This document outlines a federal solicitation for an overhead paging system project. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6 for the Durham VA Medical Center. The purpose of the project is to provide a new in-building mass notification system to cover Buildings 1 and 23 at the facility to enable public announcements, code blue alerts, and future expansion. The system must allow for interfaces with the existing fire alarm and nurse call systems. It will add new fiber runs between amplifiers, equipment locations, and the head-end system. The response deadline is not specified but the solicitation number and date indicate it was posted on or around October 1, 2020. The associated NAICS code is 236220 for commercial and institutional building construction with a small business size standard of $39.5 million.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OVERHEAD PAGING SYSTEM

PROJECT NUMBER 558-19-211

VICINITY MAP

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A B

C D

E

21 4 5 6 7

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

Revisions: Date

CONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

U.S. Department of Veterans Affairs © COPYRIGHT Apogee Consulting Group, P.A.

Engineers Architects

OVERHEAD PAGING

SYSTEM

558-19-211

DURHAM VA MEDICAL CENTER

508 FULTON STREET

DURHAM, NC 27705

19-225

BID DOCUMENTS

FULLY SPRINKLERED

JUNE 1, 2020 ABTRSB

DURHAM VAMC

VICINITY PLAN

AREA OF WORK

DURHAM MEDICAL

CENTER

G-001

COVER SHEET

DocuSign Envelope ID: CB929718-07BA-4455-89AB-E23A9972F742

6/2/2020

6/1/2020

FIRE EXTINGUISHER ON

PORTABLE FLOOR

BRACKET (ILSM MAY

REQUIRE MORE THAN

ONE).

MATS (CHANGED END

OF SHIFT OR MORE IF

NECESSARY TO

MAINTAIN

CLEANLINESS)

SUPPLY DUCTS

EITHER KEEP

RUNNING OR COVER

WHEN RUNNING TO

KEEP DUST OUT

COVER ALL RETURNS

AT THE DIFFUSERS

POST ICRA, ILSM, FIRE

INPECTION SHEETS

VISIBLE TO PUBLIC

EXISTING WALL SEE PLANS

FOR FIRE RATING

EXISTING OPENING

ICRA ENCLOSURE AS

REQUIRED BY CLASS OF

PRECAUTIONS TABLE

PROVIDE CONSTRUCTION

DOOR, HOLLOW METAL

DOOR, HOLLOW METAL

FRAME AND HARDWARE

SEE SCHEDULE THIS SHEET

A S

R

E Q

U I R

D

F

O R

M A

N U

V E

R A

B I L I T

Y

TEMPORARY DIGITAL

MANOMETER FOR

NEGATIVE PRESSURE

MONITORING OUTSIDE OF

ICRA BARRIER FOR VA'S

INSPECTION

AS REQUIRED FOR MANUVERABILITY

INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF

PRECAUTIONS FOR CONSTRUCTION AND RENOVATION

Class III

Patient Risk Group Table

Infection Control Matrix - Class of Precautions: Construction Project by

Patient Risk

TYPE A

Construction Project Type

Major demolition and construction projects

Includes, but is not limited to:

- activities which require consecutive work shifts

- requires heavy demolition or removal of a complete ceiling system

- new construction

Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies

Includes, but is not limited to:

- sanding of walls for painting or wall covering

- removal of floor coverings, ceiling tiles and casework

- new wall construction

- minor duct work or electrical work above ceilings

- major cabling activities

- any activity which cannot be completed within a single work shift

Small scale, short duration activities which create minimal dust

Includes, but is not limited to:

- installation of telephone and computer cabling

- access to chase spaces

- cutting of walls or ceiling where dust migration can be controlled

Inspection and Non-Invasive Activities

Includes, but is not limited to:

- removal of ceiling tiles for visual inspection limited to 1 tile to 50 square feet

- painting (but not sanding), wall covering

- electrical trim work, minor plumbing, and activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection

Type of Construction / Project Activity Table

Group 2

Medium Risk

Group 1

Low Risk

- Therapy areas

- Respiratory Therapy

- Outpatient Clinics

- CBOC's

- Mental Health Units

- VACANT AREA ADJACENT TO

OCCUPIED AREA

- Office areas (non-clinical)

- Hallways

- FES/EMS areas

I

Patient Risk Group

TYPE D

TYPE C

TYPE B

TYPE

A

Group 4

Highest Risk

Group 3

High Risk

- Pharmacy

- Radiology/ CT Scanner

- Urgent Care

- Laboratories

- CLC

- SPD; AMCU;

- Surgery

- Respiratory Isolation Rooms

III

TYPE DTYPE CTYPE B

control procedures are necessary.

C L

A S

S

I V

C L

A S

S

I I

During Construction Project

C L

I

C L

A S

S

I I I

1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.

2. Contain construction waste before transport in tightly covered containers.

3. Cover transport receptacles or carts. Tape covering

4. Vacuum work area with HEPA filtered vacuums.

5. Wet mop area with disinfectant after barriers are removed.

6. Remove or isolate HVAC system in areas where work was being performed.

1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.

2. Contain construction waste before transport in tightly covered containers.

3. Cover transport receptacles or carts. Tape covering.

4. Vacuum work with HEPA-filtered vacuums.

5. Wet mop with disinfectant.

6. Remove isolation of HVAC system in areas where work is being performed.

1. Wipe surfaces to remove dust

Upon Completion of Project

1. Wipe work surfaces with disinfectant.

2. Contain construction waste before transported in tightly covered containers.

3. Wet mop and/or vacuum work area with HEPA filtered vacuum before leaving work areas.

4. Remove isolation of HVAC system in areas where work is being performed.

1. Includes all activities required by Class II

2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities

Management Maintenance and Engineering department before construction begins.

3. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.

4. Complete all critical barriers before construction begins or implement control cube method.

5. Maintain negative air pressure within work site utilizing HEPA-equipped air filtration units.

6. Contain construction waste before transport in tightly covered containers.

7. Cover transport receptacles or carts. Tape covers.

8. Wet mop and/or vacuum with HEPA filtered vacuum before leaving areas of work.

9. Remove isolation of HVAC system in areas where work is being performed.

1. Execute work by methods to minimize raising dust from construction operations.

1. Includes all activities required by Class I

2. Provide active means to prevent airborne dust from dispersing into atmosphere.

3. Water mist work surfaces to control dust while cutting.

4. Seal unused doors with duct tape.

5. Block off and seal air vents.

6. Replace adhesive walk-off mats at entrance and exit of work area in accordance with manufacturer's recommendations.

7. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.

1. Includes all activities required by Class III

2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities

Management Maintenance and Engineering department before construction begins.

3. Isolate HVAC system in areas where work is being done to prevent contamination of duct system.

4. Complete all critical barriers or implement control cube method before construction begins.

5. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.

6. Seal holes, pipes, conduits, and punctures appropriately.

7. Construct anteroom and require all personnel to pass through this room so they can be vacuumed sing a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that re removed each time they leave the work site.

8. All personnel entering work site are required to wear shoe covers.

Shoe covers must be changed each time the worker exits the work area.

9. Place adhesive walk-off mats at entrance to work area within anteroom.

10. Replace per manufacturer's recommendations. Do not remove barriers work area until completed project is inspected each by the Hospital Department Safety Officer, Facilities Management Maintenance and Engineering and thoroughly cleaned by Hospital Environmental Services Department or their contracted Environmental Service Company. Contain construction waste before transport in tightly covered containers.

11. Cover transport receptacles or carts. Tape covering

12. Vacuum work area with HEPA filtered vacuums.

13. Wet mop with disinfectant after barriers are removed.

14. Remove isolation of HVAC system in areas where work is being performed.

Class IV

Note: VA Infection Control approval will be required when the Construction Activity and Risk Level indicate that

II

I

LOW Risk Group 1

HIGH Risk Group 3

HIGHEST Risk Group 4

MEDIUM Risk Group 2

IV

IV

IV

III/IV

III/IV

III/IV

III/IV

III

III

III

I

It is the Contractor's Responsibility to provide the following Infection Control

Precautions depending upon the Construction Type Activity or

Class Designation Table

It is the Contractor's Responsibility to provide the following Infection Control

Precautions depending upon the Patient Risk Group Table

GENERAL NOTES

ABBREVIATIONS

* OBTAIN INFECTION CONTROL PERMIT BEFORE CONSTRUCTION BEGINS.

COMPLETE ALL CRITICAL BARRIERS OR IMPLEMENT CONTROL CUBE METHOD BEFORE CONSTRUCTION BEGINS.

SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.

DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS INSPECTED BY THE OWNER'S SAFETY

DEPARTMENT AND THOROUGHLY CLEANED BY THE OWNER'S ENVIRONMENTAL SERVICES DEPARTMENT.

COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.

VACUUM WORK AREA WITH HEPA FILTERED VACUUMS. WET MOP AREA WITH DISINFECTANT. REMOVE ISOLATION OF HVAC SYSTEM

IN AREAS WHERE WORK IS BEING PERFORMED.

COVER ALL RETURNS AND SUPPLY DUCTS AT THE GRATE/DIFFUSES WITH FILTER MEDIA OR BLANKED OFF ENTIRELY PER ICRA

REQUIREMENTS.

KEEP CONSTRUCTION SITE CLEAN & NEAT AT ALL TIMES.

CONTRACTOR TO CLEAN THE CONSTRUCTION AREA, AND PREPARE FOR SAFETY AND INFECTION CONTROL'S INSPECTION AND

FINAL CLEANING BY VA ECM STAFF.

VA ECM STAFF WILL PERFORM FINAL VERIFICATION OF CLEANING AND SANITATION.

IF APPLICABLE:

HOT WORK PERMITS.

PERMITS MUST BE OBTAINED 24 HOURS PRIOR TO COMMENCEMENT OF WORK, WHENEVER POSSIBLE. ORIGINAL PERMIT TO

BE POSTED WHERE WORK IS BEING PERFORMED; CONTRACTOR MUST RETURN PERMIT TO SAFETY OFFICE WHEN WORK IS

COMPLETED.

FIRE WATCH. CONTRACTOR MUST INITIAL, DATE AND TIME EVERY 30 MINUTES AFTER HOT WORK HAS STARTED.

CONTRACTOR TO PROVIDE WARNING SIGNAGE AND DIRECTIONAL SIGNAGE THAT SHALL BE POSTED IN CONSTRUCTION AREA

WHILE WORK IS PERFORMED.

CONFINED SPACE. CONTRACTOR TO OBTAIN CONFINED SPACE PERMIT PRIOR TO ENTRY INTO MECHANICAL CHASE. ENSURE

IT IS APPROVED BY VA SAFETY DEPARTMENT AND COTR.

INFECTION CONTROL RISK ASSESSMENT NOTES:

INTERIM LIFE SAFETY MEASURES NOTES (ILSM):

FIBER OPTIC

SINGLE MODE

MULTIMODE

DRIVE

STREET

CONCRETE MASONRY UNIT

EQUAL

STAINLESS

NOT RATED

ABOVE FINISHED FLOOR

EXPANSION JOINT

CONTROL JOINT

QUICK RELEASE SPRINKLER

FAHRENHEIT

LIMIT OF DEMOLITION

EXISTING

NEW

NOT IN CONTRACT

EXPOSED TO STRUCTURE

NOT TO SCALE

SIMILAR

BUILDING

PHONE

INCORPORATED

SOUTH

DEAD LEG

GALLONS PER MINUTE

ON CENTER

CONTRACTING OFFICER REPRESENTATIVE

PUBLIC ADDRESS MASS NOTIFICATION SYSTEM

INFORMATION TECHNOLOGY

FO

SM

MM

DR.

ST.

CMU

EQ.

STL.

NR.

A.F.F.

EJ

CJ

Q.R.S.

°F

(E)

(N)

N.I.C.

E.T.S.

N.T.S.

SIM.

BLDG.A.

PH.

INC.

S.

DL

GPM

O.C.

COR

PAMNS

IT

1. CONTRACTOR SHALL VISIT ALL AREAS OF WORK, INCLUDING WALKING THE SITE, MEASURING EXISTING DIMENSIONS AND

OBSERVING EXISTING CONDITIONS BEFORE BEGINNING WORK, ORDERING MATERIALS, OR STARTING ANY CONSTRUCTION.

CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS OF EXISTING SITE CONDITION PRIOR TO START OF WORK AND ORDERING

OF MATERIALS.

2. CONTRACTOR IS RESPONSIBLE FOR DETERMINING INFECTION CONTROL PRECAUTION MEASURES BASED ON THE TYPE AND

LOCATION OF WORK BEING PERFORMED. CONFIRM PRECAUTION MEASURES WITH COR PRIOR TO BEGININING WORK IN SAID

AREA.

3. PENTRATIONS THRU RATED CONSTRUCTION (FIRE WALLS, FIRE BARRIERS, FIRE PARTITIONS, SMOKE BARRIERS, SMOKE

PARTITIONS, HORIZONTAL ASSEMBLIES, AND VERTICAL OPENINGS) SHALL MAINTAIN CONTINUITY OF RATED CONSTRUCTION.

CONTRACTOR RESPONSIBLE FOR IDENTIFYING RATED AREAS AND FIRESTOPPING ALL PENETRATIONS. CONTACT COR AND

A/E FOR CLARIFICATION AS NEEDED. VA GUIDELINES STATE ALL RATED CONSTRUCTION TO BE CLEARLY LABELED.

4. CONTRACTOR SHALL RECYCLE REMOVED MATERIALS WHENEVER POSSIBLE. SEE DIVISION 1 SPECIFICATIONS

5. CONTRACTOR TO PROTECT AREA ADJACENT TO THE DEMOLITION AND NEW CONSTRUCTION WORK TO PREVENT DAMAGES.

(IF DAMAGED, REPAIR, PATCH, REPLACE, OR SAND SMOOTH AND TO MATCH EXISTING ADJACENT MATERIALS.)

6. CONTRACTOR SHALL REPORT TO COR IMMEDIATELY WHEN DISCREPANCIES TO THE DRAWINGS ARE FOUND IN THE FIELD.

7. CONTRACTOR TO INSTALL TEMPORARY BALL-IN-TUBE SYSTEM TO MONITOR AND ENSURE PRESSURE LEVEL TO MEET VA

GUIDELINE WITHIN CONSTRUCTION AREA. (CONTRACTOR TO VERIFY LOCATIONS) WITH VA COR PRIOR TO INSTALLATION.

(1)

1 HR 60 MIN1 3/4"7'-0"AS SELECTED A HM HMTYPE I SET 15 3/4"

HINGES

DUST PROOF STRIKE

LATCH SET

DOOR CLOSER

KICK PLATES

GASKETING

TA2714

VA SPEC F01

DC6210xA11

K1050F

S888 x HEAD & JAMBS

HARDWARE SET 1

32D

26D

32D

MK

RO

CO

CO

RO

PE

(1)

2 HR 90 MIN1 3/4"7'-0"AS SELECTED A HM HMTYPE I SET 15 3/4"

MANUFACTURERS:

CORBIN RUSSWIN CO

McKINNEY MK

PEMKO PE

ROCKWOOD RO

HARDWARE MANUFACTURER'S LISTED AS BASIS OF DESIGN

ALTERNATE MANUFACTURER'S ACCEPTABLE, SUBJECT TO

REVIEW BY ARCHITECT AND C.O.R. FOR EQUAL QUALITY

COMPLIANCE

NOTE: MINIMUM DOOR WIDTH 3'-0", MAXIMUM 4'-0".

ICRA ENCLOSURE NOTES

ICRA BARRIERS MUST MATCH FIRE RATING OF WALL IT IS CREATING AN ENCLOSURE TO.

EXAMPLE: 2 HOUR FIRE BARRIER, ICRA ENCLOSURE AROUND DOOR MUST MAINTAIN 2 HOUR RATING.

NON RATED ICRA ENCLOSURES/BARRIERS CAN BE PLASTIC TYPE, BASIS OF DESIGN EDGEGUARD TYPE SYSTEM (OR

EQUAL),

CONTRACTOR TO VERIFY TYPE OF BARRIER PER LOCATION AND COORDINATE WITH C.O.R. PRIOR TO INSTALLATION

OR CONSTRUCTED PARTITION TYPE. NON RATED ENCLUSURES/BARRIERS MUST CONTROL AND ISOLATE DUST.

THIS DOOR AND FRAME SCHEDULE FOR RATED ICRA ENCLOSURES ONLY

HEPA

NEGATIVE AIR

UNIT

FINISHED FLOORING TO BE KEPT

CLEAN. FLOORS NOT BEING REPLACED

MUST BE PROTECTED. COVER WITH

ROSIN PAPER / FIRE RATED PLYWOOD.

E X

I S

T I N

G

D

E C

K

T

O

D

E C

K

V I F

ICRA BARRIER - EXTEND

TO UNDERSIDE OF

STRUCTURE ABOVE OR

BUILD A RATED CAP

(WHERE FIRE RATING IS

REQ.)

ICRA

WALL

RATED FLOOR/

CEILING CONSTRUCTION

LINE OF EXISTING

CEILING

V A

R I E

S

RUN EXHAUST AIR

TO EXTERIOR OR

VA APPROVED LOCATION

PROVIDE SINGLE USE DAMPER IN

HEPA UNIT DUCT WHERE DUCT PENETRATES

A RATED WALL, DAMPER TO MATCH RATING

WALL, NOT LESS THAN 1 HOUR

SWIVEL CASTERS

WITH TWO

LOCKING BRAKES

MOBILE CART

A D

J U

S T

A B

L

H

I G

H T

HEPA NEGATIVE

AIR UNIT

EXISTING WALL

EXISTING CEILING

F.F.

A P

P R

O X

A

F

F

.HARD DOOR

POST ICRA, ILSM, FIRE

INSPECTION SHEETS

VISIBLE TO PUBLIC

EXISTING

CEILING

ICRA ENCLOSURE WITH HARD CEILING AT MINIMUM

18" BELOW SPRINKLERS IN EXISTING ACOUSTIC

CEILING

TYPE AND STYLES OF ICRA

BARRIERS ARE TO BE

APPROVED BY COR AND

SUBMITTED TO A/E

SEE DETAILS THIS SHEET

ILSM SIGNAGE

INTERIM LIFE SAFETY MEASURES IN EFFECT FOR THE

UPGRADE ELEVATORS PROJECT

THIS EXIT IS CLOSED AND LEADS TO A

CONSTRUCTION AREA

PLEASE USE ALTERNATE EXITS AS MARKED

ICRA, ILSM, FIRE WATCH AND

MISC. FORMS

PAPER

CADDY

1'-5"

3 5/8" INSULATED WALL WITH

16 GAUGE METAL STUDS @

16" O.C. WALL TO EXTEND TO

UNDERSIDE OF DECK

5/8" FIRE RESISTANT GYPSUM

BOARD - BOTH SIDES

EXISTING CEILING SYSTEM

BASE - TO MATCH

EXISTING AREA

EXISTING FLOOR

UNDERSIDE OF EXISTING

DECK

C E

I L I N

G

H

E I G

T

V

R

I E

S

F

I E

R

I F

Y

W A

L L

H

E I G

R

I E

S

F

I E

R

I F

Y

5/8" FIRE RESISTANT GYPSUM

BOARD - BOTH SIDES

EXISTING CEILING SYSTEM

BASE - TO MATCH

EXISTING AREA

EXISTING FLOOR

UNDERSIDE OF EXISTING

DECK

V A

R I E

S

3 5/8" 16 GAUGE METAL

STUDS @ 16" O.C. WALL TO

EXTEND TO UNDERSIDE OF

DECK

3 5/8" INSULATED WALL WITH

16 GAUGE METAL STUDS @

16" O.C. (2) LAYERS 5/8"

GYPSUM BOARD EACH SIDE.

WALL TO EXTEND TO

UNDERSIDE OF DECK

5/8" FIRE RESISTANT GYPSUM

BOARD - BOTH SIDES

EXISTING CEILING SYSTEM

BASE - TO MATCH

EXISTING AREA

EXISTING FLOOR

UNDERSIDE OF EXISTING

DECK

C E

I L I N

G

H

E I G

R

I E

S

F

I E

R

I F

Y

W A

L L

H

E I G

R

I E

S

F

I E

R

I F

Y

FIRE RESISTANT SEALANT,

BOTH SIDES

FIRE RESISTANT SEALANT,

BOTH SIDES

FIRE RESISTANT SEALANT,

BOTH SIDES

1-HR RATED AND SMOKE RATED

U.L. DESIGN NO. U404

SMOKE RATED

2-HR RATED AND SMOKE RATED

U.L. DESIGN NO. U404

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A B

C D

E

21 4 5 6 7

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

Revisions: Date

CONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

U.S. Department of Veterans Affairs © COPYRIGHT Apogee Consulting Group, P.A.

Engineers Architects

OVERHEAD PAGING

SYSTEM

558-19-211

DURHAM VA MEDICAL CENTER

508 FULTON STREET

DURHAM, NC 27705

19-225

BID DOCUMENTS

FULLY SPRINKLERED

JUNE 1, 2020 ABTRSB

ICRA NOTES

G-002

TYPICAL SECTION - RATED ICRA ENCLOSURE HEPA CART DETAIL

TYPICAL ELEVATION - RATED ENCLOSURE

ILSM, ICRA, FIRE WATCH INFORMATION

TYPICAL RATED ICRA ENCLOSURE

TYPICAL RATED ICRA BARRIERS

SCALE 1/ 2 " = 1' - 0" SCALE 1/ 2 " = 1' - 0"

SCALE 1/ 2 " = 1' - 0"

SCALE 1/ 2 " = 1' - 0"

SCALE 1/ 2 " = 1' - 0"

DocuSign Envelope ID: CB929718-07BA-4455-89AB-E23A9972F742

ADO AUTOMATIC DOOR OPERATOR

AFF ABOVE FINISH FLOOR

CCTV CLOSED CIRCUIT TELEVISION

COAX COAXIAL CABLE

COMM COMMUNICATION

COR CONTRACTING OFFICER

REPRESENTATIVE

DC DOOR CONTACT SWITCH

DN DOWN

DO DOOR OPERATOR

DVR DIGITAL VIDEO RECORDER

EEB EMERGENCY EXIT BUTTON

EL ELECTRICAL STRIKE

FA FIRE ALARM

FAP FIRE ALARM PANEL

FAAP FIRE ALARM ANNUNCIATOR PANEL

FO FIBER OPTIC

IT INTERCOMMUNICATION ROOM

MATV MASTER ANTENNA TELEVISION

MM MULTI MODE FIBER

NAC NETWORK APPLIANCE CIRCUIT PANEL

NS NO SCALE

NTS NOT TO SCALE

NVR NETWORK VIDEO RECORDER

TECHNOLOGY ABBREVIATIONS LIST

OC ON CENTER

OIT OFFICE OF INFORMATION TECHNOLOGY

PACS PHYSICAL ACCESS CONTROL SYSTEM

PAMN PUBLIC ADDRESS AND MASS NOTIFICATION SYSTEM

PB PUSH BUTTON

PDU RACK POWER DISTRIBUTION UNITS

POE POWER OVER ETHERNET

PR PAIR

RX REQUEST TO EXIT

SEP SERVICE ENTRANCE PROTECTION

SLC SIGNALING LINE CIRCUIT

TEL TELEPHONE

TGB TELECOMM GROUND BUS BAR

TM TELEMONITORING

TMGB TELECOMM MAIN GROUND BUS BAR

TP TWISTED PAIR

TR TELECOMM ROOM

TTB TELEPHONE TERMINAL BOARD

TV TELEVISION

WM WIRE MANAGEMENT

WAP WIRELESS ACCESS POINT

UL UNDERWRITERS LABORATORY

UPS UNINTERRUPTIBLE POWER SUPPLY

UTP UNSHIELDED TWISTED PAIR

N NEW DEVICES

NCA NETWORK CONTROL ANNUNCIATOR

DVC DIGITAL VOICE COMMAND SS STAINLESS STEEL

E EXISTING DEVICES

BOD BASIS OF DESIGN

CLG CEILING

EG EQUIPMENT GROUND

NCE NURSE CALL EQUIPMENT

SM SINGLE MODE FIBER

TECHNOLOGY GENERAL NOTES

1.1. ALL COMMUNICATIONS DEVICES AND EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE

WITH THE PROJECT SPECIFICATIONS, THE MANUFACTURER'S RECOMMENDED

PROCEDURES, ALL APPLICABLE LOCAL AND STATE CODES, AMERICANS WITH DISABILITIES

ACT AND WITH THE LATEST EDITION OF THE NATIONAL ELECTRICAL CODE, BICSI

STANDARDS, VA TELECOMMUNICATIONS AND SPECIAL TELECOMMUNICATION SYSTEMS

DESIGN MANUAL.

2. PROVIDE ADDITIONAL SUPPORT FOR DEVICES AND EQUIPMENT WHERE THE BUILDING

CONSTRUCTION IS NOT SUITABLE FOR DIRECT MOUNTING.

3. FIRESTOP, DRAFTSTOP, SMOKESTOP AND/OR PROTECT THE ANNULAR SPACE AROUND

ALL PENETRATIONS THROUGH WALLS, PARTITIONS, FLOORS, CEILINGS, AND ROOF IN

ACCORDANCE WITH THE REQUIREMENTS OF THE NATIONAL ELECTRICAL CODE, UL LISTING

REQUIREMENT AND THE APPLICABLE BUILDING CODES.

4. PROVIDE DRAWINGS SHOWING ALL PENETRATIONS. ALL CABLING SHALL COMPLY WITH

THE LATEST EDITION OF TELECOMMUNICATIONS DISTRIBUTION METHOD MANUAL AND

ANSI/TIA/EIA PUBLICATIONS.

5. COMPLY WITH THE LATEST ANSI/TIA/EIA 607 - STANDARD FOR TELECOMMUNICATION

GROUNDING AND BONDING COMMERCIAL BUILDING.

6. COMPLY WITH THE LATEST ANSI/TIA/EIA 568 - 2006 STANDARD FOR INSTALLATION

COMMERCIAL BUILDING TELECOMMUNICATIONS CABLING.

7. COMPLY WITH THE LATEST ANSI/TIA/EIA 569 - COMMERCIAL BUILDING STANDARD FOR

TELECOMMUNICATIONS PATHWAYS AND SPACES.

8. COMPLY WITH THE LATEST NFPA 70 NATIONAL ELECTRICAL CODE.

9. COMPLY WITH THE LATEST NFPA 99 HEALTHCARE FACILITIES CODE.

10. COMPLY WITH THE LATEST NFPA 101 LIFE SAFETY CODE.

11. COMPLY WITH THE LATEST OIT DESIGN GUIDE.

12. COORDINATE ANY AND ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION SO

AS TO AVOID CONFLICT DURING CONSTRUCTION.

13. MOUNTING HEIGHTS INDICATED ARE TO CENTER OF DEVICE, BOXES, OUTLET, OR

EQUIPMENT UNLESS NOTED OTHERWISE.

14. ALL CONDUITS SHALL BE RGS OR EMT UNLESS OTHERWISE NOTED.

15. ALL MATERIALS, DEVICES, APPLIANCES AND EQUIPMENT SHALL BE LABEL LISTED BY AN

APPROVED THIRD PARTY TESTING AGENCY.

16. ANY DISCREPANCY BETWEEN PLANS AND SPECIFICATIONS SHALL BE BROUGHT TO THE

ATTENTION OF THE VA COR, ARCHITECT, AND ENGINEER OF RECORD FOR CLARIFICATION.

THE MORE STRINGENT OF THE THEM SHALL TAKE PRECEDENCE.

17. ALL COPPER OUTLETS/CONNECTORS SHALL BE TIA/EIA CAT 6.

18. ALL WORK AREA OUTLETS SHALL BE 8 PIN, CAT 6 KEYSTONE JACK WIRED PER T568B AS

DIRECTED BY THE VA COR.

19. LABELING SHALL BE ACCORDING TO LATEST ANSI/TIA 606A&B EDITION AS WELL AS THE

STANDARDS SET FORTH BY VA HOSPITAL OIT.

20. PAGING SYSTEM SPEAKER WIRE SHALL BE 18 GAUGE STRANDED SHIELDED.

21. ALL CABLING INSTALLED ABOVE CEILING SHALL BE PLENUM RATED.

22. PROVIDE 50 SPARE SPEAKERS.

23. PROVIDE 2 SPARE PAGING STATIONS.

24. PROVIDE 2 SPARE 2 CHANNEL 30 W AMPLIFIERS.

25. PROVIDE 1 SPARE 48 PORT POE SWITCH.

26. PROVIDE 1 SPARE 3000 VA UPS.

27. UPS SYSTEMS SHALL MEET NFPA 855 AND IFC CHAPTER 608 REQUIREMENTS.

28. AUDIO CARDS SHALL BE 600C WITH GROUND FAULT DETECTION.

29. ALL EQUIPMENT SHALL MEET LIFE SAFETY STANDARDS.

TECHNOLOGY SYMBOL LEGEND

ALL HEIGHTS ARE TO CENTER OF DEVICE UNLESS NOTED OTHERWISE.

ANY HEIGHTS INDICATED IN PLANS SHALL SUPERCEDE THOSE LISTED HERE.

SEE DRAWINGS FOR MORE INFORMATION.

WALL MOUNTED SPEAKER HORN

CEILING MOUNTED MICROPHONE

WALL MOUNTED PAGING STATION

CEILING MOUNTED SPEAKERCEILING

72" AFF

CEILING

ABOVE COUNTER

OR 60" AFF

S

P

M

S

S

SM

S

WP

CEILING MOUNTED 2x2x2 SPEAKERCEILING

SURFACE MOUNTED SPEAKERVARIES

WALL MOUNTED WATERPROOF SPEAKER

VARIES

VC

C

FACP

48" AFF

60" AFF

42" AFF

VARIES

EMERGENCY PHONE & BLUE LIGHT

VOLUME CONTROL

TV

WALL PHONE

EXISTING FIRE ALARM CONTROL PANEL

ELECTRICAL GENERAL NOTES

1. ALL ELECTRICAL DEVICES, FIXTURES, EQUIPMENT AND FEEDERS SHALL BE INSTALLED IN

ACCORDANCE WITH THE PROJECT SPECIFICATIONS, THE MANUFACTURER'S RECOMMENDED

PROCEDURES, ALL APPLICABLE LOCAL AND STATE CODES, AMERICANS WITH DISABILITIES ACT

AND WITH THE LATEST EDITION OF THE NATIONAL ELECTRICAL CODE AND VA STANDARDS.

2. PROVIDE ADDITIONAL SUPPORT FOR DEVICES, FIXTURES, EQUIPMENT AND FEEDERS WHERE THE

BUILDING CONSTRUCTION IS NOT SUITABLE FOR DIRECT MOUNTING.

3. FIRESTOP, DRAFTSTOP, SMOKESTOP AND/OR PROTECT THE ANNULAR SPACE AROUND ALL

PENETRATIONS THROUGH WALLS, PARTITIONS, FLOORS, CEILING, AND ROOFS IN ACCORDANCE

WITH THE REQUIREMENTS OF THE NATIONAL ELECTRICAL CODE, UL LISTING REQUIREMENT AND

THE APPLICABLE BUILDING CODES.

4. VERIFY CEILING SYSTEMS AND PROVIDE MOUNTING ACCESSORIES, TRIMS AND ALL REQUIRED

MOUNTING HARDWARE TO SUIT THE PARTICULAR INSTALLATION.

5. PROTECT EXISTING UNDERGROUND AND BUILDING INTERIOR UTILITIES DURING CONSTRUCTION.

6. BRANCH CIRCUIT CONDUCTORS SHALL BE 12 AWG COPPER MINIMUM.

7. COORDINATE ANY AND ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION SO AS TO

AVOID CONFLICT DURING CONSTRUCTION.

8. ALL PANELS SHALL HAVE TYPED, COMPLETED DIRECTORIES INDICATING EQUIPMENT SERVED AND

ROOM NUMBER (AS INDICATED ON FINAL BUILDING ROOM SIGNAGE) OF EQUIPMENT LOCATION, OR

SPARE, OR SPACE.

9. MANUFACTURER'S NAME AND MODEL NUMBER ARE GIVEN FOR DESCRIPTIVE PURPOSES, TO

INDICATE A QUALITY STANDARD, AND ARE NOT INTENDED TO LIMIT PRODUCTS TO A PARTICULAR

MANUFACTURER. PRODUCTS DEEMED EQUAL AND APPROVED BY THE DESIGNER WILL BE

ACCEPTED. ALL PRODUCTS MUST COMPLY WITH "BUY AMERICAN ACT".

10. ALL FEEDERS AND CIRCUITRY SHALL BE TORQUED PER THE PANEL, BREAKER, AND/OR

PARTICULAR EQUIPMENT MANUFACTURER'S SPECIFICATIONS.

11. CIRCUITRY TO SWITCHES, RECEPTACLES, AND ALL OTHER DEVICES SHALL BE TERMINATED ON THE

DEVICE'S SCREW TERMINALS.

12. MOUNTING HEIGHTS INDICATED ARE TO CENTER OF DEVICE, OUTLET, FIXTURE, OR EQUIPMENT

UNLESS NOTED OTHERWISE.

13. ALL WIRE TERMINATIONS SHALL BE RATED FOR 75 DEGREES C.

14. ALL CONDUCTORS SHALL HAVE THHN/THWN INSULATION, UNLESS OTHERWISE NOTED.

15. ALL CONDUIT SHALL BE RGS OR EMT UNLESS OTHERWISE NOTED. FMC CONDUIT SHALL BE USED

ON VIBRATING EQUIPMENT (MAXIMUM LENGTH OF 6 FEET). PVC SHALL BE USED FOR

UNDERGROUND CONDUIT OR WHERE CONCRETE-ENCASED. WHERE VIBRATING EQUIPMENT IS

LOCATED OUTSIDE, LFMC CONDUIT SHALL BE USED (MAXIMUM SIX FEET) FOR FINAL CONNECTIONS.

16. ALL ELECTRICAL MATERIALS, DEVICES, APPLIANCES AND EQUIPMENT SHALL BE LABEL LISTED BY

AN APPROVED THIRD PARTY TESTING AGENCY.

17. PROVIDE COMPRESSION COUPLINGS. SET SCREW FITTINGS ARE NOT ACCEPTABLE.

3 = THREE WAY

GFI = GROUND FAULT CIRCUIT INTERRUPTER

WIRING SYSTEM-BRANCH OR FEEDER CIRCUIT

120V QUAD RECEPTACLE, MOUNTED 18" AFF UNO

4 = FOUR WAY

JUNCTION BOX

SINGLE POLE SWITCH, MOUNTED 44" AFF

MODIFIERS FOR SWITCHES:

HOMERUN - 120V OR 277V

HOMERUN - 208V OR 480V

BRANCH OR FEEDER CIRCUIT HOMERUN TO PANELBOARD,

SWITCHBOARD, MOTOR CONTROL CENTER, ETC. SUBSCRIPT

DENOTES PANELBOARD, SWITCHBOARD, MOTOR CONTROL

CENTER, ETC. AND OVERCURRENT PROTECTION DEVICE

NUMBER.

120V DUPLEX RECEPTACLE, MOUNTED 18" AFF UNO

MODIFIERS FOR RECEPTACLES:

TELCO OUTLET MOUNTED 18" AFF UNO

WP = WEATHERPROOF

DM = DIMMER SWITCH

FUSED DISCONNECT

UNFUSED DISCONNECT

DATA/TELCO OUTLET MOUNTED 18" AFF UNO

120V SIMPLEX RECEPTACLE, MOUNTED 18" AFF UNO

208V 1PH TWISTLOCK RECEPTACLE, MOUNTED 18" AFF UNO

WIRING SYSTEM-SWITCHED BRANCH OR FEEDER CIRCUIT

OC = OCCUPANT SENSOR

J

S

ELECTRICAL LEGEND

1P

1PH

2/C

2W

3PH

A

AAP

AC

ACC

ACLG

ADO

A/E

AF

AFC

AFF

AFG

AFI

AJH

AHU

AIC

AL

ALT

AMP

APPROX

ARCH

AT

ATS

AUTO

AUX

AV

AWG

BAS

BATT

BC

BD

BFF

BLDG

BMS

BYP

C

CAB

CALC

CAP

CAT

CATV

CB

CCR

CCTV

cd

CD

CF

CKT

CLG

COAX

COMM

CONN

CONST

CONT

CONTR

COORD

CPT

CRI

CT

CTV

CTR

CU

CU FT

dB

DB

DC

DEG C

DEG F

DEMO

DEPT

DIA

DISC

DIST

DN

DS

DT

DWG

EC

EG

ELEC

ELEV

EM

EMI

EMS

EMT

EPO

EQUIP

ESMT

EWC

EWH

EX

EXP

FA

FAAP

FACP

FC

FCU

FIXT

FLR

FLUOR

FU

FUDS

FVR

FVNR

GAL

GALV

GC

GEN

GFI

GND

GRS

GYP BD

HID

HOA

HP

HT

HTR

HV

HVAC

IES

IG

IMC

IR

I/W

IWH

J-BOX

KV

KVA

KVAR

KW

KWH

LED

LF

LM

LRA

LT

LTG

LTNG

LV

MATV

MAX

MC

MCA

MCB

MCC

MDP

MECH

MFR

MFS

MH

MIC

MIN

MISC

MLO

MOA

MSBD

MT

MTS

MTR

NA

NC

NEC

NEMA

NFDS

NIC

NL

NO

NTS

OC

OD

OH

OL

PA

PB

PBPU

PCB

PC

PED

PEND

PF

PH

PIV

PNL

PoE

PR

PRI

PROJ

PRV

PT

PVC

PWR

QTY

RCP

RCPT

REQD

RGS

RM

RMS

RTU

SC

SEC

SF

SHT

SI

SIM

S/N

SPEC

SPKR

SP

SR

SS

SSW

STD

SURF

SW

SWBD

SYM

SYS

TC

TEL

TEL/DATA

TERM

TP

TPS

TR

T-STAT

TTB

TTC

TV

TYP

UC

UE

UG

UH

UL

UT

UTP

UTIL

UV

V

VA

VERT

VFD

VOL

W

W/

WH

W/O

WP

XFMR

XFR

Ø

C

P

L

L

ELECTRICAL ABBREVIATIONS LIST

STAINLESS STEEL

SELECTOR SWITCH

STANDARD

SURFACE MOUNTED

SWITCH

SWITCHBOARD

SYMMETRICAL

SYSTEM

TIMECLOCK

TELEPHONE

TELEPHONE/DATA

TERMINAL

TWISTED PAIR

TWISTED PAIR SHIELDED

TAMPER RESISTANT

THERMOSTAT

TELEPHONE TERMINAL BOARD

TELEPHONE TERMINAL CABINET

TELEVISION

TYPICAL

UNDER COUNTER

UNDERGROUND ELECTRICAL

UNDERGROUND

UNIT HEATER

UNDERWRITER'S LABORATORY

UNDERGROUND TELEPHONE

UNSHIELDED TWISTED PAIR

UTILITY

UNIT VENTILATOR OR

ULTRAVIOLET

VOLT

VOLT-AMPERES

VERTICAL

VARIABLE FREQUENCY DRIVE

VOLUME

WATT

WITH

WATER HEATER

WITHOUT

WEATHERPROOF

TRANSFORMER

TRANSFER

ANGLE

AT

DELTA

FEET

INCHES

NUMBER

PHASE

CENTER LINE

PLATE

MANUAL TRANSFER SWITCH

MOTOR, MOTORIZED

NOT APPLICABLE

NORMALLY CLOSED

NATIONAL ELECTRICAL CODE

NATIONAL ELECTRICAL

MANUFACTURER'S ASSOCIATION

NON-FUSED SAFETY

DISCONNECT SWITCH

NOT IN CONTRACT

NIGHT LIGHT

NORMALLY OPEN

NOT TO SCALE

ON CENTER

OUTSIDE DIAMETER

OVERHEAD

OVERLOAD

PUBLIC ADDRESS

PULL BOX OR PUSHBUTTON

PREFABRICATED BEDSIDE

PATIENT UNIT

POLYCHLORINATED BYPHENYL

PHOTOELECTRIC CELL

PEDESTAL

PENDANT

POWER FACTOR

PHASE

POST INDICATING VALVE

PANEL

POWER-OVER-ETHERNET

PAIR

PRIMARY

PROJECTION

POWER ROOF VENTILATOR

POTENTIAL TRANSFORMER

POLYVINYL CHLORIDE (CONDUIT)

POWER

QUANTITY

REFLECTED CEILING PLAN

RECEPTACLE

REQUIRED

RIGID GALVANIZED STEEL

ROOM

ROOT MEAN SQUARE

ROOF TOP UNIT

SURFACE CONDUIT

SERVICE ENTRANCE PROTECTION

SECONDARY

SQUARE FEET/FOOT

SHEET

INTERNATIONAL SYSTEM OF UNITS

SIMILAR

SOLID NEUTRAL

SPECIFICATION

SPEAKER

SPARE

SURFACE RACEWAY

1 POLE (2P, 3P, 4P, ETC.)

1 PHASE

TWO-CONDUCTOR (3/C, 4/C, ETC.)

TWO-WIRE (3W, 4W, ETC.)

3 PHASE

AMPERE

ALARM ANNUNCIATOR PANEL

ABOVE COUNTER

AIR CONDITIONER

ALTERNATING CURRENT

ACCESSIBLE

ABOVE CEILING

AUTOMATIC DOOR OPENER

ARCHITECT/ENGINEER

AMP FRAME

AVAILABLE FAULT CURRENT

(KILOAMPS)

ABOVE FINISHED FLOOR

ABOVE FINISHED GRADE

ARC FAULT CIRCUIT

INTERRUPTER

AUTHORITY HAVING JURISDICTION

AIR HANDLING UNIT

AMPERE INTERRUPTING CAPACITY

ALUMINUM

ALTERNATE

AMPERE

APPROXIMATELY

ARCHITECT, ARCHITECTURAL

AMP TRIP

AUTOMATIC TRANSFER SWITCH

AUTOMATIC

AUXILIARY

AUDIO VISUAL

AMERICAN WIRE GAUGE

BUILDING AUTOMATION SYSTEM

BATTERY

BARE COPPER

BOARD

BELOW FINISHED FLOOR

BUILDING

BUILDING MANAGEMENT SYSTEM

BYPASS

CONDUIT

CABINET

CALCULATED

CAPACITY

CATALOG, CATEGORY

COMMUNITY ANTENNA TELEVISION

CIRCUIT BREAKER

CONTROL CONTACTOR

CLOSED CIRCUIT TELEVISION

CANDELA

CONSTRUCTION DOCUMENTS

CONTRACTOR-FURNISHED

CIRCUIT

CEILING

COAXIAL CABLE

COMMUNICATION

CONNECTION

CONSTRUCTION

CONTINUATION OR CONTINUOUS

CONTRACTOR

COORDINATE

CONTROL POWER TRANSFORMER

COLOR RENDERING INDEX

CURRENT TRANSFORMER

CABLE TELEVISION

CENTER

COPPER

CUBIC FEET

DECIBEL

DIRECT BURIAL

DIRECT CURRENT

DEGREES CELSIUS

DEGREES FAHRENHEIT

DEMOLISH/DEMOLITION

DEPARTMENT

DIAMETER

DISCONNECT

DISTRIBUTION

DOWN

SAFETY DISCONNECT SWITCH

DOUBLE THROW

DRAWING

ELECTRICAL CONTRACTOR

EQUIPMENT GROUND

ELECTRIC, ELECTRICAL

ELEVATOR

EMERGENCY

ELECTROMAGNETIC INTERFERENCE

ENERGY MANAGEMENT SYSTEM

ELECTRICAL METALLIC TUBING

EMERGENCY POWER OFF

EQUIPMENT

EASEMENT

ELECTRIC WATER COOLER

ELECTRIC WALL HEATER

ELECTRIC WATER HEATER

EXISTING

EXPLOSION PROOF

FIRE ALARM

FIRE ALARM ANNUNCIATOR PANEL

FIRE ALARM CONTROL PANEL

FOOTCANDLE

FAN COIL UNIT

FIXTURE

FLOOR

FLUORESCENT

FUSE

FUSED SAFETY DISCONNECT

SWITCH

FULL VOLTAGE REVERSING

FULL VOLTAGE NON-REVERSING

GALLON

GALVANIZED

GENERAL CONTRACTOR

GENERATOR

GROUND FAULT CIRCUIT

INTERRUPTER

GROUND

GALVANIZED RIGID STEEL

(CONDUIT)

GYPSUM BOARD

HIGH-INTENSITY DISCHARGE

HAND-OFF-AUTOMATIC

HORSEPOWER

HEIGHT

HEATER

HIGH VOLTAGE

HEATING, VENTILATING AND

AIR CONDITIONING

ILLUMINATION ENGINEERING SOCIETY

ISOLATED GROUND

INTERMEDIATE METAL CONDUIT

INFRARED

INTERLOCK WITH

INSTANTANEOUS WATER HEATER

JUNCTION BOX

KILOVOLT

KILOVOLT-AMPERE

KILOVOLT-AMPERE REACTIVE

KILOWATT

KILOWATT HOUR

LIGHT-EMITTING DIODE

LINEAR FEET/FOOT

LUMEN

LOCKED ROTOR AMPS

LIGHT

LIGHTING

LIGHTNING

LOW VOLTAGE

MASTER ANTENNA TELEVISION

SYSTEM

MAXIMUM

MECHANICAL CONTRACTOR

METAL-CLAD (CONDUIT)

MINIMUM CIRCUIT AMPACITY

MAIN CIRCUIT BREAKER

MOTOR CONTROL CENTER

MAIN DISTRIBUTION PANEL

MECHANICAL

MANUFACTURER

MAIN FUSED DISCONNECT

SWITCH

MANHOLE

MICROPHONE

MINIMUM

MISCELLANEOUS

MAIN LUGS ONLY

MULTIOUTLET ASSEMBLY

MAIN SWITCHBOARD

MOUNT

S.E.P.

BOD BUILDING MANAGEMENT SYSTEM

TECHNOLOGY SYMBOLS,

NOTES AND ABBREVIATIONS

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

Revisions: Date

CONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

U.S. Department of Veterans Affairs © COPYRIGHT Apogee Consulting Group, P.A.

Engineers Architects

OVERHEAD PAGING

SYSTEM

558-19-211

DURHAM VA MEDICAL CENTER

508 FULTON STREET

DURHAM, NC 27705

19-225

BID DOCUMENTS

FULLY SPRINKLERED

JUNE 1, 2020 ABTJVE

T-001

DocuSign Envelope ID: CB929718-07BA-4455-89AB-E23A9972F742

SWITCH RM

S

S

S

S

S

S

S

S

S

S

S

PAMNS ZONE 'EB'

PAMNS ZONE 'BB'

PAMNS ZONE 'CB'

PAMNS ZONE 'CB'

PAMNS ZONE 'BB'

PAMNS ZONE 'EB'

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

1 BUILDING 1 BASEMENT FLOOR NEW WORK

SCALE: 1/16" = 1' 0"

01T-100

BUILDING 1 BASEMENT FLOOR

NEW WORK

N

O

R

T

H

PLAN

8 16 320

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

SHEET KEY NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

Revisions: Date

CONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

U.S. Department of Veterans Affairs © COPYRIGHT Apogee Consulting Group, P.A.

Engineers Architects

OVERHEAD PAGING

SYSTEM

558-19-211

DURHAM VA MEDICAL CENTER

508 FULTON STREET

DURHAM, NC 27705

19-225

BID DOCUMENTS

FULLY SPRINKLERED

JUNE 1, 2020 ABTJVE

A. PROVIDE PAMNS DEVICES AT LOCATIONS

INDICATED ON PLANS. PROVIDE WIRING AND

CIRCUIT AS INDICATED ON DETAILS.

B. ALL PAMN WIRING SHALL BE CONCEALED IN

WALLS, IN RACEWAY, IN WIREMOLD OR AND

ABOVE THE CEILING IN CABLE TRAY.

C. PAMN WIRING IN FINISHED AREAS SHALL BE IN

SURFACE RACEWAY (MECH. ROOM) OR

WIREMOLD (TUNNELS, ROOMS WITH NO

CEILINGS.)

D. ALL CEILING SPEAKERS SHALL BE SET AT 1/2

WATT UNLESS NOTED OTHERWISE.

E. ALL WALL MOUNTED SPEAKERS SHALL BE SET

AT 4 WATTS UNLESS NOTED OTHERWISE.

DocuSign Envelope ID: CB929718-07BA-4455-89AB-E23A9972F742

MATCHLINE T-101BMATCHLINE T-101B

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

SSS

S

S

S

S

PAMNS ZONE 'FG'

PAMNS ZONE 'FG'

PAMNS ZONE 'AG'

PAMNS ZONE 'AG'

PAMNS ZONE 'CG'

PAMNS ZONE 'BG'

PAMNS ZONE 'EG'

PAMNS ZONE 'EG'

S

S S S S

S

S

S

S

S

S

S

S

S

S

S

S S S

S

S

S

S

S

S

SS

S

S

S

SSS

S

S

S

S

S S S

S

SSSS

S

SSS

S

S

S

S

S

S

S

SSSSSSS

S

SSS

SS

S

S

S

S

S

S

SSSSSS

S

SSSS

S

S

S

S S S

S

S

SS S S S

S

S

S

SSSSSS

S S S S S S S

S

S

S

S

S

S

S

S

S

S

S

S

1 BUILDING 1 GROUND FLOOR NEW WORK

SCALE: 1/16" = 1' 0"

01T-101A

BUILDING 1 GROUND FLOOR

NEW WORK - AREA A

1. LOCATION OF PAMNS HEAD-END EQUIPMENT.

UTILIZE EXISTING EMPTY RACKS AT THIS

LOCATION TO HOLD NEW PAMNS HEAD-END

EQUIPMENT. COORDINATE WITH COR AND OIT.

2. LOCATION OF EXISTING 120/208V 3 PHASE 4

WIRE PANEL 'EEG'. COORDINATE ALL WORK

RELATED TO ELECTRICAL PANELS WITH COR.

N

O

R

T

H

PLAN

8 16 320

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

SHEET KEY NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

Revisions: Date

CONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

U.S. Department of Veterans Affairs © COPYRIGHT Apogee Consulting Group, P.A.

Engineers Architects

OVERHEAD PAGING

SYSTEM

558-19-211

DURHAM VA MEDICAL CENTER

508 FULTON STREET

DURHAM, NC 27705

19-225

BID DOCUMENTS

FULLY SPRINKLERED

JUNE 1, 2020 ABTJVE

A. PROVIDE PAMNS DEVICES AT LOCATIONS

INDICATED ON PLANS. PROVIDE WIRING AND

CIRCUIT AS INDICATED ON DETAILS.

B. ALL PAMN WIRING SHALL BE CONCEALED IN

WALLS, IN RACEWAY, IN WIREMOLD OR AND

ABOVE THE CEILING IN CABLE TRAY.

C. PAMN WIRING IN FINISHED AREAS SHALL BE IN

SURFACE RACEWAY (MECH. ROOM) OR

WIREMOLD (TUNNELS, ROOMS WITH NO

CEILINGS.)

D. ALL CEILING SPEAKERS SHALL BE SET AT 1/2

WATT UNLESS NOTED OTHERWISE.

E. ALL WALL MOUNTED SPEAKERS SHALL BE SET

AT 4 WATTS UNLESS NOTED OTHERWISE.

DocuSign Envelope ID: CB929718-07BA-4455-89AB-E23A9972F742

S

S

S

S

S

S

S

S

S

SSS

S

S

S

S

PAMNS ZONE 'FG'

PAMNS ZONE 'AG'

PAMNS ZONE 'AG'

PAMNS ZONE 'BG'

PAMNS ZONE 'CG'

PAMNS ZONE 'BG'

PAMNS ZONE 'EG'

PAMNS ZONE 'CG'

PAMNS ZONE 'DG'

SSSS

S

S

S

S

S

S

S

S

SS

S

S S S S

S

S

S

S

S

SSSSSS

S S S S S S S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

MATCHLINE T-101A MATCHLINE T-101A

1 BUILDING 1 GROUND FLOOR NEW WORK

SCALE: 1/16" = 1' 0"

01T-101B

BUILDING 1 GROUND FLOOR

NEW WORK - AREA B

N

O

R

T

H

PLAN

8 16 320

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

SHEET KEY NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

Revisions: Date

CONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

U.S. Department of Veterans Affairs © COPYRIGHT Apogee Consulting Group, P.A.

Engineers Architects

OVERHEAD PAGING

SYSTEM

558-19-211

DURHAM VA MEDICAL CENTER

508 FULTON STREET

DURHAM, NC 27705

19-225

BID DOCUMENTS

FULLY SPRINKLERED

JUNE 1, 2020 ABTJVE

A. PROVIDE PAMNS DEVICES AT LOCATIONS

INDICATED ON PLANS. PROVIDE WIRING AND

CIRCUIT AS INDICATED ON DETAILS.

B. ALL PAMN WIRING SHALL BE CONCEALED IN

WALLS, IN RACEWAY, IN WIREMOLD OR AND

ABOVE THE CEILING IN CABLE TRAY.

C. PAMN WIRING IN FINISHED AREAS SHALL BE IN

SURFACE RACEWAY (MECH. ROOM) OR

WIREMOLD (TUNNELS, ROOMS WITH NO

CEILINGS.)

D. ALL CEILING SPEAKERS SHALL BE SET AT 1/2

WATT UNLESS NOTED OTHERWISE.

E. ALL WALL MOUNTED SPEAKERS SHALL BE SET

AT 4 WATTS UNLESS NOTED OTHERWISE.

DocuSign Envelope ID: CB929718-07BA-4455-89AB-E23A9972F742

MATCHLINE T-102B

S

S

S

S

S

S

S

S

S

S

S

S

S

SS

S

S

S

S

S

S

P

PAMNS ZONE 'C1'

PAMNS ZONE 'B1'

PAMNS ZONE 'B1'

PAMNS ZONE 'F1'

PAMNS ZONE 'E1'

P

S

S

S

S

S S S S S S S S S S S

S

S S

S

S

S

S

S

S

S

SSSS

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S S

S

S

S

S

S

SSSSS

SS

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S S S S

S

S

S

S

S S

S

S

S

S

S S S

S

S

S

S

S

S

S

SS

S

S S S S S

S

S S S S S

SS

S

S

SS S S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S S S

S

SS

S

S

S

S

S

S

S

S

S

S

S

S

S

S S S S S S S S S S

S

S

S

S S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

PAMNS ZONE 'ED'

PAMNS ZONE 'F1'

PAMNS ZONE 'A1'

PAMNS ZONE 'ED'

MATCHLINE T-102B

S

S

1 BUILDING 1 1ST FLOOR NEW WORK

SCALE: 1/16" = 1' 0"

01T-102A

BUILDING 1 1ST FLOOR NEW

WORK - AREA A

N

O

R

T

H

PLAN

8 16 320

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

SHEET KEY NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

Revisions: Date

CONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

U.S. Department of Veterans Affairs © COPYRIGHT Apogee Consulting Group, P.A.

Engineers Architects

OVERHEAD PAGING

SYSTEM

558-19-211

DURHAM VA MEDICAL CENTER

508 FULTON STREET

DURHAM, NC 27705

19-225

BID DOCUMENTS

FULLY SPRINKLERED

JUNE 1, 2020 ABTJVE

A. PROVIDE PAMNS DEVICES AT LOCATIONS

INDICATED ON PLANS. PROVIDE WIRING AND

CIRCUIT AS INDICATED ON DETAILS.

B. ALL PAMN WIRING SHALL BE CONCEALED IN

WALLS, IN RACEWAY, IN WIREMOLD OR AND

ABOVE THE CEILING IN CABLE TRAY.

C. PAMN WIRING IN FINISHED AREAS SHALL BE IN

SURFACE RACEWAY (MECH. ROOM) OR

WIREMOLD (TUNNELS, ROOMS WITH NO

CEILINGS.)

D. ALL CEILING SPEAKERS SHALL BE SET AT 1/2

WATT UNLESS NOTED OTHERWISE.

E. ALL WALL MOUNTED SPEAKERS SHALL BE SET

AT 4 WATTS UNLESS NOTED OTHERWISE.

DocuSign Envelope ID: CB929718-07BA-4455-89AB-E23A9972F742

MATCHLINE T-102AMATCHLINE T-102A

S

S

S

PAMNS ZONE 'D1'

PAMNS ZONE 'C1'

PAMNS ZONE 'D1'

PAMNS ZONE 'C1'

PAMNS ZONE 'C1'

PAMNS ZONE 'A1'

S

S

S

S

S

S

SS

SSSSS

S

S

S

S

S

S

S

S

S

S

S

S

S

S

SSS

S

S

S S S S S S

S S S S S

S

S

S

S

S

1 BUILDING 1 1ST FLOOR NEW WORK

SCALE: 1/16" = 1' 0"

01T-102B

BUILDING 1 1ST FLOOR NEW

WORK - AREA B

N

O

R

T

H

PLAN

8 16 320

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

SHEET KEY NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

Revisions: Date

CONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

U.S. Department of Veterans Affairs © COPYRIGHT Apogee Consulting Group, P.A.

Engineers Architects

OVERHEAD PAGING

SYSTEM

558-19-211

DURHAM VA MEDICAL CENTER

508 FULTON STREET

DURHAM, NC 27705

19-225

BID DOCUMENTS

FULLY SPRINKLERED

JUNE 1, 2020 ABTJVE

A. PROVIDE PAMNS DEVICES AT LOCATIONS

INDICATED ON PLANS. PROVIDE WIRING AND

CIRCUIT AS INDICATED ON DETAILS.

B. ALL PAMN WIRING SHALL BE CONCEALED IN

WALLS, IN RACEWAY, IN WIREMOLD OR AND

ABOVE THE CEILING IN CABLE TRAY.

C. PAMN WIRING IN FINISHED AREAS SHALL BE IN

SURFACE RACEWAY (MECH. ROOM) OR

WIREMOLD (TUNNELS, ROOMS WITH NO

CEILINGS.)

D. ALL CEILING SPEAKERS SHALL BE SET AT 1/2

WATT UNLESS NOTED OTHERWISE.

E. ALL WALL MOUNTED SPEAKERS SHALL BE SET

AT 4 WATTS UNLESS NOTED OTHERWISE.

DocuSign Envelope ID: CB929718-07BA-4455-89AB-E23A9972F742

PAMNS ZONE 'B2'

PAMNS ZONE 'F2'

S

S

S

S

S

S

PAMNS ZONE 'A2'

PAMNS ZONE 'F2'

PAMNS ZONE 'C2'

PAMNS ZONE 'A2'

PAMNS ZONE 'C2'

PAMNS ZONE 'B2'

PAMNS ZONE 'E2'

MATCHLINE T-103BMATCHLINE T-103B

S S S S S

S

S

S

S S

S

S

SSS

S

S

S

S

S

SSSS

SSSSSSSSSSSSSSSSSS

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

1 BUILDING 1 2ND FLOOR NEW WORK

SCALE: 1/16" = 1' 0"

01T-103A

BUILDING 1 2ND FLOOR NEW

WORK - AREA A

N

O

R

T

H

PLAN

8 16 320

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

SHEET KEY NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

Revisions: Date

CONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

U.S. Department of Veterans Affairs © COPYRIGHT Apogee Consulting Group, P.A.

Engineers Architects

OVERHEAD PAGING

SYSTEM

558-19-211

DURHAM VA MEDICAL CENTER

508 FULTON STREET

DURHAM, NC 27705

19-225

BID DOCUMENTS

FULLY SPRINKLERED

JUNE 1, 2020 ABTJVE

A. PROVIDE PAMNS DEVICES AT LOCATIONS

INDICATED ON PLANS. PROVIDE WIRING AND

CIRCUIT AS INDICATED ON DETAILS.

B. ALL PAMN WIRING SHALL BE CONCEALED IN

WALLS, IN RACEWAY, IN WIREMOLD OR AND

ABOVE THE CEILING IN CABLE TRAY.

C. PAMN WIRING IN FINISHED AREAS SHALL BE IN

SURFACE RACEWAY (MECH. ROOM) OR

WIREMOLD (TUNNELS, ROOMS WITH NO

CEILINGS.)

D. ALL CEILING SPEAKERS SHALL BE SET AT 1/2

WATT UNLESS NOTED OTHERWISE.

E. ALL WALL MOUNTED SPEAKERS SHALL BE SET

AT 4 WATTS UNLESS NOTED OTHERWISE.

DocuSign Envelope ID: CB929718-07BA-4455-89AB-E23A9972F742

MATCHLINE T-103A

PAMNS ZONE 'B2'

PAMNS ZONE 'F2'

S

S

S S

PAMNS ZONE 'A2'

PAMNS ZONE 'F2'

PAMNS ZONE 'D2'

PAMNS ZONE 'C2'

PAMNS ZONE 'D2'

PAMNS ZONE 'C2'

PAMNS ZONE 'C2'

PAMNS ZONE 'A2'

PAMNS ZONE 'C2'

PAMNS ZONE 'B2'

PAMNS ZONE 'E2'

S

S

S

S

S

SSSS

SSSSSSSSSSSSSSSSSS

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

SS SS

S

S

S S S S S S

S S S S S

S

MATCHLINE T-103A

1 BUILDING 1 2ND FLOOR NEW WORK

SCALE: 1/16" = 1' 0"

01T-103B

BUILDING 1 2ND FLOOR NEW

WORK -AREA B

N

O

R

T

H

PLAN

8 16 320

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

SHEET KEY NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

Revisions: Date

CONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

U.S. Department of Veterans Affairs © COPYRIGHT Apogee Consulting Group, P.A.

Engineers Architects

OVERHEAD PAGING

SYSTEM

558-19-211

DURHAM VA MEDICAL CENTER

508 FULTON STREET

DURHAM, NC 27705

19-225

BID DOCUMENTS

FULLY SPRINKLERED

JUNE 1, 2020 ABTJVE

A. PROVIDE PAMNS DEVICES AT LOCATIONS

INDICATED ON PLANS. PROVIDE WIRING AND

CIRCUIT AS INDICATED ON DETAILS.

B. ALL PAMN WIRING SHALL BE CONCEALED IN

WALLS, IN RACEWAY, IN WIREMOLD OR AND

ABOVE THE CEILING IN CABLE TRAY.

C. PAMN WIRING IN FINISHED AREAS SHALL BE IN

SURFACE RACEWAY (MECH. ROOM) OR

WIREMOLD (TUNNELS, ROOMS WITH NO

CEILINGS.)

D. ALL CEILING SPEAKERS SHALL BE SET AT 1/2

WATT UNLESS NOTED OTHERWISE.

E. ALL WALL MOUNTED SPEAKERS SHALL BE SET

AT 4 WATTS UNLESS NOTED OTHERWISE.

DocuSign Envelope ID: CB929718-07BA-4455-89AB-E23A9972F742

SS

S

S

S

S S

S

S

S

PAMNS ZONE 'C3'

PAMNS ZONE 'B3'

PAMNS ZONE 'A3'

PAMNS ZONE 'F3'

PAMNS ZONE 'B3'

PAMNS ZONE 'F3'

PAMNS ZONE 'E3'

MATCHLINE T-104BMATCHLINE T-104B

S S S S S S S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

SS

S S S

S

S

S

S

S

S

S

S

S S S

S

S

S

S

S

S S S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S S S S

S

S

S

S

SSS

S

S

S

SS

S

S

SSSSS

S

S

S

S

S

S

S

S

SSSSSSSSSSSS

S

S

S

S

S

S

S

S

S

S

S

S

S

SS

S

S

S

S

S

S

S S

S S S

S S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S S

S

S

S

S

1 BUILDING 1 3RD FLOOR NEW WORK

SCALE: 1/16" = 1' 0"

01T-104A

BUILDING 1 3RD FLOOR NEW

WORK - AREA A

N

O

R

T

H

PLAN

8 16 320

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

SHEET KEY NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

Revisions: Date

CONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

U.S. Department of Veterans Affairs © COPYRIGHT Apogee Consulting Group, P.A.

Engineers Architects

OVERHEAD PAGING

SYSTEM

558-19-211

DURHAM VA MEDICAL CENTER

508 FULTON STREET

DURHAM, NC 27705

19-225

BID DOCUMENTS

FULLY SPRINKLERED

JUNE 1, 2020 ABTJVE

1. LOCATION OF PAMNS HEAD-END EQUIPMENT.

2. LOCATION OF EXISTING 120/208V 3 PHASE 4 WIRE

PANEL 'EC3F9'. COORDINATE ALL WORK RELATED

TO ELECTRICAL PANELS WITH COR.

A. PROVIDE PAMNS DEVICES AT LOCATIONS

INDICATED ON PLANS. PROVIDE WIRING AND

CIRCUIT AS INDICATED ON DETAILS.

B. ALL PAMN WIRING SHALL BE CONCEALED IN

WALLS, IN RACEWAY, IN WIREMOLD OR AND

ABOVE THE CEILING IN CABLE TRAY.

C. PAMN WIRING IN FINISHED AREAS SHALL BE IN

SURFACE RACEWAY (MECH. ROOM) OR

WIREMOLD (TUNNELS, ROOMS WITH NO

CEILINGS.)

D. ALL CEILING SPEAKERS SHALL BE SET AT 1/2

WATT UNLESS NOTED OTHERWISE.

E. ALL WALL MOUNTED SPEAKERS SHALL BE SET

AT 4 WATTS UNLESS NOTED OTHERWISE.

DocuSign Envelope ID: CB929718-07BA-4455-89AB-E23A9972F742

MATCHLINE T-104AMATCHLINE T-104A

SS

S

S

S

S

S

S

S S

S

S

S

PAMNS ZONE 'D3'

PAMNS ZONE 'C3'

PAMNS ZONE 'D3'

PAMNS ZONE 'C3'

PAMNS ZONE 'C3'

PAMNS ZONE 'B3'

PAMNS ZONE 'C3'

PAMNS ZONE 'A3'

PAMNS ZONE 'A3'

PAMNS ZONE 'F3'

PAMNS ZONE 'B3'

PAMNS ZONE 'F3'

PAMNS ZONE 'E3'

S

S

S

S

S

S

S

S S S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S S S S

S

S

S

S

SSS

S

S

S

SS

S

S

SSSSS

S

S

S

S

S

S

S

S

S

S

S

SSSSSSSSSSSS

S

S

S

S

S

S

S

S

S

S

S

SS

S

S

S

S

S

S

S

S

S

S

S

S

S

SSSSSS

S

S S S S

S

S

S

S

S

S

S

S

S

S

S

S

S

S S

S

S

S

S

1 BUILDING 1 3RD FLOOR NEW WORK

SCALE: 1/16" = 1' 0"

01T-104B

BUILDING 1 3RD FLOOR NEW

WORK - AREA B

N

O

R

T

H

PLAN

8 16 320

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

SHEET KEY NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

Revisions: Date

CONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

U.S. Department of Veterans Affairs © COPYRIGHT Apogee Consulting Group, P.A.

Engineers Architects

OVERHEAD PAGING

SYSTEM

558-19-211

DURHAM VA MEDICAL CENTER

508 FULTON STREET

DURHAM, NC 27705

19-225

BID DOCUMENTS

FULLY SPRINKLERED

JUNE 1, 2020 ABTJVE

A. PROVIDE PAMNS DEVICES AT LOCATIONS

INDICATED ON PLANS. PROVIDE WIRING AND

CIRCUIT AS INDICATED ON DETAILS.

B. ALL PAMN WIRING SHALL BE CONCEALED IN

WALLS, IN RACEWAY, IN WIREMOLD OR AND

ABOVE THE CEILING IN CABLE TRAY.

C. PAMN WIRING IN FINISHED AREAS SHALL BE IN

SURFACE RACEWAY (MECH. ROOM) OR

WIREMOLD (TUNNELS, ROOMS WITH NO

CEILINGS.)

D. ALL CEILING SPEAKERS SHALL BE SET AT 1/2

WATT UNLESS NOTED OTHERWISE.

E. ALL WALL MOUNTED SPEAKERS SHALL BE SET

AT 4 WATTS UNLESS NOTED OTHERWISE.

DocuSign Envelope ID: CB929718-07BA-4455-89AB-E23A9972F742

PAMNS ZONE 'C4'

PAMNS ZONE 'A4'

PAMNS ZONE 'C4'

PAMNS ZONE 'B4'

P A

M N

S

Z

O N

E

A

P A

M N

S

Z

O N

E

E

P A

M N

S

Z

O N

E

E

P A

M N

S

Z

O N

E

B

S S S S

S

SS

S

S

S

S

S

SSS

S

S

S

S

S

S

S

S

SSSS

S

S

S

S

S

S

S

S

S

S

S

S S

S

S

SS

S

S

S

S

S

S

SSSSSSSSSSS

S

S

S

S

S

S

S

S

SSSSSS S S S S S

PAMNS ZONE 'OR'

PAMNS ZONE 'C4'

P

A

M

N

Z

R

P

A

M

Z

C

VC

VC

VC

S

S

S

S

S

S

S

1 BUILDING 1 4TH FLOOR NEW WORK

SCALE: 1/16" = 1' 0"

01T-105

BUILDING 4TH FLOOR NEW

WORK

N

O

R

T

H

PLAN

8 16 320

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

SHEET KEY NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

Revisions: Date

CONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

U.S. Department of Veterans Affairs © COPYRIGHT Apogee Consulting Group, P.A.

Engineers Architects

OVERHEAD PAGING

SYSTEM

558-19-211

DURHAM VA MEDICAL CENTER

508 FULTON STREET

DURHAM, NC 27705

19-225

BID DOCUMENTS

FULLY SPRINKLERED

JUNE 1, 2020 ABTJVE

A. PROVIDE PAMNS DEVICES AT LOCATIONS

INDICATED ON PLANS. PROVIDE WIRING AND

CIRCUIT AS INDICATED ON DETAILS.

B. ALL PAMN WIRING SHALL BE CONCEALED IN

WALLS, IN RACEWAY, IN WIREMOLD OR AND

ABOVE THE CEILING IN CABLE TRAY.

C. PAMN WIRING IN FINISHED AREAS SHALL BE IN

SURFACE RACEWAY (MECH. ROOM) OR

WIREMOLD (TUNNELS, ROOMS WITH NO

CEILINGS.)

D. ALL CEILING SPEAKERS SHALL BE SET AT 1/2

WATT UNLESS NOTED OTHERWISE.

E. ALL WALL MOUNTED SPEAKERS SHALL BE SET

AT 4 WATTS UNLESS NOTED OTHERWISE.

DocuSign Envelope ID: CB929718-07BA-4455-89AB-E23A9972F742

S

S

S

S

S

S

PAMNS ZONE 'C5'

PAMNS ZONE 'A5'

PAMNS ZONE 'OR'

PAMNS ZONE 'C5'

PAMNS ZONE 'C5'

PAMNS ZONE 'B5'

PAMNS ZONE 'D5'

PAMNS ZONE 'C5'

P A

M N

S

Z

O N

E

A

P A

M N

S

Z

O N

E

B

S

S

S

S

SSS

S

S

S

SSS

SSSSSSS

S

S

S

SSSSSSSSSSSSSSS

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S S S SSSSSSS

S

S

S

S

S

S

S

S

S

S

S

S

S

S

PAMNS ZONE 'D5' PAMNS ZONE 'OR'

S

S

S

S

S

1 BUILDING 1 5TH FLOOR NEW WORK

SCALE: 1/16" = 1' 0"

01T-106

BUILDING 1 5TH FLOOR NEW

WORK

N

O

R

T

H

PLAN

8 16 320

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

SHEET KEY NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

Revisions: Date

CONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

U.S. Department of Veterans Affairs © COPYRIGHT Apogee Consulting Group, P.A.

Engineers Architects

OVERHEAD PAGING

SYSTEM

558-19-211

DURHAM VA MEDICAL CENTER

508 FULTON STREET

DURHAM, NC 27705

19-225

BID DOCUMENTS

FULLY SPRINKLERED

JUNE 1, 2020 ABTJVE

1. LOCATION OF PAMNS HEAD-END EQUIPMENT.

2. LOCATION OF 120/208V 3 PHASE 4 WIRE PANEL

'EC5A1'. COORDINATE ALL WORK RELATED TO

ELECTRICAL PANELS WITH COR.

A. PROVIDE PAMNS DEVICES AT LOCATIONS

INDICATED ON PLANS. PROVIDE WIRING AND

CIRCUIT AS INDICATED ON DETAILS.

B. ALL PAMN WIRING SHALL BE CONCEALED IN

WALLS, IN RACEWAY, IN WIREMOLD OR AND

ABOVE THE CEILING IN CABLE TRAY.

C. PAMN WIRING IN FINISHED AREAS SHALL BE IN

SURFACE RACEWAY (MECH. ROOM) OR

WIREMOLD (TUNNELS, ROOMS WITH NO

CEILINGS.)

D. ALL CEILING SPEAKERS SHALL BE SET AT 1/2

WATT UNLESS NOTED OTHERWISE.

E. ALL WALL MOUNTED SPEAKERS SHALL BE SET

AT 4 WATTS UNLESS NOTED OTHERWISE.

DocuSign Envelope ID: CB929718-07BA-4455-89AB-E23A9972F742

PAMNS ZONE 'C6'

PAMNS ZONE 'A6'

PAMNS ZONE 'C6'

PAMNS ZONE 'B6'

P A

M N

S

Z

O N

E

A

P A

M N

S

Z

O N

E

B

SSSSS

S

SSSSS

S

S

SSSSSSSSSSSSS

S

S

S

S

S

S

S

S

S

S S

S

S

1 BUILDING 1 6TH FLOOR NEW WORK

SCALE: 1/16" = 1' 0"

01T-107

BUILDING 1 6TH FLOOR NEW

WORK

N

O

R

T

H

PLAN

8 16 320

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

SHEET KEY NOTES:

321 4 5 6 7

A B

C D

E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

Revisions: Date

CONSULTANTS:

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

U.S. Department of Veterans Affairs © COPYRIGHT Apogee Consulting Group, P.A.

Engineers Architects

OVERHEAD PAGING

SYSTEM

558-19-211

DURHAM VA MEDICAL CENTER

508 FULTON STREET

DURHAM, NC 27705

19-225

BID DOCUMENTS

FULLY SPRINKLERED

JUNE 1, 2020 ABTJVE

A. PROVIDE PAMNS DEVICES AT LOCATIONS

INDICATED ON PLANS. PROVIDE WIRING AND

CIRCUIT AS INDICATED ON DETAILS.

B. ALL PAMN WIRING SHALL BE CONCEALED IN

WALLS, IN RACEWAY, IN WIREMOLD OR AND

ABOVE THE CEILING IN CABLE TRAY.

C. PAMN WIRING IN FINISHED AREAS SHALL BE IN

SURFACE RACEWAY (MECH. ROOM) OR

WIREMOLD (TUNNELS, ROOMS WITH NO

CEILINGS.)

D. ALL CEILING SPEAKERS SHALL BE SET AT 1/2

WATT UNLESS NOTED OTHERWISE.

E. ALL WALL MOUNTED SPEAKERS SHALL BE SET

AT 4 WATTS UNLESS NOTED OTHERWISE.

DocuSign Envelope ID: CB929718-07BA-4455-89AB-E23A9972F742

PAMNS ZONE 'C7'

PAMNS ZONE 'A7'

PAMNS ZONE 'B7'

P A

M N

S

Z

O N

E

A

P A

M N

S

Z

O N

E

B

S

S

SSSSS

S

SSSSS

S

S

SSSSSSSSSSSSS

S

S

S

S

S

S

S

S

S

S S

S

S

S

S

S

S

SS

S S

S

1 BUILDING 1 7TH FLOOR NEW WORK

SCALE: 1/16" = 1' 0"

01T-108

BUILDING 1 7TH FLOOR NEW

WORK

N

O

R

T

H

PLAN

8 16 320

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .