P01 550-20-110 Bid Drawings.pdf

PDF 29 MB Posted

Attached to
Z1DA--Renovate Lab and Pathology Project 550-20-110
Solicitation number
36C25222B0033
Issued by

About this file

This federal contract opportunity is a solicitation issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12 for the Z1DA--Renovate Lab and Pathology Project 550-20-110. The solicitation number is 36C25222B0033 and seeks bids for renovations to a lab and pathology project. The opportunity description provided is blank, so no further details regarding required products or services, pricing terms, response dates, or other salient information are available from this document.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N

BUILDING 58 KEY PLAN

PROJECT LOCATION:

FIRST FLOOR

SHADE

INDICATES

AREA NOT IN

SCOPE , TYP.

BUILDING 103 KEY PLAN

PROJECT

LOCATION:

FIRST FLOOR

SHADE

INDICATES

AREA NOT IN

SCOPE , TYP.

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

35% SCHEMATIC DESIGN 03/17/2020

65% DESIGN DEVELOPMENT 05/12/2020

100% CONSTRUCTION DOCUMENTS 07/21/2020

95% CONSTRUCTION DOCUMENTS 10/26/2020

100% BID DOCUMENTS 11/30/2020

95% REVISED CONSTRUCTION DOCUMENTS 04/12/2021

100% BID DOCUMENTS 11/18/2021

C U s e rs

\t s a n d e rs

\D o c u m e n ts

\1 .5

.0

A v ts a n d e rs g u id o n d e s ig n .c o m

.r v t

/1

/2

:2

:2

P

M

GI000

COVER SHEET

GUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

TYLER SANDERS

CMTA

10411 MEETING STREET

PROSPECT, KENTUCKY

ANDY MYERS

RENOVATE LAB AND PATHOLOGY

1900 E. MAIN ST., DANVILLE, IL 61832

550-20-110

58-1

11/18/2021 JF DMC

550-20-110

RENOVATE LAB AND PATHOLOGY

VA ILLIANA HEALTH CARE SYSTEM (VAIHCS)

1900 E. MAIN ST., DANVILLE, IL 61832

100% BID DOCUMENTS

100% BID DOCUMENTS

FULLY SPRINKLERED

502.326.3085

SHEET INDEX

SHEET

NUMBER SHEET NAME

PD104 FIRST FLOOR PLAN - PLUMBING DEMOLITION - PHASE 4

PL104a FIRST FLOOR PLAN - PLUMBING - PHASE 4

PL104b BASEMENT PLAN - PLUMBING - PHASE 4

P105a FIRST FLOOR PLAN - PLUMBING - PHASE 5

P105b BASEMENT PLAN - PLUMBING - PHASE 5

P106a FIRST FLOOR PLAN - PLUMBING - PHASE 6

P106b BASEMENT PLAN - PLUMBING - PHASE 6

MECHANICAL

ML100 MECHANICAL LEGEND

MD100 BASEMENT FLOOR PLAN - MECHANICAL DEMOLITION

MH100 BASEMENT FLOOR PLAN - MECHANICAL

MD101 FIRST FLOOR PLAN - MECHANICAL DEMOLITION - PHASE 1B

MH101 FIRST FLOOR PLAN - MECHANICAL - PHASE 1B

MD102 FIRST FLOOR PLAN - MECHANICAL DEMOLITION - PHASE 2

MH102 FIRST FLOOR PLAN - MECHANICAL - PHASE 2

MD103 FIRST FLOOR PLAN - MECHANICAL DEMOLITION - PHASE 3

MH103 FIRST FLOR PLAN - MECHANICAL - PHASE 3

MD104 FIRST FLOOR PLAN - MECHANICAL DEMOLITION - PHASE 4

MH104 FIRST FLOOR PLAN - MECHANICAL - PHASE 4

MD105 FIRST FLOOR PLAN - MECHANICAL DEMOLITION - PHASE 5

MH105 FIRST FLOOR PLAN - MECHANICAL - PHASE 5

MD106 FIRST FLOOR PLAN - MECHANICAL DEMOLITION - PHASE 6

MH106 FIRST FLOOR PLAN - MECHANICAL - PHASE 6

MD107 ENLARGED MECHANICAL ROOM PLAN - MECHANICAL DEMOLITION

MH107 ENLARGED MECHANICAL ROOM FLOOR PLAN - MECHANICAL

MH108 ATTIC FLOOR PLAN - MECHANICAL

MI100 MECHANICAL DETAILS

MI101 MECHANICAL DETAILS

MI102 MECHANICAL CONTROLS

MI103 MECHANICAL CONTROLS

MI200 MECHANICAL SCHEDULES

MI201 MECHANICAL SCHEDULES

ELECTRICAL

EJ100 ELECTRICAL LEGEND AND GENERAL NOTES

EJ101 ELECTRICAL DETAILS

EJ102 ELECTRICAL DETAILS

EJ103 ELECTRICAL DETAILS

EJ104 ELECTRICAL DETAILS

EJ200 PANELBOARD SCHEDULES

ED101 FIRST FLOOR PLAN - ELECTRICAL DEMOLITION - PHASE 1A AND 1B

EL101 FIRST FLOOR PLAN - LIGHTING - PHASE 1A AND 1B

EP101 FIRST FLOOR PLAN - POWER - PHASE 1A AND 1B

ES101 FIRST FLOOR PLAN - SYSTEMS - PHASE 1A AND 1B

ED102 FIRST FLOOR PLAN - ELECTRICAL DEMOLITION - PHASE 2

EL102 FIRST FLOOR PLAN - LIGHTING - PHASE 2

EP102 FIRST FLOOR PLAN - POWER - PHASE 2

ES102 FIRST FLOOR PLAN - SYSTEMS - PHASE 2

ED103 FIRST FLOOR PLAN - ELECTRICAL DEMOLITION - PHASE 3

EL103 FIRST FLOOR PLAN - LIGHTING - PHASE 3

EP103 FIRST FLOOR PLAN - POWER - PHASE 3

ES103 FIRST FLOOR PLAN - SYSTEMS - PHASE 3

ED104 FIRST FLOOR PLAN - ELECTRICAL DEMOLITION - PHASE 4

EL104 FIRST FLOOR PLAN - LIGHTING - PHASE 4

EP104 FIRST FLOOR PLAN - POWER - PHASE 4

ES104 FIRST FLOOR PLAN - SYSTEMS - PHASE 4

ED105 FIRST FLOOR PLAN - ELECTRICAL DEMOLITION - PHASE 5

EL105 FIRST FLOOR PLAN - LIGHTING - PHASE 5

EP105 FIRST FLOOR PLAN - POWER - PHASE 5

ES105 FIRST FLOOR PLAN - SYSTEMS - PHASE 5

ED106 FIRST FLOOR PLAN - ELECTRICAL DEMOLITION - PHASE 6

EL106 FIRST FLOOR PLAN - LIGHTING - PHASE 6

EP106 FIRST FLOOR PLAN - POWER - PHASE 6

ES106 FIRST FLOOR PLAN - SYSTEMS - PHASE 6

EP107 MECHANICAL ROOM - ELECTRICAL WORK

SHEET INDEX

SHEET

NUMBER SHEET NAME

GENERAL

GI000 COVER SHEET

GI101 CODE ANALYSIS LIFE AND SAFETY PLANS

GI102 CONSTRUCTION LOGISTICS

GC101 INFECTION CONTROL/PHASING PLANS

GC102 BID ALTERNATES

HA101 HAZARDOUS MATERIAL REMOVAL PLAN

STRUCTURAL

SB101 MECHANICAL EQUIPMENT SLAB AND FRAMING PLANS

ARCHITECTURAL

AE001 ARCHITECTURAL SYMBOLS AND ABBREVIATIONS

AE002 WALL TYPES

AD100 B58 OVERALL DEMOLITION PLAN

AD110 B58 OVERALL REFLECTED CEILING DEMOLITION PLAN

AE100 B58 OVERALL ARCHITECTURAL PLAN

AE110 B58 OVERALL REFLECTED CEILING PLAN

AE601 DOOR SCHEDULE

AE602 STOREFRONT ELEVATIONS

AI100 OVERALL FINISH WALL TREATMENT PLAN

AI110 OVERALL FINISH FLOOR TREATMENT PLAN

AI502 CASEWORK DETAILS

AI900 OVERALL SIGNAGE PLAN

AI901 SIGNAGE TYPES

QH100 B58 OVERALL EQUIPMENT PLAN

QH600 OVERALL EQUIPMENT & FURNITURE SCHEDULE

AD101B PHASE 1B DEMOLITION

AE101A PHASE 1A ARCHITECTURAL AND EQUIPMENT PLAN

AE101B PHASE 1B ARCHITECTURAL, EQUIPMENT, AND CEILING PLAN

AD102 PHASE 2 DEMOLITION

AE102 PHASE 2 ARCHITECTURAL AND CEILING PLAN

QH102 PHASE 2 EQUIPMENT PLAN

QH202 PHASE 2 INTERIOR ELEVATIONS

AD103 PHASE 3 DEMOLITION

AE103 PHASE 3 ARCHITECTURAL AND CEILING PLAN

QH103 PHASE 3 EQUIPMENT PLAN

QH203 PHASE 3 INTERIOR ELEVATIONS

QH213 PHASE 3 INTERIOR ELEVATIONS

AD104 PHASE 4 DEMOLITION

AE104 PHASE 4 ARCHITECTURAL AND CEILING PLAN

QH104 PHASE 4 EQUIPMENT PLAN

QH204 PHASE 4 INTERIOR ELEVATIONS

AD105 PHASE 5 DEMOLITION

AE105 PHASE 5 ARCHITECTURAL AND CEILING PLAN

QH105 PHASE 5 EQUIPMENT PLAN

QH205 PHASE 5 INTERIOR ELEVATIONS

AD106 PHASE 6 DEMOLITION

AE106 PHASE 6 ARCHITECTURAL AND CEILING PLAN

QH106 PHASE 6 EQUIPMENT PLAN

FIRE PROTECTION

FP001 FIRE SUPPRESSION LEGEND

FP100 FIRST FLOOR PLAN - FIRE SUPPRESSION DEMOLITION

FP101 FIRST FLOOR PLAN - FIRE SUPPRESSION

PLUMBING

PL001 PLUMBING LEGEND, GENERAL NOTES, SCHEDULES AND DETAILS

PD101 FIRST FLOOR PLAN - PLUMBING DEMOLITION - PHASE 1B

PL101a FIRST FLOOR PLAN - PLUMBING - PHASE 1B

PL101b BASEMENT PLAN - PLUMBING - PHASE 1B

PD102 FIRST FLOOR PLAN - PLUMBING DEMOLITION - PHASE 2

PL102a FIRST FLOOR PLAN - PLUMBING - PHASE 2

PL102b BASEMENT PLAN - PLUMBING - PHASE 2

PD103 FIRST FLOOR PLAN - PLUMBING DEMOLITION - PHASE 3

PL103a FIRST FLOOR PLAN - PLUMBING - PHASE 3

PL103b BASEMENT PLAN - PLUMBING - PHASE 3

Contact:Contact: Contact:

CMTA

Andy Myers

MEP Project Principle

MECHANICAL,

ELECTRICAL &

PLUMBING

VA Illiana Health Care System

Douglas Elia

COR

1900 E. Main St.

Danville, IL 61832 p: 217.554.4958 e: douglas.elia@va.gov

OWNER

GUIDON DESIGN INC.

Mark Jones

Project Manager

1221 North Pennsylvania Street Suite 200 Indianapolis, IN 46202 p: 317.800.6388 x 153 e: mjones@guidondesign.com

ARCHITECT

10411 Meeting St.

Prospect, KY 40059 p: 502.326.3085 e: amyers@cmta.com

AREA MAP

VICINITY MAP

PROJECT SITE

BLDG 103

BLDG 58

N

N

CAMPUS MAP

N

Tyler Sanders

Project Architect p: 317.800.6388 x 126 e: tsanders@guidondesign.com

Revisions: Date:

UP

You Are Here here

108D

111D

Storage Utility

106D Patient Toilet107D

Patient Shower

Patient's 102D

Bedroom

116D

SPD 114D

112D 113D

114D1

117D Alcove

118D1120D1122D1

Meds 128D1

127D Util.

Util.

126D

129D Women

130D MenShower

125D

Room

Elec.

129D1

Activ Rm.

Patient 105D

103-5

103-6

103-7

156C Patient's Bedroom

Bedroom Patient's 155C

Clean linen 153C154C

Treatmt.

150C

152C

Patient's Bedroom

148C

Bedroom Patient's 147C

Patient's Bedroom

146C 145C Patient's Bedroom Bedroom

Patient's 144C

Patient's Bedroom

143C

143C1145C1147C1

149C

C5C

140C Nurse Station

141C Laundry

140C1 Meds

Hsk.

142C

139CStaff Office

138C Breakroom

Office Provider

137C

136C Shower

Waiting 135C

Support Prgm 134C

Station Nurse 128C

128C1 Meds

129C Wmn.

130C Men

127C

Laundary 126C Hsk.

131C 132C Intern Office

125C

Storage

124C Visitor Peer

133C

C4C

C3C

118C 119C117C 120C 121C Voc.Rehb Counselor

122C 123C

123C1121C1119C1

116C

114C

113C

Bedroom

110B Patient's

Bedroom Patient's 110C

Bedroom Patient's 111C

Bedroom Patient's 111B

118B

112B 113B

114B

Room Break 116B

117B

SARP

Case Manager

119B

Manager Case

SARP

120B

Manager Case

SARP

121B

Cordinator Case

SARP

122B

Manager Case

SARP

123B

123B1121B1119B1

C3B

133B Office124B

Waiting 125B Shower

132B Food PrepPrep

Food 131B

126B Hsk.

Laundry 127B

129B Women Men

130B Nurse 128B

Station 116E 117E

Women

E

119E Mechanical Room

Tip 146E 146E1

Storage 147E 148E

133A Waiting Room

125A Utility Room

132A Intake Room

131A Treatment Center

Elec.

124A

124A1

130A Men Wmen.

129A

126A Util.

145A

Area Smoking

Kitchen 144E

E

C5F

123A

Bedroom Patient's

Bedroom Patient's 122A

Patient's Bedroom

121A 120A

Bedroom Patient's Patient's

Bedroom

119A 118A

Bedroom Patient's

118A1120A1122A1

C3A

117A Alcove

128A Nurse Station

Station Nurse 127A

101A Dayroom

Patient's Bedroom

102A

Bedroom

103A Patient's

C1A

104A Patient's BedroomRoom

Conference 105A

116A

114A1

113A

112A

108A-1 Tlt.

107A

106A-1 Tlt.

Patient's Bedroom

111A

Patient's Bedroom

109A

Bedroom Patient's 109D110D

Patient's Bedroom

Bedroom Patient's 110A

(Storage)(Storage)

Bedroom

104D Patient's

Bedroom

103D Patient's

C1D

101D Dayroom

Bedroom Patient's 118D119D

Bedroom Patient's

120D

Bedroom Patient's

121D

Bedroom Patient's

122D

Bedroom Patient's

123D

Bedroom Patient's

C3D

128D

Station Nurse's

131D

Room Exam

132D Break Room

Visitors 124D

Room Conf.

133D

Room

Patient's Dining

140E

Dining

139E Patient's

Therapy

120E Occupational

121E Patient's Dining

Dining Patient's 122E

Patient's Dining

123E

138E Wheelchair Repair

Service Food 124E

Food Service

126E

Food Service

125E

Corr.

Room Mechanical 127E

137E2

136E1

137E

136E

136E2

Hsk.

135E

134E Elec.

133E 132E Storage

Tip 132E1

C4D

Patient's 162D

Bedroom

Bedroom

163D Patient's

164D Patient's Bedroom

C7D

161D Office

Dayroom 165D

Tlt.

159D

Tlt.

160D

C6D

Bedroom

158D Patient's

Patient's 157D

Bedroom

156D

Bedroom Patient's

Patient's Bedroom

155D

153D

154D

152D

150D

Elec.148D

Bedroom Patient's

147D Patient's Bedroom

146D Patient's Bedroom

145D Sleep Study

144D Sleep Study

143D Sleep Study

149D Alcove

148D1146D1144D1

Nurse's Station

140D

140D1 Meds

Room

136D Shower

141D

139DHR

Links

142D

138D

MDS

137D

Coord.

135D Sleep Lab

134D

MDS

Coord.

C7E

131E 131E1

130E

128E1

Locker Female 128E

Breakroom Staff

CourtyardCourtyard

137E1

132E2

C2A

C2D

C5D

C6E

151C

115C

123C-A

165D1

115B

STOR. 106A-2

Tlt.

108A-2 Tlt.

Asst.

Support

SPC.

Room

Voc.Rehb Counselor

Social worker

Social worker

Career Lab

Clinical Pharmacist

Provider Office

Room Break

SARP

Case Manager

TOTAL OCCUPANCY

FEC

EXIT

OCCUPANCY LOAD FACTOR

EXITS REQUIRED

SQUARE FOOTAGE

OCCUPANCY TYPE

EGRESS EXIT SIGNAGE

FIRE EXTINGUISHER CABINET

DIAGONAL DISTANCE

EXIT SEPARATION DISTANCE

EGRESS PATH

EXISTING 2 HR - FIRE SEPARATION

EXISTING 1 HR - FIRE SEPARATION

EXISTING SMOKE RESISTIVE HAZARDOUS

AREA

B

1500 SF

REFER TO VA MANUAL PG-18-3 FOR ADDITIONAL CODES, STANDARDS, GUIDELINES AND

REGULATIONS, BELOW LISTING IS NOT COMPREHENSIVE.

ICC, INTERNATIONAL BUILDING CODES, 2018 EDITION (IBC)

ASCE-07-10

ACI 318-11

ACI 530-11

AISC 341-10

AISC 360-10

PCI MNL 120-10, DESIGN HANDBOOK

NFPA 10, STANDARD FOR PORTABLE FIRE EXTINGUISHERS, 2018 EDITION

NFPA 13, STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS, 2019 EDITION

NFPA 14, STANDARD FOR THE INSTALLATION OF STANDPIPE AND HOSE SYSTEM, 2019

EDITION

NFPA 20, STANDARD FOR THE INSTALLATION OF STATIONARY PUMPS FOR FIRE

PROTECTION, 2019 EDITION

NFPA 24, STANDARD FOR THE INSTALLATION OF PRIVATE FIRE SERVICE MAINS AND

THEIR APPURTENANCE, 2019 EDITION.

NFPA 54, NATOINAL FUEL GAS CODE, 2018 EDITION

NFPA 70, NATIONAL ELECTRIC CODE, 2020 EDITION

NFPA 72, NATIONAL FIRE ALARM AND SIGNALING CODE, 2019 EDITION

NFPA 75, STANDARD FOR THE FIRE PROTECTION OF INFORMATION TECHNOLOGY

EQUIPMENT, 2020 EDITION

NFPA 77, RECOMMENDED PRACTICE ON STATIC ELECTRICITY, 2019 EDITION

NFPA 80, STANDARD FOR FIRE DOORS AND OTHER OPENING PROTECTIVES, 2016

EDITION

NFPA 90A, STANDARD FOR THE INSTALLATION OF AIR-CONDITIONING AND VENTILATING

SYSTEMS, 2018 EDITION.

NFPA 92, STANDARD FOR SMOKE CONTROL SYSTEMS, 2018 EDITION

NFPA 99, HEALTH CARE FACILITIES CODE, 2018 EDITION

NFPA 101, LIFE SAFETY CODE, 2018 EDITION

NFPA 110, STANDARD FOR EMERGENCY AND STANDBY POWER SYSTEMS, 2019 EDITION

NFPA 220, STANDARD ON TYPES OF BUILDING CONSTRUCTION, 2018 EDITION

NFPA 780, STANDARD FOR INSTALLATION OF LIGHTNING PROTECTION SYSTEMS, 2020

EDITION

MOST RECENT EDITION OF NFPA NATIONAL FIRE CODES WITH THE EXCEPTION OF

NFPA 5000 AND NFPA 900

ASHRAE 90.1-2016 HVAC SYSTEMS

ANSI A117.1-2009 STANDARD ON ACCESSIBLE & USABLE BUILDINGS AND FACILITIES

2010 ADA STANDARDS FOR ACCESSIBLE DESIGN

OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS

ENERGY POLICY ACT OF 2005 (EPACT)

EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL ENVIRONMENTAL, ENERGY, AND

TRANSPORTATION MANAGEMENT.

VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD

STANDARD APPLICATION GUIDE,AND OTHER GUIDANCE ON THE TECHNICAL

INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).

VA BARRIER FREE DESIGN GUIDE PG-18-13, ABAAS

ARCHITECTURAL, JANUARY 1, 2017 (REV. 11/1/2018)

ASBESTOS ABATEMENT, JULY 2011

CMP SCHEDULE AND RISK MANAGEMENT, VOL. 1 & 2, DECEMBER 2012

ELECTRICAL, DECEMBER 2015

ENERGY SUSTAINABILITY, MAY 2014

EQUIPMENT, JANUARY 2006

ESTIMATING, MARCH 8, 2011

NFPA INTERIM GUIDANCE FOR PROJECTS, PG-18-17, SEPTEMBER 30, 2010

FIRE PROTECTION, SEVENTH EDITION REVISED DECEMBER 2015

HVAC FOR NEW, REPLACEMENT, ADD. AND REN. OF EXIST. CA FACILITIES, MARCH 2011

INTERIOR DESIGN, MAY 2008

PHYSICAL SECURITY DESIGN MANUAL, OCTOBER 2020

PLUMBING, NOVEMBER 2014

STRUCTURAL, FEBRUARY 1, 2014

WAY FINDING AND SIGNAGE, INTERIOR, DECEMBER 2012

SEISMIC DESIGN REQUIREMENTS, H-18-8, AUGUST 2013

ENVIRONMENTAL PLANNING GUIDANCE PG-18-17 NEPA INTERIM GUIDELINES FOR

PROJECTS SEPTEMBER 30, 2010

EPA GUIDELINES CHECKLIST

GOVERNING CODES

VA DESIGN MANUALS PG 18-10

CODE ANALYSIS AND LIFE SAFETY PLAN LEGEND

SMOKE RESISTANT CORRIDOR

STANDPIPE OUTLETSPO

CODE ANALYSIS - NFPA 101, BUSINESS CHAPTER 38

CODE CRITERIA

GENERAL: THIS SUMMARY OF CODE REQUIREMENTS IS BASED PRIMARILY ON NFPA 101 (LSC). DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE IDENTIFIED. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES EVEN IF THE IBC REQUIREMENTS ARE DIFFERENT).

LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE RESPONSIBILITY TO GUARD

PUBLIC HEALTH AND SAFETY THROUGH ENFORCING ITS ADOPTED CODES.

NOTES:

CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA ADOPTED NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF VA. THE RESOLUTION OF THE CONFLICT SHALL BE MADE BY THE AUTHORITY HAVING JURISDICTION FOR VA TO ENSURE A CONSISTENCY SYSTEM WIDE.

CODE REVIEW

THE 2018 EDITION OF THE LIFE SAFETY CODE, NFPA 101, HAS BEEN USED TO REVIEW THIS PROJECT FOR COMPLIANCE WITH THE FIRE AND LIFE SAFETY REQUIREMENTS.

FOR FEATURES NOT ADDRESSED BY NFPA 101 AND THE REFERENCED NATIONAL FIRE CODES, THE 2018 EDITION OF THE INTERNATIONAL BUILDING CODE HAS BEEN

USED.

PROJECT SCOPE

THE PROJECT SCOPE INCLUDES THE RENOVATION OF THE PATHOLOGY LAB, MORGUE, BLOOD DRAW, AND LOUNGE IN BUILDING 58-1. THE OPERATIONS OF THE LAB WILL NEED TO CONTINUE THROUGHOUT CONSTRUCTION, WHICH NECESSITATES THE PHASING OF CONSTRUCTION AND MOVING OF STAFF AND EQUIPMENT TO ALLOW THE CONTRACTOR TO COMPLETE THE WORK. ASSOCIATED WITH THE LAB RENOVATION IS THE UPGRADING OF INFRASTRUCTURE AND MECHANICAL AND ELECTRICAL EQUIPMENT TO PROVIDE AN ADEQUATE SPACE FOR A CONTEMPORARY LABORATORY. ADDITIONALLY, CERTAIN STAFF WILL RELOCATE TO BUILDING 103-6 TEMPORARILY

TO FACILITATE CONSTRUCTION WITHIN THE LAB IN BUILDING 58-1.

THE CONSTRUCTION TYPE IS DETERMINED BASED UPON THE ALLOWABLE AREA AND HEIGHT REQUIREMENTS OF CHAPTER 5 OF THE 2018 IBC. CONSTRUCTION TYPE AND MATERIALS SHALL BE PER CHAPTER 6 OF THE IBC FOR TYPE 2-B CONSTRUCTION AS FOLLOWS:

THE EXISTING BUILDING IS CLASSIFIED UNDER I-2 INSITUTIONAL CHAPTER 18. THE PATHOLOGY LABORATORY SUITE IS OCCUPANCY TYPE: B-BUSINESS, IBC CHAPTER 3/LSC CHAPTER 38. THE EXISTING PATHOLOGY B-BUSINESS SUITE IS BEING EXPANDED AND THE SUITE BOUNDARY WILL BE MODIFIED TO INCLUDE THE MINOR SQUARE

FOOTAGE INCREASE.

CONSTRUCTION TYPE: I-B (IBC CHAPTER 5) II (222) NFPA

1. FIRE RESISTIVE RATINGS, CHAPTER 6 IBC/NFPA 101:

PRIMARY STRUCTURAL FRAME: NONCOMBUSTIBLE, 2-HOUR FIRE RESISTIVE

BEARING WALLS

EXTERIOR: NONCOMBUSTIBLE, 2 -HOUR FIRE RESISTIVE

INTERIOR: NONCOMBUSTIBLE, 2-HOUR FIRE RESISTIVE

NON-BEARING WALLS AND PARTITIONS

EXTERIOR: NONCOMBUSTIBLE, 0-HOUR FIRE RESISTIVE

INTERIOR: NONCOMBUSTIBLE, 0-HOUR FIRE-RESISTIVE

FLOOR AND ASSOCIATED SECONDARY MEMBERS: NONCOMBUSTIBLE, 2-HOUR FIRE RESISTIVE

ROOF AND ASSOCIATED SECONDARY MEMBERS: NONCOMBUSTIBLE, 1-HOUR FIRE RESISTIVE

SHAFT ENCLOSURES 2-HOUR FIRE RESISTIVE >4 STORIES (IBC 713.4, LSC 12.3.6)

SHAFT ENCLOSURES 1-HOUR FIRE RESISTIVE <4 STORIES (IBC 713.4, LSC 12.3.6)

2. STRUCTURAL DESIGN SHALL COMPLY WITH CHAPTER 16 OF THE IBC.

3. ALLOWABLE HEIGHT: IS EXISTING AND NOT TO BE CHANGED (IBC, TABLE 504.3)

4. ALLOWABLE NUMBER OF STORIES ABOVE GRADE PLAN: 6 ACTUAL EXISTING AND NOT TO BE CHANGED (IBC, TABLE 504.4)

5. ALLOWABLE AREA: UNLIMITED. ACTUAL AREA APPROXIMATELY 26,177 SF. NOT TO BE CHANGED (IBC, TABLE 506.2)

6. BUILDING SEPARATION: NO BUILDING SEPARATION ARE BEING CREATED OR MODIFIED.

7. OCCUPANCY SEPARATION: NO OCCUPANCY SEPARATIONS ARE BEING CREATED. AN EXISTING OCCUPANCY SEPARATION IS BEING SLIGHTLY MODIFIED.

8. MEANS OF EGRESS

• CLEAR WIDTH OF CORRIDORS SHALL BE CLEAR 44 INCHES.

• CLEAR WIDTH OF DOORS SHALL BE CLEAR 32 INCHES

• NOT LESS THAN 2 EXITS SHALL BE PROVIDED PER FLOOR.

• ADDITION OCCUPANCY LOAD: <500 THEREFORE 2 EXITS REQUIRED (LSC 7.4.1)

• MAXIMUM TRAVEL DISTANCE, FULLY SPRINKLED: 300 FEET (LSC 38.2.6.3)

• COMMON PATH OF TRAVEL SHALL NOT EXCEED 100 FEET (LSC 38.2.5.3.1)

• DEAD END CORRIDORS SHALL NOT EXCEED 50 FEET. (LSC 38.2.5.2.1)

• MEANS OF EGRESS SHALL BE ILLUMINATED. (LSC 38.2.8)

• EMERGENCY LIGHTING SHALL BE PROVIDED, BUILDING OVER 3 STORIES. (LSC 38.2.9.1)

• EXIT SIGNAGE SHALL BE PROVIDED. (LSC 38.2.10)

9. PROTECTION FROM ANY AREA HAVING A DEGREE OF HAZARD GREATER THAN THAT NORMAL TO THE GENERAL OCCUPANCY OF THE BUILDING OR STRUCTURE SHALL BE PROVIDED BY PROTECTING THE AREA WITH AUTOMATIC EXTINGUISHING SYSTEMS IN ACCORDANCE WITH SECTION 9.7(3). WHERE HAZARD IS SEVERE PER LSC CHAPTER 38, SOILED HOLDING, PROTECTION IS PROVIDED WITH AN AUTOMATIC EXTINGUISHING SYSTEM. THE SPACE SHALL ALSO BE ENCLOSED WITH SMOKE

PARTITIONS IN ACCORDANCE WITH SECTION 8.4.

• 1-HOUR FIRE RESISTANCE RATING AND AUTOMATIC SPRINKLER SYSTEM IS REQUIRED FOR THE FOLLOWING: SOILED HOLDING AND HIGH HAZARD CONTENT

AREAS PER LSC 38.2.2.

10. INTERIOR FINISH

• WALLS AND CEILINGS: INTERIOR FINISH FLAME SPREAD SHALL BE LIMITED PER CHAPTER 8 OF THE NFPA 101 TO CLASS A, B AND C MATERIALS. INTERIOR WALL

AND CEILING FINISH SHALL BE CLASS A OR CLASS B IN EXITS, CORRIDORS AND LOBBIES; AND CLASS A, CLASS B, OR CLASS C IN ALL OTHER AREAS. (LSC 38.3.3)

• · CLASS A: FLAME SPREAD 0-25; SMOKE DEVELOPED 0-450.

• · CLASS B: FLAME SPREAD 26-75; SMOKE DEVELOPED 0-450.

• · CLASS C: FLAME SPREAD 76-200; SMOKE DEVELOPED 0-450

• FLOORS: INTERIOR FLOOR FINISH SHALL BE CLASS I OR CLASS II IN CORRIDORS AND EXITS.

• FABRIC DRAPERIES, CURTAINS (EXCLUDING SHOWER CURTAINS, BUT INCLUDING CUBICLE CURTAINS), AND OTHER LOOSELY HANGING FABRICS AND FILMS

SERVING AS FURNISHINGS OR DECORATIONS IN HEALTH CARE OCCUPANCIES MUST MEET THE FLAME RESISTANCE REQUIREMENTS OF NFPA 701, STANDARD

METHODS OF FIRE TESTS FOR FLAME-RESISTANT TEXTILES AND FILMS.

• UPHOLSTERED FURNITURE AND MATTRESSES. UPHOLSTERED FURNITURE AND MATTRESSES MUST ALSO MEET SPECIFIED REQUIREMENTS, BASED ON NFPA

260, NFPA 261, NFPA 266, 16 CFR 1632, ASTME E1537, AND ASTME E1590

11. EXTINGUISHMENTS REQUIREMENTS: PORTABLE FIRE EXTINGUISHERS SHALL BE PROVIDED PER NFPA 10. (38.3.5)

12. DETECTION, ALARM, AND COMMUNICATIONS SYSTEMS.

• FIRE ALARM SYSTEM SHALL BE PROVIDED LSC, NFPA 70 (NEC) AND NFPA 72. (LSC 9.6.1)

• FIRE ALARM MAY BE BY MANUAL MEANS (LSC 38.4.2)(LSC 9.6.2)

• OCCUPANT NOTIFICATION SHALL BE THROUGH AUTOMATIC MEANS. (LSC 38.3.4.3)

• SMOKE DETECTION SHALL BE PROVIDED PER NFPA 72.

• EMERGENCY RESPONDER NOTIFICATION SHALL BE NOTIFIED BY ALARM AND DETECTION SYSTEM. (LSC 38.3.4.4)

13. FIRE SUPPRESSION: BUILDING IS REQUIRED TO BE SPRINKLED THROUGHOUT IN ACCORDANCE WITH NFPA 13.

THE SPRINKLER SYSTEM SHALL BE HYDRAULICALLY DESIGNED IN ACCORDANCE WITH 2013 EDITION OF NFPA 13 AND THE SIXTH EDITION OF THE DEPARTMENT OF

VETERANS AFFAIRS FIRE PROTECTION DESIGN MANUAL: MINIMUM DESIGN REQUIREMENTS:

STORAGE MECHANICAL AND ELECTRICAL ROOMS SHALL BE PROTECTED AS:

ORDINARY HAZARD OCCUPANCY, GROUP 1: 0.15 GPM/FT2 OVER 1,500 FT2.

HOSE STREAM ALLOWANCE: 250 GPM

ALL OTHER AREAS SHALL BE PROTECTED AS:

LIGHT HAZARD OCCUPANCY: 0.10 GPM/FT2 OVER 1,500 FT2.

HOSE STREAM ALLOWANCE: 100 GPM

ALL SPRINKLERS WITHIN THE SMOKE ZONE SHALL BE QUICK RESPONSE SPRINKLERS.

14. CONSTRUCTION BARRIERS CONSTRUCTED ALONG MEANS OF EGRESS ALONG HEALTHCARE OCCUPANCIES (LSC CHAPTER 18 AND 19) SHALL BE CONSTRUCTED AND

MAINTAINED PER NFPA 241.

TEMPORARY USAGE OF B103

FOR THE PURPOSES OF THIS PROJECT, NO ARCHITECTURAL CHANGES WILL BE

MADE TO BUILDING 103. ALL EXISTING COMPONENTS AND CONFIGURATIONS WILL BE

USED AS IS. ONLY POWER AND DATA WILL BE ADDED TO ACCOMMODATE THE

ADMINISTRATIVE FUNCTIONS.

CA E H I KB D L M N Q R S T XU VG J WPF O

227 SF

B

602 SF

B

130 SF

B

6762 SF

10068

B

T R

A V

E L

D

IS

T A

N C

E

2'

-0

" TRAVEL DISTANCE: 110'-0" EXIT

E X

IT

TRAVEL DISTANCE: 93'-0"

EXIT SEPARATION: 86'-0"

DIAGONAL DISTANCE: 130'-0"

K.9

MAIN BLDG

ENTRANCE

CORRIDOR

TO OTHER

BLDGS

EXIT

EXISTING WATER

FOUNTAIN

SPO

EXISTING 1 HR RATED SMOKE BARRIER

AND SUITE BOUNDARY TO BE MODIFIED TO

NEW 1 HR RATED SMOKE BARRIER

LOCATION AS INDICATED

FEC FEC

HATCH INDICATES AREA TO

BECOME PART OF PATHOLOGY

LAB SUITE

EXIT

TRAVEL DISTANCE: 44'-6"

TRAVEL DISTANCE: 73'-0"

TRAVEL DISTANCE: 59'-0"

OFFICE

OFFICE

OFFICE

OFFICE

HAC

OFFICE

OFFICE

TLT

ELECTRICAL

OFFICE

MICROBIOLOGY

WALK IN COOLER

WASTE

CONTAINMENT

MORGUE

STAFF LOUNGE

OFFICE

OFFICE

OFFICE

CONFERENCE

URINALYSIS (EIA)

TLT

CHEMISTRY

PIPETING BLOOD BANK

REFRIGERATOR

BANK

SPECIMEN

PROCESSING

HISTOLOGY /

CYTOLOGY

BLOOD DRAW

ELECTRICAL

OFFICE

OFFICE

OPEN

WORKSTATIONS

EXIT

N

BUILDING 58 KEY PLAN

PROJECT LOCATION:

FIRST FLOOR

SHADE

INDICATES

AREA NOT IN

SCOPE , TYP.

MECHANICAL

CORRIDOR

C1-4

AMBASSADOR

OFFICE

123B

MEN'S

TOILET

WOMEN'S TOILET

HKPG

STOR

107A

FREIGHT

ELEVATOR

CORRIDOR

C1-1

SOILED

LINEN

LOADING

DOCK

100A

TIP

100B

GAS

100C

CORRIDOR

C1-8

CHIEF

OFFICE

103A

OFFICE

VAULT

103B

REFRIG.

104A

MECH

D N

DN

DN

STAIR

TEMPORARY USE

OF EXISTING

SPACES

TRAVEL DISTANCE: 138'-6"

EXIT

BUILDING 103 KEY PLAN

PROJECT

LOCATION:

FIRST FLOOR

SHADE

INDICATES

AREA NOT IN

SCOPE , TYP.

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

35% SCHEMATIC DESIGN 03/17/2020

65% DESIGN DEVELOPMENT 05/12/2020

100% CONSTRUCTION DOCUMENTS 07/21/2020

95% CONSTRUCTION DOCUMENTS 10/26/2020

100% BID DOCUMENTS 11/30/2020

95% REVISED CONSTRUCTION DOCUMENTS 04/12/2021

100% BID DOCUMENTS 11/18/2021

C U s e rs

\t s a n d e rs

\D o c u m e n ts

\1 .5

.0

A v ts a n d e rs g u id o n d e s ig n .c o m

.r v t

/1

/2

:0

:0

A

M

GI101

CODE ANALYSIS LIFE AND SAFETY

PLANSGUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

TYLER SANDERS

CMTA

10411 MEETING STREET

PROSPECT, KENTUCKY

ANDY MYERS

RENOVATE LAB AND PATHOLOGY

1900 E. MAIN ST., DANVILLE, IL 61832

550-20-110

58-1

11/18/2021 TS DMC

100% BID DOCUMENTS

FULLY SPRINKLERED

502.326.3085

N

SCALE: 1/16" = 1'-0"GI101

1 B58 FIRST FLOOR CODE ANALYSIS AND LIFE SAFETY PLAN AT CONSTRUCTION COMPLETION

LIFE SAFETY OCCUPANCY COUNT

AREA SF OCC OCC FACTOR # OF OCC

BLOOD DRAW 227 SF B 100 2

MORGUE 602 SF B 100 6

STAFF LOUNGE 130 SF B 100 1

PATHOLOGY LAB 6762 SF B 100 68

7720 SF 77

SCALE: 1/32" = 1'-0"GI101

2 B103-6 FIRST FLOOR CODE ANALYSIS AND LIFE SAFETY PLAN

N

EXISTING FIRST FLOOR TOTAL 26685 SF

EXISTING/NEW AIR

HANDLING UNIT

LOCATION

TEMPORARY AIR

HANDLER TRAILER

CONTRACTOR

SET UP AREA

VA PROVIDED

TEMPORARY

MORGUE TRAILER

ENTRY LOCATION OF

TEMPORARY DUCTWORK

CONSTRUCTION FENCE

AND ENTRY GATE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

35% SCHEMATIC DESIGN 03/17/2020

65% DESIGN DEVELOPMENT 05/12/2020

100% CONSTRUCTION DOCUMENTS 07/21/2020

95% CONSTRUCTION DOCUMENTS 10/26/2020

100% BID DOCUMENTS 11/30/2020

95% REVISED CONSTRUCTION DOCUMENTS 04/12/2021

100% BID DOCUMENTS 11/18/2021

C U s e rs

\t s a n d e rs

\D o c u m e n ts

\1 .5

.0

A v ts a n d e rs g u id o n d e s ig n .c o m

.r v t

/1

/2

:0

:0

A

M

GI102

CONSTRUCTION LOGISTICS

GUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

TYLER SANDERS

CMTA

10411 MEETING STREET

PROSPECT, KENTUCKY

ANDY MYERS

RENOVATE LAB AND PATHOLOGY

1900 E. MAIN ST., DANVILLE, IL 61832

550-20-110

58-1

11/18/2021 JF DMC

100% BID DOCUMENTS

FULLY SPRINKLERED

502.326.3085

SCALE: 1/8" = 1'-0"GI102

1 CONSTRUCTION LOGISTICS

111D

Storage Utility

106D Patient Toilet107D

Patient Shower

Patient's 102D

Bedroom

116D

SPD 114D

112D 113D

114D1

117D Alcove

118D1120D1122D1

Meds 128D1

127D Util.

Util.

126D

129D Women

130D MenShower

125D

Room

Elec.

129D1

103-6

101D Dayroom

Bedroom Patient's 118D119D

Bedroom Patient's

120D

Bedroom Patient's

121D

Bedroom Patient's

122D

Bedroom Patient's

123D

Bedroom Patient's

C3D

128D

Station Nurse's

131D

Room Exam

132D Break Room

Visitors 124D

Room Conf.

133D

Room Tip 132E1

C4D

132E2

UP

UP

UP

R E

F

R E

F

R E

F

R E

F

R E

F

UP

REF.

REF.

R E

F

REF.

R E

F

R E

F

R E

F

REF.

UP

R E

F

REF.

REF.

R E

F

REF.

R E

F

R E

F

R E

F

REF.

UP

R E

F

REF.

REF.

R E

F

REF.

BEYOND PROJECT BOUNDARY

INFECTION CONTROL / PHASING PLAN LEGEND

ACTIVE CONSTRUCTION PROJECT

PHASE AREA - VACATED BY VA

PROJECT AREA NOT YET

VACATED BY VA

COMPLETED PROJECT AREA

TURNED OVER TO VA

TEMPORARY PROPOSED STAFF

ROUTE

*NOTE: OTHER AREAS NOT SPECIFICALLY NOTED ARE BEING USED BY VA

CONTINUOUS FIRESAFE SEALANT

TOP AND BOTTOM, & BOTH SIDES

3 1/2" SOUND ATTENUATION BATT.

5/8" TYPE X GYPSUM BOARD, BOTH SIDES

3 5/8" METAL STUD @ 16" O.C. WITH

RUNNER CHANNELS ALONG TOP

AND BOTTOM

CONSTRUCTION

SIDE

PUBLIC

SIDE

6 MIL. FIRE RETARDANT VISQUEEN

MEMBRANE. CONTINUOUSLY ADHERE

TO THE STRUCTURAL DECK ABOVE AND

TO THE FLOOR BELOW WITH TAPE.

UNDERSIDE OF STRUCTURAL DECK

UL LISTING: U465

COORDINATE WITH EXISTING CEILING

TEMPORARY IC BARRIER WALL

CONSTRUCTION (DUST WALL)

BEAD OF CONT. SEALANT

6-MIL FIRE RETARDENT POLY INTERIOR SIDE

CEILING

CONTINUOUSLY ADHERE 6-MIL. FIRE

RETARDANT POLY TO DECK WITH TAPE

CONTINUOUSLY ADHERE FIRE RETARDENT

POLY TO FLOOR WITH TAPE

UNDERSIDE OF STRUCTURAL DECK

CONSTRUCTION

SIDE

OCCUPIED

SIDE

PUBLIC

SIDE

1 HOUR FIRE RATED METAL DOOR ASSEMBLY

AND FRAME WITH SEALS, CARD READER,

HARDWARE AND CLOSER

AIR PRESSURE MONITOR

HAND SANITIZER

SEAL ALL EDGES WITH TAPE

SEAL ALL EDGES WITH TAPE

REFER TO TEMPORARY BARRIER TYPE FOR

REQUIRED CONDITION TO STRUCTURE ABOVE

VA / OSHA TEMPORARY SIGNAGE

CONSTRUCTION ACTIVITY - FIRE RISK: TYPE D

PATIENT RISK GROUP: MEDIUM

CLASS OF PRECAUTION MATRIX: III

A. PROJECT SHALL BE COMPLETED IN A 6 PHASES.

B. COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND

FIELD VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE

CEILING WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE

PROJECT BOUNDARY.

C. COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER

WALL CONSTRUCTION AND INFECTION CONTROL (IC) MEASURES WITH COR

AND PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE. TEMPORARY

IC BARRIER WALL CONSTRUCTION LOCATIONS IN DRAWINGS ARE

APPROXIMATE. CONTRACTOR SHALL PROVIDE DRAWING TO COR AND

PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE ONCE ICRA

PROTOCOLS AND PLAN IS APPROVED.

D. SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR

AND LAB STAFF BEFORE CONSTRUCTION MAY BEGIN. PROVIDE PHASING

INFORMATION FOR ABOVE CEILING WORK IN THE CONTRACTOR PROVIDED

CPM SCHEDULE FOR WORK ALSO REQUIRED ABOVE AND BELOW THE FLOOR

PLATE OF THE PROJECT BOUNDARY.

E. ABOVE CEILING WORK SHALL TAKE PLACE BETWEEN THE HOURS OF 5:00 PM

AND 5:00 AM. IN AREAS THAT REQUIRE ABOVE CEILING WORK WHERE

CEILINGS ARE TO REMAIN, CEILING TILES SHALL BE REMOVED AND STORED

IN A SAFE MANNER UNTIL CEILING TILES CAN BE REINSTALLED. DAMAGED

AND BROKEN CEILING TILES SHALL BE REPLACED BY CONTRACTOR AT NO

COST TO THE VA.

F. EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED

DURING NORMAL BUSINESS HOURS.

G. WORK REQUIRING VIBRATION OR LOAD NOISE SHALL TAKE PLACE BETWEEN

THE HOURS OF 5:00 PM AND 5:00 AM. EVERY EFFORT SHALL BE MADE TO

KEEP NOISE AND VIBRATION TO A MINIMUM.

H. PROVIDE A 24"X36" STICKY WALK OFF MAT AND HAND SANITIZER AT EACH

TEMPORARY DOOR LOCATION. MAT SHALL BE REPLACED OR CLEANED AS

NECESSARY AS DETERMINED BY THE VA.

I. PROVIDE THE VA AND OSHA REQUIRED TEMPORARY SIGNAGE AT EACH

TEMPORARY DOOR LOCATION.

J. CONTRACTOR SHALL SUPPLY SPILL KIT TO INCLUDE SHOP VAC, MULTI-

PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE

LIQUIDS UP TO 30 GALLONS.

K. ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED

WITH 6 MIL. POLY SHEET.

L. ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT

BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED

ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR SUCH PURPOSE

WITH A LID.

M. ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY

STORED IN DESIGNATED AREAS AND APPROVED CONTAINERS. FLAMMABLE

MATERIALS SHALL NOT BE STORED IN THE FACILITY.

N. PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE

PROJECT BOUNDARY.

O. UTILIZE TEMPORARY CONSTRUCTION BARRIERS AS INDICATED IN PHASED

DEMOLITION AND NEW WORK DRAWINGS. REFER TO TEMPORARY

CONSTRUCTION DETAILS THIS SHEET.

P. AS REQUIRED BY NFPA 241, PROVIDE TEMPORARY UPRIGHT SPRINKLERS

WITHIN CONSTRUCTION AREA WHERE HAZARD IS GREATER THAN THE

NORMAL LEVEL OF HAZARD WITHIN THE SPACE.

INFECTION CONTROL GENERAL NOTES

INFECTION CONTROL PROJECT INFORMATION

N

BUILDING 58 KEY PLAN

PROJECT LOCATION:

FIRST FLOOR

SHADE

INDICATES

AREA NOT IN

SCOPE , TYP.

1A

FIT OUT B103 FOR

TEMPORARY OFFICE

USE

ACQUIRE TEMPORARY

TRAILER, RENOVATE

MORGUE

MAIN CONSTRUCTION

ENTRY AND ROUTE

AREAS VACATED

BY VA IN PHASE 1A

BLOOD DRAW

SPEC PROCESSING

CONFERENCE AND OFFICES

PIPATING

BLOOD BANK

CHEM

AUTO CHEM

EIA

MICROBIOLOGY

AUTOCLAVE

CUT OPENING THROUGH

AUTOCLAVE AREA

1B

2A - RENOVATE

FOR TEMP SPEC

PROCESSING,

BLOOD BANK,

PIPATING LAB,

HISTO/CYTO, AND

OTHER WORK THIS

AREA AS IS

PRACTICABLE

2B - RENOVATE FOR

USE AS TEMP BLOOD

DRAW

MAIN

CONSTRUCTION

ENTRY AND ROUTE

INSTALL TEMPORARY

AHU AND REMOVE

EXISTING AHU

CONTINUE TO

RENOVATE MORGUE

VACATED BY VA

AT COMPLETION

OF PHASE 1

BLOOD DRAW

SPEC PROCESSING

CONFERENCE AND OFFICES

PIPATING

BLOOD BANK

CHEM

AUTO CHEM

EIA

MICROBIOLOGY

AUTOCLAVE

RENOVATE

TOILETS

VA USING FOR TEMP

BLOOD DRAW

VA USING FOR

TEMP BLOOD

BANK, PIPATING

LAB, SPEC

PROCESSING,

AND HISTO/CYTO

RENOVATE BLOOD BANK,

PIPATING LAB, OFFICES,

CONFERENCE RM,

HISTO/CYTO AND BLOOD

DRAW

STAFF ENTRY AND

ROUTE

MAIN

CONSTRUCTION

ENTRY AND ROUTE,

NO STAFF (THIS

PHASE ONLY)

PROVIDE

PERMANENT

AHU

3A

3B

CHEM

AUTO CHEM

EIA

MICROBIOLOGY

AUTOCLAVE

RESTROOMS

COMPLETED

MORGUE COMPLETED

4B - RENOVATE FOR

PERMANENT LOUNGE

MAIN ENTRY, SPEC

PROCESSING, HISTO/CYTO,

BLOOD BANK, PIPATING LAB,

CHEMISTRY, AUTOCHEM,

BLOOD DRAW, TOILETS

COMPLETED

4A - RENOVATE

OLD CHEM AND

AUTO CHEM FOR

EIA AND PORTION

OF MICROBIOLOGY

MAIN

CONSTRUCTION

ENTRY AND ROUTECONTRACTOR

MAY USE AREA

FOR STORAGE

AND STAGING

EIA

MICROBIOLOGY

AUTOCLAVE

LOUNGE, EIA, PORTION OF

MICROBIOLOGY COMPLETED

CONTRACTOR

MAY USE AREA

FOR STORAGE

AND STAGING

RENOVATE OLD

EIA FOR

MICROBIOLOGY

MAIN

CONSTRUCTION

ENTRY AND ROUTE

MICROBIOLOGY COMPLETED

RENOVATE FOR

OFFICES,

STORAGE

PHASE 1

PHASE 1 AREA A -

B103-6 FIT OUT

VA OFFICES MOVE

TO B103-6,

VACATE LOUNGE,

TOILETS

PHASE 1 AREA B - MORGUE RENO (NOT REQUIRED

TO BE FINISHED PRIOR TO PHASE 2)

PHASE 2 AREA A - RENO

OFFICE AREAS IN LAB FOR

TEMP FUNCTIONS AND

COORDINATE EQUIPMENT

SET UP. RENOVATE

TOILETS

PHASE 2

VA MOVES TO

TEMP. SPECIMEN

PROCESSING,

HISTO/CYTO,

BLOOD BANK,

PIPATING LAB,

BLOOD DRAW TO

PHASE 2 AREA. VA

MOVES TO

PERMANENT

MORGUE.

TOILETS ARE

ACCESSIBLE

PHASE 3

PHASE 2 AREA B - RENO

LOUNGE FOR TEMP BLOOD

DRAW

PHASE 3 AREA A - RENO PERMANENT

BLOOD DRAW

PHASE 5

VA MOVES TO

BLOOD

DRAW, SPEC

PROCESSING,

AUTO CHEM,

CHEM,

PIPATING,

HISTO/CYTO.

MAIN ENTRY

IS

ACCESSIBLE

PHASE 3 AREA B - RENO MAIN ENTRANCE,

PREVIOUS SPECIMEN PROCESSING, BLOOD

BANK, PREVIOUS PIPATING LAB, OFFICES,

CONFERENCE, HISTO/CYTO

PHASE 5 - RENO OLD EIA

PHASE 4

PHASE 4 AREA A - RENO

OLD CHEM AND AUTO

CHEM

PHASE 6

VA MOVES TO NEW

LOUNGE, EIA

PHASE 6 - RENO

BACK OFFICES

PHASE 4 AREA B - RENO

PERMANENT LOUNGE

VA MOVES TO NEW

MICROBIOLOGY

VA VACATES

B103-6

BUILDING 103 KEY PLAN

PROJECT

LOCATION:

FIRST FLOOR

SHADE

INDICATES

AREA NOT IN

SCOPE , TYP.

N

PHASE 1 DESCRIPTION

1. PHASE 1A: THE CONTRACTOR SHALL FIT OUT B103 IN ORDER THAT ALL

ADMINISTRATIVE OFFICE PERSONNEL AND FURNITURE FROM B58-1 MAY

RELOCATE. CONSTRUCTION NEEDED IS MINIMAL AND INCLUDES THE

PROPER POWER AND DATA REQUIRED FOR THE OFFICE PERSONNEL TO

OPERATE TEMPORARILY.

2. UPON COMPLETION OF PHASE 1A BY THE CONTRACTOR, THE VA SHALL

RELOCATE ALL ADMINISTRATIVE PERSONNEL, AND THE CONTRACTOR

SHALL RELOCATE THE FURNITURE FOR THE PERSONNEL TO BUILDING 103.

STAFF SHALL CEASE TO UTILIZE THE TOILETS IN THE LAB AND THE STAFF

LOUNGE - STAFF TO USE BATHROOMS ON THE OPPOSITE SIDE OF THE

BUILDING LOBBY. THIS PHASE 1A MUST BE COMPLETED PRIOR TO PHASE 2

COMMENCING.

3. PHASE 1B: UPON REMOVAL OF ALL ITEMS FROM THE MORGUE BY THE VA,

THE CONTRACTOR SHALL REMOVE EXISTING INTERIOR FINISHES & BUILT-

INS IN THE MORGUE. THE EXISTING RESTROOM WILL BE REMOVED, AND

NEW FINISHES WILL BE APPLIED TO MATCH THE CODE AND FACILITY

STANDARDS.

4. UPON COMPLETION OF WORK BY THE CONTRACTOR WITHIN THE MORGUE,

THE SPACE SHALL BE TURNED BACK OVER TO THE VA. THIS PHASE 1B IS

REQUIRED TO BE COMPLETED PRIOR TO PHASE 3 COMMENCING,

COORDINATE WITH THE VA.

PHASE 2 DESCRIPTION

1. PHASE 2A: CONTRACTOR SHALL REMOVE THE B58 EXISTING OFFICE

CONSTRUCTION IN THE NORTH WEST CORNER OF THE LAB AND SHALL

RENOVATE THE RESTROOMS. EXISTING WALLS SHALL BE USED AND

CONSTRUCTION BARRIERS SHALL BE BUILT FOR THIS PHASE. THIS AREA

WILL BE RENOVATED TO SERVE AS TEMPORARY LAB SWING SPACE AND

AS THE PERMANENT RESTROOMS. CONTINGENT UPON COORDINATION

WITH THE VA, EXISTING EQUIPMENT SHALL BE RELOCATED TO THE

TEMPORARY SWING SPACE FOR SPECIMEN PROCESSING,

HISTOLOGY/CYTOLOGY, BLOOD BANK, AND PIPATING LAB. WHEN THE

SWING SPACE IS FULLY SET UP, CONTRACTOR SHALL TURN OVER SPACE

TO VA. VA STAFF SHALL THEN VACATE THE EXISTING SPECIMEN

PROCESSING, HISTOLOGY/CYTOLOGY, BLOOD BANK, PIPATING LAB FOR

RENOVATION. PHASE 2A MUST BE COMPLETED PRIOR TO PHASE 3

BEGINNING

2. PHASE 2B: THE EXISTING CONSTRUCTION AND FINISHES WITHIN THE

STAFF LOUNGE WILL BE PARTIALLY REMOVED AND THE SPACE SHALL BE

SET UP TO BE A TEMPORARY BLOOD DRAW SPACE, CONTINGENT UPON

COORDINATION WITH THE VA, EXISTING EQUIPMENT SHALL BE

RELOCATED TO THE TEMPORARY BLOOD DRAW ROOM. VA STAFF SHALL

THEN VACATE THE EXISTING BLOOD DRAW ROOM FOR RENOVATION.

3. INSTALL TEMPORARY AHU AND REMOVE EXISTING AHU , SEE MECHANICAL

DRAWINGS.

PHASE 3 DESCRIPTION

1. PHASE 3A: THE CONTRACTOR SHALL RENOVATE THE EXISTING BLOOD

DRAW SPACE AS INDICATED. CONTINGENT UPON COORDINATION WITH THE

VA, RELOCATE EQUIPMENT FROM TEMPORARY BLOOD DRAW TO THE

COMPLETED PERMANENT BLOOD DRAW ROOM. VA SHALL THEN RELOCATE

TO THE COMPLETE BLOOD DRAW ROOM. PHASE 3A MUST BE COMPLETED

PRIOR TO PHASE 4 BEGINNING.

2. PHASE 3B: CONTRACTOR SHALL UTILIZE EXISTING WALLS AND PROVIDE

TEMPORARY BARRIERS AS INDICATED TO RENOVATE THE PREVIOUS

SPECIMEN PROCESSING, HISTO/CYTO, BLOOD BANK, PIPATING LAB,

OFFICES, AND CONFERENCE ROOM. ONCE COMPLETED, COORDINATE WITH

THE VA TO RELOCATE THE EQUIPMENT FROM THE TEMPORARY SWING

SPACE TO THE COMPLETED SPECMEN PROCESSING, HISTO/CYTO,

CHEMISTRY AND BLOOD BANK SPACES. ALSO COORDINATE WITH THE VA

TO RELOCATE EQUIPMENT AND SET UP A TEMPORARY SPECIMEN

PROCESSING WITHIN THIS RENOVATED AREA. REMOVE TEMPORARY

CONSTRUCTION AS REQUIRED. VA SHALL THEN RELOCATE TO THESE

COMPLETED AREAS AS WELL AS THE TEMPORARY SPECIMEN PROCESSING.

PHASE 3B MUST BE COMPLETED PRIOR TO PHASE 4 COMMENCING.

3. PROVIDE NEW PERMANENT AHU, SEE MECHANICAL DRAWINGS.

PHASE 4 DESCRIPTION

1. PHASE 4A: CONTRACTOR SHALL UTILIZE EXISTING CONSTRUCTION AND

PROVIDE NEW AND TEMPORARY CONSTRUCTION AS INDICATED TO

RENOVATE CHEMISTRY’S PREVIOUS LABS. WHEN COMPLETED,

COORDINATE WITH THE VA TO RELOCATE EQUIPMENT INTO THE

COMPLETED EIA SPACE. REMOVE TEMPORARY CONSTRUCTION AS

REQUIRED. VA SHALL THEN RELOCATE TO EIA. PHASE 4A MUST BE

COMPLETED PRIOR TO PHASE 5 COMMENCING.

2. PHASE 4B: THE CONTRACTOR SHALL RENOVATE THE TEMPORARY BLOOD

DRAW SPACE TO BE THE STAFF LOUNGE. WHEN COMPLETE, TURN OVER TO

THE VA. PHASE 4B MUST BE COMPLETED PRIOR TO PHASE 5, COORDINATE

WITH VA.

PHASE 5 DESCRIPTION

1. UTILIZE EXISTING AND PROVIDE NEW WALLS AND TEMPORARY

CONSTRUCTION BARRIERS AS INDICATED. CONTRACTOR SHALL RENOVATE

THE 5A OLD EIA AREA. WHEN COMPLETE, COORDINATE WITH THE VA TO

RELOCATE EQUIPMENT INTO COMPLETED MIOCROBIOLOGY. REMOVE

TEMPORARY CONSTRUCTION AS REQUIRED. VA SHALL THEN RELOCATE TO

MICROBIOLOGY. PHASE 5A MUST BE COMPLETED PRIOR TO PHASE 6

BEGINNING.

PHASE 6 DESCRIPTION

1. CONTRACTOR SHALL UTILIZE EXISTING AND PROVIDE NEW WALLS AND

TEMPORARY CONSTRUCTION BARRIERS AS INDICATED. RENOVATE THE

ADMINISTRATIVE OFFICE SPACE WITHIN THE LAB. WHEN COMPLETED,

COORDINATE WITH THE VA TO RELOCATE ALL FURNITURE AND EQUIPMENT

FROM B103 BACK TO B58. VA SHALL THEN RELOCATE BACK TO B58.

PHASED CORRIDOR WORK NOTE

1. INTENT IS THAT WORK IN CORRIDORS MAY BE COMPLETED AT ANY TIME

DURING THE PROJECT, GIVEN APPROPRIATE INFECTION CONTROL

MEASURES ARE MADE, AND COORDINATION IS MADE WITH THE VA.

CONTRACTOR SHALL COMPLETE THIS WORK WHEN MOST EFFICIENT FOR

CONTRACTOR AND VA. NOTE THAT PORTION OF CORRIDOR MUST REMAIN

USABLE BY VA STAFF THROUGHOUT CONSTRUCTION 24 HRS A DAY SUCH

THAT SPACE REMAINS OPERATIONAL. CONTRACTOR SHALL BE REQUIRED

TO PROVIDE TEMPORARY BARRIERS FOR SHORT DURATIONS AS REQUIRED

TO PROTECT VA PATIENTS AND STAFF DURING CONSTRUCTION.

CONTRACTOR SHALL COORDINATE WITH VA FOR ALL TEMPORARY

BARRIERS AND CLOSURES REQUIRED IN THE CORRIDOR.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

35% SCHEMATIC DESIGN 03/17/2020

65% DESIGN DEVELOPMENT 05/12/2020

100% CONSTRUCTION DOCUMENTS 07/21/2020

95% CONSTRUCTION DOCUMENTS 10/26/2020

100% BID DOCUMENTS 11/30/2020

95% REVISED CONSTRUCTION DOCUMENTS 04/12/2021

100% BID DOCUMENTS 11/18/2021

C U s e rs

\t s a n d e rs

\D o c u m e n ts

\1 .5

.0

A v ts a n d e rs g u id o n d e s ig n .c o m

.r v t

/1

/2

:0

:0

A

M

GC101

INFECTION CONTROL/PHASING

PLANSGUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

TYLER SANDERS

CMTA

10411 MEETING STREET

PROSPECT, KENTUCKY

ANDY MYERS

RENOVATE LAB AND PATHOLOGY

1900 E. MAIN ST., DANVILLE, IL 61832

550-20-110

58-1

11/18/2021 TS DMC

100% BID DOCUMENTS

FULLY SPRINKLERED

502.326.3085

SCALE: 1 1/2" = 1'-0"GC101

8 TEMP. 1 HR FIRE RATED WALL PER NFPA 241

SCALE: 1 1/2" = 1'-0"GC101

9 TEMP. PLASTIC CONSTRUCTION BARRIER

SCALE: 1/4" = 1'-0"GC101

10 TEMPORARY WALL ELEVATION

SCALE: 1" = 30'-0"GC101

1 PHASE 1

SCALE: 1" = 30'-0"GC101

2 PHASE 1 AREA B - MORGUE

SCALE: 1" = 30'-0"GC101

3 PHASE 2

SCALE: 1" = 30'-0"GC101

4 PHASE 3

SCALE: 1" = 30'-0"GC101

5 PHASE 4

SCALE: 1" = 30'-0"GC101

6 PHASE 5

SCALE: 1" = 30'-0"GC101

7 PHASE 6

SCALE: 12" = 1'-0"

PHASING TIMELINE GRAPHIC

N

N

N

N

N

N

BID DEDUCT #1 - REMOVE NEW STAFF LOUNGE FROM RENOVATION

NO WORK TO BE CONDUCTED IN THE STAFF LOUNGE - TO REMAIN AS

EXISTING. LOUNGE WILL STILL BE UTILIZED AS TEMPORARY BLOOD

DRAW DURING A PORTION OF THE PROJECT.

BID DEDUCT #2 - REMOVE BLOOD DRAW FROM RENOVATION

IN ADDITION TO BID DEDUCT #1, NO WORK TO BE CONDUCTED IN

BLOOD DRAW INCLUDING PASS THRU CABINETS TO ADJOINING

TOILETS - TO REMAIN AS EXISTING. TEMPORARY SPACE IN THE

LOUNGE IS NOT NEEDED.

BID DEDUCT #3 - REMOVE MORGUE FROM RENOVATION

IN ADDITION TO BID DEDUCT #1 AND #2, NO WORK TO BE CONDUCTED

IN MORGUE INCLUDING BATHROOM - TO REMAIN AS EXISTING.

BID DEDUCT #4 - REMOVE SPECIMEN PROCESSING FROM RENOVATION

IN ADDITION TO BID DEDUCT #1, #2 AND #3, NO WORK TO BE

CONDUCTED IN SPECIMEN PROCESSING - TO REMAIN AS EXISTING.

ALSO DO NOT PROVIDE STOREFRONT WALL AND NEW VESTIBULE

ENTRY TO LAB. NEW BLOOD BANK EQUIPMENT TO BE RELOCATED TO

WORKSTATION BANK.

BASE BID: WORK TO ENCOMPASS FULL PROJECT AS DESCRIBED IN

THESE DOCUMENTS

BID DEDUCT #1: STAFF LOUNGE

BID DEDUCT #2: BLOOD DRAW

BID DEDUCT #3: MORGUE

BID DEDUCT #4: SPECIMEN PROCESSING

STATEMENT OF BID ITEMS

CA E H I KB D L M N Q R S T XU VG J WPF OK.9

N

BUILDING 58 KEY PLAN

PROJECT LOCATION:

FIRST FLOOR

SHADE

INDICATES

AREA NOT IN

SCOPE , TYP.

MECHANICAL

OFFICE

138C

CHIEF

OFFICE

138D

OFFICE

138B

OFFICE

138A

OFFICE

CORRIDOR

C1-7

STORAGE

138E

PATHOLOGY

STORAGE

CORRIDOR

1C1-6

LAB

136C

MICROBIOLOGY

CLOSET

137A

OFFICE

CHIEF MICROBIO

136A

EIA

134A

EIA

CHEMISTRY

AUTO

CHEMISTRY

W. TOILET

M. TOILET

BLOOD

BANK

OFFICE

131A

PIPATING

LAB

129A

PIPATING

LAB

CONFERENCE

128B

OFFICE

128A

OFFICE

OFFICE

143HISTOLOGY /

CYTOLOGY

CORRIDOR

C1-5

CORRIDOR

C1-4 AMBASSADOR

OFFICE

123B

TOILET

TOILET

HKPG

STORAGE

107AFREIGHT

ELEVATOR

CORRIDOR

C1-1

SOILED

LINEN

LOADING

DOCK

100A

TIP

100B

GAS

STORAGE

100C

CORRIDOR

C1-8

CHIEF

OFFICE

103A

OFFICE

VAULT

103B

REFRIGERATOR

104A

MECHANICAL

D

N DN

DN

UP

SPECIMEN

PROCESSING

127A

SPECIMEN

PROCESSING

MORGUE

BATHROOM

104C

BLOOD DRAW

AUTOCLAVE

STAFF LOUNGE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

35% SCHEMATIC DESIGN 03/17/2020

65% DESIGN DEVELOPMENT 05/12/2020

100% CONSTRUCTION DOCUMENTS 07/21/2020

95% CONSTRUCTION DOCUMENTS 10/26/2020

100% BID DOCUMENTS 11/30/2020

95% REVISED CONSTRUCTION DOCUMENTS 04/12/2021

100% BID DOCUMENTS 11/18/2021

C U s e rs

\t s a n d e rs

\D o c u m e n ts

\1 .5

.0

A v ts a n d e rs g u id o n d e s ig n .c o m

.r v t

/1

/2

:0

:0

A

M

GC102

BID ALTERNATES

GUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

TYLER SANDERS

CMTA

10411 MEETING STREET

PROSPECT, KENTUCKY

ANDY MYERS

RENOVATE LAB AND PATHOLOGY

1900 E. MAIN ST., DANVILLE, IL 61832

550-20-110

58-1

11/18/2021 TS DMC

100% BID DOCUMENTS

FULLY SPRINKLERED

502.326.3085

SCALE: 1/8" = 1'-0"GC102

1 BID DEDUCTS

BEYOND PROJECT BOUNDARY

AREA FOR REMOVAL OF ASBESTOS-CONTAINING FLOORING

AND ASSOCIATED MASTIC

A. HAZMAT REMOVAL NOTES APPLY TO ENTIRE ROOMS. CONTRACTOR SHALL

IDENTIFY ALL MATERIALS DESCRIBED BY NOTE IN EACH ROOM AND

REMOVE ACCORDING TO SAFETY STANDARDS. REFERENCE SPECIFICATION

02 82 11.

B. ALL HAZARDOUS MATERIALS SHALL BE REMOVED IN COMPLIANCE WITH

APPLICABLE CODES AND LAWS.

C. THE CONTRACTOR IS RESPONSIBLE TO VERIFY THE HAZARD(S) AND LEVEL

OF PROTECTION REQUIRED FOR ALL EMPLOYEES OR SUBCONTRACTORS

TO COMPLETE THE CONSTRUCTION WORK.

D. PROVIDE ABATEMENT OF VCT AND FLOORING MASTIC WITHIN HATCHED

AREA.

E. PROVIDE COST FOR REMOVAL OF COUNTED AND UNFORESEEN MUD

FITTINGS ON FIBERGLASS INSULATED DOMESTIC WATER LINES FOR 120

FITTINGS.

F. PROVIDE COST FOR REMOVAL OF ASBESTOS CONTAINING BLACK MASTIC

AND 12" NON-ASBESTOS FLOOR TILE OF APPROXIMATELY 3000 SQ.FT.

G. REFER TO SPECIFICATION AND ATTACHMENTS FOR ADDITIONAL

INFORMATION.

H. BASED ON THE DATE OF THE EXISTING CONSTRUCTION IT IS ASSUMED

LEAD PAINT IS WITHIN THE PROJECT AREA. CONDUCT DEMOLITION OF THE

EXISTING SPACE WITH THE ASSUMPTION OF LEAD PAINT ON EXPOSED

PLASTER WALLS, PAINTED METAL DOORS, AND PAINTED SURFACES. REFER

TO SPECIFICATION SECTION 02 83 33.13 LEAD-BASED PAINT REMOVAL,

DISPOSAL AND FOR ADDITIONAL INFORMATION.

I. BASED ON THE DATE OF THE EXISTING CONSTRUCTION AND

UNDERSTANDING OF THE FACILITY, LEAD PAINT IS WITHIN THE PROJECT

AREA. THIS PROJECT SCOPE HAS SIGNIFICANT DEMOLITION. PROVIDE LEAD

PAINT ABATEMENT. PROVIDE LEAD PAINT SURFACE STABILIZATION WHERE

WORK IS DONE. CONTRACTOR TO USE MEASURES FOR PROTECTION AND

TO MINIMIZE PAINT DEBRIS.

J. CONTRACTOR TO SUBMIT LEAD SURFACES STABILIZATION PLAN AND

PROCEDURES PRIOR TO COMMENCING WORK. SUBMITTAL SHALL BE IN

ACCORDANCE WITH SPECIFICATIONS.

1. RED DUCT SEAM MASTIC SEALANT ABOVE PLASTER CEILING - 86 SF TOTAL

2. PAPER DUCT SEAM TAPE OVER FIBERGLASS DUCT ABOVE CEILING - 220 SF

TOTAL

3. PIPE INSULATION ON STRAIGHT RUNS AND ELBOWS IN MECHANICAL ROOM

AND CRAWL SPACE UNDER BUILDING - 80 LF

HAZARDOUS MATERIAL REMOVAL GENERAL NOTES

HAZARDOUS MATERIAL REMOVAL PLAN NOTES

HAZARDOUS MATERIAL REMOVAL LEGEND

CA E H I KB D L M N Q R S T XVG J W

STAIR

ELECTRICAL

139A

STAIR

PF O

K.9

MECHANICAL

OFFICE

138C

CHIEF

OFFICE

138D

OFFICE

138B

OFFICE

138A

OFFICE

CORRIDOR

C1-7

STORAGE

138E

PATHOLOGY

STORAGE

CORRIDOR

1C1-6

LAB

136C

MICROBIOLOGY

CLOSET

137A

OFFICE

CHIEF MICROBIO

136A

EIA

134A

EIA

CHEMISTRY

AUTO

CHEMISTRY

W. TOILET

M. TOILET

BLOOD

BANK

OFFICE

131A

PIPATING

LAB

129A

PIPATING

LAB

CONFERENCE

128B

OFFICE

128A

OFFICE

OFFICE

143HISTOLOGY /

CYTOLOGY

CORRIDOR

C1-5

CORRIDOR

C1-4 AMBASSADOR

OFFICE

123B

TOILET

TOILET

HKPG

STORAGE

107AFREIGHT

ELEVATOR

CORRIDOR

C1-1

SOILED

LINEN

LOADING

DOCK

100A

TIP

100B

GAS

STORAGE

100C

CORRIDOR

C1-8

CHIEF

OFFICE

103A

OFFICE

VAULT

103B

REFRIGERATOR

104A

MECHANICAL

D

N DN

DN

UP

SPECIMEN

PROCESSING

127A

SPECIMEN

PROCESSING

MORGUE

BATHROOM

104C

BLOOD DRAW

AUTOCLAVE

STAFF LOUNGE

N

BUILDING 58 KEY PLAN

PROJECT LOCATION:

FIRST FLOOR

SHADE

INDICATES

AREA NOT IN

SCOPE , TYP.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

35% SCHEMATIC DESIGN 03/17/2020

65% DESIGN DEVELOPMENT 05/12/2020

100% CONSTRUCTION DOCUMENTS 07/21/2020

95% CONSTRUCTION DOCUMENTS 10/26/2020

100% BID DOCUMENTS 11/30/2020

95% REVISED CONSTRUCTION DOCUMENTS 04/12/2021

100% BID DOCUMENTS 11/18/2021

C U s e rs

\t s a n d e rs

\D o c u m e n ts

\1 .5

.0

A v ts a n d e rs g u id o n d e s ig n .c o m

.r v t

/1

/2

:0

:1

A

M

HA101

HAZARDOUS MATERIAL REMOVAL

PLANGUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

TYLER SANDERS

CMTA

10411 MEETING STREET

PROSPECT, KENTUCKY

ANDY MYERS

RENOVATE LAB AND PATHOLOGY

1900 E. MAIN ST., DANVILLE, IL 61832

550-20-110

58-1

11/18/2021 TS DMC

100% BID DOCUMENTS

FULLY SPRINKLERED

502.326.3085

SCALE: 1/8" = 1'-0"HA101

1 HAZARDOUS MATERIAL REMOVAL FLOOR PLAN

SECTION REFERENCE

DRAWING NUMBER

SHEET LOCATION

DRAWING NUMBER

SHEET

LOCATION

DETAIL REFERENCE

OBJECT

REFERENCED

OBJECT

REFERENCED

X

XXXX

X

XXXX

SCALE: ??

VIEW TITLE

N

NORTH ARROW

INCANDESCENT WALL MOUNTED LIGHTING

INCANDESCENT SURFACE MOUNT LIGHTING

SURFACE MOUNTED FLUORESCENT

RECESSED FLUORESCENT

HVAC RETURN AIR GRILLE

HVAC SUPPLY DIFFUSER

PENDANT LIGHT

ACCESS PANEL

EXIT LIGHTING

S

D

SPEAKER

SMOKE DETECTOR

INCANDESCENT RECESSED LIGHTING

A 9'-0"

CEILING TAG CEILING TYPE

FINISHED CEILING HEIGHT

REFER TO CEILING LEGEND FOR MORE

INFORMATION

EXTENT OF REVISION

REVISION SET

MECH/ELEC ITEMS: REFER TO MEP SHEETS AS APPLICABLE

BEYOND PROJECT BOUNDARY, NIC

DETAIL/DRAWING SCALE

TITLE OF DETAIL/DRAWING

DETAIL/DRAWING NUMBER

SHEET NUMBER

A/C AIR CONDITION

A/E ARCHITECT/ENGINEER

AB ANCHOR BOLT

ABC AGGREGATE BASE COURSE

AC ASBESTOS CEMENT OR ASPHALTIC CONCRETE

ACS DR ACCESS DOOR

ACS FLR ACCESS FLOOR

ACS PNL ACCESS PANEL

ACST ACOUSTIC

ACT ACOUSTICAL CEILING TILE

AD AREA DRAIN

ADA AMERICANS WITH DISABILITIES ACT

ADC AUTOMATIC DOOR CLOSER

ADDL ADDITIONAL

ADDN ADDITION

ADH ADHESIVE

ADJ ADJACENT, ADJOINING, OR ADJUSTABLE

ADMIN ADMINISTRATION

AFC ABOVE FINISHED COUNTER

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AFS ABOVE FINISHED SLAB

AGGR AGGREGATE

AHJ AUTHORITY HAVING JURISDICTION

AHR ANCHOR

AHU AIR HANDLING UNIT

AIA AMERICAN INSTITUTE OF ARCHITECTS

AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION

ALT ALTERNATE

ALT NO ALTERNATE NUMBER

ALUM ALUMINUM

AMP AMPERE

AMT AMOUNT

ANOD ANODIZE

ANSI AMERICAN NATIONAL STANDARDS INSTITUTE

ANT ANTENNA

APPD APPROVED

APPROX APPROXIMATE

AR AS REQUIRED

ARCH ARCHITECT

ASB ASBESTOS

ASI ARCHITECT'S SUPPLEMENTAL INSTRUCTION

ASKLR AUTOMATIC SPRINKLER

ASPH ASPHALT

ASSN ASSOCIATION

ATCH ATTACHMENT

ATS AUTOMATIC TRANSFER SWITCH

AUTO AUTOMATIC

AUX AUXILIARY

AV AUDIO VISUAL

AVG AVERAGE

AW ACID WASTE

AWI ARCHITECTURAL WOODWORKING INSTITUTE

AWS AMERICAN WELDING SOCIETY

AWT ACOUSTICAL WALL TREATMENT

B PL BASE PLATE

BALC BALCONY

BAT BATTEN

BB BULLETIN BOARD

BD BOARD

BEV BEVEL

BI FLD DR BIFOLDING DOORS

BITUM BITUMINOUS

BKG BACKING

BLD BUILD

BLDG BUILDING

BLKG BLOCKING

BLKT BLANKET

BM BEAM OR BENCHMARK

BOT BOTTOM

BRCG BRACING

BRDG BRIDGING

BRG BEARING

BRKT BRACKET

BRZ BRONZE

BSMT BASEMENT

BTWN BETWEEN

BUR BUILT-UP ROOFING

C CELSIUS CHANNEL OR CHANNEL CELSIUS

C CONC CAST CONCRETE

C TO C CENTER TO CENTER

CAB CABINET

CB CORNER BEAD

CBB CEMENTITIOUS (BACKER) BOARD

CC CUBIC CENTIMETER

CCTV CLOSED CIRCUIT TELEVISION

CCW COUNTERCLOCKWISE

CEM CEMENT

CEM PLAS CEMENT PLASTER

CER CERAMIC

CF CONTRACTOR FURNISHED

CF/CI CONTRACTOR FURNISHED/CONTRACTOR INSTALLED

CF/OI CONTRACTOR FURNISHED/OWNER INSTALLED

CFLG COUNTERFLASHING

CFM CUBIC FEET PER MINUTE

CFMF COLD-FORMED METAL FRAMING

CFS CUBIC FEET PER SECOND

CG CORNER GUARD

CGSFU CERAMIC GLAZED STRUCTURAL FACING UNITS

CH BD CHALKBOARD

CHEM CHEMICAL

CHFR CHAMFER

CI CAST IRON

CIP CAST-IN-PLACE

CIR CIRCLE

CIRC CIRCULAR

CJ CONSTRUCTION JOINT OR CONTROL JOINT

CL CENTER LINE

CLDG CLADDING

CLG CEILING

CLR CLEAR

CMU CONCRETE MASONRY UNIT

CNR CORNER

CNTR COUNTER

CO CARBON MONOXIDE, CLEANOUT

CO₂ CARBON DIOXIDE

COL COLUMN

COM COMMON

COMB COMBINATION, COMBINED

COMM COMMUNICATION

COMP COMPONENT

CONC CONCRETE

COND CONDENSER OR CONDITION

CONF CONFERENCE

CONN CONNECT

CONSTR CONSTRUCTION

CONT CONTINUE

CONTR CONTRACTOR

COORD COORDINATE

CORR CORRIDOR

CPM CRITICAL PATH METHOD

CPRS COMPRESSIBLE

CPT CARPET

CRS COLD ROLLED STEEL

CS CAST CONCRETE STONE

CSB CONCRETE SPLASH BLOCK

CSG CASING

CSK COUNTER SUNK

CSMT CASEMENT

CSWK CASEWORK

CT CERAMIC TILE

CTB CERAMIC TILE BASE

CTF CERAMIC TILE FLOOR

CTG COATING

CTR CENTER

CTRL CONTROL

CTV CABLE TELEVISION

CU COPPER C

CU FT CUBIC FEET

CU IN CUBIC INCH

CU YD CUBIC YARD

CURT CURTAIN

CYL CYLINDER

CYL L CYLINDER LOCK

N NORTH

NA NOT APPLICABLE

NAT NATURAL

NATL NATIONAL

NC NOISE CRITERIA

NCOMBL NONCOMBUSTIBLE

NEG NEGATIVE

NEUT NEUTRAL

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NR NOISE REDUCTION

NRC NOISE REDUCTION COEFFICIENT

NRP NONREMOVABLE

NS NARROW STILE

NUM NUMERAL

O/O OUT TO OUT

O OXYGEN

OA OUTSIDE AIR OR OVERALL

OC ON CENTER

OCC OCCUPY

OCT OCTAGON

OD OUTSIDE DIAMETER OR OUTSIDE DIMENSION

OF/CI OWNER FURNISHED/CONTRACTOR INSTALLED

OFD OVERFLOW DRAIN

OFF OFFICE

OF/OI OWNER FURNISHED/OWNER INSTALLED

OH OVERHANG

OH DR OVERHEAD (COILING) DOOR

OPH OPPOSITE HAND

OPNG OPENING

OPP OPPOSITE