695-21-108 _21-024-Q30_ CU201_Amend 04 20220224.pdf
PDF 2 MB Posted
- Solicitation number
- 36C25222B0013
About this file
This document package includes construction plans and specifications for a water main replacement project at the Clement J. Zablocki VA Medical Center in Milwaukee, Wisconsin. The project involves replacing approximately 800 linear feet of existing 6-inch water main between Buildings 43 and 102 on the medical center campus. The plans show the existing underground utilities, proposed water main alignment, and pertinent construction details. Bidders are advised to field verify utility crossing elevations. Minimum separation clearances are specified for crossings of other underground utilities. The related federal contract opportunity is solicitation number 36C25222B0013 for the water main replacement project, to be awarded by the Department of Veterans Affairs Veterans Health Administration VISN 10. The specifications provide requirements for trenching, pipe installation, fittings, valves, testing and disinfection.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INLET
RIM 634.82
IE. 633.08
FILLED W/ DIRT INLET
RIM 633.97
BOTTOM 627.42
FILLED W/ WATER
INLET
RIM 633.29
10"N 625.54 12"W 627.76
RIM 635.39
10"NE 628.4±
10"SE 628.4±
RIM 637.41
N 632.44 S 632.44 W 632.71
RIM 639.44
6"E 634.28 6"W 634.28
SS
SS
SS
SS
SS
SS
SS
SSSSSSSSSSSSSSSSSSSSSSSSSSSS
CONC STEPS
CONCRETE
TUNNEL
ACCESS
TRANS.
CONCRETE
CONCRETE WALK
C O
N C
. W A
LK
C
O N
C R
E
TE
W A
LK
C O
N C
R E
TE
W
A
LK
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPHALT
P O
R C
H
WOOD
STEPS
METAL
CAP
CONC.
CONC.
CONCRETE WALK
CONCRETE WALK
SIGN
FOC FOC FOC FOC
INLET
RIM 640.17
S 634.2±
INLET
RIM 637.20
8"W 632.9± 12"S 632.0±
12"SE 632.8±
INLET
RIM 638.86
8"E 634.9±
RIM 648.42
6"E 643.2± 6"N 643.32 6"W 643.42
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
RIM 648.38
E 642.4± W 642.5± N 642.9±
FOC
FOC
ASPHALT
ASPHALT
ASPHALT
GASGASGAS
GAS
UG
/E
UG
/E
UG
/E
UG
/E
WOOD FENCE
C O
N C
R E
TE
W
A
LL
GRAVEL
CONCRETE
TIMBER WALL
CONCRETE
TI
M
B E
R W
A
LL
CONCRETE
ASPHALT
GAS
TRANSFORMER
TRANSFORMER
C O
N C
R E
TE
WOOD
STEPS
P O
R C
H
3 STORY
FRAME
BUILDING
3 STORY
FRAME
BUILDING
FRAME
GARAGE
2 STORY
MASONRY
BUILDING
VAULT
HANDRAIL
TRENCH DRAIN
RIM 638.47
8"N. 629.36
8"SW. 629.26
GRATE INLET
RIM 652.40
12"N&NW. 643.21
12"S. 642.85
INLET
RIM 652.49
12"W. 643.99 12"N. 644.09
INLET
RIM 646.22
8"S. 640.67 8"W. 670.72
INLET
RIM 647.22
8"SE. 642.57
RIM 651.82
W&E. 644.42
SS
SS
SSW
W
UG/E
UG/E
UG/E
FOC
FOC
FOC
UG
/E
UG
/E
UG
/E
UG
/E
FO
C
FO
C
FO
C
FO
C
UG
/E
UG
/E
FO
C
FO
C
FO
C
FO
C
FO
C
FO
C
CONCRETE
ASPHALT
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
GRASS
GRASS
CONC CURB & GUTTER
TYPICAL
GRASS
P
LA
N
TE
R P
LA
N
TE
R
C O
N C
R E
TE
GRASS
GRASS
ASPHALT
CONC CURB & GUTTER
TYPICAL UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
FOCFOCFOCFOCFOC
FOC
FOC
W
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG
/T
UG
/T
UG
/T
UG
/T
UG
/T
UG/E
UG
/T
UG
/T
UG
/T
UG
/E
UG
/E
UG
/E
UG
/E
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
GAS GAS GAS GAS GAS GAS GAS
GAS
GAS
UG/E
UG/E
UG
/E
UG
/E
UG/E
UG/E
UG/E
UG
/E
UG
/E
UG
/E
UG
/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG/E
UG/E
UG/E UG/E UG/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG
/E
UG
/E
UG
/E
UG
/E
UG
/E
UG/T
W
W W
W W
W W
W W
W W
W W
W W
W W
W
WWWWWWWWWW
W W
W W
FO
C
FO
C
FO
C
FO
C
GASGAS
GAS
GA
S
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
UG/E
UG
/EUG
/E
UG
/E
UG
/E UG/EUG/E
UG/T
W
WUG/E
GAS
FOC
FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC
FOC
UG/T UG/T UG/T UG/T UG/T UG/T UG/T UG/T
UG/E
UG/E
UG/E
UG/E
FOC
FOC
FOC
FOC
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG
/T
UG/TUG/TUG/TUG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/E
UG/E
UG/E
UG/E
UG
/E
UG
/E
UG
/E
UG
/E
FOC
FOC
FOC
FOC
FO
C
FO
C
FO
C
FOC
GAS GAS GAS GAS GAS GAS GAS
GAS
GA
S
GA
S
GA
S
GA
S
GAS
W W W W W W
W W W W W W W W
W W
W W
W
W
W
W
W
GASGASGASGASGASGAS
WWW
UG/E
UG/E
UG/E
UG/E UG
/E
UG
/E
UG
/E
UG/E
UG/E
UG/TUG/T
UG/T
UG/T
UG/T
UG
/T
UG/E
UG
/E
UG
/E
UG
/E
UG/E
UG/E
UG/E
GAS
GAS
GAS
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E UG/E
UG/EUG/E
UG/E
UG/E
UG/E
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
GA
S
653654
651652
UG/T
UG
/E
UG
/E
UG
/E
FO
C
FO
C
FO
CUG/E
UG/E
UG/E
UG/E
UG/T
UG/T
UG/T
UG/T
UG/T
UG/T
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG/E
UG
/T
UG
/T
UG
/T
UG
/T
UG
/T
UG
/T
W
W W
W
W
W
W
W
W
W W
W W
W
W
W
W
ABANDONED
STEAM PER PLAN
BUILDING 49
BUILDING 50
RESEARCH
BUILDING
FLAGPOLE
BM: 641.53'
BW BOLT
ON HYDRANT
STORAGE AND
STAGING AREA
W
W
W
W W
W W
W W
W W
W W
W W
0+
1+00
2+00
3+00
4+00
5+00
6+00
7+00
7+01
W
GV
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
GV
GV
W
W
W
W
W
W
W
GV
G V
GV
GV
G V
GV
W W
W W
W W
W
G V
W W W W W
WWWWWWWWWWWW
GV
G V
G V
G V
GVG
V
T1 T2
T3
T4
T5
T6
B6
B7
B8
B9
B11
NEW GATE VALVE (TYP.)
V10
V9V8
V18
V7
V5V13
V3 V2
V1
CONNECT NEW MAIN
TO EXISTING MAIN
B2
B1 B3
B4
B5
V4
V12
V11
V17
V6
V19
R1
PROVIDE 8"X6" REDUCER
TO CONNECT NEW MAIN
TO EXISTING MAIN
4MH 27
MH 29 MH 32
VAULT
HVP 8
MH
XF 41
MH 18
H
IN
ES
B
LV
D
GENERAL WOLCOTT BLVD
FLOWER DR
HIN
ES B
LV
D
VAULT
E le va ti on
E levation
1" = 50' H, 1"=10' V
WATER MAIN REPLACEMENT MAIN LINE
-0+50 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00
EXISTING GRADE (TYP.)
PROPOSED 6"
DIP WATER MAIN
ENDS
OF
EXISTING
8" PVC
WATER
MAIN
PROPOSED 6"
DIP WATER MAIN
EX SS
EX FOC
EX UG/EEX FOC
EX UG/E
EX SS
EX GAS
EX UG/E
EX GAS
(4" STEEL,
39" TO TOP
OF PIPE)
EX UG/E
EX FOC
EX GAS
EX UG/E
EX FOC
EX UG/E
EX GAS
GATE VALVE
(TYP.)
EX
STEAM
TUNNEL
EXISTING
12" DI
WATER
MAIN (99"
TO TOP
OF PIPE
AT TIE IN
LOCATION)
96" TO TOP
OF EX 8" PVC
WATER MAIN
57" TO TOP OF
EX 8" PVC
8"X6"
REDUCER
EX 6" DI WATER
MAIN (72" TO TOP
OF PIPE AT TIE IN)
Fitting Table - Bend
Fitting Name
B1
B2
B3
B4
B5
B6
B7
B8
B9
B10
B11
B12
Bend Angle
45.00°
45.00°
45.00°
45.00°
45.00°
45.00°
45.00°
11.25°
22.50°
45.00°
45.00°
90.00°
Type
ELBOW
ELBOW
ELBOW
ELBOW
ELBOW
ELBOW
ELBOW
ELBOW
ELBOW
ELBOW
ELBOW
ELBOW
Size
6 IN X 6 IN
6 IN X 6 IN
6 IN X 6 IN
6 IN X 6 IN
6 IN X 6 IN
6 IN X 6 IN
6 IN X 6 IN
6 IN X 6 IN
6 IN X 6 IN
6 IN X 6 IN
6 IN X 6 IN
6 IN X 6 IN
Station
0+14.06
0+17.05
1+90.17
1+97.61
3+62.23
3+65.53
3+71.57
4+12.59
6+80.01
0+75.62
4+83.30
5+61.68
Restraint Length
7'
7'
7'
7'
7'
7'
7'
2'
4'
7'
7'
17'
Fitting Table - Other
Fitting Name
T1
T2
T3
T4
T5
T6
T7
T8
Type
TEE
TEE
TEE
TEE
TEE
TEE
TEE
TEE
Size
6 in x 6 in x 6 in
6 in x 6 in x 6 in
8 in x 8 in x 6 in
6 in x 6 in x 1 in
6 in x 6 in x 6 in
12 in x 12 in x 6 in
6 in x 6 in x 6 in
10 in x 10 in x 6 in
Station
0+11.32
0+71.25
3+56.43
3+77.31
4+83.48
7+01.20
0+72.29
0+72.10
Restraint Length
11'
11'
9'
N/A
11'
7'
11'
8'
Valve Table
Valve Name
V1
V2
V3
V4
V5
V6
V7
V8
V9
V10
Type
GATE
GATE
GATE
GATE
GATE
GATE
GATE
GATE
GATE
GATE
Size
6"
6"
6"
6"
8"
6"
6"
6"
6"
12"
Station
0+07.04
0+11.29
0+68.03
1+94.15
3+53.37
3+59.09
4+79.97
4+86.65
6+98.09
7+01.17
Valve Table
Valve Name
V11
V12
V13
V14
V15
V16
V17
Type
GATE
GATE
GATE
GATE
GATE
GATE
GATE
Size
12"
6"
6"
10"
10"
1"
6"
Station
7+01.22
0+71.34
0+74.48
0+69.15
0+75.18
3+76.97
4+83.26V18
V19 GATE 6" 4+83.26
GATE 8" 3+56.43
R1 REDUCER 8 in x 6 in 1+99.96 15'
V20 GATE 12" N/A (SW OF BLD 43)
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER:CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# Engineers Architects
Foresite Group, LLC 2128 Moores Mill Rd.
Suite C Auburn, AL 36830 o | 334.887.6064 f | 334.887.6024 w | www.foresitegroup.net
ACG Project Number 21-024
DECEMBER 1, 2021
WATER MAIN REPLACEMENT
BETWEEN BUILDING 43 AND
BUILDING 102
695-21-108
CLEMENT J. ZABLOCKI VAMC,
5000 W. NATIONAL AVENUE,
MILWAUKEE, WI 53295 FCM ZLR
43, 45, 102, & 112
BID SET
Amendment #41 2/24/2022
1" = 20'
SCALE IN FEET
20 10 20 40
LEGEND
EXISTING FENCE LINE
PROPERTY LINE
EXISTING CABLE TELEVISION LINE
EXISTING FIBER OPTIC LINE
EXISTING OVERHEAD POWER LINE
EXISTING UNDERGROUND POWER LINE
EXISTING UNDERGROUND TELEPHONE LINE
EXISTING GAS LINE
EXISTING SANITARY SEWER LINE
EXISTING WATER LINE
EXISTING STORM LINE
PROPOSED CABLE TELEVISION LINE
PROPOSED FIBER OPTIC LINE
PROPOSED OVERHEAD POWER LINE
PROPOSED UNDERGROUND POWER LINE
PROPOSED UNDERGROUND TELEPHONE LINE
PROPOSED GAS LINE
PROPOSED SANITARY SEWER LINE
PROPOSED WATER LINE
PROPOSED FIRE WATER LINE
PROPOSED STORM LINE
CATV CATV
CATV CATV
FOC FOC FOC
FOC FOC FOC
OHP OHP OHP
OHP OHP OHP
UG/E UG/E
UG/E UG/E
UG/T UG/T
UG/T UG/T
GAS GAS GAS
GAS GAS GAS
SS SS SS
SS SS SS
W W W
W W W
KEY PLAN
WATER LINE PLAN & PROFILE (1 OF 2)
CU201
1" = 10'
VERTICAL: SCALE IN FEET
10 5 10 20
SITE
NOTE:
- ALL UTILITY CROSSING ELEVATIONS ARE ASSUMED.
CONTRACTOR TO FIELD VERIFY AND NOTIFY COR OF ANY
DISCREPANCIES.
- AT CROSSINGS OF POTABLE WATER MAINS AND SANITARY
SEWERS, STORM SEWERS, FORCE MAINS, RECLAIMED/REUSE
MAINS, OR CHILLED WATER MAINS, WHERE THE POTABLE
WATER MAIN CROSSES ABOVE THE OTHER UTILITY, THE
MINIMUM VERTICAL SEPARATION SHALL BE 18".
- WHERE 18" CANNOT BE MAINTAINED OR WHERE POTABLE
WATER LINES CROSS UNDER GRAVITY SEWERS,
RECLAIMED/REUSE MAINS, OR CHILLED WATER MAINS,
ADDITIONAL PROTECTION SHALL BE PROVIDED. ADDITIONAL
PROTECTION SHALL CONSIST OF CONCRETE ENCASEMENT. THE
ADDITIONAL PROTECTION SHALL EXTEND A MINIMUM DISTANCE
OF 10'-0" OUTSIDE THE LIMITS OF THE CROSSING.
- THE PREFERRED VERTICAL CLEARANCE BETWEEN DUCT BANKS
AND PIPED UTILITIES SHALL BE 2'-0" AND THE MINIMUM
VERTICAL CLEARANCE SHALL BE 18".
- THE MINIMUM VERTICAL CLEARANCE TO ALL STEAM, PUMPED
CONDENSATE, AND HOT WATER, AND OTHER UTILITIES SHALL
BE AT LEAST 18".
- PROVIDE BOARD INSULATION WHERE DEPTH OF COVER IS LESS
THAN 6 FEET.
1" = 50'
HORIZONTAL: SCALE IN FEET
50 25 50 100
AutoCAD SHX Text G
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text B
AutoCAD SHX Text V
| Sheets and Views |
| CD101 CIVIL DEMOLITION PLAN |
| CU201 WATER LINE PLAN & PROFILE (1 OF 2) |
| CU501 WATER LINE DETAILS |
| CS501 CIVIL PAVING AND CONSTRUCTION DETAILS (1 OF 2) |