Attached to
Z1DA--Renovate Lab and Pathology Project 550-20-110
Solicitation number
36C25222B0033
Issued by

About this file

The documents include construction drawings and specifications for a renovation project at a Department of Veterans Affairs medical center. The project involves renovating laboratory and pathology areas over six phases, with work including fire suppression system demolition and reinstallation, and plumbing work divided among the phases. Plumbing plans by phase show fixture removal and addition details. The related federal contract opportunity is for the Renovate Lab and Pathology Project 550-20-110 issued by the VA Veterans Health Administration VISN 12. The solicitation number is 36C25222B0033. The project involves renovations to modernize laboratory and pathology facilities at a VA medical center over six sequenced phases based on the construction drawings and specifications provided.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CA E H I KB D L M N Q R S T XU VG J WPF OK.9

M5

M4

M3

M2

M1

CA E H M N Q R S T XU VG J WPF O

NOTE:

ALL EXISTING FIRE PROTECTION TO BE REMOVED

COMPLETE AND RE-INSTALLED IN OUTLINED AREA.

NOTE:

ALL EXISTING FIRE PROTECTION TO BE REMOVED

COMPLETE AND RE-INSTALLED IN OUTLINED AREA.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

35% SCHEMATIC DESIGN

65% DESIGN DEVELOPMENT

100% CONSTRUCTION DOCUMENTS

95% CONSTRUCTION DOCUMENTS

100% BID DOCUMENTS

95% REVISED CONSTRUCTION DOCUMENTS

03/17/2020

05/12/2020

07/21/2020

10/26/2020

11/30/2020

04/12/2021

100% BID DOCUMENTS 11/19/2021

C U s e rs \l m c la u g h lin \D o c u m e n ts \V

IR

P

M

R lm c la u g h lin P

Q H

F .r v t

/3

/2

:2

:2

A

M

FP100-R

FIRST FLOOR PLAN - FIRE

SUPPRESSION DEMOLITIONGUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

TYLER SANDERS

CMTA

10411 MEETING STREET

PROSPECT, KENTUCKY

ANDY MYERS

RENOVATE LAB AND PATHOLOGY

1900 E. MAIN ST. DANVILLE, IL

550-20-110

58-1

11/19/2021

100% BID DOCUMENTS

FULLY SPRINKLERED

502.326.3085

SCALE: 1/8" = 1'-0"FP100-R

1 FIRST FLOOR PLAN - FIRE SUPPRESSION

Revisions: Date:

PLUMBING REVISIONS 9/30/2022

CA E H I KB D L M N Q R S T XU VG J WPF OK.9

M5

M4

M3

M2

M1

CA E H M N Q R S T XU VG J WPF O

NOTE:

FIRE PROTECTION CONTRACTOR SHALL REINSTALL EXISTING FIRE PROTECTION

MAINS, BRANCH PIPING AND SPRINKLER HEADS IN OUTLINED AREA AS REQUIRED

TO ACCOMMODATE NEW CEILINGS. COORDINATE NEW SPRINKLER HEAD

LOCATIONS WITH NEW LIGHTS, DIFFUSERS, RETURN GRILLES, ETC.

NOTE:

FIRE PROTECTION CONTRACTOR SHALL REINSTALL EXISTING FIRE PROTECTION

MAINS, BRANCH PIPING AND SPRINKLER HEADS IN OUTLINED AREA AS REQUIRED

TO ACCOMMODATE NEW CEILINGS. COORDINATE NEW SPRINKLER HEAD

LOCATIONS WITH NEW LIGHTS, DIFFUSERS, RETURN GRILLES, ETC.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

35% SCHEMATIC DESIGN

65% DESIGN DEVELOPMENT

100% CONSTRUCTION DOCUMENTS

95% CONSTRUCTION DOCUMENTS

100% BID DOCUMENTS

95% REVISED CONSTRUCTION DOCUMENTS

03/17/2020

05/12/2020

07/21/2020

10/26/2020

11/30/2020

04/12/2021

100% BID DOCUMENTS 11/19/2021

C U s e rs \l m c la u g h lin \D o c u m e n ts \V

IR

P

M

R lm c la u g h lin P

Q H

F .r v t

/3

/2

:2

:3

A

M

FP101-R

FIRST FLOOR PLAN - FIRE

SUPPRESSIONGUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

TYLER SANDERS

CMTA

10411 MEETING STREET

PROSPECT, KENTUCKY

ANDY MYERS

RENOVATE LAB AND PATHOLOGY

1900 E. MAIN ST. DANVILLE, IL

550-20-110

58-1

11/19/2021

100% BID DOCUMENTS

FULLY SPRINKLERED

502.326.3085

SCALE: 1/8" = 1'-0"FP101-R

1 FIRST FLOOR PLAN - FIRE SUPPRESSION

CHANGES TO SMOKE COMPARTMENT IN

THIS AREA. SPRINKLER SYSTEM SHALL

BE REZONED ACORDINGLY PER VA

DESIGN GUIDE

Revisions: Date:

PLUMBING REVISIONS 9/30/2022

P-708

P-505

CA E H I KB D L M N Q R S T U VG J PF OK.9

MB MC MD

MA ME

M5

M4

M3

M2

M1

1/2" HW

1/2" CW

1 1/2" V

P3

P2

P4

NO SCOPE IN THIS AREA

FOR THIS PHASE.

NO SCOPE IN THIS AREA

FOR THIS PHASE.

NO SCOPE IN THIS AREA

FOR THIS PHASE.

NO SCOPE IN THIS AREA

FOR THIS PHASE.

P8

N

BUILDING 58 KEY PLAN

PROJECT LOCATION:

FIRST FLOOR

SHADE

INDICATES

AREA NOT IN

SCOPE , TYP.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

35% SCHEMATIC DESIGN

65% DESIGN DEVELOPMENT

100% CONSTRUCTION DOCUMENTS

95% CONSTRUCTION DOCUMENTS

100% BID DOCUMENTS

95% REVISED CONSTRUCTION DOCUMENTS

03/17/2020

05/12/2020

07/21/2020

10/26/2020

11/30/2020

04/12/2021

100% BID DOCUMENTS 11/19/2021

C U s e rs \l m c la u g h lin \D o c u m e n ts \V

IR

P

M

R lm c la u g h lin P

Q H

F .r v t

/3

/2

:2

:3

A

M

PL101a-R

FIRST FLOOR PLAN - PLUMBING -

PHASE 1BGUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

TYLER SANDERS

CMTA

10411 MEETING STREET

PROSPECT, KENTUCKY

ANDY MYERS

RENOVATE LAB AND PATHOLOGY

1900 E. MAIN ST. DANVILLE, IL

550-20-110

58-1

11/19/2021

100% BID DOCUMENTS

FULLY SPRINKLERED

502.326.3085

SCALE: 1/8" = 1'-0"PL101a-R

1 FIRST FLOOR PLAN - PLUMBING PHASE 1B N

TAGGED NOTES

P2 PROVIDE EMERGENCY TMV FOR EYE WASH.

P3 CONNECT CW RECIRCULATION PIPING INTO EXISTING CW

PIPING.

P4 CONNECT NEW PIPING INTO EXISTING PIPING FROM

DEMOLISHED FIXTURE.

P8 INSTALL HOT AND COLD RETURN AS CLOSE TO SUPPLY TO

FIXTURE AS POSSIBLE. (TYP)

NOTE: THERE IS NO PLUMBING SCOPE IN PHASE 1A.

Revisions: Date:

PLUMBING REVISIONS 9/30/2022

R E

F

R E

F

R E

F

R E

F

R E

F

P-401

P-401

P-101

P-420

P-101

P-101

P-401

P-420

CA E H I KB D L M N Q R S T XU VG J WPF OK.9

M5

M4

M3

M2

M1

TEMPORARY BLOOD DRAW

T6

TEMP. HISTOLOGY / CYTOLOGY

T2

TEMP. PIPETING

T3

TEMP. BLOOD BANK

T4

AAV

P5

P6

P6

NO SCOPE IN THIS AREA

FOR THIS PHASE.

NO SCOPE IN THIS AREA

FOR THIS PHASE.

NO SCOPE IN THIS AREA

FOR THIS PHASE.

NO SCOPE IN THIS AREA

FOR THIS PHASE.

1/2"

1/2"P8

P8

1/2" RHW

1/2" HW

1/2" CW

1/2" CW

AAV

P5 1/2"

1/2" P8

TEMP SPEC PROCESSING

T7AAV

P5 P8

AAV

P8

P5

1/2" RHW

1/2" HW

1/2" CW

1/2" CW

P4 P4

2" CW

3/4" CW

3/4" HW

3/4" RHW

P13

P13

P13

P13

N

BUILDING 58 KEY PLAN

PROJECT LOCATION:

FIRST FLOOR

SHADE

INDICATES

AREA NOT IN

SCOPE , TYP.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

35% SCHEMATIC DESIGN

65% DESIGN DEVELOPMENT

100% CONSTRUCTION DOCUMENTS

95% CONSTRUCTION DOCUMENTS

100% BID DOCUMENTS

95% REVISED CONSTRUCTION DOCUMENTS

03/17/2020

05/12/2020

07/21/2020

10/26/2020

11/30/2020

04/12/2021

100% BID DOCUMENTS 11/19/2021

C U s e rs \l m c la u g h lin \D o c u m e n ts \V

IR

P

M

R lm c la u g h lin P

Q H

F .r v t

/3

/2

:2

:3

A

M

PL102a-R

FIRST FLOOR PLAN - PLUMBING -

PHASE 2GUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

TYLER SANDERS

CMTA

10411 MEETING STREET

PROSPECT, KENTUCKY

ANDY MYERS

RENOVATE LAB AND PATHOLOGY

1900 E. MAIN ST. DANVILLE, IL

550-20-110

58-1

11/19/2021

100% BID DOCUMENTS

FULLY SPRINKLERED

502.326.3085

SCALE: 1/8" = 1'-0"PL102a-R

1 FIRST FLOOR PLAN - PLUMBING PHASE 2

N

TAGGED NOTES

P4 CONNECT NEW PIPING INTO EXISTING PIPING FROM

DEMOLISHED FIXTURE.

P5 PROVIDE TEMPORARY SINK/PIPING TO BE REMOVED IN LATER

PHASE.

P6 CAP VENT PIPING FOR FUTURE PHASE.

P8 INSTALL HOT AND COLD RETURN AS CLOSE TO SUPPLY TO

FIXTURE AS POSSIBLE. (TYP)

P13 FIXTURE/FAUCET SUPPLIED BY CASEWORK MANUFACTURER.

Revisions: Date:

PLUMBING REVISIONS 9/30/2022

REF.

R E

F

REF.

R E

F

R E

F

R E

F

P-420

P-413

P-413

P-420

P-413

P-420

CA E H I KB D L M N Q R S T U VG J PF OK.9

MB MC MD

MA ME

M5

M4

M3

M2

M1

BLOOD DRAW

PIPETING

HISTOLOGY / CYTOLOGY

OFFICE

HISTOLOGY / CYTOLOGY

CHEMISTRY

BLOOD BANK

14 13

1/2" RHW

1/2" HW

1 1/2" V

1/ 2"

R H

W

1/ 2"

H W 1/ 2"

C W

1/ 2"

C W

1" CW

3/4" CW

P6

P7

NO SCOPE IN THIS AREA

FOR THIS PHASE.

NO SCOPE IN THIS AREA

FOR THIS PHASE.

NO SCOPE IN THIS AREA

FOR THIS PHASE.

P9 P10

P10

P8

P9

P10

P10

P8

P10

1/ 2"

C W

3/ 4"

C W 1/

2" R

H W

3/ 4"

H W

1/

2" V P7

3/4" CW

1/2" CW

P12

3/4" CW

P11

1" C

W

P13

P13

N

BUILDING 58 KEY PLAN

PROJECT LOCATION:

FIRST FLOOR

SHADE

INDICATES

AREA NOT IN

SCOPE , TYP.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

35% SCHEMATIC DESIGN

65% DESIGN DEVELOPMENT

100% CONSTRUCTION DOCUMENTS

95% CONSTRUCTION DOCUMENTS

100% BID DOCUMENTS

95% REVISED CONSTRUCTION DOCUMENTS

03/17/2020

05/12/2020

07/21/2020

10/26/2020

11/30/2020

04/12/2021

100% BID DOCUMENTS 11/19/2021

C U s e rs \l m c la u g h lin \D o c u m e n ts \V

IR

P

M

R lm c la u g h lin P

Q H

F .r v t

/3

/2

:2

:3

A

M

PL103a-R

FIRST FLOOR PLAN - PLUMBING -

PHASE 3GUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

TYLER SANDERS

CMTA

10411 MEETING STREET

PROSPECT, KENTUCKY

ANDY MYERS

RENOVATE LAB AND PATHOLOGY

1900 E. MAIN ST. DANVILLE, IL

550-20-110

58-1

11/19/2021

100% BID DOCUMENTS

FULLY SPRINKLERED

502.326.3085

SCALE: 1/8" = 1'-0"PL103a-R

1 FIRST FLOOR PLAN - PLUMBING PHASE 3

N

TAGGED NOTES

P6 CAP VENT PIPING FOR FUTURE PHASE.

P7 CW DOWN TO LAB EQUIPMENT. PROVIDE DUAL CHECK VALVE

PRIOR TO CONNECTION. (TYP OF ALL LAB EQUIPMENT)

P8 INSTALL HOT AND COLD RETURN AS CLOSE TO SUPPLY TO

FIXTURE AS POSSIBLE. (TYP)

P9 PIPING DOWN IN WALL AND THROUGH MILLWORK TO

EQUIPMENT.

P10 PIPING DOWN IN WALL AND THROUGH MILLWORK TO FIXTURE.

P11 FLEX TUBING PROVIDED WITH MILLI-Q TO ANALYZERS.

RECIRCULATE BACK TO MILLI-Q EQUIPMENT. REFER TO

MANUFACTURERS INSTALLATIONS MANUALS.

P12 1"CW DOWN. 1/2" TO SINK AND 3/4" TO MILLI-Q EQUIPMENT.

PROVIDE PRV SET TO 45 PSI AND DOUBLE CHECK VALVE ON

WALL BEHIND EQUIPMENT PRIOR TO CONNECTION. DRAIN TO

ADJACENT FLOOR DRAIN.

P13 FIXTURE/FAUCET SUPPLIED BY CASEWORK MANUFACTURER.

PROVIDE DUAL CHECK VALVES AT WATER CONNECTIONS TO

EQUIPMENT.

Revisions: Date:

PLUMBING REVISIONS 9/30/2022

E

F

REF.

REF.

R E

F

REF.

P-413

P-413

P-420

P-101

P-101

P-401

P-420

P-420

CA E H I KB D L M N Q R S T U VG J PF OK.9

MB MC MD

MA ME

M5

M4

M3

M2

M1

URINALYSIS (EIA)

3/ 4"

H W

1/ 2"

H W

1/ 2"

C W

3/ 4"

C W

3/4" HW

3/4" CW

1/ 2"

C W

1/ 2"

H W

P2

P7

NO SCOPE IN THIS AREA

FOR THIS PHASE.

NO SCOPE IN THIS AREA

FOR THIS PHASE.

NO SCOPE IN THIS AREA

FOR THIS PHASE.

NO SCOPE IN THIS AREA

FOR THIS PHASE.

P8

P13

P13

P13

N

BUILDING 58 KEY PLAN

PROJECT LOCATION:

FIRST FLOOR

SHADE

INDICATES

AREA NOT IN

SCOPE , TYP.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

35% SCHEMATIC DESIGN

65% DESIGN DEVELOPMENT

100% CONSTRUCTION DOCUMENTS

95% CONSTRUCTION DOCUMENTS

100% BID DOCUMENTS

95% REVISED CONSTRUCTION DOCUMENTS

03/17/2020

05/12/2020

07/21/2020

10/26/2020

11/30/2020

04/12/2021

100% BID DOCUMENTS 11/19/2021

C U s e rs \l m c la u g h lin \D o c u m e n ts \V

IR

P

M

R lm c la u g h lin P

Q H

F .r v t

/3

/2

:2

:4

A

M

PL104a-R

FIRST FLOOR PLAN - PLUMBING -

PHASE 4GUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

TYLER SANDERS

CMTA

10411 MEETING STREET

PROSPECT, KENTUCKY

ANDY MYERS

RENOVATE LAB AND PATHOLOGY

1900 E. MAIN ST. DANVILLE, IL

550-20-110

58-1

11/19/2021

100% BID DOCUMENTS

FULLY SPRINKLERED

502.326.3085

SCALE: 1/8" = 1'-0"PL104a-R

1 FIRST FLOOR PLAN -PLUMBING PHASE 4 N

TAGGED NOTES

P2 PROVIDE EMERGENCY TMV FOR EYE WASH.

P7 CW DOWN TO LAB EQUIPMENT. PROVIDE DUAL CHECK VALVE

PRIOR TO CONNECTION. (TYP OF ALL LAB EQUIPMENT)

P8 INSTALL HOT AND COLD RETURN AS CLOSE TO SUPPLY TO

FIXTURE AS POSSIBLE. (TYP)

P13 FIXTURE/FAUCET SUPPLIED BY CASEWORK MANUFACTURER.

Revisions: Date:

PLUMBING REVISIONS 9/30/2022

E

F

REF.

REF.

R E

F

REF.

P-101

P-101

P-420

CA E H I KB D L M N Q R S T U VG J PF OK.9

MB MC MD

MA ME

M5

M4

M3

M2

M1

MICROBIOLOGY

WALK IN COOLER

1/ 2"

C W

3/ 4"

C W

1/ 2"

H W

1/ 2"

R H

W

1 1/2" V P13

N

BUILDING 58 KEY PLAN

PROJECT LOCATION:

FIRST FLOOR

SHADE

INDICATES

AREA NOT IN

SCOPE , TYP.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

35% SCHEMATIC DESIGN

65% DESIGN DEVELOPMENT

100% CONSTRUCTION DOCUMENTS

95% CONSTRUCTION DOCUMENTS

100% BID DOCUMENTS

95% REVISED CONSTRUCTION DOCUMENTS

03/17/2020

05/12/2020

07/21/2020

10/26/2020

11/30/2020

04/12/2021

100% BID DOCUMENTS 11/19/2021

C U s e rs \l m c la u g h lin \D o c u m e n ts \V

IR

P

M

R lm c la u g h lin P

Q H

F .r v t

/3

/2

:2

:4

A

M

PL105a-R

FIRST FLOOR PLAN - PLUMBING -

PHASE 5GUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

TYLER SANDERS

CMTA

10411 MEETING STREET

PROSPECT, KENTUCKY

ANDY MYERS

RENOVATE LAB AND PATHOLOGY

1900 E. MAIN ST. DANVILLE, IL

550-20-110

58-1

11/19/2021

100% BID DOCUMENTS

FULLY SPRINKLERED

502.326.3085

SCALE: 1/8" = 1'-0"PL105a-R

1 FIRST FLOOR PLAN - PLUMBING PHASE 5

N

Revisions: Date:

PLUMBING REVISIONS 9/30/2022

TAGGED NOTES

P13 FIXTURE/FAUCET SUPPLIED BY CASEWORK MANUFACTURER.

P-420

P-420

P-103

P-401

P-420

P-501

CA E H I KB D L M N Q R S T U VG J PF OK.9

MB MC MD

MA ME

M5

M4

M3

M2

M1

OFFICE

OFFICE

CONFERENCE

OFFICE

OFFICE

OFFICE

ELECTRICAL

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

HAC

OFFICE

TLT

WALK IN COOLER

MICROBIOLOGY

URINALYSIS (EIA)

ELECTRICAL

E140

CHEMISTRY

PIPETING

BLOOD BANK

REFRIGERATOR BANK

BLOOD DRAW

HISTOLOGY / CYTOLOGY

MORGUE

WASTE CONTAINMENT

104B

STAFF LOUNGE

1/

4" C

W 3/

4" H

W

CONNECT TO VENT

PIPING IN AREA.

3/ 4"

C W

3/4" HW

2" V

N

BUILDING 58 KEY PLAN

PROJECT LOCATION:

FIRST FLOOR

SHADE

INDICATES

AREA NOT IN

SCOPE , TYP.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

35% SCHEMATIC DESIGN

65% DESIGN DEVELOPMENT

100% CONSTRUCTION DOCUMENTS

95% CONSTRUCTION DOCUMENTS

100% BID DOCUMENTS

95% REVISED CONSTRUCTION DOCUMENTS

03/17/2020

05/12/2020

07/21/2020

10/26/2020

11/30/2020

04/12/2021

100% BID DOCUMENTS 11/19/2021

C U s e rs \l m c la u g h lin \D o c u m e n ts \V

IR

P

M

R lm c la u g h lin P

Q H

F .r v t

/3

/2

:2

:4

A

M

PL106a-R

FIRST FLOOR PLAN - PLUMBING -

PHASE 6GUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

TYLER SANDERS

CMTA

10411 MEETING STREET

PROSPECT, KENTUCKY

ANDY MYERS

RENOVATE LAB AND PATHOLOGY

1900 E. MAIN ST. DANVILLE, IL

550-20-110

58-1

11/19/2021

100% BID DOCUMENTS

FULLY SPRINKLERED

502.326.3085

SCALE: 1/8" = 1'-0"PL106a-R

1 FIRST FLOOR PLAN - PLUMBING PHASE 6

N

MOPSINK AND DRAIN

SHALL BE FIRST ITEM

INSTALLED IN PHASE 6.

Revisions: Date:

PLUMBING REVISIONS 9/30/2022

Sheets
FP100-R - FIRST FLOOR PLAN - FIRE SUPPRESSION DEMOLITION
FP101-R - FIRST FLOOR PLAN - FIRE SUPPRESSION
PL101a-R - FIRST FLOOR PLAN - PLUMBING - PHASE 1B
PL102a-R - FIRST FLOOR PLAN - PLUMBING - PHASE 2
PL103a-R - FIRST FLOOR PLAN - PLUMBING - PHASE 3
PL104a-R - FIRST FLOOR PLAN - PLUMBING - PHASE 4
PL105a-R - FIRST FLOOR PLAN - PLUMBING - PHASE 5
PL106a-R - FIRST FLOOR PLAN - PLUMBING - PHASE 6

File details come from the government source that posted it. Updated .