This federal contract opportunity is a solicitation issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12 for the Z1DA--Renovate Lab and Pathology Project 550-20-110. The solicitation number is 36C25222B0033 and seeks bids for renovations to a lab and pathology project. The opportunity description provided is blank, so no further details regarding required products or services, pricing terms, response dates, or other salient information are available from this document.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N
BUILDING 58 KEY PLAN
PROJECT LOCATION:
FIRST FLOOR
SHADE
INDICATES
AREA NOT IN
SCOPE , TYP.
BUILDING 103 KEY PLAN
PROJECT
LOCATION:
FIRST FLOOR
SHADE
INDICATES
AREA NOT IN
SCOPE , TYP.
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
35% SCHEMATIC DESIGN 03/17/2020
65% DESIGN DEVELOPMENT 05/12/2020
100% CONSTRUCTION DOCUMENTS 07/21/2020
95% CONSTRUCTION DOCUMENTS 10/26/2020
100% BID DOCUMENTS 11/30/2020
95% REVISED CONSTRUCTION DOCUMENTS 04/12/2021
100% BID DOCUMENTS 11/18/2021
C U s e rs
\t s a n d e rs
\D o c u m e n ts
\1 .5
.0
A v ts a n d e rs g u id o n d e s ig n .c o m
.r v t
/1
/2
:2
:2
P
M
GI000
COVER SHEET
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
TYLER SANDERS
CMTA
10411 MEETING STREET
PROSPECT, KENTUCKY
ANDY MYERS
RENOVATE LAB AND PATHOLOGY
1900 E. MAIN ST., DANVILLE, IL 61832
550-20-110
58-1
11/18/2021 JF DMC
550-20-110
RENOVATE LAB AND PATHOLOGY
VA ILLIANA HEALTH CARE SYSTEM (VAIHCS)
1900 E. MAIN ST., DANVILLE, IL 61832
100% BID DOCUMENTS
100% BID DOCUMENTS
FULLY SPRINKLERED
502.326.3085
SHEET INDEX
SHEET
NUMBER SHEET NAME
PD104 FIRST FLOOR PLAN - PLUMBING DEMOLITION - PHASE 4
PL104a FIRST FLOOR PLAN - PLUMBING - PHASE 4
PL104b BASEMENT PLAN - PLUMBING - PHASE 4
P105a FIRST FLOOR PLAN - PLUMBING - PHASE 5
P105b BASEMENT PLAN - PLUMBING - PHASE 5
P106a FIRST FLOOR PLAN - PLUMBING - PHASE 6
P106b BASEMENT PLAN - PLUMBING - PHASE 6
MECHANICAL
ML100 MECHANICAL LEGEND
MD100 BASEMENT FLOOR PLAN - MECHANICAL DEMOLITION
MH100 BASEMENT FLOOR PLAN - MECHANICAL
MD101 FIRST FLOOR PLAN - MECHANICAL DEMOLITION - PHASE 1B
MH101 FIRST FLOOR PLAN - MECHANICAL - PHASE 1B
MD102 FIRST FLOOR PLAN - MECHANICAL DEMOLITION - PHASE 2
MH102 FIRST FLOOR PLAN - MECHANICAL - PHASE 2
MD103 FIRST FLOOR PLAN - MECHANICAL DEMOLITION - PHASE 3
MH103 FIRST FLOR PLAN - MECHANICAL - PHASE 3
MD104 FIRST FLOOR PLAN - MECHANICAL DEMOLITION - PHASE 4
MH104 FIRST FLOOR PLAN - MECHANICAL - PHASE 4
MD105 FIRST FLOOR PLAN - MECHANICAL DEMOLITION - PHASE 5
MH105 FIRST FLOOR PLAN - MECHANICAL - PHASE 5
MD106 FIRST FLOOR PLAN - MECHANICAL DEMOLITION - PHASE 6
MH106 FIRST FLOOR PLAN - MECHANICAL - PHASE 6
MD107 ENLARGED MECHANICAL ROOM PLAN - MECHANICAL DEMOLITION
MH107 ENLARGED MECHANICAL ROOM FLOOR PLAN - MECHANICAL
MH108 ATTIC FLOOR PLAN - MECHANICAL
MI100 MECHANICAL DETAILS
MI101 MECHANICAL DETAILS
MI102 MECHANICAL CONTROLS
MI103 MECHANICAL CONTROLS
MI200 MECHANICAL SCHEDULES
MI201 MECHANICAL SCHEDULES
ELECTRICAL
EJ100 ELECTRICAL LEGEND AND GENERAL NOTES
EJ101 ELECTRICAL DETAILS
EJ102 ELECTRICAL DETAILS
EJ103 ELECTRICAL DETAILS
EJ104 ELECTRICAL DETAILS
EJ200 PANELBOARD SCHEDULES
ED101 FIRST FLOOR PLAN - ELECTRICAL DEMOLITION - PHASE 1A AND 1B
EL101 FIRST FLOOR PLAN - LIGHTING - PHASE 1A AND 1B
EP101 FIRST FLOOR PLAN - POWER - PHASE 1A AND 1B
ES101 FIRST FLOOR PLAN - SYSTEMS - PHASE 1A AND 1B
ED102 FIRST FLOOR PLAN - ELECTRICAL DEMOLITION - PHASE 2
EL102 FIRST FLOOR PLAN - LIGHTING - PHASE 2
EP102 FIRST FLOOR PLAN - POWER - PHASE 2
ES102 FIRST FLOOR PLAN - SYSTEMS - PHASE 2
ED103 FIRST FLOOR PLAN - ELECTRICAL DEMOLITION - PHASE 3
EL103 FIRST FLOOR PLAN - LIGHTING - PHASE 3
EP103 FIRST FLOOR PLAN - POWER - PHASE 3
ES103 FIRST FLOOR PLAN - SYSTEMS - PHASE 3
ED104 FIRST FLOOR PLAN - ELECTRICAL DEMOLITION - PHASE 4
EL104 FIRST FLOOR PLAN - LIGHTING - PHASE 4
EP104 FIRST FLOOR PLAN - POWER - PHASE 4
ES104 FIRST FLOOR PLAN - SYSTEMS - PHASE 4
ED105 FIRST FLOOR PLAN - ELECTRICAL DEMOLITION - PHASE 5
EL105 FIRST FLOOR PLAN - LIGHTING - PHASE 5
EP105 FIRST FLOOR PLAN - POWER - PHASE 5
ES105 FIRST FLOOR PLAN - SYSTEMS - PHASE 5
ED106 FIRST FLOOR PLAN - ELECTRICAL DEMOLITION - PHASE 6
EL106 FIRST FLOOR PLAN - LIGHTING - PHASE 6
EP106 FIRST FLOOR PLAN - POWER - PHASE 6
ES106 FIRST FLOOR PLAN - SYSTEMS - PHASE 6
EP107 MECHANICAL ROOM - ELECTRICAL WORK
SHEET INDEX
SHEET
NUMBER SHEET NAME
GENERAL
GI000 COVER SHEET
GI101 CODE ANALYSIS LIFE AND SAFETY PLANS
GI102 CONSTRUCTION LOGISTICS
GC101 INFECTION CONTROL/PHASING PLANS
GC102 BID ALTERNATES
HA101 HAZARDOUS MATERIAL REMOVAL PLAN
STRUCTURAL
SB101 MECHANICAL EQUIPMENT SLAB AND FRAMING PLANS
ARCHITECTURAL
AE001 ARCHITECTURAL SYMBOLS AND ABBREVIATIONS
AE002 WALL TYPES
AD100 B58 OVERALL DEMOLITION PLAN
AD110 B58 OVERALL REFLECTED CEILING DEMOLITION PLAN
AE100 B58 OVERALL ARCHITECTURAL PLAN
AE110 B58 OVERALL REFLECTED CEILING PLAN
AE601 DOOR SCHEDULE
AE602 STOREFRONT ELEVATIONS
AI100 OVERALL FINISH WALL TREATMENT PLAN
AI110 OVERALL FINISH FLOOR TREATMENT PLAN
AI502 CASEWORK DETAILS
AI900 OVERALL SIGNAGE PLAN
AI901 SIGNAGE TYPES
QH100 B58 OVERALL EQUIPMENT PLAN
QH600 OVERALL EQUIPMENT & FURNITURE SCHEDULE
AD101B PHASE 1B DEMOLITION
AE101A PHASE 1A ARCHITECTURAL AND EQUIPMENT PLAN
AE101B PHASE 1B ARCHITECTURAL, EQUIPMENT, AND CEILING PLAN
AD102 PHASE 2 DEMOLITION
AE102 PHASE 2 ARCHITECTURAL AND CEILING PLAN
QH102 PHASE 2 EQUIPMENT PLAN
QH202 PHASE 2 INTERIOR ELEVATIONS
AD103 PHASE 3 DEMOLITION
AE103 PHASE 3 ARCHITECTURAL AND CEILING PLAN
QH103 PHASE 3 EQUIPMENT PLAN
QH203 PHASE 3 INTERIOR ELEVATIONS
QH213 PHASE 3 INTERIOR ELEVATIONS
AD104 PHASE 4 DEMOLITION
AE104 PHASE 4 ARCHITECTURAL AND CEILING PLAN
QH104 PHASE 4 EQUIPMENT PLAN
QH204 PHASE 4 INTERIOR ELEVATIONS
AD105 PHASE 5 DEMOLITION
AE105 PHASE 5 ARCHITECTURAL AND CEILING PLAN
QH105 PHASE 5 EQUIPMENT PLAN
QH205 PHASE 5 INTERIOR ELEVATIONS
AD106 PHASE 6 DEMOLITION
AE106 PHASE 6 ARCHITECTURAL AND CEILING PLAN
QH106 PHASE 6 EQUIPMENT PLAN
FIRE PROTECTION
FP001 FIRE SUPPRESSION LEGEND
FP100 FIRST FLOOR PLAN - FIRE SUPPRESSION DEMOLITION
FP101 FIRST FLOOR PLAN - FIRE SUPPRESSION
PLUMBING
PL001 PLUMBING LEGEND, GENERAL NOTES, SCHEDULES AND DETAILS
PD101 FIRST FLOOR PLAN - PLUMBING DEMOLITION - PHASE 1B
PL101a FIRST FLOOR PLAN - PLUMBING - PHASE 1B
PL101b BASEMENT PLAN - PLUMBING - PHASE 1B
PD102 FIRST FLOOR PLAN - PLUMBING DEMOLITION - PHASE 2
PL102a FIRST FLOOR PLAN - PLUMBING - PHASE 2
PL102b BASEMENT PLAN - PLUMBING - PHASE 2
PD103 FIRST FLOOR PLAN - PLUMBING DEMOLITION - PHASE 3
PL103a FIRST FLOOR PLAN - PLUMBING - PHASE 3
PL103b BASEMENT PLAN - PLUMBING - PHASE 3
Contact:Contact: Contact:
CMTA
Andy Myers
MEP Project Principle
MECHANICAL,
ELECTRICAL &
PLUMBING
VA Illiana Health Care System
Douglas Elia
COR
1900 E. Main St.
Danville, IL 61832 p: 217.554.4958 e: douglas.elia@va.gov
OWNER
GUIDON DESIGN INC.
Mark Jones
Project Manager
1221 North Pennsylvania Street Suite 200 Indianapolis, IN 46202 p: 317.800.6388 x 153 e: mjones@guidondesign.com
ARCHITECT
10411 Meeting St.
Prospect, KY 40059 p: 502.326.3085 e: amyers@cmta.com
AREA MAP
VICINITY MAP
PROJECT SITE
BLDG 103
BLDG 58
N
N
CAMPUS MAP
N
Tyler Sanders
Project Architect p: 317.800.6388 x 126 e: tsanders@guidondesign.com
Revisions: Date:
UP
You Are Here here
108D
111D
Storage Utility
106D Patient Toilet107D
Patient Shower
Patient's 102D
Bedroom
116D
SPD 114D
112D 113D
114D1
117D Alcove
118D1120D1122D1
Meds 128D1
127D Util.
Util.
126D
129D Women
130D MenShower
125D
Room
Elec.
129D1
Activ Rm.
Patient 105D
103-5
103-6
103-7
156C Patient's Bedroom
Bedroom Patient's 155C
Clean linen 153C154C
Treatmt.
150C
152C
Patient's Bedroom
148C
Bedroom Patient's 147C
Patient's Bedroom
146C 145C Patient's Bedroom Bedroom
Patient's 144C
Patient's Bedroom
143C
143C1145C1147C1
149C
C5C
140C Nurse Station
141C Laundry
140C1 Meds
Hsk.
142C
139CStaff Office
138C Breakroom
Office Provider
137C
136C Shower
Waiting 135C
Support Prgm 134C
Station Nurse 128C
128C1 Meds
129C Wmn.
130C Men
127C
Laundary 126C Hsk.
131C 132C Intern Office
125C
Storage
124C Visitor Peer
133C
C4C
C3C
118C 119C117C 120C 121C Voc.Rehb Counselor
122C 123C
123C1121C1119C1
116C
114C
113C
Bedroom
110B Patient's
Bedroom Patient's 110C
Bedroom Patient's 111C
Bedroom Patient's 111B
118B
112B 113B
114B
Room Break 116B
117B
SARP
Case Manager
119B
Manager Case
SARP
120B
Manager Case
SARP
121B
Cordinator Case
SARP
122B
Manager Case
SARP
123B
123B1121B1119B1
C3B
133B Office124B
Waiting 125B Shower
132B Food PrepPrep
Food 131B
126B Hsk.
Laundry 127B
129B Women Men
130B Nurse 128B
Station 116E 117E
Women
E
119E Mechanical Room
Tip 146E 146E1
Storage 147E 148E
133A Waiting Room
125A Utility Room
132A Intake Room
131A Treatment Center
Elec.
124A
124A1
130A Men Wmen.
129A
126A Util.
145A
Area Smoking
Kitchen 144E
E
C5F
123A
Bedroom Patient's
Bedroom Patient's 122A
Patient's Bedroom
121A 120A
Bedroom Patient's Patient's
Bedroom
119A 118A
Bedroom Patient's
118A1120A1122A1
C3A
117A Alcove
128A Nurse Station
Station Nurse 127A
101A Dayroom
Patient's Bedroom
102A
Bedroom
103A Patient's
C1A
104A Patient's BedroomRoom
Conference 105A
116A
114A1
113A
112A
108A-1 Tlt.
107A
106A-1 Tlt.
Patient's Bedroom
111A
Patient's Bedroom
109A
Bedroom Patient's 109D110D
Patient's Bedroom
Bedroom Patient's 110A
(Storage)(Storage)
Bedroom
104D Patient's
Bedroom
103D Patient's
C1D
101D Dayroom
Bedroom Patient's 118D119D
Bedroom Patient's
120D
Bedroom Patient's
121D
Bedroom Patient's
122D
Bedroom Patient's
123D
Bedroom Patient's
C3D
128D
Station Nurse's
131D
Room Exam
132D Break Room
Visitors 124D
Room Conf.
133D
Room
Patient's Dining
140E
Dining
139E Patient's
Therapy
120E Occupational
121E Patient's Dining
Dining Patient's 122E
Patient's Dining
123E
138E Wheelchair Repair
Service Food 124E
Food Service
126E
Food Service
125E
Corr.
Room Mechanical 127E
137E2
136E1
137E
136E
136E2
Hsk.
135E
134E Elec.
133E 132E Storage
Tip 132E1
C4D
Patient's 162D
Bedroom
Bedroom
163D Patient's
164D Patient's Bedroom
C7D
161D Office
Dayroom 165D
Tlt.
159D
Tlt.
160D
C6D
Bedroom
158D Patient's
Patient's 157D
Bedroom
156D
Bedroom Patient's
Patient's Bedroom
155D
153D
154D
152D
150D
Elec.148D
Bedroom Patient's
147D Patient's Bedroom
146D Patient's Bedroom
145D Sleep Study
144D Sleep Study
143D Sleep Study
149D Alcove
148D1146D1144D1
Nurse's Station
140D
140D1 Meds
Room
136D Shower
141D
139DHR
Links
142D
138D
MDS
137D
Coord.
135D Sleep Lab
134D
MDS
Coord.
C7E
131E 131E1
130E
128E1
Locker Female 128E
Breakroom Staff
CourtyardCourtyard
137E1
132E2
C2A
C2D
C5D
C6E
151C
115C
123C-A
165D1
115B
STOR. 106A-2
Tlt.
108A-2 Tlt.
Asst.
Support
SPC.
Room
Voc.Rehb Counselor
Social worker
Social worker
Career Lab
Clinical Pharmacist
Provider Office
Room Break
SARP
Case Manager
TOTAL OCCUPANCY
FEC
EXIT
OCCUPANCY LOAD FACTOR
EXITS REQUIRED
SQUARE FOOTAGE
OCCUPANCY TYPE
EGRESS EXIT SIGNAGE
FIRE EXTINGUISHER CABINET
DIAGONAL DISTANCE
EXIT SEPARATION DISTANCE
EGRESS PATH
EXISTING 2 HR - FIRE SEPARATION
EXISTING 1 HR - FIRE SEPARATION
EXISTING SMOKE RESISTIVE HAZARDOUS
AREA
B
1500 SF
REFER TO VA MANUAL PG-18-3 FOR ADDITIONAL CODES, STANDARDS, GUIDELINES AND
REGULATIONS, BELOW LISTING IS NOT COMPREHENSIVE.
ICC, INTERNATIONAL BUILDING CODES, 2018 EDITION (IBC)
ASCE-07-10
ACI 318-11
ACI 530-11
AISC 341-10
AISC 360-10
PCI MNL 120-10, DESIGN HANDBOOK
NFPA 10, STANDARD FOR PORTABLE FIRE EXTINGUISHERS, 2018 EDITION
NFPA 13, STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS, 2019 EDITION
NFPA 14, STANDARD FOR THE INSTALLATION OF STANDPIPE AND HOSE SYSTEM, 2019
EDITION
NFPA 20, STANDARD FOR THE INSTALLATION OF STATIONARY PUMPS FOR FIRE
PROTECTION, 2019 EDITION
NFPA 24, STANDARD FOR THE INSTALLATION OF PRIVATE FIRE SERVICE MAINS AND
THEIR APPURTENANCE, 2019 EDITION.
NFPA 54, NATOINAL FUEL GAS CODE, 2018 EDITION
NFPA 70, NATIONAL ELECTRIC CODE, 2020 EDITION
NFPA 72, NATIONAL FIRE ALARM AND SIGNALING CODE, 2019 EDITION
NFPA 75, STANDARD FOR THE FIRE PROTECTION OF INFORMATION TECHNOLOGY
EQUIPMENT, 2020 EDITION
NFPA 77, RECOMMENDED PRACTICE ON STATIC ELECTRICITY, 2019 EDITION
NFPA 80, STANDARD FOR FIRE DOORS AND OTHER OPENING PROTECTIVES, 2016
EDITION
NFPA 90A, STANDARD FOR THE INSTALLATION OF AIR-CONDITIONING AND VENTILATING
SYSTEMS, 2018 EDITION.
NFPA 92, STANDARD FOR SMOKE CONTROL SYSTEMS, 2018 EDITION
NFPA 99, HEALTH CARE FACILITIES CODE, 2018 EDITION
NFPA 101, LIFE SAFETY CODE, 2018 EDITION
NFPA 110, STANDARD FOR EMERGENCY AND STANDBY POWER SYSTEMS, 2019 EDITION
NFPA 220, STANDARD ON TYPES OF BUILDING CONSTRUCTION, 2018 EDITION
NFPA 780, STANDARD FOR INSTALLATION OF LIGHTNING PROTECTION SYSTEMS, 2020
EDITION
MOST RECENT EDITION OF NFPA NATIONAL FIRE CODES WITH THE EXCEPTION OF
NFPA 5000 AND NFPA 900
ASHRAE 90.1-2016 HVAC SYSTEMS
ANSI A117.1-2009 STANDARD ON ACCESSIBLE & USABLE BUILDINGS AND FACILITIES
2010 ADA STANDARDS FOR ACCESSIBLE DESIGN
OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS
ENERGY POLICY ACT OF 2005 (EPACT)
EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL ENVIRONMENTAL, ENERGY, AND
TRANSPORTATION MANAGEMENT.
VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD
STANDARD APPLICATION GUIDE,AND OTHER GUIDANCE ON THE TECHNICAL
INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).
VA BARRIER FREE DESIGN GUIDE PG-18-13, ABAAS
ARCHITECTURAL, JANUARY 1, 2017 (REV. 11/1/2018)
ASBESTOS ABATEMENT, JULY 2011
CMP SCHEDULE AND RISK MANAGEMENT, VOL. 1 & 2, DECEMBER 2012
ELECTRICAL, DECEMBER 2015
ENERGY SUSTAINABILITY, MAY 2014
EQUIPMENT, JANUARY 2006
ESTIMATING, MARCH 8, 2011
NFPA INTERIM GUIDANCE FOR PROJECTS, PG-18-17, SEPTEMBER 30, 2010
FIRE PROTECTION, SEVENTH EDITION REVISED DECEMBER 2015
HVAC FOR NEW, REPLACEMENT, ADD. AND REN. OF EXIST. CA FACILITIES, MARCH 2011
INTERIOR DESIGN, MAY 2008
PHYSICAL SECURITY DESIGN MANUAL, OCTOBER 2020
PLUMBING, NOVEMBER 2014
STRUCTURAL, FEBRUARY 1, 2014
WAY FINDING AND SIGNAGE, INTERIOR, DECEMBER 2012
SEISMIC DESIGN REQUIREMENTS, H-18-8, AUGUST 2013
ENVIRONMENTAL PLANNING GUIDANCE PG-18-17 NEPA INTERIM GUIDELINES FOR
PROJECTS SEPTEMBER 30, 2010
EPA GUIDELINES CHECKLIST
GOVERNING CODES
VA DESIGN MANUALS PG 18-10
CODE ANALYSIS AND LIFE SAFETY PLAN LEGEND
SMOKE RESISTANT CORRIDOR
STANDPIPE OUTLETSPO
CODE ANALYSIS - NFPA 101, BUSINESS CHAPTER 38
CODE CRITERIA
GENERAL: THIS SUMMARY OF CODE REQUIREMENTS IS BASED PRIMARILY ON NFPA 101 (LSC). DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE IDENTIFIED. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES EVEN IF THE IBC REQUIREMENTS ARE DIFFERENT).
LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE RESPONSIBILITY TO GUARD
PUBLIC HEALTH AND SAFETY THROUGH ENFORCING ITS ADOPTED CODES.
NOTES:
CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA ADOPTED NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF VA. THE RESOLUTION OF THE CONFLICT SHALL BE MADE BY THE AUTHORITY HAVING JURISDICTION FOR VA TO ENSURE A CONSISTENCY SYSTEM WIDE.
CODE REVIEW
THE 2018 EDITION OF THE LIFE SAFETY CODE, NFPA 101, HAS BEEN USED TO REVIEW THIS PROJECT FOR COMPLIANCE WITH THE FIRE AND LIFE SAFETY REQUIREMENTS.
FOR FEATURES NOT ADDRESSED BY NFPA 101 AND THE REFERENCED NATIONAL FIRE CODES, THE 2018 EDITION OF THE INTERNATIONAL BUILDING CODE HAS BEEN
USED.
PROJECT SCOPE
THE PROJECT SCOPE INCLUDES THE RENOVATION OF THE PATHOLOGY LAB, MORGUE, BLOOD DRAW, AND LOUNGE IN BUILDING 58-1. THE OPERATIONS OF THE LAB WILL NEED TO CONTINUE THROUGHOUT CONSTRUCTION, WHICH NECESSITATES THE PHASING OF CONSTRUCTION AND MOVING OF STAFF AND EQUIPMENT TO ALLOW THE CONTRACTOR TO COMPLETE THE WORK. ASSOCIATED WITH THE LAB RENOVATION IS THE UPGRADING OF INFRASTRUCTURE AND MECHANICAL AND ELECTRICAL EQUIPMENT TO PROVIDE AN ADEQUATE SPACE FOR A CONTEMPORARY LABORATORY. ADDITIONALLY, CERTAIN STAFF WILL RELOCATE TO BUILDING 103-6 TEMPORARILY
TO FACILITATE CONSTRUCTION WITHIN THE LAB IN BUILDING 58-1.
THE CONSTRUCTION TYPE IS DETERMINED BASED UPON THE ALLOWABLE AREA AND HEIGHT REQUIREMENTS OF CHAPTER 5 OF THE 2018 IBC. CONSTRUCTION TYPE AND MATERIALS SHALL BE PER CHAPTER 6 OF THE IBC FOR TYPE 2-B CONSTRUCTION AS FOLLOWS:
THE EXISTING BUILDING IS CLASSIFIED UNDER I-2 INSITUTIONAL CHAPTER 18. THE PATHOLOGY LABORATORY SUITE IS OCCUPANCY TYPE: B-BUSINESS, IBC CHAPTER 3/LSC CHAPTER 38. THE EXISTING PATHOLOGY B-BUSINESS SUITE IS BEING EXPANDED AND THE SUITE BOUNDARY WILL BE MODIFIED TO INCLUDE THE MINOR SQUARE
FOOTAGE INCREASE.
CONSTRUCTION TYPE: I-B (IBC CHAPTER 5) II (222) NFPA
1. FIRE RESISTIVE RATINGS, CHAPTER 6 IBC/NFPA 101:
PRIMARY STRUCTURAL FRAME: NONCOMBUSTIBLE, 2-HOUR FIRE RESISTIVE
BEARING WALLS
EXTERIOR: NONCOMBUSTIBLE, 2 -HOUR FIRE RESISTIVE
INTERIOR: NONCOMBUSTIBLE, 2-HOUR FIRE RESISTIVE
NON-BEARING WALLS AND PARTITIONS
EXTERIOR: NONCOMBUSTIBLE, 0-HOUR FIRE RESISTIVE
INTERIOR: NONCOMBUSTIBLE, 0-HOUR FIRE-RESISTIVE
FLOOR AND ASSOCIATED SECONDARY MEMBERS: NONCOMBUSTIBLE, 2-HOUR FIRE RESISTIVE
ROOF AND ASSOCIATED SECONDARY MEMBERS: NONCOMBUSTIBLE, 1-HOUR FIRE RESISTIVE
SHAFT ENCLOSURES 2-HOUR FIRE RESISTIVE >4 STORIES (IBC 713.4, LSC 12.3.6)
SHAFT ENCLOSURES 1-HOUR FIRE RESISTIVE <4 STORIES (IBC 713.4, LSC 12.3.6)
2. STRUCTURAL DESIGN SHALL COMPLY WITH CHAPTER 16 OF THE IBC.
3. ALLOWABLE HEIGHT: IS EXISTING AND NOT TO BE CHANGED (IBC, TABLE 504.3)
4. ALLOWABLE NUMBER OF STORIES ABOVE GRADE PLAN: 6 ACTUAL EXISTING AND NOT TO BE CHANGED (IBC, TABLE 504.4)
5. ALLOWABLE AREA: UNLIMITED. ACTUAL AREA APPROXIMATELY 26,177 SF. NOT TO BE CHANGED (IBC, TABLE 506.2)
6. BUILDING SEPARATION: NO BUILDING SEPARATION ARE BEING CREATED OR MODIFIED.
7. OCCUPANCY SEPARATION: NO OCCUPANCY SEPARATIONS ARE BEING CREATED. AN EXISTING OCCUPANCY SEPARATION IS BEING SLIGHTLY MODIFIED.
8. MEANS OF EGRESS
• CLEAR WIDTH OF CORRIDORS SHALL BE CLEAR 44 INCHES.
• CLEAR WIDTH OF DOORS SHALL BE CLEAR 32 INCHES
• NOT LESS THAN 2 EXITS SHALL BE PROVIDED PER FLOOR.
• ADDITION OCCUPANCY LOAD: <500 THEREFORE 2 EXITS REQUIRED (LSC 7.4.1)
• MAXIMUM TRAVEL DISTANCE, FULLY SPRINKLED: 300 FEET (LSC 38.2.6.3)
• COMMON PATH OF TRAVEL SHALL NOT EXCEED 100 FEET (LSC 38.2.5.3.1)
• DEAD END CORRIDORS SHALL NOT EXCEED 50 FEET. (LSC 38.2.5.2.1)
• MEANS OF EGRESS SHALL BE ILLUMINATED. (LSC 38.2.8)
• EMERGENCY LIGHTING SHALL BE PROVIDED, BUILDING OVER 3 STORIES. (LSC 38.2.9.1)
• EXIT SIGNAGE SHALL BE PROVIDED. (LSC 38.2.10)
9. PROTECTION FROM ANY AREA HAVING A DEGREE OF HAZARD GREATER THAN THAT NORMAL TO THE GENERAL OCCUPANCY OF THE BUILDING OR STRUCTURE SHALL BE PROVIDED BY PROTECTING THE AREA WITH AUTOMATIC EXTINGUISHING SYSTEMS IN ACCORDANCE WITH SECTION 9.7(3). WHERE HAZARD IS SEVERE PER LSC CHAPTER 38, SOILED HOLDING, PROTECTION IS PROVIDED WITH AN AUTOMATIC EXTINGUISHING SYSTEM. THE SPACE SHALL ALSO BE ENCLOSED WITH SMOKE
PARTITIONS IN ACCORDANCE WITH SECTION 8.4.
• 1-HOUR FIRE RESISTANCE RATING AND AUTOMATIC SPRINKLER SYSTEM IS REQUIRED FOR THE FOLLOWING: SOILED HOLDING AND HIGH HAZARD CONTENT
AREAS PER LSC 38.2.2.
10. INTERIOR FINISH
• WALLS AND CEILINGS: INTERIOR FINISH FLAME SPREAD SHALL BE LIMITED PER CHAPTER 8 OF THE NFPA 101 TO CLASS A, B AND C MATERIALS. INTERIOR WALL
AND CEILING FINISH SHALL BE CLASS A OR CLASS B IN EXITS, CORRIDORS AND LOBBIES; AND CLASS A, CLASS B, OR CLASS C IN ALL OTHER AREAS. (LSC 38.3.3)
• · CLASS A: FLAME SPREAD 0-25; SMOKE DEVELOPED 0-450.
• · CLASS B: FLAME SPREAD 26-75; SMOKE DEVELOPED 0-450.
• · CLASS C: FLAME SPREAD 76-200; SMOKE DEVELOPED 0-450
• FLOORS: INTERIOR FLOOR FINISH SHALL BE CLASS I OR CLASS II IN CORRIDORS AND EXITS.
• FABRIC DRAPERIES, CURTAINS (EXCLUDING SHOWER CURTAINS, BUT INCLUDING CUBICLE CURTAINS), AND OTHER LOOSELY HANGING FABRICS AND FILMS
SERVING AS FURNISHINGS OR DECORATIONS IN HEALTH CARE OCCUPANCIES MUST MEET THE FLAME RESISTANCE REQUIREMENTS OF NFPA 701, STANDARD
METHODS OF FIRE TESTS FOR FLAME-RESISTANT TEXTILES AND FILMS.
• UPHOLSTERED FURNITURE AND MATTRESSES. UPHOLSTERED FURNITURE AND MATTRESSES MUST ALSO MEET SPECIFIED REQUIREMENTS, BASED ON NFPA
260, NFPA 261, NFPA 266, 16 CFR 1632, ASTME E1537, AND ASTME E1590
11. EXTINGUISHMENTS REQUIREMENTS: PORTABLE FIRE EXTINGUISHERS SHALL BE PROVIDED PER NFPA 10. (38.3.5)
12. DETECTION, ALARM, AND COMMUNICATIONS SYSTEMS.
• FIRE ALARM SYSTEM SHALL BE PROVIDED LSC, NFPA 70 (NEC) AND NFPA 72. (LSC 9.6.1)
• FIRE ALARM MAY BE BY MANUAL MEANS (LSC 38.4.2)(LSC 9.6.2)
• OCCUPANT NOTIFICATION SHALL BE THROUGH AUTOMATIC MEANS. (LSC 38.3.4.3)
• SMOKE DETECTION SHALL BE PROVIDED PER NFPA 72.
• EMERGENCY RESPONDER NOTIFICATION SHALL BE NOTIFIED BY ALARM AND DETECTION SYSTEM. (LSC 38.3.4.4)
13. FIRE SUPPRESSION: BUILDING IS REQUIRED TO BE SPRINKLED THROUGHOUT IN ACCORDANCE WITH NFPA 13.
THE SPRINKLER SYSTEM SHALL BE HYDRAULICALLY DESIGNED IN ACCORDANCE WITH 2013 EDITION OF NFPA 13 AND THE SIXTH EDITION OF THE DEPARTMENT OF
VETERANS AFFAIRS FIRE PROTECTION DESIGN MANUAL: MINIMUM DESIGN REQUIREMENTS:
STORAGE MECHANICAL AND ELECTRICAL ROOMS SHALL BE PROTECTED AS:
ORDINARY HAZARD OCCUPANCY, GROUP 1: 0.15 GPM/FT2 OVER 1,500 FT2.
HOSE STREAM ALLOWANCE: 250 GPM
ALL OTHER AREAS SHALL BE PROTECTED AS:
LIGHT HAZARD OCCUPANCY: 0.10 GPM/FT2 OVER 1,500 FT2.
HOSE STREAM ALLOWANCE: 100 GPM
ALL SPRINKLERS WITHIN THE SMOKE ZONE SHALL BE QUICK RESPONSE SPRINKLERS.
14. CONSTRUCTION BARRIERS CONSTRUCTED ALONG MEANS OF EGRESS ALONG HEALTHCARE OCCUPANCIES (LSC CHAPTER 18 AND 19) SHALL BE CONSTRUCTED AND
MAINTAINED PER NFPA 241.
TEMPORARY USAGE OF B103
FOR THE PURPOSES OF THIS PROJECT, NO ARCHITECTURAL CHANGES WILL BE
MADE TO BUILDING 103. ALL EXISTING COMPONENTS AND CONFIGURATIONS WILL BE
USED AS IS. ONLY POWER AND DATA WILL BE ADDED TO ACCOMMODATE THE
ADMINISTRATIVE FUNCTIONS.
CA E H I KB D L M N Q R S T XU VG J WPF O
227 SF
B
602 SF
B
130 SF
B
6762 SF
10068
B
T R
A V
E L
D
IS
T A
N C
E
2'
-0
" TRAVEL DISTANCE: 110'-0" EXIT
E X
IT
TRAVEL DISTANCE: 93'-0"
EXIT SEPARATION: 86'-0"
DIAGONAL DISTANCE: 130'-0"
K.9
MAIN BLDG
ENTRANCE
CORRIDOR
TO OTHER
BLDGS
EXIT
EXISTING WATER
FOUNTAIN
SPO
EXISTING 1 HR RATED SMOKE BARRIER
AND SUITE BOUNDARY TO BE MODIFIED TO
NEW 1 HR RATED SMOKE BARRIER
LOCATION AS INDICATED
FEC FEC
HATCH INDICATES AREA TO
BECOME PART OF PATHOLOGY
LAB SUITE
EXIT
TRAVEL DISTANCE: 44'-6"
TRAVEL DISTANCE: 73'-0"
TRAVEL DISTANCE: 59'-0"
OFFICE
OFFICE
OFFICE
OFFICE
HAC
OFFICE
OFFICE
TLT
ELECTRICAL
OFFICE
MICROBIOLOGY
WALK IN COOLER
WASTE
CONTAINMENT
MORGUE
STAFF LOUNGE
OFFICE
OFFICE
OFFICE
CONFERENCE
URINALYSIS (EIA)
TLT
CHEMISTRY
PIPETING BLOOD BANK
REFRIGERATOR
BANK
SPECIMEN
PROCESSING
HISTOLOGY /
CYTOLOGY
BLOOD DRAW
ELECTRICAL
OFFICE
OFFICE
OPEN
WORKSTATIONS
EXIT
N
BUILDING 58 KEY PLAN
PROJECT LOCATION:
FIRST FLOOR
SHADE
INDICATES
AREA NOT IN
SCOPE , TYP.
MECHANICAL
CORRIDOR
C1-4
AMBASSADOR
OFFICE
123B
MEN'S
TOILET
WOMEN'S TOILET
HKPG
STOR
107A
FREIGHT
ELEVATOR
CORRIDOR
C1-1
SOILED
LINEN
LOADING
DOCK
100A
TIP
100B
GAS
100C
CORRIDOR
C1-8
CHIEF
OFFICE
103A
OFFICE
VAULT
103B
REFRIG.
104A
MECH
D N
DN
DN
STAIR
TEMPORARY USE
OF EXISTING
SPACES
TRAVEL DISTANCE: 138'-6"
EXIT
BUILDING 103 KEY PLAN
PROJECT
LOCATION:
FIRST FLOOR
SHADE
INDICATES
AREA NOT IN
SCOPE , TYP.
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
35% SCHEMATIC DESIGN 03/17/2020
65% DESIGN DEVELOPMENT 05/12/2020
100% CONSTRUCTION DOCUMENTS 07/21/2020
95% CONSTRUCTION DOCUMENTS 10/26/2020
100% BID DOCUMENTS 11/30/2020
95% REVISED CONSTRUCTION DOCUMENTS 04/12/2021
100% BID DOCUMENTS 11/18/2021
C U s e rs
\t s a n d e rs
\D o c u m e n ts
\1 .5
.0
A v ts a n d e rs g u id o n d e s ig n .c o m
.r v t
/1
/2
:0
:0
A
M
GI101
CODE ANALYSIS LIFE AND SAFETY
PLANSGUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
TYLER SANDERS
CMTA
10411 MEETING STREET
PROSPECT, KENTUCKY
ANDY MYERS
RENOVATE LAB AND PATHOLOGY
1900 E. MAIN ST., DANVILLE, IL 61832
550-20-110
58-1
11/18/2021 TS DMC
100% BID DOCUMENTS
FULLY SPRINKLERED
502.326.3085
N
SCALE: 1/16" = 1'-0"GI101
1 B58 FIRST FLOOR CODE ANALYSIS AND LIFE SAFETY PLAN AT CONSTRUCTION COMPLETION
LIFE SAFETY OCCUPANCY COUNT
AREA SF OCC OCC FACTOR # OF OCC
BLOOD DRAW 227 SF B 100 2
MORGUE 602 SF B 100 6
STAFF LOUNGE 130 SF B 100 1
PATHOLOGY LAB 6762 SF B 100 68
7720 SF 77
SCALE: 1/32" = 1'-0"GI101
2 B103-6 FIRST FLOOR CODE ANALYSIS AND LIFE SAFETY PLAN
N
EXISTING FIRST FLOOR TOTAL 26685 SF
EXISTING/NEW AIR
HANDLING UNIT
LOCATION
TEMPORARY AIR
HANDLER TRAILER
CONTRACTOR
SET UP AREA
VA PROVIDED
TEMPORARY
MORGUE TRAILER
ENTRY LOCATION OF
TEMPORARY DUCTWORK
CONSTRUCTION FENCE
AND ENTRY GATE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
35% SCHEMATIC DESIGN 03/17/2020
65% DESIGN DEVELOPMENT 05/12/2020
100% CONSTRUCTION DOCUMENTS 07/21/2020
95% CONSTRUCTION DOCUMENTS 10/26/2020
100% BID DOCUMENTS 11/30/2020
95% REVISED CONSTRUCTION DOCUMENTS 04/12/2021
100% BID DOCUMENTS 11/18/2021
C U s e rs
\t s a n d e rs
\D o c u m e n ts
\1 .5
.0
A v ts a n d e rs g u id o n d e s ig n .c o m
.r v t
/1
/2
:0
:0
A
M
GI102
CONSTRUCTION LOGISTICS
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
TYLER SANDERS
CMTA
10411 MEETING STREET
PROSPECT, KENTUCKY
ANDY MYERS
RENOVATE LAB AND PATHOLOGY
1900 E. MAIN ST., DANVILLE, IL 61832
550-20-110
58-1
11/18/2021 JF DMC
100% BID DOCUMENTS
FULLY SPRINKLERED
502.326.3085
SCALE: 1/8" = 1'-0"GI102
1 CONSTRUCTION LOGISTICS
111D
Storage Utility
106D Patient Toilet107D
Patient Shower
Patient's 102D
Bedroom
116D
SPD 114D
112D 113D
114D1
117D Alcove
118D1120D1122D1
Meds 128D1
127D Util.
Util.
126D
129D Women
130D MenShower
125D
Room
Elec.
129D1
103-6
101D Dayroom
Bedroom Patient's 118D119D
Bedroom Patient's
120D
Bedroom Patient's
121D
Bedroom Patient's
122D
Bedroom Patient's
123D
Bedroom Patient's
C3D
128D
Station Nurse's
131D
Room Exam
132D Break Room
Visitors 124D
Room Conf.
133D
Room Tip 132E1
C4D
132E2
UP
UP
UP
R E
F
R E
F
R E
F
R E
F
R E
F
UP
REF.
REF.
R E
F
REF.
R E
F
R E
F
R E
F
REF.
UP
R E
F
REF.
REF.
R E
F
REF.
R E
F
R E
F
R E
F
REF.
UP
R E
F
REF.
REF.
R E
F
REF.
BEYOND PROJECT BOUNDARY
INFECTION CONTROL / PHASING PLAN LEGEND
ACTIVE CONSTRUCTION PROJECT
PHASE AREA - VACATED BY VA
PROJECT AREA NOT YET
VACATED BY VA
COMPLETED PROJECT AREA
TURNED OVER TO VA
TEMPORARY PROPOSED STAFF
ROUTE
*NOTE: OTHER AREAS NOT SPECIFICALLY NOTED ARE BEING USED BY VA
CONTINUOUS FIRESAFE SEALANT
TOP AND BOTTOM, & BOTH SIDES
3 1/2" SOUND ATTENUATION BATT.
5/8" TYPE X GYPSUM BOARD, BOTH SIDES
3 5/8" METAL STUD @ 16" O.C. WITH
RUNNER CHANNELS ALONG TOP
AND BOTTOM
CONSTRUCTION
SIDE
PUBLIC
SIDE
6 MIL. FIRE RETARDANT VISQUEEN
MEMBRANE. CONTINUOUSLY ADHERE
TO THE STRUCTURAL DECK ABOVE AND
TO THE FLOOR BELOW WITH TAPE.
UNDERSIDE OF STRUCTURAL DECK
UL LISTING: U465
COORDINATE WITH EXISTING CEILING
TEMPORARY IC BARRIER WALL
CONSTRUCTION (DUST WALL)
BEAD OF CONT. SEALANT
6-MIL FIRE RETARDENT POLY INTERIOR SIDE
CEILING
CONTINUOUSLY ADHERE 6-MIL. FIRE
RETARDANT POLY TO DECK WITH TAPE
CONTINUOUSLY ADHERE FIRE RETARDENT
POLY TO FLOOR WITH TAPE
UNDERSIDE OF STRUCTURAL DECK
CONSTRUCTION
SIDE
OCCUPIED
SIDE
PUBLIC
SIDE
1 HOUR FIRE RATED METAL DOOR ASSEMBLY
AND FRAME WITH SEALS, CARD READER,
HARDWARE AND CLOSER
AIR PRESSURE MONITOR
HAND SANITIZER
SEAL ALL EDGES WITH TAPE
SEAL ALL EDGES WITH TAPE
REFER TO TEMPORARY BARRIER TYPE FOR
REQUIRED CONDITION TO STRUCTURE ABOVE
VA / OSHA TEMPORARY SIGNAGE
CONSTRUCTION ACTIVITY - FIRE RISK: TYPE D
PATIENT RISK GROUP: MEDIUM
CLASS OF PRECAUTION MATRIX: III
A. PROJECT SHALL BE COMPLETED IN A 6 PHASES.
B. COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND
FIELD VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE
CEILING WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE
PROJECT BOUNDARY.
C. COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER
WALL CONSTRUCTION AND INFECTION CONTROL (IC) MEASURES WITH COR
AND PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE. TEMPORARY
IC BARRIER WALL CONSTRUCTION LOCATIONS IN DRAWINGS ARE
APPROXIMATE. CONTRACTOR SHALL PROVIDE DRAWING TO COR AND
PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE ONCE ICRA
PROTOCOLS AND PLAN IS APPROVED.
D. SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR
AND LAB STAFF BEFORE CONSTRUCTION MAY BEGIN. PROVIDE PHASING
INFORMATION FOR ABOVE CEILING WORK IN THE CONTRACTOR PROVIDED
CPM SCHEDULE FOR WORK ALSO REQUIRED ABOVE AND BELOW THE FLOOR
PLATE OF THE PROJECT BOUNDARY.
E. ABOVE CEILING WORK SHALL TAKE PLACE BETWEEN THE HOURS OF 5:00 PM
AND 5:00 AM. IN AREAS THAT REQUIRE ABOVE CEILING WORK WHERE
CEILINGS ARE TO REMAIN, CEILING TILES SHALL BE REMOVED AND STORED
IN A SAFE MANNER UNTIL CEILING TILES CAN BE REINSTALLED. DAMAGED
AND BROKEN CEILING TILES SHALL BE REPLACED BY CONTRACTOR AT NO
COST TO THE VA.
F. EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED
DURING NORMAL BUSINESS HOURS.
G. WORK REQUIRING VIBRATION OR LOAD NOISE SHALL TAKE PLACE BETWEEN
THE HOURS OF 5:00 PM AND 5:00 AM. EVERY EFFORT SHALL BE MADE TO
KEEP NOISE AND VIBRATION TO A MINIMUM.
H. PROVIDE A 24"X36" STICKY WALK OFF MAT AND HAND SANITIZER AT EACH
TEMPORARY DOOR LOCATION. MAT SHALL BE REPLACED OR CLEANED AS
NECESSARY AS DETERMINED BY THE VA.
I. PROVIDE THE VA AND OSHA REQUIRED TEMPORARY SIGNAGE AT EACH
TEMPORARY DOOR LOCATION.
J. CONTRACTOR SHALL SUPPLY SPILL KIT TO INCLUDE SHOP VAC, MULTI-
PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE
LIQUIDS UP TO 30 GALLONS.
K. ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED
WITH 6 MIL. POLY SHEET.
L. ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT
BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED
ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR SUCH PURPOSE
WITH A LID.
M. ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY
STORED IN DESIGNATED AREAS AND APPROVED CONTAINERS. FLAMMABLE
MATERIALS SHALL NOT BE STORED IN THE FACILITY.
N. PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE
PROJECT BOUNDARY.
O. UTILIZE TEMPORARY CONSTRUCTION BARRIERS AS INDICATED IN PHASED
DEMOLITION AND NEW WORK DRAWINGS. REFER TO TEMPORARY
CONSTRUCTION DETAILS THIS SHEET.
P. AS REQUIRED BY NFPA 241, PROVIDE TEMPORARY UPRIGHT SPRINKLERS
WITHIN CONSTRUCTION AREA WHERE HAZARD IS GREATER THAN THE
NORMAL LEVEL OF HAZARD WITHIN THE SPACE.
INFECTION CONTROL GENERAL NOTES
INFECTION CONTROL PROJECT INFORMATION
N
BUILDING 58 KEY PLAN
PROJECT LOCATION:
FIRST FLOOR
SHADE
INDICATES
AREA NOT IN
SCOPE , TYP.
1A
FIT OUT B103 FOR
TEMPORARY OFFICE
USE
ACQUIRE TEMPORARY
TRAILER, RENOVATE
MORGUE
MAIN CONSTRUCTION
ENTRY AND ROUTE
AREAS VACATED
BY VA IN PHASE 1A
BLOOD DRAW
SPEC PROCESSING
CONFERENCE AND OFFICES
PIPATING
BLOOD BANK
CHEM
AUTO CHEM
EIA
MICROBIOLOGY
AUTOCLAVE
CUT OPENING THROUGH
AUTOCLAVE AREA
1B
2A - RENOVATE
FOR TEMP SPEC
PROCESSING,
BLOOD BANK,
PIPATING LAB,
HISTO/CYTO, AND
OTHER WORK THIS
AREA AS IS
PRACTICABLE
2B - RENOVATE FOR
USE AS TEMP BLOOD
DRAW
MAIN
CONSTRUCTION
ENTRY AND ROUTE
INSTALL TEMPORARY
AHU AND REMOVE
EXISTING AHU
CONTINUE TO
RENOVATE MORGUE
VACATED BY VA
AT COMPLETION
OF PHASE 1
BLOOD DRAW
SPEC PROCESSING
CONFERENCE AND OFFICES
PIPATING
BLOOD BANK
CHEM
AUTO CHEM
EIA
MICROBIOLOGY
AUTOCLAVE
RENOVATE
TOILETS
VA USING FOR TEMP
BLOOD DRAW
VA USING FOR
TEMP BLOOD
BANK, PIPATING
LAB, SPEC
PROCESSING,
AND HISTO/CYTO
RENOVATE BLOOD BANK,
PIPATING LAB, OFFICES,
CONFERENCE RM,
HISTO/CYTO AND BLOOD
DRAW
STAFF ENTRY AND
ROUTE
MAIN
CONSTRUCTION
ENTRY AND ROUTE,
NO STAFF (THIS
PHASE ONLY)
PROVIDE
PERMANENT
AHU
3A
3B
CHEM
AUTO CHEM
EIA
MICROBIOLOGY
AUTOCLAVE
RESTROOMS
COMPLETED
MORGUE COMPLETED
4B - RENOVATE FOR
PERMANENT LOUNGE
MAIN ENTRY, SPEC
PROCESSING, HISTO/CYTO,
BLOOD BANK, PIPATING LAB,
CHEMISTRY, AUTOCHEM,
BLOOD DRAW, TOILETS
COMPLETED
4A - RENOVATE
OLD CHEM AND
AUTO CHEM FOR
EIA AND PORTION
OF MICROBIOLOGY
MAIN
CONSTRUCTION
ENTRY AND ROUTECONTRACTOR
MAY USE AREA
FOR STORAGE
AND STAGING
EIA
MICROBIOLOGY
AUTOCLAVE
LOUNGE, EIA, PORTION OF
MICROBIOLOGY COMPLETED
CONTRACTOR
MAY USE AREA
FOR STORAGE
AND STAGING
RENOVATE OLD
EIA FOR
MICROBIOLOGY
MAIN
CONSTRUCTION
ENTRY AND ROUTE
MICROBIOLOGY COMPLETED
RENOVATE FOR
OFFICES,
STORAGE
PHASE 1
PHASE 1 AREA A -
B103-6 FIT OUT
VA OFFICES MOVE
TO B103-6,
VACATE LOUNGE,
TOILETS
PHASE 1 AREA B - MORGUE RENO (NOT REQUIRED
TO BE FINISHED PRIOR TO PHASE 2)
PHASE 2 AREA A - RENO
OFFICE AREAS IN LAB FOR
TEMP FUNCTIONS AND
COORDINATE EQUIPMENT
SET UP. RENOVATE
TOILETS
PHASE 2
VA MOVES TO
TEMP. SPECIMEN
PROCESSING,
HISTO/CYTO,
BLOOD BANK,
PIPATING LAB,
BLOOD DRAW TO
PHASE 2 AREA. VA
MOVES TO
PERMANENT
MORGUE.
TOILETS ARE
ACCESSIBLE
PHASE 3
PHASE 2 AREA B - RENO
LOUNGE FOR TEMP BLOOD
DRAW
PHASE 3 AREA A - RENO PERMANENT
BLOOD DRAW
PHASE 5
VA MOVES TO
BLOOD
DRAW, SPEC
PROCESSING,
AUTO CHEM,
CHEM,
PIPATING,
HISTO/CYTO.
MAIN ENTRY
IS
ACCESSIBLE
PHASE 3 AREA B - RENO MAIN ENTRANCE,
PREVIOUS SPECIMEN PROCESSING, BLOOD
BANK, PREVIOUS PIPATING LAB, OFFICES,
CONFERENCE, HISTO/CYTO
PHASE 5 - RENO OLD EIA
PHASE 4
PHASE 4 AREA A - RENO
OLD CHEM AND AUTO
CHEM
PHASE 6
VA MOVES TO NEW
LOUNGE, EIA
PHASE 6 - RENO
BACK OFFICES
PHASE 4 AREA B - RENO
PERMANENT LOUNGE
VA MOVES TO NEW
MICROBIOLOGY
VA VACATES
B103-6
BUILDING 103 KEY PLAN
PROJECT
LOCATION:
FIRST FLOOR
SHADE
INDICATES
AREA NOT IN
SCOPE , TYP.
N
PHASE 1 DESCRIPTION
1. PHASE 1A: THE CONTRACTOR SHALL FIT OUT B103 IN ORDER THAT ALL
ADMINISTRATIVE OFFICE PERSONNEL AND FURNITURE FROM B58-1 MAY
RELOCATE. CONSTRUCTION NEEDED IS MINIMAL AND INCLUDES THE
PROPER POWER AND DATA REQUIRED FOR THE OFFICE PERSONNEL TO
OPERATE TEMPORARILY.
2. UPON COMPLETION OF PHASE 1A BY THE CONTRACTOR, THE VA SHALL
RELOCATE ALL ADMINISTRATIVE PERSONNEL, AND THE CONTRACTOR
SHALL RELOCATE THE FURNITURE FOR THE PERSONNEL TO BUILDING 103.
STAFF SHALL CEASE TO UTILIZE THE TOILETS IN THE LAB AND THE STAFF
LOUNGE - STAFF TO USE BATHROOMS ON THE OPPOSITE SIDE OF THE
BUILDING LOBBY. THIS PHASE 1A MUST BE COMPLETED PRIOR TO PHASE 2
COMMENCING.
3. PHASE 1B: UPON REMOVAL OF ALL ITEMS FROM THE MORGUE BY THE VA,
THE CONTRACTOR SHALL REMOVE EXISTING INTERIOR FINISHES & BUILT-
INS IN THE MORGUE. THE EXISTING RESTROOM WILL BE REMOVED, AND
NEW FINISHES WILL BE APPLIED TO MATCH THE CODE AND FACILITY
STANDARDS.
4. UPON COMPLETION OF WORK BY THE CONTRACTOR WITHIN THE MORGUE,
THE SPACE SHALL BE TURNED BACK OVER TO THE VA. THIS PHASE 1B IS
REQUIRED TO BE COMPLETED PRIOR TO PHASE 3 COMMENCING,
COORDINATE WITH THE VA.
PHASE 2 DESCRIPTION
1. PHASE 2A: CONTRACTOR SHALL REMOVE THE B58 EXISTING OFFICE
CONSTRUCTION IN THE NORTH WEST CORNER OF THE LAB AND SHALL
RENOVATE THE RESTROOMS. EXISTING WALLS SHALL BE USED AND
CONSTRUCTION BARRIERS SHALL BE BUILT FOR THIS PHASE. THIS AREA
WILL BE RENOVATED TO SERVE AS TEMPORARY LAB SWING SPACE AND
AS THE PERMANENT RESTROOMS. CONTINGENT UPON COORDINATION
WITH THE VA, EXISTING EQUIPMENT SHALL BE RELOCATED TO THE
TEMPORARY SWING SPACE FOR SPECIMEN PROCESSING,
HISTOLOGY/CYTOLOGY, BLOOD BANK, AND PIPATING LAB. WHEN THE
SWING SPACE IS FULLY SET UP, CONTRACTOR SHALL TURN OVER SPACE
TO VA. VA STAFF SHALL THEN VACATE THE EXISTING SPECIMEN
PROCESSING, HISTOLOGY/CYTOLOGY, BLOOD BANK, PIPATING LAB FOR
RENOVATION. PHASE 2A MUST BE COMPLETED PRIOR TO PHASE 3
BEGINNING
2. PHASE 2B: THE EXISTING CONSTRUCTION AND FINISHES WITHIN THE
STAFF LOUNGE WILL BE PARTIALLY REMOVED AND THE SPACE SHALL BE
SET UP TO BE A TEMPORARY BLOOD DRAW SPACE, CONTINGENT UPON
COORDINATION WITH THE VA, EXISTING EQUIPMENT SHALL BE
RELOCATED TO THE TEMPORARY BLOOD DRAW ROOM. VA STAFF SHALL
THEN VACATE THE EXISTING BLOOD DRAW ROOM FOR RENOVATION.
3. INSTALL TEMPORARY AHU AND REMOVE EXISTING AHU , SEE MECHANICAL
DRAWINGS.
PHASE 3 DESCRIPTION
1. PHASE 3A: THE CONTRACTOR SHALL RENOVATE THE EXISTING BLOOD
DRAW SPACE AS INDICATED. CONTINGENT UPON COORDINATION WITH THE
VA, RELOCATE EQUIPMENT FROM TEMPORARY BLOOD DRAW TO THE
COMPLETED PERMANENT BLOOD DRAW ROOM. VA SHALL THEN RELOCATE
TO THE COMPLETE BLOOD DRAW ROOM. PHASE 3A MUST BE COMPLETED
PRIOR TO PHASE 4 BEGINNING.
2. PHASE 3B: CONTRACTOR SHALL UTILIZE EXISTING WALLS AND PROVIDE
TEMPORARY BARRIERS AS INDICATED TO RENOVATE THE PREVIOUS
SPECIMEN PROCESSING, HISTO/CYTO, BLOOD BANK, PIPATING LAB,
OFFICES, AND CONFERENCE ROOM. ONCE COMPLETED, COORDINATE WITH
THE VA TO RELOCATE THE EQUIPMENT FROM THE TEMPORARY SWING
SPACE TO THE COMPLETED SPECMEN PROCESSING, HISTO/CYTO,
CHEMISTRY AND BLOOD BANK SPACES. ALSO COORDINATE WITH THE VA
TO RELOCATE EQUIPMENT AND SET UP A TEMPORARY SPECIMEN
PROCESSING WITHIN THIS RENOVATED AREA. REMOVE TEMPORARY
CONSTRUCTION AS REQUIRED. VA SHALL THEN RELOCATE TO THESE
COMPLETED AREAS AS WELL AS THE TEMPORARY SPECIMEN PROCESSING.
PHASE 3B MUST BE COMPLETED PRIOR TO PHASE 4 COMMENCING.
3. PROVIDE NEW PERMANENT AHU, SEE MECHANICAL DRAWINGS.
PHASE 4 DESCRIPTION
1. PHASE 4A: CONTRACTOR SHALL UTILIZE EXISTING CONSTRUCTION AND
PROVIDE NEW AND TEMPORARY CONSTRUCTION AS INDICATED TO
RENOVATE CHEMISTRY’S PREVIOUS LABS. WHEN COMPLETED,
COORDINATE WITH THE VA TO RELOCATE EQUIPMENT INTO THE
COMPLETED EIA SPACE. REMOVE TEMPORARY CONSTRUCTION AS
REQUIRED. VA SHALL THEN RELOCATE TO EIA. PHASE 4A MUST BE
COMPLETED PRIOR TO PHASE 5 COMMENCING.
2. PHASE 4B: THE CONTRACTOR SHALL RENOVATE THE TEMPORARY BLOOD
DRAW SPACE TO BE THE STAFF LOUNGE. WHEN COMPLETE, TURN OVER TO
THE VA. PHASE 4B MUST BE COMPLETED PRIOR TO PHASE 5, COORDINATE
WITH VA.
PHASE 5 DESCRIPTION
1. UTILIZE EXISTING AND PROVIDE NEW WALLS AND TEMPORARY
CONSTRUCTION BARRIERS AS INDICATED. CONTRACTOR SHALL RENOVATE
THE 5A OLD EIA AREA. WHEN COMPLETE, COORDINATE WITH THE VA TO
RELOCATE EQUIPMENT INTO COMPLETED MIOCROBIOLOGY. REMOVE
TEMPORARY CONSTRUCTION AS REQUIRED. VA SHALL THEN RELOCATE TO
MICROBIOLOGY. PHASE 5A MUST BE COMPLETED PRIOR TO PHASE 6
BEGINNING.
PHASE 6 DESCRIPTION
1. CONTRACTOR SHALL UTILIZE EXISTING AND PROVIDE NEW WALLS AND
TEMPORARY CONSTRUCTION BARRIERS AS INDICATED. RENOVATE THE
ADMINISTRATIVE OFFICE SPACE WITHIN THE LAB. WHEN COMPLETED,
COORDINATE WITH THE VA TO RELOCATE ALL FURNITURE AND EQUIPMENT
FROM B103 BACK TO B58. VA SHALL THEN RELOCATE BACK TO B58.
PHASED CORRIDOR WORK NOTE
1. INTENT IS THAT WORK IN CORRIDORS MAY BE COMPLETED AT ANY TIME
DURING THE PROJECT, GIVEN APPROPRIATE INFECTION CONTROL
MEASURES ARE MADE, AND COORDINATION IS MADE WITH THE VA.
CONTRACTOR SHALL COMPLETE THIS WORK WHEN MOST EFFICIENT FOR
CONTRACTOR AND VA. NOTE THAT PORTION OF CORRIDOR MUST REMAIN
USABLE BY VA STAFF THROUGHOUT CONSTRUCTION 24 HRS A DAY SUCH
THAT SPACE REMAINS OPERATIONAL. CONTRACTOR SHALL BE REQUIRED
TO PROVIDE TEMPORARY BARRIERS FOR SHORT DURATIONS AS REQUIRED
TO PROTECT VA PATIENTS AND STAFF DURING CONSTRUCTION.
CONTRACTOR SHALL COORDINATE WITH VA FOR ALL TEMPORARY
BARRIERS AND CLOSURES REQUIRED IN THE CORRIDOR.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
35% SCHEMATIC DESIGN 03/17/2020
65% DESIGN DEVELOPMENT 05/12/2020
100% CONSTRUCTION DOCUMENTS 07/21/2020
95% CONSTRUCTION DOCUMENTS 10/26/2020
100% BID DOCUMENTS 11/30/2020
95% REVISED CONSTRUCTION DOCUMENTS 04/12/2021
100% BID DOCUMENTS 11/18/2021
C U s e rs
\t s a n d e rs
\D o c u m e n ts
\1 .5
.0
A v ts a n d e rs g u id o n d e s ig n .c o m
.r v t
/1
/2
:0
:0
A
M
GC101
INFECTION CONTROL/PHASING
PLANSGUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
TYLER SANDERS
CMTA
10411 MEETING STREET
PROSPECT, KENTUCKY
ANDY MYERS
RENOVATE LAB AND PATHOLOGY
1900 E. MAIN ST., DANVILLE, IL 61832
550-20-110
58-1
11/18/2021 TS DMC
100% BID DOCUMENTS
FULLY SPRINKLERED
502.326.3085
SCALE: 1 1/2" = 1'-0"GC101
8 TEMP. 1 HR FIRE RATED WALL PER NFPA 241
SCALE: 1 1/2" = 1'-0"GC101
9 TEMP. PLASTIC CONSTRUCTION BARRIER
SCALE: 1/4" = 1'-0"GC101
10 TEMPORARY WALL ELEVATION
SCALE: 1" = 30'-0"GC101
1 PHASE 1
SCALE: 1" = 30'-0"GC101
2 PHASE 1 AREA B - MORGUE
SCALE: 1" = 30'-0"GC101
3 PHASE 2
SCALE: 1" = 30'-0"GC101
4 PHASE 3
SCALE: 1" = 30'-0"GC101
5 PHASE 4
SCALE: 1" = 30'-0"GC101
6 PHASE 5
SCALE: 1" = 30'-0"GC101
7 PHASE 6
SCALE: 12" = 1'-0"
PHASING TIMELINE GRAPHIC
N
N
N
N
N
N
BID DEDUCT #1 - REMOVE NEW STAFF LOUNGE FROM RENOVATION
NO WORK TO BE CONDUCTED IN THE STAFF LOUNGE - TO REMAIN AS
EXISTING. LOUNGE WILL STILL BE UTILIZED AS TEMPORARY BLOOD
DRAW DURING A PORTION OF THE PROJECT.
BID DEDUCT #2 - REMOVE BLOOD DRAW FROM RENOVATION
IN ADDITION TO BID DEDUCT #1, NO WORK TO BE CONDUCTED IN
BLOOD DRAW INCLUDING PASS THRU CABINETS TO ADJOINING
TOILETS - TO REMAIN AS EXISTING. TEMPORARY SPACE IN THE
LOUNGE IS NOT NEEDED.
BID DEDUCT #3 - REMOVE MORGUE FROM RENOVATION
IN ADDITION TO BID DEDUCT #1 AND #2, NO WORK TO BE CONDUCTED
IN MORGUE INCLUDING BATHROOM - TO REMAIN AS EXISTING.
BID DEDUCT #4 - REMOVE SPECIMEN PROCESSING FROM RENOVATION
IN ADDITION TO BID DEDUCT #1, #2 AND #3, NO WORK TO BE
CONDUCTED IN SPECIMEN PROCESSING - TO REMAIN AS EXISTING.
ALSO DO NOT PROVIDE STOREFRONT WALL AND NEW VESTIBULE
ENTRY TO LAB. NEW BLOOD BANK EQUIPMENT TO BE RELOCATED TO
WORKSTATION BANK.
BASE BID: WORK TO ENCOMPASS FULL PROJECT AS DESCRIBED IN
THESE DOCUMENTS
BID DEDUCT #1: STAFF LOUNGE
BID DEDUCT #2: BLOOD DRAW
BID DEDUCT #3: MORGUE
BID DEDUCT #4: SPECIMEN PROCESSING
STATEMENT OF BID ITEMS
CA E H I KB D L M N Q R S T XU VG J WPF OK.9
N
BUILDING 58 KEY PLAN
PROJECT LOCATION:
FIRST FLOOR
SHADE
INDICATES
AREA NOT IN
SCOPE , TYP.
MECHANICAL
OFFICE
138C
CHIEF
OFFICE
138D
OFFICE
138B
OFFICE
138A
OFFICE
CORRIDOR
C1-7
STORAGE
138E
PATHOLOGY
STORAGE
CORRIDOR
1C1-6
LAB
136C
MICROBIOLOGY
CLOSET
137A
OFFICE
CHIEF MICROBIO
136A
EIA
134A
EIA
CHEMISTRY
AUTO
CHEMISTRY
W. TOILET
M. TOILET
BLOOD
BANK
OFFICE
131A
PIPATING
LAB
129A
PIPATING
LAB
CONFERENCE
128B
OFFICE
128A
OFFICE
OFFICE
143HISTOLOGY /
CYTOLOGY
CORRIDOR
C1-5
CORRIDOR
C1-4 AMBASSADOR
OFFICE
123B
TOILET
TOILET
HKPG
STORAGE
107AFREIGHT
ELEVATOR
CORRIDOR
C1-1
SOILED
LINEN
LOADING
DOCK
100A
TIP
100B
GAS
STORAGE
100C
CORRIDOR
C1-8
CHIEF
OFFICE
103A
OFFICE
VAULT
103B
REFRIGERATOR
104A
MECHANICAL
D
N DN
DN
UP
SPECIMEN
PROCESSING
127A
SPECIMEN
PROCESSING
MORGUE
BATHROOM
104C
BLOOD DRAW
AUTOCLAVE
STAFF LOUNGE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
35% SCHEMATIC DESIGN 03/17/2020
65% DESIGN DEVELOPMENT 05/12/2020
100% CONSTRUCTION DOCUMENTS 07/21/2020
95% CONSTRUCTION DOCUMENTS 10/26/2020
100% BID DOCUMENTS 11/30/2020
95% REVISED CONSTRUCTION DOCUMENTS 04/12/2021
100% BID DOCUMENTS 11/18/2021
C U s e rs
\t s a n d e rs
\D o c u m e n ts
\1 .5
.0
A v ts a n d e rs g u id o n d e s ig n .c o m
.r v t
/1
/2
:0
:0
A
M
GC102
BID ALTERNATES
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
TYLER SANDERS
CMTA
10411 MEETING STREET
PROSPECT, KENTUCKY
ANDY MYERS
RENOVATE LAB AND PATHOLOGY
1900 E. MAIN ST., DANVILLE, IL 61832
550-20-110
58-1
11/18/2021 TS DMC
100% BID DOCUMENTS
FULLY SPRINKLERED
502.326.3085
SCALE: 1/8" = 1'-0"GC102
1 BID DEDUCTS
BEYOND PROJECT BOUNDARY
AREA FOR REMOVAL OF ASBESTOS-CONTAINING FLOORING
AND ASSOCIATED MASTIC
A. HAZMAT REMOVAL NOTES APPLY TO ENTIRE ROOMS. CONTRACTOR SHALL
IDENTIFY ALL MATERIALS DESCRIBED BY NOTE IN EACH ROOM AND
REMOVE ACCORDING TO SAFETY STANDARDS. REFERENCE SPECIFICATION
02 82 11.
B. ALL HAZARDOUS MATERIALS SHALL BE REMOVED IN COMPLIANCE WITH
APPLICABLE CODES AND LAWS.
C. THE CONTRACTOR IS RESPONSIBLE TO VERIFY THE HAZARD(S) AND LEVEL
OF PROTECTION REQUIRED FOR ALL EMPLOYEES OR SUBCONTRACTORS
TO COMPLETE THE CONSTRUCTION WORK.
D. PROVIDE ABATEMENT OF VCT AND FLOORING MASTIC WITHIN HATCHED
AREA.
E. PROVIDE COST FOR REMOVAL OF COUNTED AND UNFORESEEN MUD
FITTINGS ON FIBERGLASS INSULATED DOMESTIC WATER LINES FOR 120
FITTINGS.
F. PROVIDE COST FOR REMOVAL OF ASBESTOS CONTAINING BLACK MASTIC
AND 12" NON-ASBESTOS FLOOR TILE OF APPROXIMATELY 3000 SQ.FT.
G. REFER TO SPECIFICATION AND ATTACHMENTS FOR ADDITIONAL
INFORMATION.
H. BASED ON THE DATE OF THE EXISTING CONSTRUCTION IT IS ASSUMED
LEAD PAINT IS WITHIN THE PROJECT AREA. CONDUCT DEMOLITION OF THE
EXISTING SPACE WITH THE ASSUMPTION OF LEAD PAINT ON EXPOSED
PLASTER WALLS, PAINTED METAL DOORS, AND PAINTED SURFACES. REFER
TO SPECIFICATION SECTION 02 83 33.13 LEAD-BASED PAINT REMOVAL,
DISPOSAL AND FOR ADDITIONAL INFORMATION.
I. BASED ON THE DATE OF THE EXISTING CONSTRUCTION AND
UNDERSTANDING OF THE FACILITY, LEAD PAINT IS WITHIN THE PROJECT
AREA. THIS PROJECT SCOPE HAS SIGNIFICANT DEMOLITION. PROVIDE LEAD
PAINT ABATEMENT. PROVIDE LEAD PAINT SURFACE STABILIZATION WHERE
WORK IS DONE. CONTRACTOR TO USE MEASURES FOR PROTECTION AND
TO MINIMIZE PAINT DEBRIS.
J. CONTRACTOR TO SUBMIT LEAD SURFACES STABILIZATION PLAN AND
PROCEDURES PRIOR TO COMMENCING WORK. SUBMITTAL SHALL BE IN
ACCORDANCE WITH SPECIFICATIONS.
1. RED DUCT SEAM MASTIC SEALANT ABOVE PLASTER CEILING - 86 SF TOTAL
2. PAPER DUCT SEAM TAPE OVER FIBERGLASS DUCT ABOVE CEILING - 220 SF
TOTAL
3. PIPE INSULATION ON STRAIGHT RUNS AND ELBOWS IN MECHANICAL ROOM
AND CRAWL SPACE UNDER BUILDING - 80 LF
HAZARDOUS MATERIAL REMOVAL GENERAL NOTES
HAZARDOUS MATERIAL REMOVAL PLAN NOTES
HAZARDOUS MATERIAL REMOVAL LEGEND
CA E H I KB D L M N Q R S T XVG J W
STAIR
ELECTRICAL
139A
STAIR
PF O
K.9
MECHANICAL
OFFICE
138C
CHIEF
OFFICE
138D
OFFICE
138B
OFFICE
138A
OFFICE
CORRIDOR
C1-7
STORAGE
138E
PATHOLOGY
STORAGE
CORRIDOR
1C1-6
LAB
136C
MICROBIOLOGY
CLOSET
137A
OFFICE
CHIEF MICROBIO
136A
EIA
134A
EIA
CHEMISTRY
AUTO
CHEMISTRY
W. TOILET
M. TOILET
BLOOD
BANK
OFFICE
131A
PIPATING
LAB
129A
PIPATING
LAB
CONFERENCE
128B
OFFICE
128A
OFFICE
OFFICE
143HISTOLOGY /
CYTOLOGY
CORRIDOR
C1-5
CORRIDOR
C1-4 AMBASSADOR
OFFICE
123B
TOILET
TOILET
HKPG
STORAGE
107AFREIGHT
ELEVATOR
CORRIDOR
C1-1
SOILED
LINEN
LOADING
DOCK
100A
TIP
100B
GAS
STORAGE
100C
CORRIDOR
C1-8
CHIEF
OFFICE
103A
OFFICE
VAULT
103B
REFRIGERATOR
104A
MECHANICAL
D
N DN
DN
UP
SPECIMEN
PROCESSING
127A
SPECIMEN
PROCESSING
MORGUE
BATHROOM
104C
BLOOD DRAW
AUTOCLAVE
STAFF LOUNGE
N
BUILDING 58 KEY PLAN
PROJECT LOCATION:
FIRST FLOOR
SHADE
INDICATES
AREA NOT IN
SCOPE , TYP.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
35% SCHEMATIC DESIGN 03/17/2020
65% DESIGN DEVELOPMENT 05/12/2020
100% CONSTRUCTION DOCUMENTS 07/21/2020
95% CONSTRUCTION DOCUMENTS 10/26/2020
100% BID DOCUMENTS 11/30/2020
95% REVISED CONSTRUCTION DOCUMENTS 04/12/2021
100% BID DOCUMENTS 11/18/2021
C U s e rs
\t s a n d e rs
\D o c u m e n ts
\1 .5
.0
A v ts a n d e rs g u id o n d e s ig n .c o m
.r v t
/1
/2
:0
:1
A
M
HA101
HAZARDOUS MATERIAL REMOVAL
PLANGUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
TYLER SANDERS
CMTA
10411 MEETING STREET
PROSPECT, KENTUCKY
ANDY MYERS
RENOVATE LAB AND PATHOLOGY
1900 E. MAIN ST., DANVILLE, IL 61832
550-20-110
58-1
11/18/2021 TS DMC
100% BID DOCUMENTS
FULLY SPRINKLERED
502.326.3085
SCALE: 1/8" = 1'-0"HA101
1 HAZARDOUS MATERIAL REMOVAL FLOOR PLAN
SECTION REFERENCE
DRAWING NUMBER
SHEET LOCATION
DRAWING NUMBER
SHEET
LOCATION
DETAIL REFERENCE
OBJECT
REFERENCED
OBJECT
REFERENCED
X
XXXX
X
XXXX
SCALE: ??
VIEW TITLE
N
NORTH ARROW
INCANDESCENT WALL MOUNTED LIGHTING
INCANDESCENT SURFACE MOUNT LIGHTING
SURFACE MOUNTED FLUORESCENT
RECESSED FLUORESCENT
HVAC RETURN AIR GRILLE
HVAC SUPPLY DIFFUSER
PENDANT LIGHT
ACCESS PANEL
EXIT LIGHTING
S
D
SPEAKER
SMOKE DETECTOR
INCANDESCENT RECESSED LIGHTING
A 9'-0"
CEILING TAG CEILING TYPE
FINISHED CEILING HEIGHT
REFER TO CEILING LEGEND FOR MORE
INFORMATION
EXTENT OF REVISION
REVISION SET
MECH/ELEC ITEMS: REFER TO MEP SHEETS AS APPLICABLE
BEYOND PROJECT BOUNDARY, NIC
DETAIL/DRAWING SCALE
TITLE OF DETAIL/DRAWING
DETAIL/DRAWING NUMBER
SHEET NUMBER
A/C AIR CONDITION
A/E ARCHITECT/ENGINEER
AB ANCHOR BOLT
ABC AGGREGATE BASE COURSE
AC ASBESTOS CEMENT OR ASPHALTIC CONCRETE
ACS DR ACCESS DOOR
ACS FLR ACCESS FLOOR
ACS PNL ACCESS PANEL
ACST ACOUSTIC
ACT ACOUSTICAL CEILING TILE
AD AREA DRAIN
ADA AMERICANS WITH DISABILITIES ACT
ADC AUTOMATIC DOOR CLOSER
ADDL ADDITIONAL
ADDN ADDITION
ADH ADHESIVE
ADJ ADJACENT, ADJOINING, OR ADJUSTABLE
ADMIN ADMINISTRATION
AFC ABOVE FINISHED COUNTER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFS ABOVE FINISHED SLAB
AGGR AGGREGATE
AHJ AUTHORITY HAVING JURISDICTION
AHR ANCHOR
AHU AIR HANDLING UNIT
AIA AMERICAN INSTITUTE OF ARCHITECTS
AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION
ALT ALTERNATE
ALT NO ALTERNATE NUMBER
ALUM ALUMINUM
AMP AMPERE
AMT AMOUNT
ANOD ANODIZE
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
ANT ANTENNA
APPD APPROVED
APPROX APPROXIMATE
AR AS REQUIRED
ARCH ARCHITECT
ASB ASBESTOS
ASI ARCHITECT'S SUPPLEMENTAL INSTRUCTION
ASKLR AUTOMATIC SPRINKLER
ASPH ASPHALT
ASSN ASSOCIATION
ATCH ATTACHMENT
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AUX AUXILIARY
AV AUDIO VISUAL
AVG AVERAGE
AW ACID WASTE
AWI ARCHITECTURAL WOODWORKING INSTITUTE
AWS AMERICAN WELDING SOCIETY
AWT ACOUSTICAL WALL TREATMENT
B PL BASE PLATE
BALC BALCONY
BAT BATTEN
BB BULLETIN BOARD
BD BOARD
BEV BEVEL
BI FLD DR BIFOLDING DOORS
BITUM BITUMINOUS
BKG BACKING
BLD BUILD
BLDG BUILDING
BLKG BLOCKING
BLKT BLANKET
BM BEAM OR BENCHMARK
BOT BOTTOM
BRCG BRACING
BRDG BRIDGING
BRG BEARING
BRKT BRACKET
BRZ BRONZE
BSMT BASEMENT
BTWN BETWEEN
BUR BUILT-UP ROOFING
C CELSIUS CHANNEL OR CHANNEL CELSIUS
C CONC CAST CONCRETE
C TO C CENTER TO CENTER
CAB CABINET
CB CORNER BEAD
CBB CEMENTITIOUS (BACKER) BOARD
CC CUBIC CENTIMETER
CCTV CLOSED CIRCUIT TELEVISION
CCW COUNTERCLOCKWISE
CEM CEMENT
CEM PLAS CEMENT PLASTER
CER CERAMIC
CF CONTRACTOR FURNISHED
CF/CI CONTRACTOR FURNISHED/CONTRACTOR INSTALLED
CF/OI CONTRACTOR FURNISHED/OWNER INSTALLED
CFLG COUNTERFLASHING
CFM CUBIC FEET PER MINUTE
CFMF COLD-FORMED METAL FRAMING
CFS CUBIC FEET PER SECOND
CG CORNER GUARD
CGSFU CERAMIC GLAZED STRUCTURAL FACING UNITS
CH BD CHALKBOARD
CHEM CHEMICAL
CHFR CHAMFER
CI CAST IRON
CIP CAST-IN-PLACE
CIR CIRCLE
CIRC CIRCULAR
CJ CONSTRUCTION JOINT OR CONTROL JOINT
CL CENTER LINE
CLDG CLADDING
CLG CEILING
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CNR CORNER
CNTR COUNTER
CO CARBON MONOXIDE, CLEANOUT
CO₂ CARBON DIOXIDE
COL COLUMN
COM COMMON
COMB COMBINATION, COMBINED
COMM COMMUNICATION
COMP COMPONENT
CONC CONCRETE
COND CONDENSER OR CONDITION
CONF CONFERENCE
CONN CONNECT
CONSTR CONSTRUCTION
CONT CONTINUE
CONTR CONTRACTOR
COORD COORDINATE
CORR CORRIDOR
CPM CRITICAL PATH METHOD
CPRS COMPRESSIBLE
CPT CARPET
CRS COLD ROLLED STEEL
CS CAST CONCRETE STONE
CSB CONCRETE SPLASH BLOCK
CSG CASING
CSK COUNTER SUNK
CSMT CASEMENT
CSWK CASEWORK
CT CERAMIC TILE
CTB CERAMIC TILE BASE
CTF CERAMIC TILE FLOOR
CTG COATING
CTR CENTER
CTRL CONTROL
CTV CABLE TELEVISION
CU COPPER C
CU FT CUBIC FEET
CU IN CUBIC INCH
CU YD CUBIC YARD
CURT CURTAIN
CYL CYLINDER
CYL L CYLINDER LOCK
N NORTH
NA NOT APPLICABLE
NAT NATURAL
NATL NATIONAL
NC NOISE CRITERIA
NCOMBL NONCOMBUSTIBLE
NEG NEGATIVE
NEUT NEUTRAL
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NR NOISE REDUCTION
NRC NOISE REDUCTION COEFFICIENT
NRP NONREMOVABLE
NS NARROW STILE
NUM NUMERAL
O/O OUT TO OUT
O OXYGEN
OA OUTSIDE AIR OR OVERALL
OC ON CENTER
OCC OCCUPY
OCT OCTAGON
OD OUTSIDE DIAMETER OR OUTSIDE DIMENSION
OF/CI OWNER FURNISHED/CONTRACTOR INSTALLED
OFD OVERFLOW DRAIN
OFF OFFICE
OF/OI OWNER FURNISHED/OWNER INSTALLED
OH OVERHANG
OH DR OVERHEAD (COILING) DOOR
OPH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
O…