Drawing Plumbing and Fire-Revised.pdf
PDF 3 MB Posted
- Solicitation number
- 36C25222B0033
About this file
The documents include construction drawings and specifications for a renovation project at a Department of Veterans Affairs medical center. The project involves renovating laboratory and pathology areas over six phases, with work including fire suppression system demolition and reinstallation, and plumbing work divided among the phases. Plumbing plans by phase show fixture removal and addition details. The related federal contract opportunity is for the Renovate Lab and Pathology Project 550-20-110 issued by the VA Veterans Health Administration VISN 12. The solicitation number is 36C25222B0033. The project involves renovations to modernize laboratory and pathology facilities at a VA medical center over six sequenced phases based on the construction drawings and specifications provided.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CA E H I KB D L M N Q R S T XU VG J WPF OK.9
M5
M4
M3
M2
M1
CA E H M N Q R S T XU VG J WPF O
NOTE:
ALL EXISTING FIRE PROTECTION TO BE REMOVED
COMPLETE AND RE-INSTALLED IN OUTLINED AREA.
NOTE:
ALL EXISTING FIRE PROTECTION TO BE REMOVED
COMPLETE AND RE-INSTALLED IN OUTLINED AREA.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
35% SCHEMATIC DESIGN
65% DESIGN DEVELOPMENT
100% CONSTRUCTION DOCUMENTS
95% CONSTRUCTION DOCUMENTS
100% BID DOCUMENTS
95% REVISED CONSTRUCTION DOCUMENTS
03/17/2020
05/12/2020
07/21/2020
10/26/2020
11/30/2020
04/12/2021
100% BID DOCUMENTS 11/19/2021
C U s e rs \l m c la u g h lin \D o c u m e n ts \V
IR
P
M
R lm c la u g h lin P
Q H
F .r v t
/3
/2
:2
:2
A
M
FP100-R
FIRST FLOOR PLAN - FIRE
SUPPRESSION DEMOLITIONGUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
TYLER SANDERS
CMTA
10411 MEETING STREET
PROSPECT, KENTUCKY
ANDY MYERS
RENOVATE LAB AND PATHOLOGY
1900 E. MAIN ST. DANVILLE, IL
550-20-110
58-1
11/19/2021
100% BID DOCUMENTS
FULLY SPRINKLERED
502.326.3085
SCALE: 1/8" = 1'-0"FP100-R
1 FIRST FLOOR PLAN - FIRE SUPPRESSION
Revisions: Date:
PLUMBING REVISIONS 9/30/2022
CA E H I KB D L M N Q R S T XU VG J WPF OK.9
M5
M4
M3
M2
M1
CA E H M N Q R S T XU VG J WPF O
NOTE:
FIRE PROTECTION CONTRACTOR SHALL REINSTALL EXISTING FIRE PROTECTION
MAINS, BRANCH PIPING AND SPRINKLER HEADS IN OUTLINED AREA AS REQUIRED
TO ACCOMMODATE NEW CEILINGS. COORDINATE NEW SPRINKLER HEAD
LOCATIONS WITH NEW LIGHTS, DIFFUSERS, RETURN GRILLES, ETC.
NOTE:
FIRE PROTECTION CONTRACTOR SHALL REINSTALL EXISTING FIRE PROTECTION
MAINS, BRANCH PIPING AND SPRINKLER HEADS IN OUTLINED AREA AS REQUIRED
TO ACCOMMODATE NEW CEILINGS. COORDINATE NEW SPRINKLER HEAD
LOCATIONS WITH NEW LIGHTS, DIFFUSERS, RETURN GRILLES, ETC.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
35% SCHEMATIC DESIGN
65% DESIGN DEVELOPMENT
100% CONSTRUCTION DOCUMENTS
95% CONSTRUCTION DOCUMENTS
100% BID DOCUMENTS
95% REVISED CONSTRUCTION DOCUMENTS
03/17/2020
05/12/2020
07/21/2020
10/26/2020
11/30/2020
04/12/2021
100% BID DOCUMENTS 11/19/2021
C U s e rs \l m c la u g h lin \D o c u m e n ts \V
IR
P
M
R lm c la u g h lin P
Q H
F .r v t
/3
/2
:2
:3
A
M
FP101-R
FIRST FLOOR PLAN - FIRE
SUPPRESSIONGUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
TYLER SANDERS
CMTA
10411 MEETING STREET
PROSPECT, KENTUCKY
ANDY MYERS
RENOVATE LAB AND PATHOLOGY
1900 E. MAIN ST. DANVILLE, IL
550-20-110
58-1
11/19/2021
100% BID DOCUMENTS
FULLY SPRINKLERED
502.326.3085
SCALE: 1/8" = 1'-0"FP101-R
1 FIRST FLOOR PLAN - FIRE SUPPRESSION
CHANGES TO SMOKE COMPARTMENT IN
THIS AREA. SPRINKLER SYSTEM SHALL
BE REZONED ACORDINGLY PER VA
DESIGN GUIDE
Revisions: Date:
PLUMBING REVISIONS 9/30/2022
P-708
P-505
CA E H I KB D L M N Q R S T U VG J PF OK.9
MB MC MD
MA ME
M5
M4
M3
M2
M1
1/2" HW
1/2" CW
1 1/2" V
P3
P2
P4
NO SCOPE IN THIS AREA
FOR THIS PHASE.
NO SCOPE IN THIS AREA
FOR THIS PHASE.
NO SCOPE IN THIS AREA
FOR THIS PHASE.
NO SCOPE IN THIS AREA
FOR THIS PHASE.
P8
N
BUILDING 58 KEY PLAN
PROJECT LOCATION:
FIRST FLOOR
SHADE
INDICATES
AREA NOT IN
SCOPE , TYP.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
35% SCHEMATIC DESIGN
65% DESIGN DEVELOPMENT
100% CONSTRUCTION DOCUMENTS
95% CONSTRUCTION DOCUMENTS
100% BID DOCUMENTS
95% REVISED CONSTRUCTION DOCUMENTS
03/17/2020
05/12/2020
07/21/2020
10/26/2020
11/30/2020
04/12/2021
100% BID DOCUMENTS 11/19/2021
C U s e rs \l m c la u g h lin \D o c u m e n ts \V
IR
P
M
R lm c la u g h lin P
Q H
F .r v t
/3
/2
:2
:3
A
M
PL101a-R
FIRST FLOOR PLAN - PLUMBING -
PHASE 1BGUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
TYLER SANDERS
CMTA
10411 MEETING STREET
PROSPECT, KENTUCKY
ANDY MYERS
RENOVATE LAB AND PATHOLOGY
1900 E. MAIN ST. DANVILLE, IL
550-20-110
58-1
11/19/2021
100% BID DOCUMENTS
FULLY SPRINKLERED
502.326.3085
SCALE: 1/8" = 1'-0"PL101a-R
1 FIRST FLOOR PLAN - PLUMBING PHASE 1B N
TAGGED NOTES
P2 PROVIDE EMERGENCY TMV FOR EYE WASH.
P3 CONNECT CW RECIRCULATION PIPING INTO EXISTING CW
PIPING.
P4 CONNECT NEW PIPING INTO EXISTING PIPING FROM
DEMOLISHED FIXTURE.
P8 INSTALL HOT AND COLD RETURN AS CLOSE TO SUPPLY TO
FIXTURE AS POSSIBLE. (TYP)
NOTE: THERE IS NO PLUMBING SCOPE IN PHASE 1A.
Revisions: Date:
PLUMBING REVISIONS 9/30/2022
R E
F
R E
F
R E
F
R E
F
R E
F
P-401
P-401
P-101
P-420
P-101
P-101
P-401
P-420
CA E H I KB D L M N Q R S T XU VG J WPF OK.9
M5
M4
M3
M2
M1
TEMPORARY BLOOD DRAW
T6
TEMP. HISTOLOGY / CYTOLOGY
T2
TEMP. PIPETING
T3
TEMP. BLOOD BANK
T4
AAV
P5
P6
P6
NO SCOPE IN THIS AREA
FOR THIS PHASE.
NO SCOPE IN THIS AREA
FOR THIS PHASE.
NO SCOPE IN THIS AREA
FOR THIS PHASE.
NO SCOPE IN THIS AREA
FOR THIS PHASE.
1/2"
1/2"P8
P8
1/2" RHW
1/2" HW
1/2" CW
1/2" CW
AAV
P5 1/2"
1/2" P8
TEMP SPEC PROCESSING
T7AAV
P5 P8
AAV
P8
P5
1/2" RHW
1/2" HW
1/2" CW
1/2" CW
P4 P4
2" CW
3/4" CW
3/4" HW
3/4" RHW
P13
P13
P13
P13
N
BUILDING 58 KEY PLAN
PROJECT LOCATION:
FIRST FLOOR
SHADE
INDICATES
AREA NOT IN
SCOPE , TYP.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
35% SCHEMATIC DESIGN
65% DESIGN DEVELOPMENT
100% CONSTRUCTION DOCUMENTS
95% CONSTRUCTION DOCUMENTS
100% BID DOCUMENTS
95% REVISED CONSTRUCTION DOCUMENTS
03/17/2020
05/12/2020
07/21/2020
10/26/2020
11/30/2020
04/12/2021
100% BID DOCUMENTS 11/19/2021
C U s e rs \l m c la u g h lin \D o c u m e n ts \V
IR
P
M
R lm c la u g h lin P
Q H
F .r v t
/3
/2
:2
:3
A
M
PL102a-R
FIRST FLOOR PLAN - PLUMBING -
PHASE 2GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
TYLER SANDERS
CMTA
10411 MEETING STREET
PROSPECT, KENTUCKY
ANDY MYERS
RENOVATE LAB AND PATHOLOGY
1900 E. MAIN ST. DANVILLE, IL
550-20-110
58-1
11/19/2021
100% BID DOCUMENTS
FULLY SPRINKLERED
502.326.3085
SCALE: 1/8" = 1'-0"PL102a-R
1 FIRST FLOOR PLAN - PLUMBING PHASE 2
N
TAGGED NOTES
P4 CONNECT NEW PIPING INTO EXISTING PIPING FROM
DEMOLISHED FIXTURE.
P5 PROVIDE TEMPORARY SINK/PIPING TO BE REMOVED IN LATER
PHASE.
P6 CAP VENT PIPING FOR FUTURE PHASE.
P8 INSTALL HOT AND COLD RETURN AS CLOSE TO SUPPLY TO
FIXTURE AS POSSIBLE. (TYP)
P13 FIXTURE/FAUCET SUPPLIED BY CASEWORK MANUFACTURER.
Revisions: Date:
PLUMBING REVISIONS 9/30/2022
REF.
R E
F
REF.
R E
F
R E
F
R E
F
P-420
P-413
P-413
P-420
P-413
P-420
CA E H I KB D L M N Q R S T U VG J PF OK.9
MB MC MD
MA ME
M5
M4
M3
M2
M1
BLOOD DRAW
PIPETING
HISTOLOGY / CYTOLOGY
OFFICE
HISTOLOGY / CYTOLOGY
CHEMISTRY
BLOOD BANK
14 13
1/2" RHW
1/2" HW
1 1/2" V
1/ 2"
R H
W
1/ 2"
H W 1/ 2"
C W
1/ 2"
C W
1" CW
3/4" CW
P6
P7
NO SCOPE IN THIS AREA
FOR THIS PHASE.
NO SCOPE IN THIS AREA
FOR THIS PHASE.
NO SCOPE IN THIS AREA
FOR THIS PHASE.
P9 P10
P10
P8
P9
P10
P10
P8
P10
1/ 2"
C W
3/ 4"
C W 1/
2" R
H W
3/ 4"
H W
1/
2" V P7
3/4" CW
1/2" CW
P12
3/4" CW
P11
1" C
W
P13
P13
N
BUILDING 58 KEY PLAN
PROJECT LOCATION:
FIRST FLOOR
SHADE
INDICATES
AREA NOT IN
SCOPE , TYP.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
35% SCHEMATIC DESIGN
65% DESIGN DEVELOPMENT
100% CONSTRUCTION DOCUMENTS
95% CONSTRUCTION DOCUMENTS
100% BID DOCUMENTS
95% REVISED CONSTRUCTION DOCUMENTS
03/17/2020
05/12/2020
07/21/2020
10/26/2020
11/30/2020
04/12/2021
100% BID DOCUMENTS 11/19/2021
C U s e rs \l m c la u g h lin \D o c u m e n ts \V
IR
P
M
R lm c la u g h lin P
Q H
F .r v t
/3
/2
:2
:3
A
M
PL103a-R
FIRST FLOOR PLAN - PLUMBING -
PHASE 3GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
TYLER SANDERS
CMTA
10411 MEETING STREET
PROSPECT, KENTUCKY
ANDY MYERS
RENOVATE LAB AND PATHOLOGY
1900 E. MAIN ST. DANVILLE, IL
550-20-110
58-1
11/19/2021
100% BID DOCUMENTS
FULLY SPRINKLERED
502.326.3085
SCALE: 1/8" = 1'-0"PL103a-R
1 FIRST FLOOR PLAN - PLUMBING PHASE 3
N
TAGGED NOTES
P6 CAP VENT PIPING FOR FUTURE PHASE.
P7 CW DOWN TO LAB EQUIPMENT. PROVIDE DUAL CHECK VALVE
PRIOR TO CONNECTION. (TYP OF ALL LAB EQUIPMENT)
P8 INSTALL HOT AND COLD RETURN AS CLOSE TO SUPPLY TO
FIXTURE AS POSSIBLE. (TYP)
P9 PIPING DOWN IN WALL AND THROUGH MILLWORK TO
EQUIPMENT.
P10 PIPING DOWN IN WALL AND THROUGH MILLWORK TO FIXTURE.
P11 FLEX TUBING PROVIDED WITH MILLI-Q TO ANALYZERS.
RECIRCULATE BACK TO MILLI-Q EQUIPMENT. REFER TO
MANUFACTURERS INSTALLATIONS MANUALS.
P12 1"CW DOWN. 1/2" TO SINK AND 3/4" TO MILLI-Q EQUIPMENT.
PROVIDE PRV SET TO 45 PSI AND DOUBLE CHECK VALVE ON
WALL BEHIND EQUIPMENT PRIOR TO CONNECTION. DRAIN TO
ADJACENT FLOOR DRAIN.
P13 FIXTURE/FAUCET SUPPLIED BY CASEWORK MANUFACTURER.
PROVIDE DUAL CHECK VALVES AT WATER CONNECTIONS TO
EQUIPMENT.
Revisions: Date:
PLUMBING REVISIONS 9/30/2022
E
F
REF.
REF.
R E
F
REF.
P-413
P-413
P-420
P-101
P-101
P-401
P-420
P-420
CA E H I KB D L M N Q R S T U VG J PF OK.9
MB MC MD
MA ME
M5
M4
M3
M2
M1
URINALYSIS (EIA)
3/ 4"
H W
1/ 2"
H W
1/ 2"
C W
3/ 4"
C W
3/4" HW
3/4" CW
1/ 2"
C W
1/ 2"
H W
P2
P7
NO SCOPE IN THIS AREA
FOR THIS PHASE.
NO SCOPE IN THIS AREA
FOR THIS PHASE.
NO SCOPE IN THIS AREA
FOR THIS PHASE.
NO SCOPE IN THIS AREA
FOR THIS PHASE.
P8
P13
P13
P13
N
BUILDING 58 KEY PLAN
PROJECT LOCATION:
FIRST FLOOR
SHADE
INDICATES
AREA NOT IN
SCOPE , TYP.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
35% SCHEMATIC DESIGN
65% DESIGN DEVELOPMENT
100% CONSTRUCTION DOCUMENTS
95% CONSTRUCTION DOCUMENTS
100% BID DOCUMENTS
95% REVISED CONSTRUCTION DOCUMENTS
03/17/2020
05/12/2020
07/21/2020
10/26/2020
11/30/2020
04/12/2021
100% BID DOCUMENTS 11/19/2021
C U s e rs \l m c la u g h lin \D o c u m e n ts \V
IR
P
M
R lm c la u g h lin P
Q H
F .r v t
/3
/2
:2
:4
A
M
PL104a-R
FIRST FLOOR PLAN - PLUMBING -
PHASE 4GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
TYLER SANDERS
CMTA
10411 MEETING STREET
PROSPECT, KENTUCKY
ANDY MYERS
RENOVATE LAB AND PATHOLOGY
1900 E. MAIN ST. DANVILLE, IL
550-20-110
58-1
11/19/2021
100% BID DOCUMENTS
FULLY SPRINKLERED
502.326.3085
SCALE: 1/8" = 1'-0"PL104a-R
1 FIRST FLOOR PLAN -PLUMBING PHASE 4 N
TAGGED NOTES
P2 PROVIDE EMERGENCY TMV FOR EYE WASH.
P7 CW DOWN TO LAB EQUIPMENT. PROVIDE DUAL CHECK VALVE
PRIOR TO CONNECTION. (TYP OF ALL LAB EQUIPMENT)
P8 INSTALL HOT AND COLD RETURN AS CLOSE TO SUPPLY TO
FIXTURE AS POSSIBLE. (TYP)
P13 FIXTURE/FAUCET SUPPLIED BY CASEWORK MANUFACTURER.
Revisions: Date:
PLUMBING REVISIONS 9/30/2022
E
F
REF.
REF.
R E
F
REF.
P-101
P-101
P-420
CA E H I KB D L M N Q R S T U VG J PF OK.9
MB MC MD
MA ME
M5
M4
M3
M2
M1
MICROBIOLOGY
WALK IN COOLER
1/ 2"
C W
3/ 4"
C W
1/ 2"
H W
1/ 2"
R H
W
1 1/2" V P13
N
BUILDING 58 KEY PLAN
PROJECT LOCATION:
FIRST FLOOR
SHADE
INDICATES
AREA NOT IN
SCOPE , TYP.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
35% SCHEMATIC DESIGN
65% DESIGN DEVELOPMENT
100% CONSTRUCTION DOCUMENTS
95% CONSTRUCTION DOCUMENTS
100% BID DOCUMENTS
95% REVISED CONSTRUCTION DOCUMENTS
03/17/2020
05/12/2020
07/21/2020
10/26/2020
11/30/2020
04/12/2021
100% BID DOCUMENTS 11/19/2021
C U s e rs \l m c la u g h lin \D o c u m e n ts \V
IR
P
M
R lm c la u g h lin P
Q H
F .r v t
/3
/2
:2
:4
A
M
PL105a-R
FIRST FLOOR PLAN - PLUMBING -
PHASE 5GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
TYLER SANDERS
CMTA
10411 MEETING STREET
PROSPECT, KENTUCKY
ANDY MYERS
RENOVATE LAB AND PATHOLOGY
1900 E. MAIN ST. DANVILLE, IL
550-20-110
58-1
11/19/2021
100% BID DOCUMENTS
FULLY SPRINKLERED
502.326.3085
SCALE: 1/8" = 1'-0"PL105a-R
1 FIRST FLOOR PLAN - PLUMBING PHASE 5
N
Revisions: Date:
PLUMBING REVISIONS 9/30/2022
TAGGED NOTES
P13 FIXTURE/FAUCET SUPPLIED BY CASEWORK MANUFACTURER.
P-420
P-420
P-103
P-401
P-420
P-501
CA E H I KB D L M N Q R S T U VG J PF OK.9
MB MC MD
MA ME
M5
M4
M3
M2
M1
OFFICE
OFFICE
CONFERENCE
OFFICE
OFFICE
OFFICE
ELECTRICAL
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
HAC
OFFICE
TLT
WALK IN COOLER
MICROBIOLOGY
URINALYSIS (EIA)
ELECTRICAL
E140
CHEMISTRY
PIPETING
BLOOD BANK
REFRIGERATOR BANK
BLOOD DRAW
HISTOLOGY / CYTOLOGY
MORGUE
WASTE CONTAINMENT
104B
STAFF LOUNGE
1/
4" C
W 3/
4" H
W
CONNECT TO VENT
PIPING IN AREA.
3/ 4"
C W
3/4" HW
2" V
N
BUILDING 58 KEY PLAN
PROJECT LOCATION:
FIRST FLOOR
SHADE
INDICATES
AREA NOT IN
SCOPE , TYP.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
35% SCHEMATIC DESIGN
65% DESIGN DEVELOPMENT
100% CONSTRUCTION DOCUMENTS
95% CONSTRUCTION DOCUMENTS
100% BID DOCUMENTS
95% REVISED CONSTRUCTION DOCUMENTS
03/17/2020
05/12/2020
07/21/2020
10/26/2020
11/30/2020
04/12/2021
100% BID DOCUMENTS 11/19/2021
C U s e rs \l m c la u g h lin \D o c u m e n ts \V
IR
P
M
R lm c la u g h lin P
Q H
F .r v t
/3
/2
:2
:4
A
M
PL106a-R
FIRST FLOOR PLAN - PLUMBING -
PHASE 6GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
TYLER SANDERS
CMTA
10411 MEETING STREET
PROSPECT, KENTUCKY
ANDY MYERS
RENOVATE LAB AND PATHOLOGY
1900 E. MAIN ST. DANVILLE, IL
550-20-110
58-1
11/19/2021
100% BID DOCUMENTS
FULLY SPRINKLERED
502.326.3085
SCALE: 1/8" = 1'-0"PL106a-R
1 FIRST FLOOR PLAN - PLUMBING PHASE 6
N
MOPSINK AND DRAIN
SHALL BE FIRST ITEM
INSTALLED IN PHASE 6.
Revisions: Date:
PLUMBING REVISIONS 9/30/2022
| Sheets |
| FP100-R - FIRST FLOOR PLAN - FIRE SUPPRESSION DEMOLITION |
| FP101-R - FIRST FLOOR PLAN - FIRE SUPPRESSION |
| PL101a-R - FIRST FLOOR PLAN - PLUMBING - PHASE 1B |
| PL102a-R - FIRST FLOOR PLAN - PLUMBING - PHASE 2 |
| PL103a-R - FIRST FLOOR PLAN - PLUMBING - PHASE 3 |
| PL104a-R - FIRST FLOOR PLAN - PLUMBING - PHASE 4 |
| PL105a-R - FIRST FLOOR PLAN - PLUMBING - PHASE 5 |
| PL106a-R - FIRST FLOOR PLAN - PLUMBING - PHASE 6 |
File details come from the government source that posted it. Updated .