Overhead Paging System - Drawings.pdf
PDF 11 MB Posted
- Attached to
- Z1DA--Overhead Paging System
- Solicitation number
- 36C24620R0144
About this file
This document outlines a federal solicitation for an overhead paging system project. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6 for the Durham VA Medical Center. The purpose of the project is to provide a new in-building mass notification system to cover Buildings 1 and 23 at the facility to enable public announcements, code blue alerts, and future expansion. The system must allow for interfaces with the existing fire alarm and nurse call systems. It will add new fiber runs between amplifiers, equipment locations, and the head-end system. The response deadline is not specified but the solicitation number and date indicate it was posted on or around October 1, 2020. The associated NAICS code is 236220 for commercial and institutional building construction with a small business size standard of $39.5 million.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24620R0144 0003.pdf | ||
| 01T-101A - Building 1 Ground Floor New Work - Area A - RFI Revisions 1 - 12-17-2020.pdf | ||
| 36C24620R0144 0002.docx | DOCX document | |
| Pre-proposal Site Investigation Attendance.pdf | ||
| 36C24620R0144 0001.docx | DOCX document | |
| 36C24620R0144_1.docx | DOCX document | |
| Overhead Paging System - Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OVERHEAD PAGING SYSTEM
PROJECT NUMBER 558-19-211
VICINITY MAP
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A B
C D
E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
Revisions: Date
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs © COPYRIGHT Apogee Consulting Group, P.A.
Engineers Architects
OVERHEAD PAGING
SYSTEM
558-19-211
DURHAM VA MEDICAL CENTER
508 FULTON STREET
DURHAM, NC 27705
19-225
BID DOCUMENTS
FULLY SPRINKLERED
JUNE 1, 2020 ABTRSB
DURHAM VAMC
VICINITY PLAN
AREA OF WORK
DURHAM MEDICAL
CENTER
G-001
COVER SHEET
DocuSign Envelope ID: CB929718-07BA-4455-89AB-E23A9972F742
6/2/2020
6/1/2020
FIRE EXTINGUISHER ON
PORTABLE FLOOR
BRACKET (ILSM MAY
REQUIRE MORE THAN
ONE).
MATS (CHANGED END
OF SHIFT OR MORE IF
NECESSARY TO
MAINTAIN
CLEANLINESS)
SUPPLY DUCTS
EITHER KEEP
RUNNING OR COVER
WHEN RUNNING TO
KEEP DUST OUT
COVER ALL RETURNS
AT THE DIFFUSERS
POST ICRA, ILSM, FIRE
INPECTION SHEETS
VISIBLE TO PUBLIC
EXISTING WALL SEE PLANS
FOR FIRE RATING
EXISTING OPENING
ICRA ENCLOSURE AS
REQUIRED BY CLASS OF
PRECAUTIONS TABLE
PROVIDE CONSTRUCTION
DOOR, HOLLOW METAL
DOOR, HOLLOW METAL
FRAME AND HARDWARE
SEE SCHEDULE THIS SHEET
A S
R
E Q
U I R
D
F
O R
M A
N U
V E
R A
B I L I T
Y
TEMPORARY DIGITAL
MANOMETER FOR
NEGATIVE PRESSURE
MONITORING OUTSIDE OF
ICRA BARRIER FOR VA'S
INSPECTION
AS REQUIRED FOR MANUVERABILITY
INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF
PRECAUTIONS FOR CONSTRUCTION AND RENOVATION
Class III
Patient Risk Group Table
Infection Control Matrix - Class of Precautions: Construction Project by
Patient Risk
TYPE A
Construction Project Type
Major demolition and construction projects
Includes, but is not limited to:
- activities which require consecutive work shifts
- requires heavy demolition or removal of a complete ceiling system
- new construction
Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies
Includes, but is not limited to:
- sanding of walls for painting or wall covering
- removal of floor coverings, ceiling tiles and casework
- new wall construction
- minor duct work or electrical work above ceilings
- major cabling activities
- any activity which cannot be completed within a single work shift
Small scale, short duration activities which create minimal dust
Includes, but is not limited to:
- installation of telephone and computer cabling
- access to chase spaces
- cutting of walls or ceiling where dust migration can be controlled
Inspection and Non-Invasive Activities
Includes, but is not limited to:
- removal of ceiling tiles for visual inspection limited to 1 tile to 50 square feet
- painting (but not sanding), wall covering
- electrical trim work, minor plumbing, and activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection
Type of Construction / Project Activity Table
Group 2
Medium Risk
Group 1
Low Risk
- Therapy areas
- Respiratory Therapy
- Outpatient Clinics
- CBOC's
- Mental Health Units
- VACANT AREA ADJACENT TO
OCCUPIED AREA
- Office areas (non-clinical)
- Hallways
- FES/EMS areas
I
Patient Risk Group
TYPE D
TYPE C
TYPE B
TYPE
A
Group 4
Highest Risk
Group 3
High Risk
- Pharmacy
- Radiology/ CT Scanner
- Urgent Care
- Laboratories
- CLC
- SPD; AMCU;
- Surgery
- Respiratory Isolation Rooms
III
TYPE DTYPE CTYPE B
control procedures are necessary.
C L
A S
S
I V
C L
A S
S
I I
During Construction Project
C L
I
C L
A S
S
I I I
1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
2. Contain construction waste before transport in tightly covered containers.
3. Cover transport receptacles or carts. Tape covering
4. Vacuum work area with HEPA filtered vacuums.
5. Wet mop area with disinfectant after barriers are removed.
6. Remove or isolate HVAC system in areas where work was being performed.
1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
2. Contain construction waste before transport in tightly covered containers.
3. Cover transport receptacles or carts. Tape covering.
4. Vacuum work with HEPA-filtered vacuums.
5. Wet mop with disinfectant.
6. Remove isolation of HVAC system in areas where work is being performed.
1. Wipe surfaces to remove dust
Upon Completion of Project
1. Wipe work surfaces with disinfectant.
2. Contain construction waste before transported in tightly covered containers.
3. Wet mop and/or vacuum work area with HEPA filtered vacuum before leaving work areas.
4. Remove isolation of HVAC system in areas where work is being performed.
1. Includes all activities required by Class II
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities
Management Maintenance and Engineering department before construction begins.
3. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
4. Complete all critical barriers before construction begins or implement control cube method.
5. Maintain negative air pressure within work site utilizing HEPA-equipped air filtration units.
6. Contain construction waste before transport in tightly covered containers.
7. Cover transport receptacles or carts. Tape covers.
8. Wet mop and/or vacuum with HEPA filtered vacuum before leaving areas of work.
9. Remove isolation of HVAC system in areas where work is being performed.
1. Execute work by methods to minimize raising dust from construction operations.
1. Includes all activities required by Class I
2. Provide active means to prevent airborne dust from dispersing into atmosphere.
3. Water mist work surfaces to control dust while cutting.
4. Seal unused doors with duct tape.
5. Block off and seal air vents.
6. Replace adhesive walk-off mats at entrance and exit of work area in accordance with manufacturer's recommendations.
7. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
1. Includes all activities required by Class III
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities
Management Maintenance and Engineering department before construction begins.
3. Isolate HVAC system in areas where work is being done to prevent contamination of duct system.
4. Complete all critical barriers or implement control cube method before construction begins.
5. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.
6. Seal holes, pipes, conduits, and punctures appropriately.
7. Construct anteroom and require all personnel to pass through this room so they can be vacuumed sing a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that re removed each time they leave the work site.
8. All personnel entering work site are required to wear shoe covers.
Shoe covers must be changed each time the worker exits the work area.
9. Place adhesive walk-off mats at entrance to work area within anteroom.
10. Replace per manufacturer's recommendations. Do not remove barriers work area until completed project is inspected each by the Hospital Department Safety Officer, Facilities Management Maintenance and Engineering and thoroughly cleaned by Hospital Environmental Services Department or their contracted Environmental Service Company. Contain construction waste before transport in tightly covered containers.
11. Cover transport receptacles or carts. Tape covering
12. Vacuum work area with HEPA filtered vacuums.
13. Wet mop with disinfectant after barriers are removed.
14. Remove isolation of HVAC system in areas where work is being performed.
Class IV
Note: VA Infection Control approval will be required when the Construction Activity and Risk Level indicate that
II
I
LOW Risk Group 1
HIGH Risk Group 3
HIGHEST Risk Group 4
MEDIUM Risk Group 2
IV
IV
IV
III/IV
III/IV
III/IV
III/IV
III
III
III
I
It is the Contractor's Responsibility to provide the following Infection Control
Precautions depending upon the Construction Type Activity or
Class Designation Table
It is the Contractor's Responsibility to provide the following Infection Control
Precautions depending upon the Patient Risk Group Table
GENERAL NOTES
ABBREVIATIONS
* OBTAIN INFECTION CONTROL PERMIT BEFORE CONSTRUCTION BEGINS.
COMPLETE ALL CRITICAL BARRIERS OR IMPLEMENT CONTROL CUBE METHOD BEFORE CONSTRUCTION BEGINS.
SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.
DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS INSPECTED BY THE OWNER'S SAFETY
DEPARTMENT AND THOROUGHLY CLEANED BY THE OWNER'S ENVIRONMENTAL SERVICES DEPARTMENT.
COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.
VACUUM WORK AREA WITH HEPA FILTERED VACUUMS. WET MOP AREA WITH DISINFECTANT. REMOVE ISOLATION OF HVAC SYSTEM
IN AREAS WHERE WORK IS BEING PERFORMED.
COVER ALL RETURNS AND SUPPLY DUCTS AT THE GRATE/DIFFUSES WITH FILTER MEDIA OR BLANKED OFF ENTIRELY PER ICRA
REQUIREMENTS.
KEEP CONSTRUCTION SITE CLEAN & NEAT AT ALL TIMES.
CONTRACTOR TO CLEAN THE CONSTRUCTION AREA, AND PREPARE FOR SAFETY AND INFECTION CONTROL'S INSPECTION AND
FINAL CLEANING BY VA ECM STAFF.
VA ECM STAFF WILL PERFORM FINAL VERIFICATION OF CLEANING AND SANITATION.
IF APPLICABLE:
HOT WORK PERMITS.
PERMITS MUST BE OBTAINED 24 HOURS PRIOR TO COMMENCEMENT OF WORK, WHENEVER POSSIBLE. ORIGINAL PERMIT TO
BE POSTED WHERE WORK IS BEING PERFORMED; CONTRACTOR MUST RETURN PERMIT TO SAFETY OFFICE WHEN WORK IS
COMPLETED.
FIRE WATCH. CONTRACTOR MUST INITIAL, DATE AND TIME EVERY 30 MINUTES AFTER HOT WORK HAS STARTED.
CONTRACTOR TO PROVIDE WARNING SIGNAGE AND DIRECTIONAL SIGNAGE THAT SHALL BE POSTED IN CONSTRUCTION AREA
WHILE WORK IS PERFORMED.
CONFINED SPACE. CONTRACTOR TO OBTAIN CONFINED SPACE PERMIT PRIOR TO ENTRY INTO MECHANICAL CHASE. ENSURE
IT IS APPROVED BY VA SAFETY DEPARTMENT AND COTR.
INFECTION CONTROL RISK ASSESSMENT NOTES:
INTERIM LIFE SAFETY MEASURES NOTES (ILSM):
FIBER OPTIC
SINGLE MODE
MULTIMODE
DRIVE
STREET
CONCRETE MASONRY UNIT
EQUAL
STAINLESS
NOT RATED
ABOVE FINISHED FLOOR
EXPANSION JOINT
CONTROL JOINT
QUICK RELEASE SPRINKLER
FAHRENHEIT
LIMIT OF DEMOLITION
EXISTING
NEW
NOT IN CONTRACT
EXPOSED TO STRUCTURE
NOT TO SCALE
SIMILAR
BUILDING
PHONE
INCORPORATED
SOUTH
DEAD LEG
GALLONS PER MINUTE
ON CENTER
CONTRACTING OFFICER REPRESENTATIVE
PUBLIC ADDRESS MASS NOTIFICATION SYSTEM
INFORMATION TECHNOLOGY
FO
SM
MM
DR.
ST.
CMU
EQ.
STL.
NR.
A.F.F.
EJ
CJ
Q.R.S.
°F
(E)
(N)
N.I.C.
E.T.S.
N.T.S.
SIM.
BLDG.A.
PH.
INC.
S.
DL
GPM
O.C.
COR
PAMNS
IT
1. CONTRACTOR SHALL VISIT ALL AREAS OF WORK, INCLUDING WALKING THE SITE, MEASURING EXISTING DIMENSIONS AND
OBSERVING EXISTING CONDITIONS BEFORE BEGINNING WORK, ORDERING MATERIALS, OR STARTING ANY CONSTRUCTION.
CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS OF EXISTING SITE CONDITION PRIOR TO START OF WORK AND ORDERING
OF MATERIALS.
2. CONTRACTOR IS RESPONSIBLE FOR DETERMINING INFECTION CONTROL PRECAUTION MEASURES BASED ON THE TYPE AND
LOCATION OF WORK BEING PERFORMED. CONFIRM PRECAUTION MEASURES WITH COR PRIOR TO BEGININING WORK IN SAID
AREA.
3. PENTRATIONS THRU RATED CONSTRUCTION (FIRE WALLS, FIRE BARRIERS, FIRE PARTITIONS, SMOKE BARRIERS, SMOKE
PARTITIONS, HORIZONTAL ASSEMBLIES, AND VERTICAL OPENINGS) SHALL MAINTAIN CONTINUITY OF RATED CONSTRUCTION.
CONTRACTOR RESPONSIBLE FOR IDENTIFYING RATED AREAS AND FIRESTOPPING ALL PENETRATIONS. CONTACT COR AND
A/E FOR CLARIFICATION AS NEEDED. VA GUIDELINES STATE ALL RATED CONSTRUCTION TO BE CLEARLY LABELED.
4. CONTRACTOR SHALL RECYCLE REMOVED MATERIALS WHENEVER POSSIBLE. SEE DIVISION 1 SPECIFICATIONS
5. CONTRACTOR TO PROTECT AREA ADJACENT TO THE DEMOLITION AND NEW CONSTRUCTION WORK TO PREVENT DAMAGES.
(IF DAMAGED, REPAIR, PATCH, REPLACE, OR SAND SMOOTH AND TO MATCH EXISTING ADJACENT MATERIALS.)
6. CONTRACTOR SHALL REPORT TO COR IMMEDIATELY WHEN DISCREPANCIES TO THE DRAWINGS ARE FOUND IN THE FIELD.
7. CONTRACTOR TO INSTALL TEMPORARY BALL-IN-TUBE SYSTEM TO MONITOR AND ENSURE PRESSURE LEVEL TO MEET VA
GUIDELINE WITHIN CONSTRUCTION AREA. (CONTRACTOR TO VERIFY LOCATIONS) WITH VA COR PRIOR TO INSTALLATION.
(1)
1 HR 60 MIN1 3/4"7'-0"AS SELECTED A HM HMTYPE I SET 15 3/4"
HINGES
DUST PROOF STRIKE
LATCH SET
DOOR CLOSER
KICK PLATES
GASKETING
TA2714
VA SPEC F01
DC6210xA11
K1050F
S888 x HEAD & JAMBS
HARDWARE SET 1
32D
26D
32D
MK
RO
CO
CO
RO
PE
(1)
2 HR 90 MIN1 3/4"7'-0"AS SELECTED A HM HMTYPE I SET 15 3/4"
MANUFACTURERS:
CORBIN RUSSWIN CO
McKINNEY MK
PEMKO PE
ROCKWOOD RO
HARDWARE MANUFACTURER'S LISTED AS BASIS OF DESIGN
ALTERNATE MANUFACTURER'S ACCEPTABLE, SUBJECT TO
REVIEW BY ARCHITECT AND C.O.R. FOR EQUAL QUALITY
COMPLIANCE
NOTE: MINIMUM DOOR WIDTH 3'-0", MAXIMUM 4'-0".
ICRA ENCLOSURE NOTES
ICRA BARRIERS MUST MATCH FIRE RATING OF WALL IT IS CREATING AN ENCLOSURE TO.
EXAMPLE: 2 HOUR FIRE BARRIER, ICRA ENCLOSURE AROUND DOOR MUST MAINTAIN 2 HOUR RATING.
NON RATED ICRA ENCLOSURES/BARRIERS CAN BE PLASTIC TYPE, BASIS OF DESIGN EDGEGUARD TYPE SYSTEM (OR
EQUAL),
CONTRACTOR TO VERIFY TYPE OF BARRIER PER LOCATION AND COORDINATE WITH C.O.R. PRIOR TO INSTALLATION
OR CONSTRUCTED PARTITION TYPE. NON RATED ENCLUSURES/BARRIERS MUST CONTROL AND ISOLATE DUST.
THIS DOOR AND FRAME SCHEDULE FOR RATED ICRA ENCLOSURES ONLY
HEPA
NEGATIVE AIR
UNIT
FINISHED FLOORING TO BE KEPT
CLEAN. FLOORS NOT BEING REPLACED
MUST BE PROTECTED. COVER WITH
ROSIN PAPER / FIRE RATED PLYWOOD.
E X
I S
T I N
G
D
E C
K
T
O
D
E C
K
V I F
ICRA BARRIER - EXTEND
TO UNDERSIDE OF
STRUCTURE ABOVE OR
BUILD A RATED CAP
(WHERE FIRE RATING IS
REQ.)
ICRA
WALL
RATED FLOOR/
CEILING CONSTRUCTION
LINE OF EXISTING
CEILING
V A
R I E
S
RUN EXHAUST AIR
TO EXTERIOR OR
VA APPROVED LOCATION
PROVIDE SINGLE USE DAMPER IN
HEPA UNIT DUCT WHERE DUCT PENETRATES
A RATED WALL, DAMPER TO MATCH RATING
WALL, NOT LESS THAN 1 HOUR
SWIVEL CASTERS
WITH TWO
LOCKING BRAKES
MOBILE CART
A D
J U
S T
A B
L
H
I G
H T
HEPA NEGATIVE
AIR UNIT
EXISTING WALL
EXISTING CEILING
F.F.
A P
P R
O X
A
F
F
.HARD DOOR
POST ICRA, ILSM, FIRE
INSPECTION SHEETS
VISIBLE TO PUBLIC
EXISTING
CEILING
ICRA ENCLOSURE WITH HARD CEILING AT MINIMUM
18" BELOW SPRINKLERS IN EXISTING ACOUSTIC
CEILING
TYPE AND STYLES OF ICRA
BARRIERS ARE TO BE
APPROVED BY COR AND
SUBMITTED TO A/E
SEE DETAILS THIS SHEET
ILSM SIGNAGE
INTERIM LIFE SAFETY MEASURES IN EFFECT FOR THE
UPGRADE ELEVATORS PROJECT
THIS EXIT IS CLOSED AND LEADS TO A
CONSTRUCTION AREA
PLEASE USE ALTERNATE EXITS AS MARKED
ICRA, ILSM, FIRE WATCH AND
MISC. FORMS
PAPER
CADDY
1'-5"
3 5/8" INSULATED WALL WITH
16 GAUGE METAL STUDS @
16" O.C. WALL TO EXTEND TO
UNDERSIDE OF DECK
5/8" FIRE RESISTANT GYPSUM
BOARD - BOTH SIDES
EXISTING CEILING SYSTEM
BASE - TO MATCH
EXISTING AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING
DECK
C E
I L I N
G
H
E I G
T
V
R
I E
S
F
I E
R
I F
Y
W A
L L
H
E I G
R
I E
S
F
I E
R
I F
Y
5/8" FIRE RESISTANT GYPSUM
BOARD - BOTH SIDES
EXISTING CEILING SYSTEM
BASE - TO MATCH
EXISTING AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING
DECK
V A
R I E
S
3 5/8" 16 GAUGE METAL
STUDS @ 16" O.C. WALL TO
EXTEND TO UNDERSIDE OF
DECK
3 5/8" INSULATED WALL WITH
16 GAUGE METAL STUDS @
16" O.C. (2) LAYERS 5/8"
GYPSUM BOARD EACH SIDE.
WALL TO EXTEND TO
UNDERSIDE OF DECK
5/8" FIRE RESISTANT GYPSUM
BOARD - BOTH SIDES
EXISTING CEILING SYSTEM
BASE - TO MATCH
EXISTING AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING
DECK
C E
I L I N
G
H
E I G
R
I E
S
F
I E
R
I F
Y
W A
L L
H
E I G
R
I E
S
F
I E
R
I F
Y
FIRE RESISTANT SEALANT,
BOTH SIDES
FIRE RESISTANT SEALANT,
BOTH SIDES
FIRE RESISTANT SEALANT,
BOTH SIDES
1-HR RATED AND SMOKE RATED
U.L. DESIGN NO. U404
SMOKE RATED
2-HR RATED AND SMOKE RATED
U.L. DESIGN NO. U404
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A B
C D
E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
Revisions: Date
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs © COPYRIGHT Apogee Consulting Group, P.A.
Engineers Architects
OVERHEAD PAGING
SYSTEM
558-19-211
DURHAM VA MEDICAL CENTER
508 FULTON STREET
DURHAM, NC 27705
19-225
BID DOCUMENTS
FULLY SPRINKLERED
JUNE 1, 2020 ABTRSB
ICRA NOTES
G-002
TYPICAL SECTION - RATED ICRA ENCLOSURE HEPA CART DETAIL
TYPICAL ELEVATION - RATED ENCLOSURE
ILSM, ICRA, FIRE WATCH INFORMATION
TYPICAL RATED ICRA ENCLOSURE
TYPICAL RATED ICRA BARRIERS
SCALE 1/ 2 " = 1' - 0" SCALE 1/ 2 " = 1' - 0"
SCALE 1/ 2 " = 1' - 0"
SCALE 1/ 2 " = 1' - 0"
SCALE 1/ 2 " = 1' - 0"
DocuSign Envelope ID: CB929718-07BA-4455-89AB-E23A9972F742
ADO AUTOMATIC DOOR OPERATOR
AFF ABOVE FINISH FLOOR
CCTV CLOSED CIRCUIT TELEVISION
COAX COAXIAL CABLE
COMM COMMUNICATION
COR CONTRACTING OFFICER
REPRESENTATIVE
DC DOOR CONTACT SWITCH
DN DOWN
DO DOOR OPERATOR
DVR DIGITAL VIDEO RECORDER
EEB EMERGENCY EXIT BUTTON
EL ELECTRICAL STRIKE
FA FIRE ALARM
FAP FIRE ALARM PANEL
FAAP FIRE ALARM ANNUNCIATOR PANEL
FO FIBER OPTIC
IT INTERCOMMUNICATION ROOM
MATV MASTER ANTENNA TELEVISION
MM MULTI MODE FIBER
NAC NETWORK APPLIANCE CIRCUIT PANEL
NS NO SCALE
NTS NOT TO SCALE
NVR NETWORK VIDEO RECORDER
TECHNOLOGY ABBREVIATIONS LIST
OC ON CENTER
OIT OFFICE OF INFORMATION TECHNOLOGY
PACS PHYSICAL ACCESS CONTROL SYSTEM
PAMN PUBLIC ADDRESS AND MASS NOTIFICATION SYSTEM
PB PUSH BUTTON
PDU RACK POWER DISTRIBUTION UNITS
POE POWER OVER ETHERNET
PR PAIR
RX REQUEST TO EXIT
SEP SERVICE ENTRANCE PROTECTION
SLC SIGNALING LINE CIRCUIT
TEL TELEPHONE
TGB TELECOMM GROUND BUS BAR
TM TELEMONITORING
TMGB TELECOMM MAIN GROUND BUS BAR
TP TWISTED PAIR
TR TELECOMM ROOM
TTB TELEPHONE TERMINAL BOARD
TV TELEVISION
WM WIRE MANAGEMENT
WAP WIRELESS ACCESS POINT
UL UNDERWRITERS LABORATORY
UPS UNINTERRUPTIBLE POWER SUPPLY
UTP UNSHIELDED TWISTED PAIR
N NEW DEVICES
NCA NETWORK CONTROL ANNUNCIATOR
DVC DIGITAL VOICE COMMAND SS STAINLESS STEEL
E EXISTING DEVICES
BOD BASIS OF DESIGN
CLG CEILING
EG EQUIPMENT GROUND
NCE NURSE CALL EQUIPMENT
SM SINGLE MODE FIBER
TECHNOLOGY GENERAL NOTES
1.1. ALL COMMUNICATIONS DEVICES AND EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE
WITH THE PROJECT SPECIFICATIONS, THE MANUFACTURER'S RECOMMENDED
PROCEDURES, ALL APPLICABLE LOCAL AND STATE CODES, AMERICANS WITH DISABILITIES
ACT AND WITH THE LATEST EDITION OF THE NATIONAL ELECTRICAL CODE, BICSI
STANDARDS, VA TELECOMMUNICATIONS AND SPECIAL TELECOMMUNICATION SYSTEMS
DESIGN MANUAL.
2. PROVIDE ADDITIONAL SUPPORT FOR DEVICES AND EQUIPMENT WHERE THE BUILDING
CONSTRUCTION IS NOT SUITABLE FOR DIRECT MOUNTING.
3. FIRESTOP, DRAFTSTOP, SMOKESTOP AND/OR PROTECT THE ANNULAR SPACE AROUND
ALL PENETRATIONS THROUGH WALLS, PARTITIONS, FLOORS, CEILINGS, AND ROOF IN
ACCORDANCE WITH THE REQUIREMENTS OF THE NATIONAL ELECTRICAL CODE, UL LISTING
REQUIREMENT AND THE APPLICABLE BUILDING CODES.
4. PROVIDE DRAWINGS SHOWING ALL PENETRATIONS. ALL CABLING SHALL COMPLY WITH
THE LATEST EDITION OF TELECOMMUNICATIONS DISTRIBUTION METHOD MANUAL AND
ANSI/TIA/EIA PUBLICATIONS.
5. COMPLY WITH THE LATEST ANSI/TIA/EIA 607 - STANDARD FOR TELECOMMUNICATION
GROUNDING AND BONDING COMMERCIAL BUILDING.
6. COMPLY WITH THE LATEST ANSI/TIA/EIA 568 - 2006 STANDARD FOR INSTALLATION
COMMERCIAL BUILDING TELECOMMUNICATIONS CABLING.
7. COMPLY WITH THE LATEST ANSI/TIA/EIA 569 - COMMERCIAL BUILDING STANDARD FOR
TELECOMMUNICATIONS PATHWAYS AND SPACES.
8. COMPLY WITH THE LATEST NFPA 70 NATIONAL ELECTRICAL CODE.
9. COMPLY WITH THE LATEST NFPA 99 HEALTHCARE FACILITIES CODE.
10. COMPLY WITH THE LATEST NFPA 101 LIFE SAFETY CODE.
11. COMPLY WITH THE LATEST OIT DESIGN GUIDE.
12. COORDINATE ANY AND ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION SO
AS TO AVOID CONFLICT DURING CONSTRUCTION.
13. MOUNTING HEIGHTS INDICATED ARE TO CENTER OF DEVICE, BOXES, OUTLET, OR
EQUIPMENT UNLESS NOTED OTHERWISE.
14. ALL CONDUITS SHALL BE RGS OR EMT UNLESS OTHERWISE NOTED.
15. ALL MATERIALS, DEVICES, APPLIANCES AND EQUIPMENT SHALL BE LABEL LISTED BY AN
APPROVED THIRD PARTY TESTING AGENCY.
16. ANY DISCREPANCY BETWEEN PLANS AND SPECIFICATIONS SHALL BE BROUGHT TO THE
ATTENTION OF THE VA COR, ARCHITECT, AND ENGINEER OF RECORD FOR CLARIFICATION.
THE MORE STRINGENT OF THE THEM SHALL TAKE PRECEDENCE.
17. ALL COPPER OUTLETS/CONNECTORS SHALL BE TIA/EIA CAT 6.
18. ALL WORK AREA OUTLETS SHALL BE 8 PIN, CAT 6 KEYSTONE JACK WIRED PER T568B AS
DIRECTED BY THE VA COR.
19. LABELING SHALL BE ACCORDING TO LATEST ANSI/TIA 606A&B EDITION AS WELL AS THE
STANDARDS SET FORTH BY VA HOSPITAL OIT.
20. PAGING SYSTEM SPEAKER WIRE SHALL BE 18 GAUGE STRANDED SHIELDED.
21. ALL CABLING INSTALLED ABOVE CEILING SHALL BE PLENUM RATED.
22. PROVIDE 50 SPARE SPEAKERS.
23. PROVIDE 2 SPARE PAGING STATIONS.
24. PROVIDE 2 SPARE 2 CHANNEL 30 W AMPLIFIERS.
25. PROVIDE 1 SPARE 48 PORT POE SWITCH.
26. PROVIDE 1 SPARE 3000 VA UPS.
27. UPS SYSTEMS SHALL MEET NFPA 855 AND IFC CHAPTER 608 REQUIREMENTS.
28. AUDIO CARDS SHALL BE 600C WITH GROUND FAULT DETECTION.
29. ALL EQUIPMENT SHALL MEET LIFE SAFETY STANDARDS.
TECHNOLOGY SYMBOL LEGEND
ALL HEIGHTS ARE TO CENTER OF DEVICE UNLESS NOTED OTHERWISE.
ANY HEIGHTS INDICATED IN PLANS SHALL SUPERCEDE THOSE LISTED HERE.
SEE DRAWINGS FOR MORE INFORMATION.
WALL MOUNTED SPEAKER HORN
CEILING MOUNTED MICROPHONE
WALL MOUNTED PAGING STATION
CEILING MOUNTED SPEAKERCEILING
72" AFF
CEILING
ABOVE COUNTER
OR 60" AFF
S
P
M
S
S
SM
S
WP
CEILING MOUNTED 2x2x2 SPEAKERCEILING
SURFACE MOUNTED SPEAKERVARIES
WALL MOUNTED WATERPROOF SPEAKER
VARIES
VC
C
FACP
48" AFF
60" AFF
42" AFF
VARIES
EMERGENCY PHONE & BLUE LIGHT
VOLUME CONTROL
TV
WALL PHONE
EXISTING FIRE ALARM CONTROL PANEL
ELECTRICAL GENERAL NOTES
1. ALL ELECTRICAL DEVICES, FIXTURES, EQUIPMENT AND FEEDERS SHALL BE INSTALLED IN
ACCORDANCE WITH THE PROJECT SPECIFICATIONS, THE MANUFACTURER'S RECOMMENDED
PROCEDURES, ALL APPLICABLE LOCAL AND STATE CODES, AMERICANS WITH DISABILITIES ACT
AND WITH THE LATEST EDITION OF THE NATIONAL ELECTRICAL CODE AND VA STANDARDS.
2. PROVIDE ADDITIONAL SUPPORT FOR DEVICES, FIXTURES, EQUIPMENT AND FEEDERS WHERE THE
BUILDING CONSTRUCTION IS NOT SUITABLE FOR DIRECT MOUNTING.
3. FIRESTOP, DRAFTSTOP, SMOKESTOP AND/OR PROTECT THE ANNULAR SPACE AROUND ALL
PENETRATIONS THROUGH WALLS, PARTITIONS, FLOORS, CEILING, AND ROOFS IN ACCORDANCE
WITH THE REQUIREMENTS OF THE NATIONAL ELECTRICAL CODE, UL LISTING REQUIREMENT AND
THE APPLICABLE BUILDING CODES.
4. VERIFY CEILING SYSTEMS AND PROVIDE MOUNTING ACCESSORIES, TRIMS AND ALL REQUIRED
MOUNTING HARDWARE TO SUIT THE PARTICULAR INSTALLATION.
5. PROTECT EXISTING UNDERGROUND AND BUILDING INTERIOR UTILITIES DURING CONSTRUCTION.
6. BRANCH CIRCUIT CONDUCTORS SHALL BE 12 AWG COPPER MINIMUM.
7. COORDINATE ANY AND ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION SO AS TO
AVOID CONFLICT DURING CONSTRUCTION.
8. ALL PANELS SHALL HAVE TYPED, COMPLETED DIRECTORIES INDICATING EQUIPMENT SERVED AND
ROOM NUMBER (AS INDICATED ON FINAL BUILDING ROOM SIGNAGE) OF EQUIPMENT LOCATION, OR
SPARE, OR SPACE.
9. MANUFACTURER'S NAME AND MODEL NUMBER ARE GIVEN FOR DESCRIPTIVE PURPOSES, TO
INDICATE A QUALITY STANDARD, AND ARE NOT INTENDED TO LIMIT PRODUCTS TO A PARTICULAR
MANUFACTURER. PRODUCTS DEEMED EQUAL AND APPROVED BY THE DESIGNER WILL BE
ACCEPTED. ALL PRODUCTS MUST COMPLY WITH "BUY AMERICAN ACT".
10. ALL FEEDERS AND CIRCUITRY SHALL BE TORQUED PER THE PANEL, BREAKER, AND/OR
PARTICULAR EQUIPMENT MANUFACTURER'S SPECIFICATIONS.
11. CIRCUITRY TO SWITCHES, RECEPTACLES, AND ALL OTHER DEVICES SHALL BE TERMINATED ON THE
DEVICE'S SCREW TERMINALS.
12. MOUNTING HEIGHTS INDICATED ARE TO CENTER OF DEVICE, OUTLET, FIXTURE, OR EQUIPMENT
UNLESS NOTED OTHERWISE.
13. ALL WIRE TERMINATIONS SHALL BE RATED FOR 75 DEGREES C.
14. ALL CONDUCTORS SHALL HAVE THHN/THWN INSULATION, UNLESS OTHERWISE NOTED.
15. ALL CONDUIT SHALL BE RGS OR EMT UNLESS OTHERWISE NOTED. FMC CONDUIT SHALL BE USED
ON VIBRATING EQUIPMENT (MAXIMUM LENGTH OF 6 FEET). PVC SHALL BE USED FOR
UNDERGROUND CONDUIT OR WHERE CONCRETE-ENCASED. WHERE VIBRATING EQUIPMENT IS
LOCATED OUTSIDE, LFMC CONDUIT SHALL BE USED (MAXIMUM SIX FEET) FOR FINAL CONNECTIONS.
16. ALL ELECTRICAL MATERIALS, DEVICES, APPLIANCES AND EQUIPMENT SHALL BE LABEL LISTED BY
AN APPROVED THIRD PARTY TESTING AGENCY.
17. PROVIDE COMPRESSION COUPLINGS. SET SCREW FITTINGS ARE NOT ACCEPTABLE.
3 = THREE WAY
GFI = GROUND FAULT CIRCUIT INTERRUPTER
WIRING SYSTEM-BRANCH OR FEEDER CIRCUIT
120V QUAD RECEPTACLE, MOUNTED 18" AFF UNO
4 = FOUR WAY
JUNCTION BOX
SINGLE POLE SWITCH, MOUNTED 44" AFF
MODIFIERS FOR SWITCHES:
HOMERUN - 120V OR 277V
HOMERUN - 208V OR 480V
BRANCH OR FEEDER CIRCUIT HOMERUN TO PANELBOARD,
SWITCHBOARD, MOTOR CONTROL CENTER, ETC. SUBSCRIPT
DENOTES PANELBOARD, SWITCHBOARD, MOTOR CONTROL
CENTER, ETC. AND OVERCURRENT PROTECTION DEVICE
NUMBER.
120V DUPLEX RECEPTACLE, MOUNTED 18" AFF UNO
MODIFIERS FOR RECEPTACLES:
TELCO OUTLET MOUNTED 18" AFF UNO
WP = WEATHERPROOF
DM = DIMMER SWITCH
FUSED DISCONNECT
UNFUSED DISCONNECT
DATA/TELCO OUTLET MOUNTED 18" AFF UNO
120V SIMPLEX RECEPTACLE, MOUNTED 18" AFF UNO
208V 1PH TWISTLOCK RECEPTACLE, MOUNTED 18" AFF UNO
WIRING SYSTEM-SWITCHED BRANCH OR FEEDER CIRCUIT
OC = OCCUPANT SENSOR
J
S
ELECTRICAL LEGEND
1P
1PH
2/C
2W
3PH
A
AAP
AC
ACC
ACLG
ADO
A/E
AF
AFC
AFF
AFG
AFI
AJH
AHU
AIC
AL
ALT
AMP
APPROX
ARCH
AT
ATS
AUTO
AUX
AV
AWG
BAS
BATT
BC
BD
BFF
BLDG
BMS
BYP
C
CAB
CALC
CAP
CAT
CATV
CB
CCR
CCTV
cd
CD
CF
CKT
CLG
COAX
COMM
CONN
CONST
CONT
CONTR
COORD
CPT
CRI
CT
CTV
CTR
CU
CU FT
dB
DB
DC
DEG C
DEG F
DEMO
DEPT
DIA
DISC
DIST
DN
DS
DT
DWG
EC
EG
ELEC
ELEV
EM
EMI
EMS
EMT
EPO
EQUIP
ESMT
EWC
EWH
EX
EXP
FA
FAAP
FACP
FC
FCU
FIXT
FLR
FLUOR
FU
FUDS
FVR
FVNR
GAL
GALV
GC
GEN
GFI
GND
GRS
GYP BD
HID
HOA
HP
HT
HTR
HV
HVAC
IES
IG
IMC
IR
I/W
IWH
J-BOX
KV
KVA
KVAR
KW
KWH
LED
LF
LM
LRA
LT
LTG
LTNG
LV
MATV
MAX
MC
MCA
MCB
MCC
MDP
MECH
MFR
MFS
MH
MIC
MIN
MISC
MLO
MOA
MSBD
MT
MTS
MTR
NA
NC
NEC
NEMA
NFDS
NIC
NL
NO
NTS
OC
OD
OH
OL
PA
PB
PBPU
PCB
PC
PED
PEND
PF
PH
PIV
PNL
PoE
PR
PRI
PROJ
PRV
PT
PVC
PWR
QTY
RCP
RCPT
REQD
RGS
RM
RMS
RTU
SC
SEC
SF
SHT
SI
SIM
S/N
SPEC
SPKR
SP
SR
SS
SSW
STD
SURF
SW
SWBD
SYM
SYS
TC
TEL
TEL/DATA
TERM
TP
TPS
TR
T-STAT
TTB
TTC
TV
TYP
UC
UE
UG
UH
UL
UT
UTP
UTIL
UV
V
VA
VERT
VFD
VOL
W
W/
WH
W/O
WP
XFMR
XFR
Ø
C
P
L
L
ELECTRICAL ABBREVIATIONS LIST
STAINLESS STEEL
SELECTOR SWITCH
STANDARD
SURFACE MOUNTED
SWITCH
SWITCHBOARD
SYMMETRICAL
SYSTEM
TIMECLOCK
TELEPHONE
TELEPHONE/DATA
TERMINAL
TWISTED PAIR
TWISTED PAIR SHIELDED
TAMPER RESISTANT
THERMOSTAT
TELEPHONE TERMINAL BOARD
TELEPHONE TERMINAL CABINET
TELEVISION
TYPICAL
UNDER COUNTER
UNDERGROUND ELECTRICAL
UNDERGROUND
UNIT HEATER
UNDERWRITER'S LABORATORY
UNDERGROUND TELEPHONE
UNSHIELDED TWISTED PAIR
UTILITY
UNIT VENTILATOR OR
ULTRAVIOLET
VOLT
VOLT-AMPERES
VERTICAL
VARIABLE FREQUENCY DRIVE
VOLUME
WATT
WITH
WATER HEATER
WITHOUT
WEATHERPROOF
TRANSFORMER
TRANSFER
ANGLE
AT
DELTA
FEET
INCHES
NUMBER
PHASE
CENTER LINE
PLATE
MANUAL TRANSFER SWITCH
MOTOR, MOTORIZED
NOT APPLICABLE
NORMALLY CLOSED
NATIONAL ELECTRICAL CODE
NATIONAL ELECTRICAL
MANUFACTURER'S ASSOCIATION
NON-FUSED SAFETY
DISCONNECT SWITCH
NOT IN CONTRACT
NIGHT LIGHT
NORMALLY OPEN
NOT TO SCALE
ON CENTER
OUTSIDE DIAMETER
OVERHEAD
OVERLOAD
PUBLIC ADDRESS
PULL BOX OR PUSHBUTTON
PREFABRICATED BEDSIDE
PATIENT UNIT
POLYCHLORINATED BYPHENYL
PHOTOELECTRIC CELL
PEDESTAL
PENDANT
POWER FACTOR
PHASE
POST INDICATING VALVE
PANEL
POWER-OVER-ETHERNET
PAIR
PRIMARY
PROJECTION
POWER ROOF VENTILATOR
POTENTIAL TRANSFORMER
POLYVINYL CHLORIDE (CONDUIT)
POWER
QUANTITY
REFLECTED CEILING PLAN
RECEPTACLE
REQUIRED
RIGID GALVANIZED STEEL
ROOM
ROOT MEAN SQUARE
ROOF TOP UNIT
SURFACE CONDUIT
SERVICE ENTRANCE PROTECTION
SECONDARY
SQUARE FEET/FOOT
SHEET
INTERNATIONAL SYSTEM OF UNITS
SIMILAR
SOLID NEUTRAL
SPECIFICATION
SPEAKER
SPARE
SURFACE RACEWAY
1 POLE (2P, 3P, 4P, ETC.)
1 PHASE
TWO-CONDUCTOR (3/C, 4/C, ETC.)
TWO-WIRE (3W, 4W, ETC.)
3 PHASE
AMPERE
ALARM ANNUNCIATOR PANEL
ABOVE COUNTER
AIR CONDITIONER
ALTERNATING CURRENT
ACCESSIBLE
ABOVE CEILING
AUTOMATIC DOOR OPENER
ARCHITECT/ENGINEER
AMP FRAME
AVAILABLE FAULT CURRENT
(KILOAMPS)
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
ARC FAULT CIRCUIT
INTERRUPTER
AUTHORITY HAVING JURISDICTION
AIR HANDLING UNIT
AMPERE INTERRUPTING CAPACITY
ALUMINUM
ALTERNATE
AMPERE
APPROXIMATELY
ARCHITECT, ARCHITECTURAL
AMP TRIP
AUTOMATIC TRANSFER SWITCH
AUTOMATIC
AUXILIARY
AUDIO VISUAL
AMERICAN WIRE GAUGE
BUILDING AUTOMATION SYSTEM
BATTERY
BARE COPPER
BOARD
BELOW FINISHED FLOOR
BUILDING
BUILDING MANAGEMENT SYSTEM
BYPASS
CONDUIT
CABINET
CALCULATED
CAPACITY
CATALOG, CATEGORY
COMMUNITY ANTENNA TELEVISION
CIRCUIT BREAKER
CONTROL CONTACTOR
CLOSED CIRCUIT TELEVISION
CANDELA
CONSTRUCTION DOCUMENTS
CONTRACTOR-FURNISHED
CIRCUIT
CEILING
COAXIAL CABLE
COMMUNICATION
CONNECTION
CONSTRUCTION
CONTINUATION OR CONTINUOUS
CONTRACTOR
COORDINATE
CONTROL POWER TRANSFORMER
COLOR RENDERING INDEX
CURRENT TRANSFORMER
CABLE TELEVISION
CENTER
COPPER
CUBIC FEET
DECIBEL
DIRECT BURIAL
DIRECT CURRENT
DEGREES CELSIUS
DEGREES FAHRENHEIT
DEMOLISH/DEMOLITION
DEPARTMENT
DIAMETER
DISCONNECT
DISTRIBUTION
DOWN
SAFETY DISCONNECT SWITCH
DOUBLE THROW
DRAWING
ELECTRICAL CONTRACTOR
EQUIPMENT GROUND
ELECTRIC, ELECTRICAL
ELEVATOR
EMERGENCY
ELECTROMAGNETIC INTERFERENCE
ENERGY MANAGEMENT SYSTEM
ELECTRICAL METALLIC TUBING
EMERGENCY POWER OFF
EQUIPMENT
EASEMENT
ELECTRIC WATER COOLER
ELECTRIC WALL HEATER
ELECTRIC WATER HEATER
EXISTING
EXPLOSION PROOF
FIRE ALARM
FIRE ALARM ANNUNCIATOR PANEL
FIRE ALARM CONTROL PANEL
FOOTCANDLE
FAN COIL UNIT
FIXTURE
FLOOR
FLUORESCENT
FUSE
FUSED SAFETY DISCONNECT
SWITCH
FULL VOLTAGE REVERSING
FULL VOLTAGE NON-REVERSING
GALLON
GALVANIZED
GENERAL CONTRACTOR
GENERATOR
GROUND FAULT CIRCUIT
INTERRUPTER
GROUND
GALVANIZED RIGID STEEL
(CONDUIT)
GYPSUM BOARD
HIGH-INTENSITY DISCHARGE
HAND-OFF-AUTOMATIC
HORSEPOWER
HEIGHT
HEATER
HIGH VOLTAGE
HEATING, VENTILATING AND
AIR CONDITIONING
ILLUMINATION ENGINEERING SOCIETY
ISOLATED GROUND
INTERMEDIATE METAL CONDUIT
INFRARED
INTERLOCK WITH
INSTANTANEOUS WATER HEATER
JUNCTION BOX
KILOVOLT
KILOVOLT-AMPERE
KILOVOLT-AMPERE REACTIVE
KILOWATT
KILOWATT HOUR
LIGHT-EMITTING DIODE
LINEAR FEET/FOOT
LUMEN
LOCKED ROTOR AMPS
LIGHT
LIGHTING
LIGHTNING
LOW VOLTAGE
MASTER ANTENNA TELEVISION
SYSTEM
MAXIMUM
MECHANICAL CONTRACTOR
METAL-CLAD (CONDUIT)
MINIMUM CIRCUIT AMPACITY
MAIN CIRCUIT BREAKER
MOTOR CONTROL CENTER
MAIN DISTRIBUTION PANEL
MECHANICAL
MANUFACTURER
MAIN FUSED DISCONNECT
SWITCH
MANHOLE
MICROPHONE
MINIMUM
MISCELLANEOUS
MAIN LUGS ONLY
MULTIOUTLET ASSEMBLY
MAIN SWITCHBOARD
MOUNT
S.E.P.
BOD BUILDING MANAGEMENT SYSTEM
TECHNOLOGY SYMBOLS,
NOTES AND ABBREVIATIONS
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
Revisions: Date
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs © COPYRIGHT Apogee Consulting Group, P.A.
Engineers Architects
OVERHEAD PAGING
SYSTEM
558-19-211
DURHAM VA MEDICAL CENTER
508 FULTON STREET
DURHAM, NC 27705
19-225
BID DOCUMENTS
FULLY SPRINKLERED
JUNE 1, 2020 ABTJVE
T-001
DocuSign Envelope ID: CB929718-07BA-4455-89AB-E23A9972F742
SWITCH RM
S
S
S
S
S
S
S
S
S
S
S
PAMNS ZONE 'EB'
PAMNS ZONE 'BB'
PAMNS ZONE 'CB'
PAMNS ZONE 'CB'
PAMNS ZONE 'BB'
PAMNS ZONE 'EB'
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
1 BUILDING 1 BASEMENT FLOOR NEW WORK
SCALE: 1/16" = 1' 0"
01T-100
BUILDING 1 BASEMENT FLOOR
NEW WORK
N
O
R
T
H
PLAN
8 16 320
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
SHEET KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
Revisions: Date
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs © COPYRIGHT Apogee Consulting Group, P.A.
Engineers Architects
OVERHEAD PAGING
SYSTEM
558-19-211
DURHAM VA MEDICAL CENTER
508 FULTON STREET
DURHAM, NC 27705
19-225
BID DOCUMENTS
FULLY SPRINKLERED
JUNE 1, 2020 ABTJVE
A. PROVIDE PAMNS DEVICES AT LOCATIONS
INDICATED ON PLANS. PROVIDE WIRING AND
CIRCUIT AS INDICATED ON DETAILS.
B. ALL PAMN WIRING SHALL BE CONCEALED IN
WALLS, IN RACEWAY, IN WIREMOLD OR AND
ABOVE THE CEILING IN CABLE TRAY.
C. PAMN WIRING IN FINISHED AREAS SHALL BE IN
SURFACE RACEWAY (MECH. ROOM) OR
WIREMOLD (TUNNELS, ROOMS WITH NO
CEILINGS.)
D. ALL CEILING SPEAKERS SHALL BE SET AT 1/2
WATT UNLESS NOTED OTHERWISE.
E. ALL WALL MOUNTED SPEAKERS SHALL BE SET
AT 4 WATTS UNLESS NOTED OTHERWISE.
DocuSign Envelope ID: CB929718-07BA-4455-89AB-E23A9972F742
MATCHLINE T-101BMATCHLINE T-101B
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
SSS
S
S
S
S
PAMNS ZONE 'FG'
PAMNS ZONE 'FG'
PAMNS ZONE 'AG'
PAMNS ZONE 'AG'
PAMNS ZONE 'CG'
PAMNS ZONE 'BG'
PAMNS ZONE 'EG'
PAMNS ZONE 'EG'
S
S S S S
S
S
S
S
S
S
S
S
S
S
S
S S S
S
S
S
S
S
S
SS
S
S
S
SSS
S
S
S
S
S S S
S
SSSS
S
SSS
S
S
S
S
S
S
S
SSSSSSS
S
SSS
SS
S
S
S
S
S
S
SSSSSS
S
SSSS
S
S
S
S S S
S
S
SS S S S
S
S
S
SSSSSS
S S S S S S S
S
S
S
S
S
S
S
S
S
S
S
S
1 BUILDING 1 GROUND FLOOR NEW WORK
SCALE: 1/16" = 1' 0"
01T-101A
BUILDING 1 GROUND FLOOR
NEW WORK - AREA A
1. LOCATION OF PAMNS HEAD-END EQUIPMENT.
UTILIZE EXISTING EMPTY RACKS AT THIS
LOCATION TO HOLD NEW PAMNS HEAD-END
EQUIPMENT. COORDINATE WITH COR AND OIT.
2. LOCATION OF EXISTING 120/208V 3 PHASE 4
WIRE PANEL 'EEG'. COORDINATE ALL WORK
RELATED TO ELECTRICAL PANELS WITH COR.
N
O
R
T
H
PLAN
8 16 320
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
SHEET KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
Revisions: Date
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs © COPYRIGHT Apogee Consulting Group, P.A.
Engineers Architects
OVERHEAD PAGING
SYSTEM
558-19-211
DURHAM VA MEDICAL CENTER
508 FULTON STREET
DURHAM, NC 27705
19-225
BID DOCUMENTS
FULLY SPRINKLERED
JUNE 1, 2020 ABTJVE
A. PROVIDE PAMNS DEVICES AT LOCATIONS
INDICATED ON PLANS. PROVIDE WIRING AND
CIRCUIT AS INDICATED ON DETAILS.
B. ALL PAMN WIRING SHALL BE CONCEALED IN
WALLS, IN RACEWAY, IN WIREMOLD OR AND
ABOVE THE CEILING IN CABLE TRAY.
C. PAMN WIRING IN FINISHED AREAS SHALL BE IN
SURFACE RACEWAY (MECH. ROOM) OR
WIREMOLD (TUNNELS, ROOMS WITH NO
CEILINGS.)
D. ALL CEILING SPEAKERS SHALL BE SET AT 1/2
WATT UNLESS NOTED OTHERWISE.
E. ALL WALL MOUNTED SPEAKERS SHALL BE SET
AT 4 WATTS UNLESS NOTED OTHERWISE.
DocuSign Envelope ID: CB929718-07BA-4455-89AB-E23A9972F742
S
S
S
S
S
S
S
S
S
SSS
S
S
S
S
PAMNS ZONE 'FG'
PAMNS ZONE 'AG'
PAMNS ZONE 'AG'
PAMNS ZONE 'BG'
PAMNS ZONE 'CG'
PAMNS ZONE 'BG'
PAMNS ZONE 'EG'
PAMNS ZONE 'CG'
PAMNS ZONE 'DG'
SSSS
S
S
S
S
S
S
S
S
SS
S
S S S S
S
S
S
S
S
SSSSSS
S S S S S S S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
MATCHLINE T-101A MATCHLINE T-101A
1 BUILDING 1 GROUND FLOOR NEW WORK
SCALE: 1/16" = 1' 0"
01T-101B
BUILDING 1 GROUND FLOOR
NEW WORK - AREA B
N
O
R
T
H
PLAN
8 16 320
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
SHEET KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
Revisions: Date
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs © COPYRIGHT Apogee Consulting Group, P.A.
Engineers Architects
OVERHEAD PAGING
SYSTEM
558-19-211
DURHAM VA MEDICAL CENTER
508 FULTON STREET
DURHAM, NC 27705
19-225
BID DOCUMENTS
FULLY SPRINKLERED
JUNE 1, 2020 ABTJVE
A. PROVIDE PAMNS DEVICES AT LOCATIONS
INDICATED ON PLANS. PROVIDE WIRING AND
CIRCUIT AS INDICATED ON DETAILS.
B. ALL PAMN WIRING SHALL BE CONCEALED IN
WALLS, IN RACEWAY, IN WIREMOLD OR AND
ABOVE THE CEILING IN CABLE TRAY.
C. PAMN WIRING IN FINISHED AREAS SHALL BE IN
SURFACE RACEWAY (MECH. ROOM) OR
WIREMOLD (TUNNELS, ROOMS WITH NO
CEILINGS.)
D. ALL CEILING SPEAKERS SHALL BE SET AT 1/2
WATT UNLESS NOTED OTHERWISE.
E. ALL WALL MOUNTED SPEAKERS SHALL BE SET
AT 4 WATTS UNLESS NOTED OTHERWISE.
DocuSign Envelope ID: CB929718-07BA-4455-89AB-E23A9972F742
MATCHLINE T-102B
S
S
S
S
S
S
S
S
S
S
S
S
S
SS
S
S
S
S
S
S
P
PAMNS ZONE 'C1'
PAMNS ZONE 'B1'
PAMNS ZONE 'B1'
PAMNS ZONE 'F1'
PAMNS ZONE 'E1'
P
S
S
S
S
S S S S S S S S S S S
S
S S
S
S
S
S
S
S
S
SSSS
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S S
S
S
S
S
S
SSSSS
SS
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S S S S
S
S
S
S
S S
S
S
S
S
S S S
S
S
S
S
S
S
S
SS
S
S S S S S
S
S S S S S
SS
S
S
SS S S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S S S
S
SS
S
S
S
S
S
S
S
S
S
S
S
S
S
S S S S S S S S S S
S
S
S
S S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
PAMNS ZONE 'ED'
PAMNS ZONE 'F1'
PAMNS ZONE 'A1'
PAMNS ZONE 'ED'
MATCHLINE T-102B
S
S
1 BUILDING 1 1ST FLOOR NEW WORK
SCALE: 1/16" = 1' 0"
01T-102A
BUILDING 1 1ST FLOOR NEW
WORK - AREA A
N
O
R
T
H
PLAN
8 16 320
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
SHEET KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
Revisions: Date
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs © COPYRIGHT Apogee Consulting Group, P.A.
Engineers Architects
OVERHEAD PAGING
SYSTEM
558-19-211
DURHAM VA MEDICAL CENTER
508 FULTON STREET
DURHAM, NC 27705
19-225
BID DOCUMENTS
FULLY SPRINKLERED
JUNE 1, 2020 ABTJVE
A. PROVIDE PAMNS DEVICES AT LOCATIONS
INDICATED ON PLANS. PROVIDE WIRING AND
CIRCUIT AS INDICATED ON DETAILS.
B. ALL PAMN WIRING SHALL BE CONCEALED IN
WALLS, IN RACEWAY, IN WIREMOLD OR AND
ABOVE THE CEILING IN CABLE TRAY.
C. PAMN WIRING IN FINISHED AREAS SHALL BE IN
SURFACE RACEWAY (MECH. ROOM) OR
WIREMOLD (TUNNELS, ROOMS WITH NO
CEILINGS.)
D. ALL CEILING SPEAKERS SHALL BE SET AT 1/2
WATT UNLESS NOTED OTHERWISE.
E. ALL WALL MOUNTED SPEAKERS SHALL BE SET
AT 4 WATTS UNLESS NOTED OTHERWISE.
DocuSign Envelope ID: CB929718-07BA-4455-89AB-E23A9972F742
MATCHLINE T-102AMATCHLINE T-102A
S
S
S
PAMNS ZONE 'D1'
PAMNS ZONE 'C1'
PAMNS ZONE 'D1'
PAMNS ZONE 'C1'
PAMNS ZONE 'C1'
PAMNS ZONE 'A1'
S
S
S
S
S
S
SS
SSSSS
S
S
S
S
S
S
S
S
S
S
S
S
S
S
SSS
S
S
S S S S S S
S S S S S
S
S
S
S
S
1 BUILDING 1 1ST FLOOR NEW WORK
SCALE: 1/16" = 1' 0"
01T-102B
BUILDING 1 1ST FLOOR NEW
WORK - AREA B
N
O
R
T
H
PLAN
8 16 320
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
SHEET KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
Revisions: Date
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs © COPYRIGHT Apogee Consulting Group, P.A.
Engineers Architects
OVERHEAD PAGING
SYSTEM
558-19-211
DURHAM VA MEDICAL CENTER
508 FULTON STREET
DURHAM, NC 27705
19-225
BID DOCUMENTS
FULLY SPRINKLERED
JUNE 1, 2020 ABTJVE
A. PROVIDE PAMNS DEVICES AT LOCATIONS
INDICATED ON PLANS. PROVIDE WIRING AND
CIRCUIT AS INDICATED ON DETAILS.
B. ALL PAMN WIRING SHALL BE CONCEALED IN
WALLS, IN RACEWAY, IN WIREMOLD OR AND
ABOVE THE CEILING IN CABLE TRAY.
C. PAMN WIRING IN FINISHED AREAS SHALL BE IN
SURFACE RACEWAY (MECH. ROOM) OR
WIREMOLD (TUNNELS, ROOMS WITH NO
CEILINGS.)
D. ALL CEILING SPEAKERS SHALL BE SET AT 1/2
WATT UNLESS NOTED OTHERWISE.
E. ALL WALL MOUNTED SPEAKERS SHALL BE SET
AT 4 WATTS UNLESS NOTED OTHERWISE.
DocuSign Envelope ID: CB929718-07BA-4455-89AB-E23A9972F742
PAMNS ZONE 'B2'
PAMNS ZONE 'F2'
S
S
S
S
S
S
PAMNS ZONE 'A2'
PAMNS ZONE 'F2'
PAMNS ZONE 'C2'
PAMNS ZONE 'A2'
PAMNS ZONE 'C2'
PAMNS ZONE 'B2'
PAMNS ZONE 'E2'
MATCHLINE T-103BMATCHLINE T-103B
S S S S S
S
S
S
S S
S
S
SSS
S
S
S
S
S
SSSS
SSSSSSSSSSSSSSSSSS
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
1 BUILDING 1 2ND FLOOR NEW WORK
SCALE: 1/16" = 1' 0"
01T-103A
BUILDING 1 2ND FLOOR NEW
WORK - AREA A
N
O
R
T
H
PLAN
8 16 320
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
SHEET KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
Revisions: Date
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs © COPYRIGHT Apogee Consulting Group, P.A.
Engineers Architects
OVERHEAD PAGING
SYSTEM
558-19-211
DURHAM VA MEDICAL CENTER
508 FULTON STREET
DURHAM, NC 27705
19-225
BID DOCUMENTS
FULLY SPRINKLERED
JUNE 1, 2020 ABTJVE
A. PROVIDE PAMNS DEVICES AT LOCATIONS
INDICATED ON PLANS. PROVIDE WIRING AND
CIRCUIT AS INDICATED ON DETAILS.
B. ALL PAMN WIRING SHALL BE CONCEALED IN
WALLS, IN RACEWAY, IN WIREMOLD OR AND
ABOVE THE CEILING IN CABLE TRAY.
C. PAMN WIRING IN FINISHED AREAS SHALL BE IN
SURFACE RACEWAY (MECH. ROOM) OR
WIREMOLD (TUNNELS, ROOMS WITH NO
CEILINGS.)
D. ALL CEILING SPEAKERS SHALL BE SET AT 1/2
WATT UNLESS NOTED OTHERWISE.
E. ALL WALL MOUNTED SPEAKERS SHALL BE SET
AT 4 WATTS UNLESS NOTED OTHERWISE.
DocuSign Envelope ID: CB929718-07BA-4455-89AB-E23A9972F742
MATCHLINE T-103A
PAMNS ZONE 'B2'
PAMNS ZONE 'F2'
S
S
S S
PAMNS ZONE 'A2'
PAMNS ZONE 'F2'
PAMNS ZONE 'D2'
PAMNS ZONE 'C2'
PAMNS ZONE 'D2'
PAMNS ZONE 'C2'
PAMNS ZONE 'C2'
PAMNS ZONE 'A2'
PAMNS ZONE 'C2'
PAMNS ZONE 'B2'
PAMNS ZONE 'E2'
S
S
S
S
S
SSSS
SSSSSSSSSSSSSSSSSS
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
SS SS
S
S
S S S S S S
S S S S S
S
MATCHLINE T-103A
1 BUILDING 1 2ND FLOOR NEW WORK
SCALE: 1/16" = 1' 0"
01T-103B
BUILDING 1 2ND FLOOR NEW
WORK -AREA B
N
O
R
T
H
PLAN
8 16 320
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
SHEET KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
Revisions: Date
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs © COPYRIGHT Apogee Consulting Group, P.A.
Engineers Architects
OVERHEAD PAGING
SYSTEM
558-19-211
DURHAM VA MEDICAL CENTER
508 FULTON STREET
DURHAM, NC 27705
19-225
BID DOCUMENTS
FULLY SPRINKLERED
JUNE 1, 2020 ABTJVE
A. PROVIDE PAMNS DEVICES AT LOCATIONS
INDICATED ON PLANS. PROVIDE WIRING AND
CIRCUIT AS INDICATED ON DETAILS.
B. ALL PAMN WIRING SHALL BE CONCEALED IN
WALLS, IN RACEWAY, IN WIREMOLD OR AND
ABOVE THE CEILING IN CABLE TRAY.
C. PAMN WIRING IN FINISHED AREAS SHALL BE IN
SURFACE RACEWAY (MECH. ROOM) OR
WIREMOLD (TUNNELS, ROOMS WITH NO
CEILINGS.)
D. ALL CEILING SPEAKERS SHALL BE SET AT 1/2
WATT UNLESS NOTED OTHERWISE.
E. ALL WALL MOUNTED SPEAKERS SHALL BE SET
AT 4 WATTS UNLESS NOTED OTHERWISE.
DocuSign Envelope ID: CB929718-07BA-4455-89AB-E23A9972F742
SS
S
S
S
S S
S
S
S
PAMNS ZONE 'C3'
PAMNS ZONE 'B3'
PAMNS ZONE 'A3'
PAMNS ZONE 'F3'
PAMNS ZONE 'B3'
PAMNS ZONE 'F3'
PAMNS ZONE 'E3'
MATCHLINE T-104BMATCHLINE T-104B
S S S S S S S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
SS
S S S
S
S
S
S
S
S
S
S
S S S
S
S
S
S
S
S S S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S S S S
S
S
S
S
SSS
S
S
S
SS
S
S
SSSSS
S
S
S
S
S
S
S
S
SSSSSSSSSSSS
S
S
S
S
S
S
S
S
S
S
S
S
S
SS
S
S
S
S
S
S
S S
S S S
S S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S S
S
S
S
S
1 BUILDING 1 3RD FLOOR NEW WORK
SCALE: 1/16" = 1' 0"
01T-104A
BUILDING 1 3RD FLOOR NEW
WORK - AREA A
N
O
R
T
H
PLAN
8 16 320
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
SHEET KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
Revisions: Date
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs © COPYRIGHT Apogee Consulting Group, P.A.
Engineers Architects
OVERHEAD PAGING
SYSTEM
558-19-211
DURHAM VA MEDICAL CENTER
508 FULTON STREET
DURHAM, NC 27705
19-225
BID DOCUMENTS
FULLY SPRINKLERED
JUNE 1, 2020 ABTJVE
1. LOCATION OF PAMNS HEAD-END EQUIPMENT.
2. LOCATION OF EXISTING 120/208V 3 PHASE 4 WIRE
PANEL 'EC3F9'. COORDINATE ALL WORK RELATED
TO ELECTRICAL PANELS WITH COR.
A. PROVIDE PAMNS DEVICES AT LOCATIONS
INDICATED ON PLANS. PROVIDE WIRING AND
CIRCUIT AS INDICATED ON DETAILS.
B. ALL PAMN WIRING SHALL BE CONCEALED IN
WALLS, IN RACEWAY, IN WIREMOLD OR AND
ABOVE THE CEILING IN CABLE TRAY.
C. PAMN WIRING IN FINISHED AREAS SHALL BE IN
SURFACE RACEWAY (MECH. ROOM) OR
WIREMOLD (TUNNELS, ROOMS WITH NO
CEILINGS.)
D. ALL CEILING SPEAKERS SHALL BE SET AT 1/2
WATT UNLESS NOTED OTHERWISE.
E. ALL WALL MOUNTED SPEAKERS SHALL BE SET
AT 4 WATTS UNLESS NOTED OTHERWISE.
DocuSign Envelope ID: CB929718-07BA-4455-89AB-E23A9972F742
MATCHLINE T-104AMATCHLINE T-104A
SS
S
S
S
S
S
S
S S
S
S
S
PAMNS ZONE 'D3'
PAMNS ZONE 'C3'
PAMNS ZONE 'D3'
PAMNS ZONE 'C3'
PAMNS ZONE 'C3'
PAMNS ZONE 'B3'
PAMNS ZONE 'C3'
PAMNS ZONE 'A3'
PAMNS ZONE 'A3'
PAMNS ZONE 'F3'
PAMNS ZONE 'B3'
PAMNS ZONE 'F3'
PAMNS ZONE 'E3'
S
S
S
S
S
S
S
S S S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S S S S
S
S
S
S
SSS
S
S
S
SS
S
S
SSSSS
S
S
S
S
S
S
S
S
S
S
S
SSSSSSSSSSSS
S
S
S
S
S
S
S
S
S
S
S
SS
S
S
S
S
S
S
S
S
S
S
S
S
S
SSSSSS
S
S S S S
S
S
S
S
S
S
S
S
S
S
S
S
S
S S
S
S
S
S
1 BUILDING 1 3RD FLOOR NEW WORK
SCALE: 1/16" = 1' 0"
01T-104B
BUILDING 1 3RD FLOOR NEW
WORK - AREA B
N
O
R
T
H
PLAN
8 16 320
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
SHEET KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
Revisions: Date
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs © COPYRIGHT Apogee Consulting Group, P.A.
Engineers Architects
OVERHEAD PAGING
SYSTEM
558-19-211
DURHAM VA MEDICAL CENTER
508 FULTON STREET
DURHAM, NC 27705
19-225
BID DOCUMENTS
FULLY SPRINKLERED
JUNE 1, 2020 ABTJVE
A. PROVIDE PAMNS DEVICES AT LOCATIONS
INDICATED ON PLANS. PROVIDE WIRING AND
CIRCUIT AS INDICATED ON DETAILS.
B. ALL PAMN WIRING SHALL BE CONCEALED IN
WALLS, IN RACEWAY, IN WIREMOLD OR AND
ABOVE THE CEILING IN CABLE TRAY.
C. PAMN WIRING IN FINISHED AREAS SHALL BE IN
SURFACE RACEWAY (MECH. ROOM) OR
WIREMOLD (TUNNELS, ROOMS WITH NO
CEILINGS.)
D. ALL CEILING SPEAKERS SHALL BE SET AT 1/2
WATT UNLESS NOTED OTHERWISE.
E. ALL WALL MOUNTED SPEAKERS SHALL BE SET
AT 4 WATTS UNLESS NOTED OTHERWISE.
DocuSign Envelope ID: CB929718-07BA-4455-89AB-E23A9972F742
PAMNS ZONE 'C4'
PAMNS ZONE 'A4'
PAMNS ZONE 'C4'
PAMNS ZONE 'B4'
P A
M N
S
Z
O N
E
A
P A
M N
S
Z
O N
E
E
P A
M N
S
Z
O N
E
E
P A
M N
S
Z
O N
E
B
S S S S
S
SS
S
S
S
S
S
SSS
S
S
S
S
S
S
S
S
SSSS
S
S
S
S
S
S
S
S
S
S
S
S S
S
S
SS
S
S
S
S
S
S
SSSSSSSSSSS
S
S
S
S
S
S
S
S
SSSSSS S S S S S
PAMNS ZONE 'OR'
PAMNS ZONE 'C4'
P
A
M
N
Z
R
P
A
M
Z
C
VC
VC
VC
S
S
S
S
S
S
S
1 BUILDING 1 4TH FLOOR NEW WORK
SCALE: 1/16" = 1' 0"
01T-105
BUILDING 4TH FLOOR NEW
WORK
N
O
R
T
H
PLAN
8 16 320
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
SHEET KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
Revisions: Date
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs © COPYRIGHT Apogee Consulting Group, P.A.
Engineers Architects
OVERHEAD PAGING
SYSTEM
558-19-211
DURHAM VA MEDICAL CENTER
508 FULTON STREET
DURHAM, NC 27705
19-225
BID DOCUMENTS
FULLY SPRINKLERED
JUNE 1, 2020 ABTJVE
A. PROVIDE PAMNS DEVICES AT LOCATIONS
INDICATED ON PLANS. PROVIDE WIRING AND
CIRCUIT AS INDICATED ON DETAILS.
B. ALL PAMN WIRING SHALL BE CONCEALED IN
WALLS, IN RACEWAY, IN WIREMOLD OR AND
ABOVE THE CEILING IN CABLE TRAY.
C. PAMN WIRING IN FINISHED AREAS SHALL BE IN
SURFACE RACEWAY (MECH. ROOM) OR
WIREMOLD (TUNNELS, ROOMS WITH NO
CEILINGS.)
D. ALL CEILING SPEAKERS SHALL BE SET AT 1/2
WATT UNLESS NOTED OTHERWISE.
E. ALL WALL MOUNTED SPEAKERS SHALL BE SET
AT 4 WATTS UNLESS NOTED OTHERWISE.
DocuSign Envelope ID: CB929718-07BA-4455-89AB-E23A9972F742
S
S
S
S
S
S
PAMNS ZONE 'C5'
PAMNS ZONE 'A5'
PAMNS ZONE 'OR'
PAMNS ZONE 'C5'
PAMNS ZONE 'C5'
PAMNS ZONE 'B5'
PAMNS ZONE 'D5'
PAMNS ZONE 'C5'
P A
M N
S
Z
O N
E
A
P A
M N
S
Z
O N
E
B
S
S
S
S
SSS
S
S
S
SSS
SSSSSSS
S
S
S
SSSSSSSSSSSSSSS
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S S S SSSSSSS
S
S
S
S
S
S
S
S
S
S
S
S
S
S
PAMNS ZONE 'D5' PAMNS ZONE 'OR'
S
S
S
S
S
1 BUILDING 1 5TH FLOOR NEW WORK
SCALE: 1/16" = 1' 0"
01T-106
BUILDING 1 5TH FLOOR NEW
WORK
N
O
R
T
H
PLAN
8 16 320
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
SHEET KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
Revisions: Date
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs © COPYRIGHT Apogee Consulting Group, P.A.
Engineers Architects
OVERHEAD PAGING
SYSTEM
558-19-211
DURHAM VA MEDICAL CENTER
508 FULTON STREET
DURHAM, NC 27705
19-225
BID DOCUMENTS
FULLY SPRINKLERED
JUNE 1, 2020 ABTJVE
1. LOCATION OF PAMNS HEAD-END EQUIPMENT.
2. LOCATION OF 120/208V 3 PHASE 4 WIRE PANEL
'EC5A1'. COORDINATE ALL WORK RELATED TO
ELECTRICAL PANELS WITH COR.
A. PROVIDE PAMNS DEVICES AT LOCATIONS
INDICATED ON PLANS. PROVIDE WIRING AND
CIRCUIT AS INDICATED ON DETAILS.
B. ALL PAMN WIRING SHALL BE CONCEALED IN
WALLS, IN RACEWAY, IN WIREMOLD OR AND
ABOVE THE CEILING IN CABLE TRAY.
C. PAMN WIRING IN FINISHED AREAS SHALL BE IN
SURFACE RACEWAY (MECH. ROOM) OR
WIREMOLD (TUNNELS, ROOMS WITH NO
CEILINGS.)
D. ALL CEILING SPEAKERS SHALL BE SET AT 1/2
WATT UNLESS NOTED OTHERWISE.
E. ALL WALL MOUNTED SPEAKERS SHALL BE SET
AT 4 WATTS UNLESS NOTED OTHERWISE.
DocuSign Envelope ID: CB929718-07BA-4455-89AB-E23A9972F742
PAMNS ZONE 'C6'
PAMNS ZONE 'A6'
PAMNS ZONE 'C6'
PAMNS ZONE 'B6'
P A
M N
S
Z
O N
E
A
P A
M N
S
Z
O N
E
B
SSSSS
S
SSSSS
S
S
SSSSSSSSSSSSS
S
S
S
S
S
S
S
S
S
S S
S
S
1 BUILDING 1 6TH FLOOR NEW WORK
SCALE: 1/16" = 1' 0"
01T-107
BUILDING 1 6TH FLOOR NEW
WORK
N
O
R
T
H
PLAN
8 16 320
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
SHEET KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
Revisions: Date
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
U.S. Department of Veterans Affairs © COPYRIGHT Apogee Consulting Group, P.A.
Engineers Architects
OVERHEAD PAGING
SYSTEM
558-19-211
DURHAM VA MEDICAL CENTER
508 FULTON STREET
DURHAM, NC 27705
19-225
BID DOCUMENTS
FULLY SPRINKLERED
JUNE 1, 2020 ABTJVE
A. PROVIDE PAMNS DEVICES AT LOCATIONS
INDICATED ON PLANS. PROVIDE WIRING AND
CIRCUIT AS INDICATED ON DETAILS.
B. ALL PAMN WIRING SHALL BE CONCEALED IN
WALLS, IN RACEWAY, IN WIREMOLD OR AND
ABOVE THE CEILING IN CABLE TRAY.
C. PAMN WIRING IN FINISHED AREAS SHALL BE IN
SURFACE RACEWAY (MECH. ROOM) OR
WIREMOLD (TUNNELS, ROOMS WITH NO
CEILINGS.)
D. ALL CEILING SPEAKERS SHALL BE SET AT 1/2
WATT UNLESS NOTED OTHERWISE.
E. ALL WALL MOUNTED SPEAKERS SHALL BE SET
AT 4 WATTS UNLESS NOTED OTHERWISE.
DocuSign Envelope ID: CB929718-07BA-4455-89AB-E23A9972F742
PAMNS ZONE 'C7'
PAMNS ZONE 'A7'
PAMNS ZONE 'B7'
P A
M N
S
Z
O N
E
A
P A
M N
S
Z
O N
E
B
S
S
SSSSS
S
SSSSS
S
S
SSSSSSSSSSSSS
S
S
S
S
S
S
S
S
S
S S
S
S
S
S
S
S
SS
S S
S
1 BUILDING 1 7TH FLOOR NEW WORK
SCALE: 1/16" = 1' 0"
01T-108
BUILDING 1 7TH FLOOR NEW
WORK
N
O
R
T
H
PLAN
8 16 320
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .