST CONTROL AND SHALL
PROTECT ADJACENT PAVEMENTS FROM SOIL ACCUMULATION
DURING CONSTRUCTION.
15) ADDITIONAL EROSION CONTROL DEVICES MAY BE REQUIRED BY
THE VA COR AS DETERMINED BY FIELD CONDITIONS.
16) STORM DRAINAGE STRUCTURES AND CONDUITS SHALL BE
PROTECTED FROM SEDIMENTATION AS REQUIRED BY STATE OR
LOCAL CODES.
17) ALL DEMOLITION TO STOP AT 5' OUTSIDE OF EXISTING BUILDINGS.
NEW PIPING IS TO BE CONNECTED TO EXISTING PIPING AT 5' OUTSIDE
OF BUILDING.
18) ALL EXISTING UTILITIES ARE TO BE PROTECTED THROUGHOUT
CONSTRUCTION.
19) CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING ALL
UTILITY CROSSING AND DEPTHS PRIOR TO BEGINNING EXCAVATION.
CONTRACTOR TO NOTIFY COR IF ADDITIONAL UTILITIES OR ANY
DEVIATIONS ARE FOUND IN THE FIELD.
20) ALL DISTURBED LANDSCAPED OR VEGETATED AREAS ARE TO BE
RESTORED TO ORIGINAL CONDITION UPON COMPLETION OF WORK.
21) ALL WORK IN ROADWAYS TO BE PERFORMED ON SATURDAYS
AND COORDINATED WITH THE VA.
22) BUILDING 112 HAS AN ALTERNATE FEED FROM THE NORTH. VA TO
REALIGN FEED TO MAINTAIN SERVICE. SEE PHASING PLAN FOR MORE
INFORMATION.
23) BUILDING 102 TO BE REFED BY VA PERSONNEL TO MAINTAIN
SERVICE. SEE PHASING PLAN FOR MORE INFORMATION.
24) PROVIDE TEMPORARY CHAINLINK FENCING AROUND ALL WORK
AREAS. SUBMIT FENCING PLAN TO VA FOR REVIEW.
KEY NOTES:
1) EXISTING WATER MAIN TO BE REMOVED.
2) HYDRANT TO BE REMOVED AND REPLACED.
3) EXISTING 1" COPPER SERVICE FOR BUILDING 50 TO REMAIN.
4) EXISTING TREE TO BE REMOVED.
5) LATERAL TO BE CUT, CAPPED AND ABANDONED IN PLACE.
6) IF LINE IS IN PLACE AND IN SERVICE, CUT, CAP, AND ABANDON.
7) EXISTING ASPHALT PAVING AND/OR CONCRETE CURB AND
GUTTER TO BE SAWCUT, REMOVED, AND REPLACED FOR WATER LINE
REMOVAL AND/OR INSTALLATION.
8) EXISTING HYDRANT TO REMAIN.
9) APPROXIMATE LOCATION OF EXISTING WATER MAIN (TO REMAIN).
CONTRACTOR TO POTHOLE AND DETERMINE EXACT LOCATION AND
DEPTH OF EXISTING MAIN PRIOR TO ANY DEMOLITION OR NEW
CONSTRUCTION.
10) EXISTING WATER MAIN, TO REMAIN AND BE REFED.
11) PROVIDE TREE PROTECTION FENCING.
12) EXISTING CONCRETE SIDEWALK TO BE REMOVED AND
REPLACED.
13) BUILDING 45 IS SCHEDULED TO BE DEMOLISHED.
SHEET NOTES:
GAS GAS
FOC FOC
UG/T UG/T
UG/E UG/E
SS SS
AutoCAD SHX Text
CONCRETE WALK
AutoCAD SHX Text G
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text
BLDG S
AutoCAD SHX Text B
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
BLDG 1002 S
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
BLDG E
AutoCAD SHX Text
BLDG E
AutoCAD SHX Text
BLDG E
AutoCAD SHX Text
STORM RD
AutoCAD SHX Text
STORM RD
AutoCAD SHX Text
STORM RD
AutoCAD SHX Text
STORM RD
AutoCAD SHX Text
STORM RD
AutoCAD SHX Text
BLDG S
AutoCAD SHX Text
STORM RD
AutoCAD SHX Text M
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text
ST
AutoCAD SHX Text V
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text V
AutoCAD SHX Text
ST
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text B
AutoCAD SHX Text
ST
AutoCAD SHX Text X
12"E 650.34
RIM 641.23
IE. 636.23
TO SUMP
(NO VIS. PIPES)
RIM 634.82
IE. 633.08
FILLED W/ DIRT RIM 633.97
BOTTOM 627.42
FILLED W/ WATER
RIM 633.29
10"N 625.54 12"W 627.76
RIM 635.39
10"NE 628.4±
10"SE 628.4±
RIM 637.41
N 632.44 S 632.44 W 632.71
RIM 650.00
E 640.46 W 640.46
SE 640.46
RIM 639.44
6"E 634.28 6"W 634.28
RIM 651.03
ABANDONED
RIM 646.72
N 639.6± S 639.6±
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SSSSSSSSSSSSSSSSSSSSSSSSSS
CHAIN LINK FENCE
CONCRETE WALL
C H
A
IN
L
IN
K F
E N
C
E CONCRETE WALL
GUARD RAIL
CONC STEPS
VENT
CONCRETE
TUNNEL
ACCESS
TRANS.
CONCRETE
CONCRETE WALK
CHAIN
LINK
FENCE
C O
N C
. W A
LK
C
O N
C R
E
TE
W A
LK
C O
N C
R E
TE
W
A
LK
ASPHALT
ASPHALT
CONCRET
E
W
AL
K
AS
PH
AL
T
AS
PH
AL
T
ASPHALT
ASPHALT C
H
A
IN
LIN
K
FE
N
C E
VAULT
PIPES
CONC.
STEPS
CHAIN LINK FENCE
HANDRAIL
C H
A
IN
LIN
K
FE
N
C E
ASPHALT
CHAIN LINK FENCE
CONC.
WINDOW WELL
CONCRETE
ASPHALT WALK
ASPHALT WALK
CONC. WALK
CONC.
FAN
CONC.
CHAIN LINK
FENCE
CHAIN LINK FENCE
ASPHALT
P O
R C
H
WOOD
STEPS
CONC.
CONCRETE
METAL
CAP
CONC. CONC.
CONCRETE WALK
C O
N C
R E
TE
W
A
LK
CONCRETE WALK
EXISTING
BUILDING
PUMP
SIGN
EXISTING
BUILDING
EXISTING
BUILDING
EXISTING
BUILDING
FO
C
FO
C
GAS
UG/T
UG/T
W
W
W
W
W
W
W
W
W
W
FOC FOC FOC FOC
RIM 640.17
S 634.2±
RIM 637.20
8"W 632.9± 12"S 632.0±
12"SE 632.8±
RIM 638.86
8"E 634.9±
APPROX.
LOCATION
STEAM
TUNNEL
RIM 648.42
6"E 643.2± 6"N 643.32 6"W 643.42
SS
SS
SS
SS
SS
SS
SS
SSSS
SS
SS
SS
SS
SS
SS
SS
RIM 648.38
E 642.4± W 642.5± N 642.9±
FOCFOC
UG/E
SSSSSSSSSSSSSSSS
ASPHALT
ASPHALT
ASPHALT
ASPHALT
GASGASGAS
GAS GAS GAS
UG
/E
UG
/E
UG
/E
UG
/E
BENCH
M
ET
AL
F
EN
CE
BLO
CK W
ALL
STONE WALL
CONCRETE
CONCRETE WALL
CONCRETE
CONCRETE
VENT
BENCH
WOOD FENCE
TRANSFORMER
GAS
TRANSFORMER
C O
N C
R E
TE
W
A
LL
CONCRETE
C O
N
C TRENCH DRAIN
GRAVEL
CONCRETE
CHAIN LINK FENCE
UG
/E
UG
/E
TIMBER WALL
CONCRETE
TI
M
B E
R W
A
LL
CONCRETE
ASPHALT
CONCRETE
TR
AN
SF
ORM
ER
CONC WALLCONC
STONE WALL
CONC WALL
ST
AI
RS
ST
ONE
W
AL
L
C O
N C
R E
TE
W
A
LK
GAS
TRANSFORMER
TRANSFORMER
C O
N C
R E
TE
WOOD
STEPS
P O
R C
H
3 STORY
FRAME
BUILDING
3 STORY
FRAME
BUILDING
FRAME
GARAGE
TR
AN
SFO
R
M
ER
S
BRICK
BUILDING
2 STORY
BRICK
BUILDING
2 STORY
MASONRY
BUILDING
2 STORY
BRICK
BUILDING
BUILDING 102
SPS
WOOD STEPS
VAULT
HANDRAIL
SI
G
N
TRENCH DRAIN
RIM 631.55
6"N. 627.5
RIM 631.74
12"SW. 623.73
20"NE. 623.70
RIM 638.47
8"N. 629.36
8"SW. 629.26
RIM 652.58
6"S. 658.78
NW. 649.78
TRENCH DRAIN
RIM 650.62
6"N. 647.52 8"W. 647.72
RIM 646.51
NW. 636.05
S. 634.11
RIM 641.42
6"S. 639.17
FUNNEL 638.46
RIM 652.40
12"N&NW. 643.21
12"S. 642.85
RIM 652.49
12"W. 643.99 12"N. 644.09
RIM 637.53
FUNNEL 634.48
RIM 644.59
8"N. 634.55
8"NW. 637.62
8"SE. 633.69
RIM 646.22
8"S. 640.67 8"W. 670.72
RIM 647.22
8"SE. 642.57
RIM 651.82
W&E. 644.42
SS
SS
SSW
W
UG/E
UG/E
UG/EFOC
FOC
FOC
UG
/E
UG
/E
UG
/E
FO
C
FO
C
FO
C
UG
/E
FO
C
FO
C
FO
C
FO
C
FO
C
FOC
FOC
FOC
FOC
FOC
FOC
UTILITY
COMPOST
CAPPED PIPE
METAL PIPE
2' ABV GRD
UG/E
UG/E
PIPE
MARKED
WATERMAIN
SIGN
RIM 630.70
12"NW. 625.65
CONCRETE
ASPHALT
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
GRASS
GRASS
GRASS
CONC CURB & GUTTER
TYPICAL
GRASS
GRASS
P
LA
N
TE
R P
LA
N
TE
R
C O
N C
R E
TE
ASPHALT
CONCRETE
GRASS
GRASS
GRASS
GRASS
GRASS
CONCRETE
PLA
NTE
R
PLA
NTE
R
PLA
NTE
R
PLA
NTE
R
OVERHANG
OVERHANG
OVERHANG
OVERHANG
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPHALT
CONC CURB & GUTTER
TYPICAL
GRASS
GRASS
GRASS
OUTLET
12" RCP
IE. 650.39
WATER
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
FOC
FOC
UG/E
UG/E
UG/E
GASGASGASGASGAS
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GAS
GAS
GAS
FOCFOCFOCFOCFOCFOC
ST
ST
UG/EUG/EUG/E
ST
ST
ST
ST
ST
W
ST
ST
ST
ST
ST
ST
ST
ST
UG/T UG/T UG/T UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG
/T
UG
/T
UG
/T
UG
/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
GAS GAS GAS GAS GAS GAS GAS
GAS
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E UG/E UG/E UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG
/E
UG/E
UG/E
UG/E
UG
/E
UG/E
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
UG/EUG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG
/T
UG
/T
UG
/T
UG
/T
UG
/T
UG
/T
UG
/T
UG
/T
UG
/T
UG
/T
UG
/T
UG
/T
UG
/T
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E UG/E
W
W W
W W
W W
W W
W W
W W
W W
W
WWWWWWWWWW
W W
W W
W W
GAS
FOC
FOC
FOC
FOC
FOC
FOC
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
UG/T
UG/T
UG/T
UG/T
UG/T
UG/E
UG/E
UG/E
UG/E UG/E UG/E UG/E
FO
C
FO
C
FO
C
FOC
FOC FOC FOC FOC
UG/T
UG/T
UG/T
UG/TUG/TUG/TUG/TUG/TUG/TUG/TUG/TUG/T
W W
W W
W
W W
W W
W W
W
UG/TUG/E
UG/E
UG
/T
UG
/T
UG
/T
UG
/T
UG
/T
UG
/T
UG
/T
UG
/T
UG/T UG/T UG/T UG/T UG/T UG/T UG/T UG/T UG/T UG/T UG/T UG/T
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E UG/E
W
GA
S
GA
S
GA
S
GA
S
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
W
W W
W W
W W
W W
W W
W W
W
W W W W
GASGAS
GAS
GAS GAS GAS GAS GAS GAS GAS
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E UG/E
UG/E
UG
/E
UG
/E
UG/E
UG/E
UG/E
UG/E
UG/E UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/EUG/E
UG
/E
W
UG/E
UG/E
W W
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/T
UG/T
UG/T
UG/T
W
W W
W
W
W W
W
W
W
W
W
W
W
W
W
W
WW
W
W
W
W
W
W
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E UG/E
UG/E
GAS
GAS
GAS
GAS
W
UG
/E
UG/E
UG
/E
UG
/E
FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC
FOC
FOC
FOC
FOC
FOC
FOC
W
W
W
W W
W W
W W W
W
W
W
W
W
W
W
W W
W
UG/E
UG/E UG/E
UG/E
UG/T
UG/T
UG/T
UG/T
GAS
WUG/E
UG/E
UG/E
UG/T UG/T UG/T UG/T UG/T UG/T UG/T
UG/E
UG/E
UG/E
UG/E
FOC
FOC
FOC
FOC
UG/E
UG/E
UG/EUG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/T
UG/TUG/TUG/TUG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
GAS GAS GAS GAS GAS GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
W W W W W W
W W W W W W W W
W W
W W
W
W
W
UG/T
UG/T
UG
/T
UG
/T
UG
/T
UG
/T
UG
/T
UG
/T
UG
/T
UG/T FOC
FOC
FOC FOC
UG
/E
GAS
GAS
GAS GA
S
GA
S UG/E
UG
/E
UG
/E
UG
/E
UG/T
UG/T
UG
/T
UG
/T
UG
/T
UG
/T
UG
/T
UG
/T
UG/T
GAS
GAS
GAS
GAS
GAS
GAS
GASGASGASGASGASGAS
WWW
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E UG
/E
UG
/E
UG
/E
UG
/E
UG/E
UG/E
UG/TUG/TUG/T
UG/T
UG/T
UG/T
GAS
GASGAS
GASGASGAS
W
W
W
UG/E
UG
/T
UG
/T
UG/T
UG/T
UG/T
UG
/T
UG
/T
UG
/T
UG
/E
UG
/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG
/T
UG
/T
UG/TUG/TFOCFOC
UG/E
UG/E
UG
/E
UG
/E
UG/E
UG/E
UG/E
UG/E
UG/E
GAS
GAS
GAS
FOC FOC FOC
FOC
FOCFOCFOCFOCFOCFOCFOCFOCFOCFOC
UG/E
UG/EUG/EUG/EUG/EUG/EUG/EUG/EUG/EUG/E
UG/E
UG/EUG/E
UG/E
UG/E
UG/E
GAS
GAS
GAS
GAS
GAS
GAS
GAS
0 64
655 653654
64264
651652
W W
UG/TUG/TUG/TUG/T
UG
/T
UG/T
UG/E
UG/E
UG/E
UG/E
FOC
FOC
FOC
FOC
GAS
UG/E
UG/E
UG/E
UG/E
UG/T
UG/T
UG/T
UG/T
UG/T
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG
/E
UG
/E
UG
/E
UG/T
UG/T
UG/T
UG/T
UG/T
WWWWWWWWWWWWWWW
W
W W
W
W
W
W
W
W
W W
W W
W
W
W
W
W
W
W
ABANDONED
STEAM PER PLAN
BUILDING 43
BUILDING 45
BUILDING 112
BUILDING 49
BUILDING 50
RESEARCH
BUILDING
W
W
W
W
W
W
W
W
W
W
BUILDING 150
FISHER HOUSE
WATER PER PLAN
FLAGPOLE
EXISTING MECHANICAL
EQUIPMENT AT BASEMENT LEVEL
BM: 655.62'
NW BOLT
ON HYDRANT
BM: 641.53'
BW BOLT
ON HYDRANT
STORAGE AND
STAGING AREA
TEE AND VALVE FOR
NEW STUB FOR
EXISTING HYDRANT
J
E
D
K
B
C
H
G
F
A
SEE WATER LINE PROFILE
ON SHEET CU201
SEE WATER LINE PROFILE
ON SHEET CU202
SEE WATER LINE PROFILE
ON SHEET CU202
W
W
W W
W W
W W
W W
W W
W
W W
W W
W
W
GV
W
W
W
W
W
W
W
W
W
W
W
W
W
W
GV
GV
W
W
W
W
GV
G V
GV
GV
G V
GV
W W
W W
W W
G V
GV
GV
GV
W W W
WWWWWWWW
GV
G V
G V
G V
GVG
V
G V
A
4MH 27
MH 29 MH 32
VAULT
HVP 8
MH
XF 41
MH 18
H
IN
ES
B
LV
D
GENERAL WOLCOTT BLVD
FLOWER DR
HIN
ES B
LV
D
VAULT
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER:CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects
Foresite Group, LLC 2128 Moores Mill Rd.
Suite C Auburn, AL 36830 o | 334.887.6064 f | 334.887.6024 w | www.foresitegroup.net
ACG Project Number 21-024
DECEMBER 1, 2021
WATER MAIN REPLACEMENT
BETWEEN BUILDING 43 AND
BUILDING 102
695-21-108
CLEMENT J. ZABLOCKI VAMC,
5000 W. NATIONAL AVENUE,
MILWAUKEE, WI 53295 FCM ZLR
43, 45, 102, & 112
BID SET
OVERALL WATER LAYOUT PLAN
CU101
1) CONTRACTOR SHALL NOTIFY ENGINEER OF ANY DISCREPANCIES
BETWEEN THE EXISTING CONDITIONS IN THE FIELD AND THE SURVEY
SHOWN ON THE PLANS BEFORE PROCEEDING WITH ANY NEW
CONSTRUCTION.
2) CONTRACTOR IS RESPONSIBLE FOR CORRECT HORIZONTAL AND
VERTICAL ALIGNMENT OF ALL TIES BETWEEN NEW AND EXISTING
PAVEMENTS, CURB AND GUTTER, SIDEWALKS, WALLS, AND UTILITIES.
3) ALL EROSION, SEDIMENT CONTROL AND TREE PROTECTION
MEASURES SHALL BE INSTALLED PRIOR TO ANY GRADING.
4) MAXIMUM CUT OR FILL SLOPE=3H:1V
5) 24 HOUR CONTACT: VA COR
6) IN ALL AREAS OF FILL OR OTHERWISE DISTURBANCE OF
EXISTING CONDITIONS, UNLESS OTHERWISE NOTED, THE
CONTRACTOR SHALL FULLY AND COMPLETELY REMOVE AND
LEGALLY DISPOSE OFF-SITE, ALL PLANT MATERIALS INCLUDING BUT
NOT LIMITED TO ROOT SYSTEMS, CONCRETE, REINFORCED
CONCRETE, ASPHALT DEBRIS, UNDERBRUSH, TOPSOIL, AND OTHER
DELETERIOUS MATERIAL. THE SUBGRADE TO REMAIN SHALL BE
COMPACTED TO 98% STANDARD PROCTOR MAXIMUM DRY DENSITY
FOLLOWING FULL REMOVAL OF THESE MATERIALS. REFER TO SPEC
31 20 00 FOR FURTHER DETAILS.
7) CONTRACTOR SHALL BE RESPONSIBLE FOR CONSTRUCTION
AND MAINTENANCE OF EROSION AND SEDIMENTATION CONTROLS
DURING CONSTRUCTION FOR PROTECTION OF ADJACENT
ROADWAYS.
8) ALL CONNECTIONS TO EXISTING BUILDINGS TO TAKE PLACE 5'
OUTSIDE OF BUILDING. CONNECT NEW PIPING TO EXISTING PIPING
AT 5' OUTSIDE OF BUILDING.
9) ALL NEW PIPING TO BE DISINFECTED PER AWWA C651-05.
10) ALL NEW PIPING TO BE PRESSURE TESTED PER VA
SPECIFICATION SECTION 33 10 00 WATER UTILITIES.
11) PROVIDE TEMPORARY CHAINLINK FENCING AROUND ALL WORK
AREAS. SUBMIT FENCING PLAN TO VA FOR REVIEW.
12) PROVIDE BOARD INSULATION WHERE DEPTH OF COVER IS LESS
THAN 6 FEET.
SHEET NOTES:
KEY NOTES:
KEY PLAN
LEGEND
PROPOSED CONCRETE PAVING
PROPOSED PAVEMENT PATCH TO MATCH EXISTING
PROPOSED UNDERGROUND WATER LINE
EXISTING UNDERGROUND WATER LINE
EXISTING CONTOUR LINE
SURVEY MOUMENT
PROPOSED VALVE
PROPOSED TEE
PROPOSED BEND
PROPOSED FIRE HYDRANT
EXISTING FIRE HYDRANT
PHASING PLAN LOCATION MARKER
W W
1" = 30'
SCALE IN FEET
30 15 30 60
SITE
XXXX
W W W
1) PROVIDE 6" DUCTILE IRON WATER MAIN TO BE OFFSET 5 FEET
FROM EXISTING WATER MAIN.
2) PER POTHOLING OPERATIONS, AN UNKNOWN CONCRETE UTILITY
STRUCTURE RUNS DIRECTLY OVER THE EXISTING WATER MAIN
HERE. CONCRETE STRUCTURE IS 20" DEEP TO THE TOP AND 62" TO
THE BOTTOM. SEE ULO SUMMARY REPORT.
3) RESET EXISTING HYDRANT WITH CONNECTION TO NEW WATER
MAIN.
4) PROVIDE FISHER HOUSE LINE STOP VALVE
5) PROVIDE REPLACEMENT FOR SERVICE TO BUILDING 112.
BUILDING 112 TO BE BACKFED FROM THE NORTH BY VA PERSONNEL.
6) NEW HYDRANT TO REPLACE EXISTING.
7) PROVIDE 6" WATER MAIN TO CREATE LOOP
8) PROVIDE 6" GATE VALVE
9) PROVIDE STORAGE AND STAGING AREA. THIS AREA TO BE
ENCLOSED WITH CONSTRUCTION FENCING.
10) EXISTING SERVICE TO BUILDING 50 TO BE CONNECTED TO NEW
MAIN. SERVICE TO THESE BUILDINGS IS NOT TO BE INTERRUPTED.
11) CONNECT TO EXISTING WATER MAIN.
12) BUILDING 102 TO BE BACKFED BY VA PERSONNEL TO PREVENT
SERVICE INTERRUPTION.
13) PROVIDE CONSTRUCTION SIGN. SEE DETAIL 1-CS502.
14) PROVIDE SAFETY SIGN. SEE DETAIL 2-CS502.
15) PROVIDE 12" GATE VALVE.
16) PROVIDE 10" GATE VALVE.
17) PROVIDE 8" GATE VALVE.
18) PROVIDE 1" GATE VALVE.
19) RESTRIPE ALL AFFECTED PARKING AREAS TO MATCH EXISTING.
20) PROVIDE 2 BOLLARDS. COORDINATE FINAL LOCATION WITH VA
COR. SEE DETAIL ON SHEET CS502.
PHASING PLAN
1. INSTALL ISOLATION VALVE ON FISHER HOUSE LINE TO MAINTAIN SERVICE TO FISHER HOUSE THROUGHOUT CONSTRUCTION. THIS WORK IS TO BE DONE ON A SATURDAY.
2. OPEN TRENCH EXPOSING EXISTING MAIN AS WELL AS ROOM FOR NEW MAIN FIVE FEET FROM EXISTING MAIN BETWEEN LOCATIONS J & B. ALL TRENCHES IN ROADWAYS AND PARKING AREAS TO BE PLATED WHEN WORK IS NOT BEING PERFORMED TO ALLOW FOR USE OF THESE AREAS.
3. LAY NEW MAIN PIPING AND ASSOCIATED BENDS, CONNECTIONS TEES, AND VALVES BETWEEN LOCATIONS J & B PREPARING FOR CONNECTIONS.
4. VA TO BACK FEED BUILDING 102 TO INSURE UNINTERRUPTED SERVICE. PROVIDE 2 WEEKS NOTICE TO VA TO ACCOMPLISH THIS.
5. PERFORM CONNECTIONS AT LOCATIONS J & B.
6. OPEN TRENCH EXPOSING EXISTING MAIN AS WELL AS ROOM FOR NEW MAIN FIVE FEET FROM EXISTING MAIN BETWEEN LOCATIONS K & D. ALL TRENCHES IN ROADWAYS AND PARKING AREAS TO BE PLATED WHEN WORK IS NOT BEING PERFORMED TO ALLOW FOR USE OF THESE AREAS.
7. LAY NEW MAIN PIPING AND ASSOCIATED BENDS, TEES, AND VALVES BETWEEN LOCATIONS K & D PREPARING FOR CONNECTIONS INCLUDING STUB FOR HYDRANT AT E.
8. MAKE CONNECTION AT K WHERE NEW TEE WAS INSTALLED IN STEP 3.
9. MAKE CONNECTION TO HYDRANT AT E
10. MAKE CONNECTION TO EXISTING MAIN AT D. THIS MUST BE DONE ON A SATURDAY TO PREVENT INTERRUPTIONS TO BUILDING 102'S WATER SERVICE.
11. REMOVE ALL EXISTING, ABANDONED PIPING BETWEEN LOCATIONS B & J AND LOCATIONS K & D.
12. OPEN TRENCH EXPOSING EXISTING MAIN AS WELL AS ROOM FOR NEW MAIN FIVE FEET FROM EXISTING MAIN BETWEEN LOCATIONS H & A. ALL TRENCHES IN ROADWAYS TO BE PLATED WHEN WORK IS NOT BEING PERFORMED TO ALLOW FOR USE OF THESE AREAS. AE RECOMMENDS CLOSING THE NORTH HALF OF THE BUILDING 43 PARKING LOT.
13. LAY NEW MAIN PIPING AND ASSOCIATED BENDS, TEES, AND VALVES BETWEEN LOCATIONS H & A PREPARING FOR CONNECTIONS.
14. VA TO BACK FEED BUILDING 112 FROM THE NORTH. (THIS STEP MUST BE COMPLETED PRIOR TO STEP 21). PROVIDE TWO WEEKS FOR THE VA TO COMPLETE THIS WORK.
15. PROVIDE TEMPORARY SERVICE TO BUILDINGS 49 & 50.
16. CONNECT NEW MAIN AT LOCATION H. THIS WORK TO BE PERFORMED ON A SATURDAY.
17. CONNECT NEW MAIN TO EXISTING SERVICE FOR BUILDINGS 49 & 50 AT LOCATION G.
18. CONNECT NEW MAIN AT LOCATION A. THIS WORK MUST BE DONE ON A SATURDAY.
19. OPEN A TRENCH BETWEEN LOCATION F AND BUILDING 112.
20. LAY NEW MAIN PIPING AND ASSOCIATED BENDS, AND VALVES BETWEEN LOCATION F AND BUILDING 112.
21. MAKE CONNECTION AT LOCATION F AND THEN AT BUILDING 112.
22. REMOVE ALL EXISTING, ABANDONED PIPING BETWEEN LOCATION F AND BUILDING 112, AND BETWEEN LOCATIONS H AND A.
ALL NEW PIPING MUST BE PRESSURE TESTED PER VA SPEC SECTION 33 10 00 WATER UTILITIES.
ALL NEW PIPING MUST BE DISINFECTED PER AWWA C651-05.
AutoCAD SHX Text
CONCRETE WALK
AutoCAD SHX Text G
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text
BLDG S
AutoCAD SHX Text B
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
BLDG 1002 S
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
BLDG E
AutoCAD SHX Text
BLDG E
AutoCAD SHX Text
BLDG E
AutoCAD SHX Text
STORM RD
AutoCAD SHX Text
STORM RD
AutoCAD SHX Text
STORM RD
AutoCAD SHX Text
STORM RD
AutoCAD SHX Text
STORM RD
AutoCAD SHX Text
BLDG S
AutoCAD SHX Text
STORM RD
AutoCAD SHX Text M
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text
ST
AutoCAD SHX Text V
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text V
AutoCAD SHX Text
ST
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text
ST
RIM 634.82
IE. 633.08
FILLED W/ DIRT
RIM 633.97
BOTTOM 627.42
FILLED W/ WATER
RIM 633.29
10"N 625.54 12"W 627.76
RIM 635.39
10"NE 628.4±
10"SE 628.4±
RIM 637.41
N 632.44 S 632.44 W 632.71
RIM 639.44
6"E 634.28 6"W 634.28
SS
SS
SS
SS
SS
SS
SS
SSSSSSSSSSSSSSSSSSSSSSSSSSSS
CONC STEPS
CONCRETE
TUNNEL
ACCESS
TRANS.
CONCRETE
CONCRETE WALK
C O
N C
. W A
LK
C
O N
C R
E
TE
W A
LK
C O
N C
R E
TE
W
A
LK
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPHALT
P O
R C
H
WOOD
STEPS
METAL
CAP
CONC.
CONC.
CONCRETE WALK
CONCRETE WALK
SIGN
FOC FOC FOC FOC
RIM 640.17
S 634.2±
RIM 637.20
8"W 632.9± 12"S 632.0±
12"SE 632.8±
RIM 638.86
8"E 634.9±
RIM 648.42
6"E 643.2± 6"N 643.32 6"W 643.42
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
RIM 648.38
E 642.4± W 642.5± N 642.9±
FOC
FOC
ASPHALT
ASPHALT
ASPHALT
GASGASGAS
GAS
UG
/E
UG
/E
UG
/E
UG
/E
WOOD FENCE
C O
N C
R E
TE
W
A
LL
GRAVEL
CONCRETE
TIMBER WALL
CONCRETE
TI
M
B E
R W
A
LL
CONCRETE
ASPHALT
GAS
TRANSFORMER
TRANSFORMER
C O
N C
R E
TE
WOOD
STEPS
P O
R C
H
3 STORY
FRAME
BUILDING
3 STORY
FRAME
BUILDING
FRAME
GARAGE
2 STORY
MASONRY
BUILDING
VAULT
HANDRAIL
TRENCH DRAIN
RIM 638.47
8"N. 629.36
8"SW. 629.26
RIM 652.40
12"N&NW. 643.21
12"S. 642.85
RIM 652.49
12"W. 643.99 12"N. 644.09
RIM 646.22
8"S. 640.67 8"W. 670.72
RIM 647.22
8"SE. 642.57
RIM 651.82
W&E. 644.42
SS
SS
SSW
W
UG/E
UG/E
UG/E
FOC
FOC
FOC
UG
/E
UG
/E
UG
/E
UG
/E
FO
C
FO
C
FO
C
FO
C
UG
/E
UG
/E
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
CONCRETE
ASPHALT
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
GRASS
GRASS
CONC CURB & GUTTER
TYPICAL
GRASS
P
LA
N
TE
R P
LA
N
TE
R
C O
N C
R E
TE
GRASS
GRASS
ASPHALT
CONC CURB & GUTTER
TYPICAL UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
FOCFOCFOCFOCFOC
FOC
FOC
W
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG
/T
UG
/T
UG
/T
UG
/T
UG
/T
UG/E
UG
/T
UG
/T
UG
/T
UG
/E
UG
/E
UG
/E
UG
/E
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
GAS GAS GAS GAS GAS GAS GAS
GAS
GAS
UG/E
UG/E
UG
/E
UG
/E
UG/E
UG/E
UG/E
UG
/E
UG
/E
UG
/E
UG
/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG/E
UG/E
UG/E UG/E UG/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG/T
W
W W
W W
W W
W W
W W
W W
W W
W W
W
WWWWWWWWWW
W W
W W
FO
C
FO
C
FO
C
FO
C
GASGAS
GAS
GA
S
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
UG/E
UG
/EUG
/E
UG
/E
UG
/E UG/EUG/E
UG/T
W
WUG/E
GAS
FOC
FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC
FOC
UG/T UG/T UG/T UG/T UG/T UG/T UG/T UG/T
UG/E
UG/E
UG/E
UG/E
FOC
FOC
FOC
FOC
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG
/T
UG/TUG/TUG/TUG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/E
UG/E
UG/E
UG/E
UG
/E
UG
/E
UG
/E
UG
/E
FOC
FOC
FOC
FOC
FO
C
FO
C
FO
C
FOC
GAS GAS GAS GAS GAS GAS GAS
GAS
GA
S
GA
S
GA
S
GA
S
GAS
W W W W W W
W W W W W W W W
W W
W W
W
W
W
W
W
GASGASGASGASGASGAS
WWW
UG/E
UG/E
UG/E
UG/E UG
/E
UG
/E
UG
/E
UG/E
UG/E
UG/TUG/T
UG/T
UG/T
UG/T
UG
/T
UG/E
UG
/E
UG
/E
UG
/E
UG/E
UG/E
UG/E
GAS
GAS
GAS
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E UG/E
UG/EUG/E
UG/E
UG/E
UG/E
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
653654
651652
UG/T
UG
/E
UG
/E
UG
/E
FO
C
FO
C
FO
CUG/E
UG/E
UG/E
UG/E
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG
/T
UG
/T
UG
/T
UG
/T
UG
/T
UG
/T
W
W W
W
W
W
W
W
W
W W
W W
W
W
W
W
ABANDONED
STEAM PER PLAN
BUILDING 49
BUILDING 50
RESEARCH
BUILDING
FLAGPOLE
BM: 641.53'
BW BOLT
ON HYDRANT
STORAGE AND
STAGING AREA
W
W
W
W W
W W
W W
W W
W W
W W
0+
1+00
2+00
3+00
4+00
5+00
6+00
7+00
7+01
W
GV
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
GV
GV
W
W
W
W
W
W
W
GV
G V
GV
GV
G V
GV
W W
W W
W W
W
G V
W W W W W
WWWWWWWWWWWW
GV
G V
G V
G V
GVG
V
T1 T2
T3
T4
T5
T6
B6
B7
B8
B9
B11
NEW GATE VALVE (TYP.)
V10
V9V8
V18
V7
V5V13
V3 V2
V1
CONNECT NEW MAIN
TO EXISTING MAIN
B2
B1 B3
B4
B5
V4
V12
V11
V17
V6
V19
R1
PROVIDE 8"X6" REDUCER
TO CONNECT NEW MAIN
TO EXISTING MAIN
4MH 27
MH 29 MH 32
VAULT
HVP 8
MH
XF 41
MH 18
H
IN
ES
B
LV
D
GENERAL WOLCOTT BLVD
FLOWER DR
HIN
ES B
LV
D
VAULT
E le va ti on
1" = 20' H, 1"=5' V
WATER MAIN REPLACEMENT MAIN LINE
-0+50 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00
EXISTING GRADE (TYP.)
PROPOSED 6"
DIP WATER MAIN
ENDS
OF
EXISTING
8" PVC
WATER
MAIN PROPOSED 6"
DIP WATER MAIN
EX SS
EX FOC
EX UG/EEX FOC
EX UG/E
EX SS
EX GAS
EX UG/E
EX GAS
(4" STEEL,
39" TO TOP
OF PIPE)
EX UG/E
EX FOC
EX GAS
EX UG/E
EX FOC
EX UG/E
EX GAS
GATE VALVE
(TYP.)
EX
STEAM
TUNNEL
EXISTING
12" DI
WATER
MAIN (99"
TO TOP
OF PIPE
AT TIE IN
LOCATION)
96" TO TOP
OF EX 8" PVC
WATER MAIN
57" TO TOP OF
EX 8" PVC
8"X6"
REDUCER
EX 6" DI WATER
MAIN (72" TO TOP
OF PIPE AT TIE IN)
Fitting Table - Bend
Fitting Name
B1
B2
B3
B4
B5
B6
B7
B8
B9
B10
B11
B12
Bend Angle
45.00°
45.00°
45.00°
45.00°
45.00°
45.00°
45.00°
11.25°
22.50°
45.00°
45.00°
90.00°
Type
ELBOW
ELBOW
ELBOW
ELBOW
ELBOW
ELBOW
ELBOW
ELBOW
ELBOW
ELBOW
ELBOW
ELBOW
Size
6 IN X 6 IN
6 IN X 6 IN
6 IN X 6 IN
6 IN X 6 IN
6 IN X 6 IN
6 IN X 6 IN
6 IN X 6 IN
6 IN X 6 IN
6 IN X 6 IN
6 IN X 6 IN
6 IN X 6 IN
6 IN X 6 IN
Station
0+14.06
0+17.05
1+90.17
1+97.61
3+62.23
3+65.53
3+71.57
4+12.59
6+80.01
0+75.62
4+83.30
5+61.68
Restraint Length
7'
7'
7'
7'
7'
7'
7'
2'
4'
7'
7'
17'
Fitting Table - Other
Fitting Name
T1
T2
T3
T4
T5
T6
T7
T8
Type
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
Size
6 in x 6 in x 6 in
6 in x 6 in x 6 in
8 in x 8 in x 6 in
6 in x 6 in x 1 in
6 in x 6 in x 6 in
12 in x 12 in x 6 in
6 in x 6 in x 6 in
10 in x 10 in x 6 in
Station
0+11.32
0+71.25
3+56.43
3+77.31
4+83.48
7+01.20
0+72.29
0+72.10
Restraint Length
11'
11'
9'
N/A
11'
7'
11'
8'
Valve Table
Valve Name
V1
V2
V3
V4
V5
V6
V7
V8
V9
V10
Type
GATE
GATE
GATE
GATE
GATE
GATE
GATE
GATE
GATE
GATE
Size
6"
6"
6"
6"
8"
6"
6"
6"
6"
12"
Station
0+07.04
0+11.29
0+68.03
1+94.15
3+53.37
3+59.09
4+79.97
4+86.65
6+98.09
7+01.17
Valve Table
Valve Name
V11
V12
V13
V14
V15
V16
V17
Type
GATE
GATE
GATE
GATE
GATE
GATE
GATE
Size
12"
6"
6"
10"
10"
1"
6"
Station
7+01.22
0+71.34
0+74.48
0+69.15
0+75.18
3+76.97
4+83.26V18
V19 GATE 6" 4+83.26
GATE 8" 3+56.43
R1 REDUCER 8 in x 6 in 1+99.96 15'
V20 GATE 12" N/A (SW OF BLD 43)
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER:CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects
Foresite Group, LLC 2128 Moores Mill Rd.
Suite C Auburn, AL 36830 o | 334.887.6064 f | 334.887.6024 w | www.foresitegroup.net
ACG Project Number 21-024
DECEMBER 1, 2021
WATER MAIN REPLACEMENT
BETWEEN BUILDING 43 AND
BUILDING 102
695-21-108
CLEMENT J. ZABLOCKI VAMC,
5000 W. NATIONAL AVENUE,
MILWAUKEE, WI 53295 FCM ZLR
43, 45, 102, & 112
BID SET
1" = 20'
SCALE IN FEET
20 10 20 40
LEGEND
EXISTING FENCE LINE
PROPERTY LINE
EXISTING CABLE TELEVISION LINE
EXISTING FIBER OPTIC LINE
EXISTING OVERHEAD POWER LINE
EXISTING UNDERGROUND POWER LINE
EXISTING UNDERGROUND TELEPHONE LINE
EXISTING GAS LINE
EXISTING SANITARY SEWER LINE
EXISTING WATER LINE
EXISTING STORM LINE
PROPOSED CABLE TELEVISION LINE
PROPOSED FIBER OPTIC LINE
PROPOSED OVERHEAD POWER LINE
PROPOSED UNDERGROUND POWER LINE
PROPOSED UNDERGROUND TELEPHONE LINE
PROPOSED GAS LINE
PROPOSED SANITARY SEWER LINE
PROPOSED WATER LINE
PROPOSED FIRE WATER LINE
PROPOSED STORM LINE
CATV CATV
CATV CATV
FOC FOC FOC
FOC FOC FOC
OHP OHP OHP
OHP OHP OHP
UG/E UG/E
UG/E UG/E
UG/T UG/T
UG/T UG/T
GAS GAS GAS
GAS GAS GAS
SS SS SS
SS SS SS
W W W
W W W
KEY PLAN
WATER LINE PLAN & PROFILE (1 OF 2)
CU201
1" = 5'
VERTICAL: SCALE IN FEET
10 5 10 20
SITE
NOTE:
- ALL UTILITY CROSSING ELEVATIONS ARE ASSUMED.
CONTRACTOR TO FIELD VERIFY AND NOTIFY COR OF ANY
DISCREPANCIES.
- AT CROSSINGS OF POTABLE WATER MAINS AND SANITARY
SEWERS, STORM SEWERS, FORCE MAINS, RECLAIMED/REUSE
MAINS, OR CHILLED WATER MAINS, WHERE THE POTABLE
WATER MAIN CROSSES ABOVE THE OTHER UTILITY, THE
MINIMUM VERTICAL SEPARATION SHALL BE 18".
- WHERE 18" CANNOT BE MAINTAINED OR WHERE POTABLE
WATER LINES CROSS UNDER GRAVITY SEWERS,
RECLAIMED/REUSE MAINS, OR CHILLED WATER MAINS,
ADDITIONAL PROTECTION SHALL BE PROVIDED. ADDITIONAL
PROTECTION SHALL CONSIST OF CONCRETE ENCASEMENT. THE
ADDITIONAL PROTECTION SHALL EXTEND A MINIMUM DISTANCE
OF 10'-0" OUTSIDE THE LIMITS OF THE CROSSING.
- THE PREFERRED VERTICAL CLEARANCE BETWEEN DUCT BANKS
AND PIPED UTILITIES SHALL BE 2'-0" AND THE MINIMUM
VERTICAL CLEARANCE SHALL BE 18".
- THE MINIMUM VERTICAL CLEARANCE TO ALL STEAM, PUMPED
CONDENSATE, AND HOT WATER, AND OTHER UTILITIES SHALL
BE AT LEAST 18".
- PROVIDE BOARD INSULATION WHERE DEPTH OF COVER IS LESS
THAN 6 FEET.
1" = 20'
HORIZONTAL: SCALE IN FEET
20 10 20 40
AutoCAD SHX Text G
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
V
4MH 27
MH 29 MH 32
VAULT
HVP 8
MH
XF 41
MH 18
H
IN
ES
B
LV
D
GENERAL WOLCOTT BLVD
FLOWER DR
HIN
ES B
LV
D
VAULT
E le va ti on
E levation
1" = 20' H, 1"=5' V
WATER MAIN LOOP
-0+50 0+00 0+50 1+00 1+50 2+00 2+50
EXISTING GRADE (TYP.)
PROPOSED 6" DIP
WATER MAIN
EX WATER
EX UG/T
EX UG/E
ASPHALT
ASPHALT
GASGAS
GAS
TRANSFORMER
C
O N
C R
E
TE
W A
LL
CONCRETE
GRAVEL
CONCRETE
2 STORY
MASONRY
BUILDING
SI
G
N
RIM 641.42
6"S. 639.17
FUNNEL 638.46
RIM 652.40
12"N&NW. 643.21
12"S. 642.85
RIM 652.49
12"W. 643.99 12"N. 644.09
FOC
FOC
CAPPED PIPE
UG
/E
UG
/E
ASPHALT
GRASS
GRASS
GASGASGASGASGASGAS
WWW
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG
/E
UG/T
UG/T
UG/T
UG/T
UG
/T
W
W
UG/E
UG
/T
UG
/T
UG
/T
UG
/T
UG
/T
UG
/T
UG
/T
UG
/T
UG
/T
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG/T
UG/TUG/T
FOC
FOC FOC
FOC
0 64
653654
W
W W
W
W
W
RESEARCH
BUILDING
W
W
W
W
W
WATER PER PLAN
1+80
0+00
1+
W W
W W
W W
W W
GV
G V
GV
W W
W W
W W
W W
W
G V
GV
GV
GV
W W W W W
WWWWWWW
T1 T2
T7
T8
B10
V13
V3 V2
V1
V14
V15
V16
CONNECT NEW MAIN
TO EXISTING MAIN
B2
B1
E le va ti on
E levation
1" = 20' H, 1"=5' V
WATER MAIN TO BLD 112
-0+50 0+00 0+50 1+00 1+50 2+00 2+50
PROPOSED 6" DIP
WATER LINE
EX SS
EX SS
EX UG/T
EX FOC
EX GAS
GATE VALVE
(TYP.)
EXISTING
DUCT
BANK
RIM 650.00
E 640.46 W 640.46
SE 640.46RIM 651.03
ABANDONED
SSSSSS
CONC STEPS
VENT
ASPHALT
FAN
CONC.
CONCRETE
CONCRETE WALK
PUMP
RIM 640.17
S 634.2±
RIM 648.42
6"E 643.2± 6"N 643.32 6"W 643.42
SS
SS
SS
SS
SS
CONCRETE
FOCFOCFOCFOCFOC
GAS
GAS
GAS
GAS
GAS
GAS
UG/E
UG/E
UG/E
GA
S
GA
S
GA
S
GA
S
GAS
FOC FOC FOC
FOC FOC FOC
UG/T UG/T UG/T UG/T UG/T UG/T
W
W W
W W
W W
W W
W W
W W
W W
W W
W
0+00
1+
1+69
W
W
W
W
W
GV
GV
W
W
W
W
GV T5
B11
B12
V9V8
V18
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER:CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects
Foresite Group, LLC 2128 Moores Mill Rd.
Suite C Auburn, AL 36830 o | 334.887.6064 f | 334.887.6024 w | www.foresitegroup.net
ACG Project Number 21-024
DECEMBER 1, 2021
WATER MAIN REPLACEMENT
BETWEEN BUILDING 43 AND
BUILDING 102
695-21-108
CLEMENT J. ZABLOCKI VAMC,
5000 W. NATIONAL AVENUE,
MILWAUKEE, WI 53295 FCM ZLR
43, 45, 102, & 112
BID SET
1" = 20'
SCALE IN FEET
20 10 20 40
1" = 12'
VERTICAL: SCALE IN FEET
12 6 12 24
LEGEND
EXISTING FENCE LINE
PROPERTY LINE
EXISTING CABLE TELEVISION LINE
EXISTING FIBER OPTIC LINE
EXISTING OVERHEAD POWER LINE
EXISTING UNDERGROUND POWER LINE
EXISTING UNDERGROUND TELEPHONE LINE
EXISTING GAS LINE
EXISTING SANITARY SEWER LINE
EXISTING WATER LINE
EXISTING STORM LINE
PROPOSED CABLE TELEVISION LINE
PROPOSED FIBER OPTIC LINE
PROPOSED OVERHEAD POWER LINE
PROPOSED UNDERGROUND POWER LINE
PROPOSED UNDERGROUND TELEPHONE LINE
PROPOSED GAS LINE
PROPOSED SANITARY SEWER LINE
PROPOSED WATER LINE
PROPOSED FIRE WATER LINE
PROPOSED STORM LINE
CATV CATV
CATV CATV
FOC FOC FOC
FOC FOC FOC
OHP OHP OHP
OHP OHP OHP
UG/E UG/E
UG/E UG/E
UG/T UG/T
UG/T UG/T
GAS GAS GAS
GAS GAS GAS
SS SS SS
SS SS SS
W W W
W W W
KEY PLAN
WATER LINE PLAN & PROFILE (2 OF 2)
CU202
SITE
NOTE:
- ALL UTILITY CROSSING ELEVATIONS ARE ASSUMED.
CONTRACTOR TO FIELD VERIFY AND NOTIFY COR OF ANY
DISCREPANCIES.
- AT CROSSINGS OF POTABLE WATER MAINS AND SANITARY
SEWERS, STORM SEWERS, FORCE MAINS, RECLAIMED/REUSE
MAINS, OR CHILLED WATER MAINS, WHERE THE POTABLE
WATER MAIN CROSSES ABOVE THE OTHER UTILITY, THE
MINIMUM VERTICAL SEPARATION SHALL BE 18".
- WHERE 18" CANNOT BE MAINTAINED OR WHERE POTABLE
WATER LINES CROSS UNDER GRAVITY SEWERS,
RECLAIMED/REUSE MAINS, OR CHILLED WATER MAINS,
ADDITIONAL PROTECTION SHALL BE PROVIDED. ADDITIONAL
PROTECTION SHALL CONSIST OF CONCRETE ENCASEMENT. THE
ADDITIONAL PROTECTION SHALL EXTEND A MINIMUM DISTANCE
OF 10'-0" OUTSIDE THE LIMITS OF THE CROSSING.
- THE PREFERRED VERTICAL CLEARANCE BETWEEN DUCT BANKS
AND PIPED UTILITIES SHALL BE 2'-0" AND THE MINIMUM
VERTICAL CLEARANCE SHALL BE 18".
- THE MINIMUM VERTICAL CLEARANCE TO ALL STEAM, PUMPED
CONDENSATE, AND HOT WATER, AND OTHER UTILITIES SHALL
BE AT LEAST 18".
- PROVIDE BOARD INSULATION WHERE DEPTH OF COVER IS LESS
THAN 6 FEET.
1" = 20'
HORIZONTAL: SCALE IN FEET
20 10 20 40
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text V
AutoCAD SHX Text B
AutoCAD SHX Text
ST
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text M
M
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER:CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects
Foresite Group, LLC 2128 Moores Mill Rd.
Suite C Auburn, AL 36830 o | 334.887.6064 f | 334.887.6024 w | www.foresitegroup.net
ACG Project Number 21-024
DECEMBER 1, 2021
WATER MAIN REPLACEMENT
BETWEEN BUILDING 43 AND
BUILDING 102
695-21-108
CLEMENT J. ZABLOCKI VAMC,
5000 W. NATIONAL AVENUE,
MILWAUKEE, WI 53295 FCM ZLR
43, 45, 102, & 112
BID SET
WATER LINE DETAILS
CU501
STANDARD WATER MAIN TRENCH SECTION
NOT TO SCALE
CU501
FIRE HYDRANT INSTALLATION
NOT TO SCALE
CU501
STANDARD GATE VALVE BOX SETTING
NOT TO SCALE
CU501
TRACER WIRE
NOT TO SCALE
CU501
WATER BRANCH SERVICE PIPE TAP
NOT TO SCALE
CU501
AutoCAD SHX Text
ENCASE ENTIRE BRANCH & VALVE IN POLYETHYLENE
AutoCAD SHX Text
CONCRETE BLOCKING
AutoCAD SHX Text
VALVE WHERE SPECIFIED
AutoCAD SHX Text
HYDRANT
AutoCAD SHX Text
CONCRETE THRUST BLOCK
AutoCAD SHX Text
CONCRETE THRUST BLOCK
AutoCAD SHX Text
TYP.
AutoCAD SHX Text
TRENCH
AutoCAD SHX Text
MAIN
AutoCAD SHX Text 24"
AutoCAD SHX Text
VALVE WHERE SPECIFIED
AutoCAD SHX Text
TO CENTER OF STEAMER NOZZLE PROVIDE CHAINS ON ALL CAPS
AutoCAD SHX Text
VARIABLE
AutoCAD SHX Text
NOTE: ALL CONNECTIONS SHALL BE RESTRAINED USING MECHANICAL JOINT RESTRAINTS
AutoCAD SHX Text
BEDDING MATERIAL
AutoCAD SHX Text
CONCRETE THRUST BLOCK
AutoCAD SHX Text
DRAIN
AutoCAD SHX Text
1/2 CU. YD. CRUSHED STONE
AutoCAD SHX Text
BACKFILL
AutoCAD SHX Text
BOX TOP
AutoCAD SHX Text 6"
AutoCAD SHX Text X
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
INCHES
AutoCAD SHX Text
X = SETTING
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
INCHES
AutoCAD SHX Text
PIPE DIA.
AutoCAD SHX Text
SIDE VIEW
AutoCAD SHX Text
FRONT VIEW
AutoCAD SHX Text
MATERIAL
AutoCAD SHX Text
BEDDING
AutoCAD SHX Text
GRADE
AutoCAD SHX Text
POLYETHYLENE WRAP
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ENCASE VALVE IN POLYETHYLENE
AutoCAD SHX Text 2" x 6" x 18" CONCRETE BLOCKING
AutoCAD SHX Text 1' ±
AutoCAD SHX Text 1' ±
AutoCAD SHX Text
OVERLAP
AutoCAD SHX Text 6"
AutoCAD SHX Text 4"
AutoCAD SHX Text 6"
AutoCAD SHX Text 4"
AutoCAD SHX Text 3"
AutoCAD SHX Text
DRY TRENCH
AutoCAD SHX Text
WET TRENCH
AutoCAD SHX Text
APPROVED ADHESIVE WRAP WHERE REQUIRED
AutoCAD SHX Text
SUBGRADE
AutoCAD SHX Text
SHEATING WHERE REQUIRED
AutoCAD SHX Text
BACKFILL
AutoCAD SHX Text
POLYETHYLENE WRAP WHERE REQUIRED
AutoCAD SHX Text
BEDDING MATERIAL
AutoCAD SHX Text
3" OF 1-1/2" GRADED CRUSHED STONE REQUIRED IN WET TRENCH
AutoCAD SHX Text
POLYETHYLENE WRAP PER SPECIFICATIONS
AutoCAD SHX Text
SEAL W/TAPE (TYP)
AutoCAD SHX Text
6'-6'' MIN
AutoCAD SHX Text
PROVIDE 18" EXTRA WIRE
AutoCAD SHX Text
BURY 2" PVC 2' DEEP
AutoCAD SHX Text
HYDRANT
AutoCAD SHX Text
END CONDUIT 6" BELOW GRADE
AutoCAD SHX Text
1/2" PVC CONDUIT
AutoCAD SHX Text
TYPICAL MAIN OR HYDRANT VALVE
AutoCAD SHX Text
TAPE AT 10' INTERVALS
AutoCAD SHX Text
2" PVC CONDUIT WITH SLIP CAP OR ACCESS BOX
AutoCAD SHX Text
EXTEND CONDUIT 3" ABOVE BREAK FLANGE. PROVIDE 24" OF EXTRA WIRE
AutoCAD SHX Text
TAPE TO HYDRANT BARREL
AutoCAD SHX Text
%%UNOTE:
AutoCAD SHX Text
LOCATING WIRE SHALL BE INSTALLED AT ALL
AutoCAD SHX Text
HYDRANTS AND VALVES.
AutoCAD SHX Text
GRADE
AutoCAD SHX Text
WATERMAIN
AutoCAD SHX Text
TAPPING SLEEVE (MECHANICAL)
AutoCAD SHX Text
VALVE BOX
AutoCAD SHX Text
VALVE BOX BASE ADAPTER
AutoCAD SHX Text
TAPPING VALVE
AutoCAD SHX Text
POLYETHYLENE FILM ENVELOPE (FOR DUCTILE IRON)
AutoCAD SHX Text
CONCRETE BLOCKING
AutoCAD SHX Text
CONCRETE BLOCKING
AutoCAD SHX Text
CONCRETE BLOCKING
AutoCAD SHX Text
%%UNOTES:
AutoCAD SHX Text
1. WATER SERVICE PIPING SHALL BE 6'-0" MIN. BELOW GRADE AND BE LEVEL WITH THE WATERMAIN.
AutoCAD SHX Text
2. WHERE AVAILABLE, ANCHOR TEES ARE PERMITTED.
AutoCAD SHX Text
3. COMM 82.40(8)(b) SHALL GOVERN ACCEPTABLE DISTANCES BETWEEN ANY SANITARY SEWER AND WATER SERVICE PIPING.
AutoCAD SHX Text
4. VALVE STOP BOXES SHALL BE A MAXIMUM OF 1" ABOVE FINISHED GRADE AND SHALL BE ACCESSIBLE IN UNPAVED AREAS.
AutoCAD SHX Text
5. VALVE STOP BOXES SHALL BE FLUSH WITH FINISHED GRADE IN PAVED AREAS.
AutoCAD SHX Text
TRENCH WIDTH
AutoCAD SHX Text
BEDDING MATERIAL TO BE 1/4" TO 1-1/2" GRADED CRUSHED STONE
BEDDING MATERIAL TO BE 1/4" TO 1-1/2" GRADED CRUSHED STONE
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER:CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects
Foresite Group, LLC 2128 Moores Mill Rd.
Suite C Auburn, AL 36830 o | 334.887.6064 f | 334.887.6024 w | www.foresitegroup.net
ACG Project Number 21-024
DECEMBER 1, 2021
WATER MAIN REPLACEMENT
BETWEEN BUILDING 43 AND
BUILDING 102
695-21-108
CLEMENT J. ZABLOCKI VAMC,
5000 W. NATIONAL AVENUE,
MILWAUKEE, WI 53295 FCM ZLR
43, 45, 102, & 112
BID SET
CIVIL PAVING AND CONSTRUCTION
DETAILS (1 OF 2)
CS501
3' MIN.
6" MIN.
6"
AutoCAD SHX Text
CONCRETE HEADER
AutoCAD SHX Text
AutoCAD SHX Text
NTS
AutoCAD SHX Text
TOP OF CURB
AutoCAD SHX Text
IMPROVED ROADWAY
AutoCAD SHX Text
SIDEWALK
AutoCAD SHX Text 4" [102mm]
AutoCAD SHX Text 6" [150mm]
AutoCAD SHX Text STANDARD CONCRETE VERTICAL CURB TERMINAL SECTION PER VA STANDARD DETAIL 32 05 23-17 "CONCRETE VERTICLE CURB AND TERMINAL SECTION"
AutoCAD SHX Text 1/2" [13mm] BITUMINOUS JOINT FILLER
AutoCAD SHX Text
CS-501
AutoCAD SHX Text
NTS
AutoCAD SHX Text
CONCRETE SIDEWALK
AutoCAD SHX Text NOTES: 1. EXPANSION JOINTS SHALL BE LOCATED WHERE SIDEWALK ABUTS CONCRETE DRIVEWAYS, CURB EXPANSION JOINTS SHALL BE LOCATED WHERE SIDEWALK ABUTS CONCRETE DRIVEWAYS, CURB OR OTHER ADJACENT STRUCTURES. 2. ONE-HALF INCH BITUMINOUS JOINT FILLER SHALL BE INSTALLED AT EXPANSION JOINT ONE-HALF INCH BITUMINOUS JOINT FILLER SHALL BE INSTALLED AT EXPANSION JOINT LOCATIONS AND SHALL EXTEND THE FULL DEPTH OF THE CONCRETE. 3. 1" DEEP CONTRACTION JOINTS SHALL BE PLACED AT INTERVALS OF APPROXIMATELY 15' 1" DEEP CONTRACTION JOINTS SHALL BE PLACED AT INTERVALS OF APPROXIMATELY 15' [4572mm] OR AT A SPACING THAT MATCHES THE ADJACENT CURB. 4. FORMED CONTRACTION JOINTS SHALL BE FINISHED WITH A TOOL HAVING A 1/4" [6mm] RADIUS. FORMED CONTRACTION JOINTS SHALL BE FINISHED WITH A TOOL HAVING A 1/4" [6mm] RADIUS. 5. SCORED JOINTS SHALL BE 1/4" [6mm] DEEP AND PLACED AT THE SPACING INDICATED FOR SCORED JOINTS SHALL BE 1/4" [6mm] DEEP AND PLACED AT THE SPACING INDICATED FOR THE WIDTH OF SIDEWALK OR MATCH SCORED JOINTS OF ADJACENT CURB. 6. CONCRETE SHALL BE FINISHED BY MEANS OF A FLOAT, STEEL TROWELLED AND BROOMED WITH CONCRETE SHALL BE FINISHED BY MEANS OF A FLOAT, STEEL TROWELLED AND BROOMED WITH A FINE BRUSH IN A TRANSVERSE DIRECTION.
AutoCAD SHX Text 1" DEEP X 1/4" WIDE MAX. [25mm] SCORED OR SAWCUT CONTRACTION JOINT.
AutoCAD SHX Text
TOP OF CURB
AutoCAD SHX Text 1/4" [6mm] DEEP SCORED JOINTS
AutoCAD SHX Text 1/4" [6mm] R. (TYP.) FORMED JOINTS ONLY
AutoCAD SHX Text
CLASS "B" CONCRETE
AutoCAD SHX Text EXPANSION JOINT WITH 1/4" [6mm] BITUMINOUS JOINT FILLER
AutoCAD SHX Text
1% MIN. 2% MAX.
AutoCAD SHX Text
1% MIN. 2% MAX.
AutoCAD SHX Text [102mm]
AutoCAD SHX Text 10.5' MAX. [3200mm]
AutoCAD SHX Text
TYPICAL SECTION
AutoCAD SHX Text
EXPANSION AND SCORED JOINT DETAIL
AutoCAD SHX Text [5mm]
AutoCAD SHX Text [102mm]
AutoCAD SHX Text [18288mm] EXPANSION JOINT TO EXPANSION JOINT
AutoCAD SHX Text [18288mm] EXPANSION JOINT TO EXPANSION JOINT
AutoCAD SHX Text
(TYP)
AutoCAD SHX Text
PLANS
AutoCAD SHX Text
PLANS
AutoCAD SHX Text
PLAN
AutoCAD SHX Text
AutoCAD SHX Text
CS-501
AutoCAD SHX Text
SIDEWALK
AutoCAD SHX Text
NTS
AutoCAD SHX Text
TYPE 2 UTILITY TRENCH PATCH
AutoCAD SHX Text
AutoCAD SHX Text
CS-501
AutoCAD…