NNL16560334E_Solicitation_Conformed_through_Amendment_4.rtf.pdf
PDF 668 KB Posted
- Attached to
- NASA LARC BUILDING 1230 EAST WING RENOVATION
- Solicitation number
- NNL15560334E
About this file
NNL16560334E Solicitation Conformed through Amendment 4
View the file
Other files
| File | Type | Posted |
|---|---|---|
| NNL16560334E_Amend_6.pdf | ||
| NNL16560334E_Amend_5.pdf | ||
| NNL16560334E_Amendment_000004.pdf | ||
| NNL16560334E_Amendment_4_Questions_and_Answers.pdf | ||
| NNL16560334E_Amendment_000003.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
LARC
NASA Langley Research Center Office of Procurement Bid Depository 5 Langley Blvd., Bldg. 2101, Rm. 308 Hampton, VA 23681-2199
Krista Jensen 757-864-3346 xNNL16560334E
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
PROJECT TITLE: NASA Langley Research Center Building 1230 East Wing Renovation
PROJECT DESCRIPTION: The Contractor shall provide all resources necessary to deliver and/or perform the construction project entitled "NASA Langley Research Center (LaRC)Building 1230 East Wing Renovation.
NASA Langley Research Center Building 1230 East Wing Renovation. The required work includes, but is not limited to, demolition of walls, piping and insulation, earth work, foundation repair, steel erection, rollup doors, site work, wall and ceiling replacement, painting, plumbing, mechanical, electrical, fire detection and prevention, and other work as indicated in the attached contract specification documents.
THIS PROCUREMENT IS A TOTAL SERVICE-DISBALED VETERAN-OWNED SMALL BUSINESS
SET-ASIDE PROCUREMENT.
North American Industry Classification System (NAICS): 236220; Size Standard: $36.5 Million
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
10 420 calendar days and complete it within ________________ ________________ calendar days after receiving
SECTION F CLAUSE 52.211-10
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time
_____________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected .
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
NASA Langley Research Center Office of Procurement Bid Depository 5 Langley Blvd., Bldg. 2101, Rm. 308 Hampton, VA 23681-2199
PR 4200560334
2/3/2016
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
NASA/Langley Research Center 5 Langley Blvd., Bldg. 2101
M/S 12 Hampton VA 23681-2199
LARC
31a. NAME OF CONTRACTING OFFICER (Type or print)
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
Continued...
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 43
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
NNL16560334E
001 Building 1230 East Wing Renovation.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
NNL16560334E
PART I -- THE SCHEDULE
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
B.1 LaRC 52.201-90 NAMING/NUMBERING SCHEME FOR CLAUSES IN FULL TEXT
AND FOR CLAUSES INCORPORATED BY REFERENCE (MARCH 2012)
There are various types of clauses contained in the contract. Most clauses will reference a numbered cite such as: Federal Acquisition Regulation (FAR 52.#); NASA FAR Supplement (NFS 1852.#); or Langley Research Center (LaRC 52.#). There are also clauses that have no numbered cite designation. Those clauses were written by LaRC for this specific contract or were written as generic Agency clauses specific for this contract type.
B.2 1852.216-78 FIRM FIXED PRICE. (DEC 1988)
The total firm fixed price of this contract is $_____________.
(End of clause)
B.3 SUPPLIES AND/OR SERVICES TO BE PROVIDED
The Contractor shall provide all resources (except as may be expressly stated in the contract as furnished by the Government) necessary to deliver and/or perform the items below in accordance with the Description/Specifications/Statement of Work for construction project entitled “NASA Langley Research Center (LaRC) Building 1230 East Wing Renovation” incorporated in Exhibit A Specifications.
(End of clause)
(End of Section)
SECTIONS C, D, & E
SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C.1 SPECIFICATION/STATEMENT OF WORK
The Contractor shall provide the item or services specified in Section B in accordance with the following:
Section J, Exhibit A Section J, Exhibit B
SECTION D - PACKAGING AND MARKING
This Section Not Used.
SECTION E - INSPECTION AND ACCEPTANCE
E.1 CLAUSES INCORPORATED BY REFERENCE -- SECTION E
This Section contains clauses incorporated by reference, which have the same force and effect as if they were given in full text. Clauses incorporated by reference which require a fill-in by the Government include the text of the affected paragraph(s) only. This does not limit the clause to the affected paragraph(s). The Contractor is responsible for understanding and complying with the entire clause. The full text of the clause is available at the addresses contained in clause 52.252-2, Clauses Incorporated by Reference, of this contract.
(End of Clause)
CLAUSES INCORPORATED BY REFERENCE
CLAUSE
NUMBER CLAUSE TITLE (DATE)
52.246-12 INSPECTION OF CONSTRUCTION. (APR 1996)
E.2 1852.246-71 GOVERNMENT CONTRACT QUALITY ASSURANCE FUNCTIONS.
(OCT 1988)
In accordance with the inspection clause of this contract, the Government intends to perform the following functions at the locations indicated:
Item Quality Assurance Location Function
1. Project Site, LaRC In-Process Inspection
2. Project Site, LaRC Final Inspection
SECTION F - DELIVERIES OR PERFORMANCE
F.1 CLAUSES INCORPORATED BY REFERENCE -- SECTION F
Clause(s) below at the beginning of this Section are incorporated by reference, with the same force and effect as if they were given in full text. Clauses incorporated by reference which require a fill-in by the Government include the text of the affected paragraph(s) only. This does not limit the clause to the affected paragraph(s). The Contractor is responsible for understanding and complying with the entire clause. The full text of the clause is available at the addresses contained in clause 52.252-2, Clauses Incorporated by Reference, of this contract.
(End of Clause)
CLAUSES INCORPORATED BY REFERENCE
CLAUSE
NUMBER CLAUSE TITLE (DATE)
52.211-13 TIME EXTENSIONS (SEP 2000)
52.242-14 SUSPENSION OF WORK. (APR 1984)
F.2 52.211-12 LIQUIDATED DAMAGES - CONSTRUCTION. (SEP 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $773.00 the first day of delay, and $370.00 per day for each subsequent calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
(End of clause)
F.3 PLACE OF PERFORMANCE
The services to be performed under this contact shall be performed at the following location(s): NASA Langley Research Center, Hampton, VA 23681.
SECTION G - CONTRACT ADMINISTRATION DATA
G.1 CLAUSES INCORPORATED BY REFERENCE -- SECTION G
Clause(s) below at the beginning of this Section are incorporated by reference, with the same force and effect as if they were given in full text. Clauses incorporated by reference which require a fill-in by the Government include the text of the affected paragraph(s) only. This does not limit the clause to the affected paragraph(s). The Contractor is responsible for understanding and complying with the entire clause. The full text of the clause is available at the addresses contained in clause 52.252-2, Clauses Incorporated by Reference, of this contract.
(End of Clause)
CLAUSES INCORPORATED BY REFERENCE
CLAUSE
NUMBER CLAUSE TITLE (DATE)
1852.245-82
OCCUPANCY MANAGEMENT REQUIREMENTS. (JAN 2011)
Paragraph (a)(3) fill-in: LAPD 8800.14, Real Property Management
1852.245-83
REAL PROPERTY MANAGEMENT REQUIREMENTS. (JAN 2011)
Paragraph (a)(3) fill-in: LAPD 8800.14, Real Property Management
SECTION H - SPECIAL CONTRACT REQUIREMENTS
H.1 CLAUSES INCORPORATED BY REFERENCE -- SECTION H
Clause(s) below at the beginning of this Section are incorporated by reference, with the same force and effect as if they were given in full text. Clauses incorporated by reference which require a fill-in by the Government include the text of the affected paragraph(s) only. This does not limit the clause to the affected paragraph(s). The Contractor is responsible for understanding and complying with the entire clause. The full text of the clause is available at the addresses contained in clause 52.252-2, Clauses Incorporated by Reference, of this contract.
(End of Clause)
CLAUSES INCORPORATED BY REFERENCE
CLAUSE
NUMBER CLAUSE TITLE (DATE)
1852.223-70 SAFETY AND HEALTH. (APR 2002)
1852.223-75 MAJOR BREACH OF SAFETY OR SECURITY. (FEB 2002)
1852.225-70 EXPORT LICENSES. (FEB 2000)
Paragraph (b) fill-in: NASA Langley Research Center.
H.2 1852.242–72 Denied Access to NASA Facilities (OCT 2015)
(a)
(1) The performance of this contract requires contractor employees of the prime contractor or any subcontractor, affiliate, partner, joint venture, or team member with which the contractor is associated, including consultants engaged by any of these entities, to have access to, physical entry into, and to the extent authorized, mobility within, a NASA facility.
(2) NASA may close and or deny contractor access to a NASA facility for a portion of a business day or longer due to any one of the following events:
(i) Federal public holidays for federal employees in accordance with 5 U.S.C. 6103.
(ii) Fires, floods, earthquakes, unusually severe weather to include snow storms, tornadoes and hurricanes.
(iii) Occupational safety or health hazards.
(iv) Non-appropriation of funds by Congress.
(v) Any other reason.
(3) In such events, the contractor employees may be denied access to a NASA facility, in part or in whole, to perform work required by the contract. Contractor personnel already present at a NASA facility during such events may be required to leave the facility.
(b) In all instances where contractor employees are denied access or required to vacate a NASA facility, in part or in whole, the contractor shall be responsible to ensure contractor personnel working under the contract comply. If the circumstances permit, the contracting officer will provide direction to the contractor, which could include continuing on-site performance during the NASA facility closure period. In the absence of such direction, the contractor shall exercise sound judgment to minimize unnecessary contract costs and performance impacts by, for example, performing required work off-site if possible or reassigning personnel to other activities if appropriate.
(c) The contractor shall be responsible for monitoring the local radio, television stations, NASA Web sites, other communications channels, for example contracting officer notification, that the NASA facility is accessible. Once accessible the contractor shall resume contract performance as required by the contract.
(d) For the period that NASA facilities were not accessible to contractor employees, the contracting officer may—
(1) Adjust the contract performance or delivery schedule for a period equivalent to the period the NASA facility was not accessible;
(2) Forego the work;
(3) Reschedule the work by mutual agreement of the parties; or
(4) Consider properly documented requests for equitable adjustment, claim, or any other remedy pursuant to the terms and conditions of the contract.
(e) Notification procedures of a NASA facility closure, including contractor denial of access, as follows:
(1) The contractor shall be responsible for monitoring the local radio, television stations, NASA Web sites, other communications channels, for example contracting officer notification, for announcement of a NASA facility closure to include denial of access to the NASA facility. The contractor shall be responsible for notification of its employees of the NASA facility closure to include denial of access to the NASA facility. The dismissal of NASA employees in accordance with statute and regulations providing for such dismissals shall not, in itself, equate to a NASA facility closure in which contractor employees are denied access. Moreover, the leave status of NASA employees shall not be conveyed or imputed to contractor personnel. Accordingly, unless a NASA facility is closed and the contractor is denied access to the facility, the contractor shall continue performance in accordance with the contract.
(2) NASA’s Emergency Notification System (ENS). ENS is a NASA-wide Emergency Notification and Accountability System that provides NASA the ability to send messages, both Agency-related and/or Center-related, in the event of an emergency or emerging situation at a NASA facility. Notification is provided via multiple communication devices, e.g. Email, text, cellular, home/office numbers.
The ENS provides the capability to respond to notifications and provide the safety status. Contractor employees may register for these notifications at the ENS Web site: http://www.hq.nasa.gov/office/ops/nasaonly/ENSinformation.html.
http://www.hq.nasa.gov/office/ops/nasaonly/ENSinformation.html
H.3 1852.243-72 EQUITABLE ADJUSTMENTS. (APR 1998)
Paragraph (b) fill-in:
H.4 LaRC 52.204-91 Security Program/Foreign National Employee Access Requirements (APRIL 2014)
1) Applicable Definitions:
Foreign National: Any person who is not a U.S. citizen and who is not a lawful permanent resident as defined by 8 U.S.C. 1101(a) (20) or any person who is not a protected individual as defined by 8 U.S.C. 1324b(a) (3). This also means any foreign corporation, business association, partnership, trust, society or any other entity or group that is not incorporated or organized to do business in the U.S., as well as any international organizations, any foreign government, and any agency or subdivision of foreign governments (e.g., diplomatic missions).
Lawful Permanent Resident (LPR): A non-U.S. citizen legally permitted to reside and work within the U.S. and issued a Resident Alien Identification (also known as a Green Card). LPRs are to be afforded all the rights and privileges of a U.S. citizen with the exception of voting, holding public office, access to classified national security information, and employment in the federal sector (except for specific needs or under temporary appointment per 5 CFR, Part 7, Section 7.4). LPRs are not prohibited from accessing export controlled commodities, but must have a work-related "need-to-know" for access. LPRs are considered foreign nationals under immigration laws. LPR, as defined herein, is to replace the term “Permanent Resident Alien” (PRA) in all NASA guidance that has not yet been updated to the use of LPR.
2) Requirements for Center Access for Foreign Nationals who are not LPRs:
Access to the NASA Langley Research Center by foreign nationals who are not LPRs shall be approved in accordance with NPR 1600.4, “Identity and Credential Management” and Interim Policy Regarding Foreign National Access Management, dated April 2, 2014. Center access approval requires a minimum of 5 (five) working days advance notice. Designated country nationals require a minimum of 30 (thirty) working days advance notice
Overhead Profit Commission To Contractor on work performed by other than its own forces
0% 0% 10%
To first tier subcontractor on work performed by its subcontractors
0% 0% 10%
To Contractor and/or subcontractors on work performed with their own forces
10% 10% 10% because of additional approval requirements. Foreign nationals who are not LPRs must be escorted by a NASA Civil Servant or permanently badged contractor at all times while on Center unless otherwise approved in writing by the International Visitors Coordinator (IVC).
3) Requirements for Center Access for LPRs:
a) Visit requests should be submitted directly to the Badge and Pass Office (BPO) using an LF-103. LPRs may be sponsored for Center access by permanently badged contractor employees or NASA civil servants.
Contractor LPRs are generally expected to be sponsored by the employing contractor.
b) LPRs who will be at LaRC in excess of 29 days will be processed through IdMAX.
c) LPRs who will be at LaRC in excess of 179 days will be processed for PIV credentials that will remain valid for 5 years.
d) Contractor management is responsible for ensuring credentials issued to LPRs sponsored by the contractor are returned when the LPR no longer requires access to NASA LaRC under the contract or no longer works for the contractor.
e) No Security Transfer Technology Control Plan (STTCP) is required for LPRs.
f) LPRs on a work related, "need-to-know” basis are allowed access to export controlled commodities. It is incumbent on the Branch Head or Program Manager to appropriately determine who should have access to export controlled information. The Security Services Branch and the Center Export Administrator are available for guidance.
g) LPRs are permitted to carry personal mobile devices on Center. Personal mobile devices are not be used to record, store, or process NASA data and are not to be used to take photographs within NASA facilities.
h) LPRs and non-LPR Foreign Nationals must request and obtain prior approval from Joint Base Langley-Eustis prior to entering Joint Base Langley-Eustis.
Access is subject to conditions imposed by Joint Base Langley-Eustis and may require a U.S. citizen escort at all times.
4) Violation of security policies by contractor personnel may result in withdrawal of Center access for the offending personnel and/or contractual actions against the contractor. Additionally, violations may be criminal in nature and are subject to criminal prosecution.
H.5 LaRC 52.204-92 Requirements for Access to NASA Langley Research Center
(AUG 2014)
(a) Visitors seeking entry to NASA Langley Research Center using a state-issued driver’s license or state-issued personal identification card are advised that identification documents must be compliant with the REAL ID Act of 2005, Public Law 109-13.
Information on the REAL ID Act of 2005, Public Law 109-13, requirements can be found at: http://www.dhs.gov/real-id-public-faqs. Questions concerning REAL ID can be forwarded to the NASA Langley Badge and Pass Office via email at LaRC- RealId@mail.nasa.gov
(b) A state-issued ID that is non-compliant with the REAL ID standards cannot be used for access to the Center. A list of non-compliant forms of state identification can be found in the PDF document titled “REAL ID Enforcement in Brief” located at:
http://www.dhs.gov/publication/real-id-enforcement-brief
(c) The following alternate forms of identification are accepted for NASA LaRC access:
(1) Federal employee badges,
(2) Passports,
(3) Military identification cards,
(4) Enhanced Driver’s Licenses,
(5) U.S. Coast Guard Merchant Mariner Card,
(6) Native American tribal document,
(7) School identification accompanied by an item from List C (Documents that Establish Employment Authorization) from the “List of the Acceptable Documents” on Form I-9, which can be found at: http://www.uscis.gov/i-9-central/complete-correct-form-i-9.
(d) Visitors without acceptable identity documents require an escort at all times while on the NASA Langley Research Center.
H.6 LaRC 52.211-104 OBSERVATION OF REGULATIONS AND IDENTIFICATION OF
CONTRACTOR’S EMPLOYEES (JANUARY 2013)
a) The Contractor shall require its employees to observe and obey all rules and regulations as prescribed by the authorities at LaRC and other installations including all applicable Federal, NASA, and Langley safety, health, environmental and security regulations.
b) At all times while on NASA property, the Contractor shall require its employees, subcontractors, and agents to display a valid NASA issued identification badge.
Contractors shall be held accountable for these identification badges, and may be required to validate its active employees on an annual basis with the NASA Office of Security Services. Immediately upon employee termination or contract completion, the Contractor shall return NASA identification badges and facility keys to the NASA LaRC Badge and Pass Office. All NASA identification badges and facility keys remain the property of NASA and the Government reserves the right to invalidate such badges at any time.
H.7 LARC 52.223-92 OBSERVATION OF SAFETY AWARENESS EVENT BY
CONTRACTOR EMPLOYEES (JAN 2013)
The Langley Research Center (LaRC) Safety Awareness Event is an annual event dedicated to learning best practices for a safe work environment. When the LaRC http://www.dhs.gov/real-id-public-faqs mailto:michelle.m.sowden@nasa.gov mailto:michelle.m.sowden@nasa.gov http://www.uscis.gov/i-9-http://www.uscis.gov/i-9-
Director designates the Safety Awareness Event, the Contractor shall require all onsite and nearsite employees to participate in Safety Awareness activities at LaRC.
H.8 LARC 52.223-93 REPORTING OF INVOLUNTARY SEPARATIONS AND
INCIDENTS INVOLVING WORKPLACE VIOLENCE (JULY 2015)
a) The Contractor and its employees shall comply with LAPD 1600.5, Workplace Violence and Threatening Behavior. The Contractor shall conduct training on and develop procedures for recognizing, managing, and responding to incidents and threats of workplace violence as defined in LAPD 1600.5.
b) In accordance with LAPD 1600.5, if the LaRC Workplace Violence and Prevention Program (WVPP) Threat Assessment Team determines it is appropriate for the Contractor to participate in a WVPP Threat Assessment Team meeting, the Contractor shall comply with the request. The Contractor shall report the disposition of any incidents to the LaRC WVPP Threat Assessment Team.
c) In addition to the conditions set forth in paragraphs (a) and (b) above, the Contractor shall consider any personnel action resulting in the involuntary separation of a contractor employee as a "potential violent situation" and follow the reporting procedures in LAPD
1600.5.
d) The Contractor shall include these requirements in all subcontracts, however, the subcontractors shall provide reports through the prime Contractor.
H.9 LaRC 52.223-94 LARC ENVIRONMENTAL MANAGEMENT (JULY 2015)
a) Located in the ecologically sensitive Chesapeake Bay watershed, Langley Research Center (LaRC) is committed to fulfilling its mission in a manner that promotes environmental stewardship, sustainability, and continual improvement, while mitigating environmentally driven mission risks. LaRC expects its contractors to support LaRC in fulfilling this commitment.
b) The Contractor shall ensure that all onsite activities performed and equipment used to fulfill the requirements of the contract are in compliance with all local, state, and federal environmental laws and regulations; environmental Executive Orders; NASA Policy Directives (NPDs) and Procedural Requirements (NPRs), and LaRC environmental directives (LAPDs) and procedures (LPRs). The NASA and LaRC regulatory authorities include, but are not limited to the most recent version of the following:
• NPD 8500.1, NASA Environmental Management
• NPR 8553.1, NASA Environmental Management System
• NPR 8570.1, Energy Management Program
• NPR 8530.1, Affirmative Procurement Program and Plan for Environmentally
Preferable Products
• LAPD 8500.1, LaRC Environmental and Energy Management
• LPR 8500.1, Environmental and Energy Program Manual
c) Contractor support of LaRC’s Environmental Management System (EMS) pursuant to NPR 8553.1 and LPR 8500.1 includes conducting operations pursuant to these requirements, responding to information requests, and attendance at team meetings (up to 2 one-hour meetings a year)
d) The Government remains the owner and operator of record for all environmental activities conducted on LaRC owned properties. LaRC’s Standard Practice and Environmental Engineering Branch (SPEEB) is the single point of contact with federal, state, or local regulatory agencies and their representatives unless otherwise directed by the Contracting Officer. All on-site Contractor activities and personnel are subject to environmental compliance reviews, investigations, inspections, or similar inquiries which may be conducted by federal, state, or local regulatory agencies or the LaRC SPEEB. The Contractor shall immediately notify the LaRC SPEEB when contacted by external regulatory agency representatives and shall cooperate fully with the LaRC SPEEB in responding to regulatory agency representatives. The Contractor shall complete, maintain, and make available to the Contracting Officer and LaRC SPEEB, all documentation relating to environmental compliance required by law or regulation. As directed by the Contracting Officer, the Contractor will make such documentation available to personnel of regulatory agencies. If a Notice of Violation, Notice of Noncompliance, Notice of Deficiency, or similar notice is received by the Contractor or one of its subcontractors in the performance of work under this contract, the Contractor shall immediately notify the Contracting Officer or the Contracting Officer’s Representative. The Contractor shall fully cooperate with NASA LaRC in correcting any problems giving rise to any such notices and shall fully cooperate with NASA LaRC personnel in their efforts to resolve any violations so that regulatory assessments of civil fines or penalties are minimized or avoided.
H.10 LARC 52.229-92 VIRGINIA AND LOCAL SALES TAXES (MARCH 2012)
To perform this contract, the Contractor must be knowledgeable of relevant state and local taxes when making purchases of tangible personal property. The Contractor shall refrain from paying inapplicable taxes or taxes where an exemption exists, but shall pay applicable taxes that are allowable pursuant to FAR 31.205-41, Taxes. Even though title to property purchased under this contract may pass to the Government and the price is reimbursable under contract cost principles, such transactions do not in themselves provide tax immunity to the Contractor. Therefore, within 30 days after the effective date of this contract, the Contractor shall request from the Virginia State Tax Commission a ruling on any tax exemptions that may be applicable to purchases made under this contract. The Contractor shall provide all facts relevant to the situation and shall pursue an interpretation of the law that is most favorable to both the Contractor and the Government.
PART II -- CONTRACT CLAUSES
SECTION I - CONTRACT CLAUSES
I.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE. (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
Federal Acquisition Regulation (FAR) Clauses:
https://www.acquisition.gov/far/index.html
NASA FAR Supplement (NFS) Clauses:
http://www.hq.nasa.gov/office/procurement/regs/nfstoc.htm
(End of clause)
CLAUSES INCORPORATED BY REFERENCE
CLAUSE
NUMBER CLAUSE TITLE (DATE)
52.202-1 DEFINITIONS. (NOV 2013)
52.203-3 GRATUITIES. (APR 1984)
52.203-5 COVENANT AGAINST CONTINGENT FEES. (MAY 2014)
52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT.
(SEP 2006)
52.203-7 ANTI-KICKBACK PROCEDURES. (MAY 2014)
52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR
IMPROPER ACTIVITY. (MAY 2014)
52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY. (MAY
2014)
52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL
TRANSACTIONS. (OCT 2010)
52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND REQUIREMENT
TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS. (APR 2014)
52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER CONTENT
PAPER. (MAY 2011)
52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL. (JAN
2011)
52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT
AWARDS. (JUL 2013)
52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE. (JUL 2013)
52.209-6
PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING
WITH CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR
DEBARMENT. (AUG 2013)
52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING
RESPONSIBILITY MATTERS. (JUL 2013)
52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC
https://www.acquisition.gov/far/index.html http://www.hq.nasa.gov/office/procurement/regs/nfstoc.htm
CORPORATIONS. (DEC 2014)
52.214-26 AUDIT AND RECORDS - SEALED BIDDING. (OCT 2010)
52.214-27 PRICE REDUCTION FOR DEFECTIVE CERTIFIED COST OR PRICING DATA -
MODIFICATIONS - SEALED BIDDING. (AUG 2011)
52.214-28 SUBCONTRACTOR CERTIFIED COST OR PRICING DATA - MODIFICATIONS -
SEALED BIDDING. (OCT 2010)
52.214-29 ORDER OF PRECEDENCE - SEALED BIDDING. (JAN 1986)
52.215-8 ORDER OF PRECEDENCE - UNIFORM CONTRACT FORMAT. (OCT 1997)
52.215-21
REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA
OTHER THAN CERTIFIED COST OR PRICING DATA - MODIFICATIONS. (OCT
2010)
52.215-23 LIMITATIONS ON PASS-THROUGH CHARGES. (OCT 2009) -- ALTERNATE I
(OCT 2009)
52.219-8
UTILIZATION OF SMALL BUSINESS CONCERNS. (OCT 2014)
52.219-14 LIMITATIONS ON SUBCONTRACTING. (NOV 2011)
52.219-27 NOTICE OF SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS SET-
ASIDE. (NOV 2011)
52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION. (JUL
2013)
52.222-3 CONVICT LABOR. (JUN 2003)
52.222-4 CONTRACT WORK HOURS AND SAFETY STANDARDS - OVERTIME
COMPENSATION. (MAY 2014)
52.222-6 CONSTRUCTION WAGE RATE REQUIREMENTS. (MAY 2014)
52.222-7 WITHHOLDING OF FUNDS. (MAY 2014)
52.222-8 PAYROLLS AND BASIC RECORDS. (MAY 2014)
52.222-9 APPRENTICES AND TRAINEES. (JUL 2005)
52.222-10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS. (FEB 1988)
52.222-11 SUBCONTRACTS (LABOR STANDARDS). (MAY 2014) 52.222-12 CONTRACT
TERMINATION - DEBARMENT. (MAY 2014)
52.222-13 COMPLIANCE WITH CONSTRUCTION WAGE RATE REQUIREMENTS AND
RELATED REGULATIONS. (MAY 2014)
52.222-14 DISPUTES CONCERNING LABOR STANDARDS. (FEB 1988)
52.222-15 CERTIFICATION OF ELIGIBILITY. (MAY 2014)
52.222-21 PROHIBITION OF SEGREGATED FACILITIES. (APR 2015)
52.222-26 EQUAL OPPORTUNITY. (APR 2015)
52.222-27 AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS FOR CONSTRUCTION.
(APR 2015)
52.222-35 EQUAL OPPORTUNITY FOR VETERANS. (JUL 2014)
52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES. (JUL 2014)
52.222-37 EMPLOYMENT REPORTS ON VETERANS. (JUL 2014)
52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR
RELATIONS ACT. (DEC 2010)
52.222-50 COMBATING TRAFFICKING IN PERSONS. (MAR 2015)
52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION. (AUG 2013)
52.222-55 MINIMUM WAGES UNDER EXECUTIVE ORDER 13658. (DEC 2014)
52.223-2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER SERVICE
AND CONSTRUCTION CONTRACTS. (SEP 2013)
52.223-3 HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA.
(JAN 1997) - ALTERNATE I (JUL 1995)
52.223-5 POLLUTION PREVENTION AND RIGHT-TO-KNOW INFORMATION. (MAY 2011)
-- ALTERNATE I (MAY 2011)
52.223-6 DRUG-FREE WORKPLACE. (MAY 2001)
52.223-15 ENERGY EFFICIENCY IN ENERGY-CONSUMING PRODUCTS. (DEC 2007)
52.223-17 AFFIRMATIVE PROCUREMENT OF EPA-DESIGNATED ITEMS IN SERVICE
AND CONSTRUCTION CONTRACTS. (MAY 2008)
52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE
DRIVING. (AUG 2011)
52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES. (JUN 2008)
52.227-1 AUTHORIZATION AND CONSENT. (DEC 2007)
52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT
INFRINGEMENT. (DEC 2007)
52.227-4 PATENT INDEMNITY--CONSTRUCTION CONTRACTS. (DEC 2007)
52.228-1
BID GUARANTEE. (SEP 1996)
(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3 million, whichever is less.
52.228-2 ADDITIONAL BOND SECURITY. (OCT 1997)
52.228-5 INSURANCE - WORK ON A GOVERNMENT INSTALLATION. (JAN 1997)
52.228-11 PLEDGES OF ASSETS. (JAN 2012)
52.228-12 PROSPECTIVE SUBCONTRACTOR REQUESTS FOR BONDS. (MAY 2014)
52.228-14 IRREVOCABLE LETTER OF CREDIT. (NOV 2014)
52.228-15 PERFORMANCE AND PAYMENT BONDS - CONSTRUCTION. (OCT 2010)
52.229-3 FEDERAL, STATE, AND LOCAL TAXES. (FEB 2013)
52.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS. (MAY 2014)
52.232-17 INTEREST. (MAY 2014)
52.232-23 ASSIGNMENT OF CLAIMS. (MAY 2014)
52.232-27 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS. (MAY 2014)
52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER - SYSTEM FOR AWARD
MANAGEMENT. (JUL 2013)
52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS. (JUN 2013)
52.233-1 DISPUTES. (MAY 2014) - ALTERNATE I (DEC 1991)
52.233-3 PROTEST AFTER AWARD. (AUG 1996)
52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM. (OCT 2004)
52.236-2 DIFFERING SITE CONDITIONS. (APR 1984)
52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK. (APR 1984)
52.236-5 MATERIAL AND WORKMANSHIP. (APR 1984)
52.236-6 SUPERINTENDENCE BY THE CONTRACTOR. (APR 1984)
52.236-7 PERMITS AND RESPONSIBILITIES. (NOV 1991)
52.236-8 OTHER CONTRACTS. (APR 1984)
52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT,
UTILITIES, AND IMPROVEMENTS. (APR 1984)
52.236-10 OPERATIONS AND STORAGE AREAS. (APR 1984)
52.236-11 USE AND POSSESSION PRIOR TO COMPLETION. (APR 1984)
52.236-12 CLEANING UP. (APR 1984)
52.236-14 AVAILABILITY AND USE OF UTILITY SERVICES. (APR 1984)
52.236-15 SCHEDULES FOR CONSTRUCTION CONTRACTS. (APR 1984)
52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION. (FEB 1997) -
ALTERNATE I (APR 1984)
52.236-26 PRECONSTRUCTION CONFERENCE. (FEB 1995)
52.242-13 BANKRUPTCY. (JUL 1995)
52.243-4 CHANGES. (JUN 2007)
52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS. (APR 2015)
52.246-21 WARRANTY OF CONSTRUCTION. (MAR 1994)
52.248-3 VALUE ENGINEERING - CONSTRUCTION. (OCT 2010)
52.249-2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE).
(APR 2012) - ALTERNATE I (SEP 1996)
52.249-10 DEFAULT (FIXED-PRICE CONSTRUCTION). (APR 1984)
52.253-1 COMPUTER GENERATED FORMS. (JAN 1991)
1852.203-71 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS.
(AUG 2014)
1852.223-74 DRUG-AND ALCOHOL-FREE WORKFORCE. (MAR 1996)
1852.228-75 MINIMUM INSURANCE COVERAGE. (OCT 1988)
1852.236-73 HURRICANE PLAN. (DEC 1988)
1852.237-70 EMERGENCY EVACUATION PROCEDURES. (DEC 1988)
1852.237-73 RELEASE OF SENSITIVE INFORMATION (JUN 2005)
I.2 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK.
(APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 150 days. The time stated for completion shall include final cleanup of the premises.
I.3 52.223-9 ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT
FOR EPA-DESIGNATED ITEMS (MAY 2008)
(a) Definitions. As used in this clause -
"Postconsumer material" means a material or finished product that has served its intended use and has been discarded for disposal or recovery, having completed its life as a consumer item.
Postconsumer material is a part of the broader category of "recovered material."
"Recovered material" means waste materials and by-products recovered or diverted from solid waste, but the term does not include those materials and by-products generated from, and commonly reused within, an original manufacturing process.
(b) The Contractor, on completion of this contract, shall -
(1) Estimate the percentage of the total recovered material content for EPA-designated item(s) delivered and/or used in contract performance, including, if applicable, the percentage of postconsumer material content; and
(2) Submit this estimate to Contracting Officer in accordance with agency procedures.
(End of Clause)
52.232-18 AVAILABILITY OF FUNDS (APR 1984)
I.4 52.225-9 BUY AMERICAN - CONSTRUCTION MATERIALS. (MAY 2014)
(a) Definitions. As used in this clause-
Commercially available off-the-shelf (COTS) item- (1) Means any item of supply (including construction material) that is-
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
Construction material means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
Cost of components means-
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph
(1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
Domestic construction material means-
(1) An unmanufactured construction material mined or produced in the United States;
(2) A construction material manufactured in the United States, if-
(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or
(ii) The construction material is a COTS item.
Foreign construction material means a construction material other than a domestic construction material.
United States means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference. (1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that-
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American statute. (1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including-
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute or Balance of Payments Program.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Price Comparison Construction material description
Unit of measure
Quantity Price (dollars) *
Item 1 Foreign construction material Domestic construction material
Item 2 Foreign construction material Domestic construction material
* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).
List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.
Include other applicable supporting information.
(End of clause)
I.5 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES. (APR 1984)
(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause.
(b) The use in this solicitation or contract of any NASA FAR Supplement (48 CFR 18) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.
(End of clause)
I.6 1852.215-84 OMBUDSMAN. (NOV 2011)
(a) An ombudsman has been appointed to hear and facilitate the resolution of concerns from offerors, potential offerors, and contractors during the preaward and postaward phases of this acquisition. When requested, the ombudsman will maintain strict confidentiality as to the source of the concern. The existence of the ombudsman is not to diminish the authority of the contracting officer, the Source Evaluation Board, or the selection official. Further, the ombudsman does not participate in the evaluation of proposals, the source selection process, or the adjudication of formal contract disputes.
Therefore, before consulting with an ombudsman, interested parties must first address their concerns, issues, disagreements, and/or recommendations to the contracting officer for resolution.
(b) If resolution cannot be made by the contracting officer, interested parties may contact the installation ombudsman, whose name, address, telephone number, facsimile number, and email address may be found at:
http://prod.nais.nasa.gov/pub/pub_library/Omb.html. Concerns, issues, disagreements, and recommendations which cannot be resolved at the installation may be referred to the Agency ombudsman identified at the above URL. Please do not contact the ombudsman to request copies of the solicitation, verify offer due date, or clarify technical requirements. Such inquiries shall be directed to the Contracting Officer or as specified elsewhere in this document.
(End of clause)
I.7 1852.225-71 RESTRICTION ON FUNDING ACTIVITY WITH CHINA (FEB 2012)
(a) Definition - "China" or "Chinese-owned company" means the People's Republic of China, any company owned by the People's Republic of China or any company incorporated under the laws of the People's Republic of China.
(b) Public Laws 112-10, Section 1340(a) and 112-55, Section 539, restrict NASA from contracting to participate, collaborate, coordinate bilaterally in any way with China or a Chinese-owned company using funds appropriated on or after April 25, 2011.
Contracts for commercial and non developmental items are exempted from the prohibition because they constitute purchase of goods or services that would not involve participation, collaboration, or coordination between the parties.
(c) This contract may use restricted funding that was appropriated on or after April 25, 2011. The contractor shall not contract with China or Chinese-owned companies for any effort related to this contract except for acquisition of commercial and non-developmental items. If the contractor anticipates making an award to China or Chinese-owned companies, the contractor must contact the contracting officer to determine if funding on this contract can be used for that purpose.
(d) Subcontracts - The contractor shall include the substance of this clause in all subcontracts made hereunder.
PART III -- LIST OF DOCUMENTS, EXHIBTS, AND OTHER ATTACHMENTS
SECTION J - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
J.1 LIST OF ATTACHMENTS
The following documents are attached hereto and made a part of this contract:
Exhibit A- Specifications for NASA Langley Research Center (LaRC) Building 1230 East Wing Renovation.
Exhibit B- Drawings for NASA Langley Research Center (LaRC) Building 1230 East Wing Renovation.
Exhibit C- Contract Documentation Requirements Exhibit D- Wage Determination Exhibit E- Brand Name or Equal Salient Characteristics Exhibit F-Safety and Health Plan: The Safety and Health Plan is to be submitted within ten (10) calendar days from notice of award. No on-site activities shall commence without an approved Safety and Health Plan.
Attachment 1- Personal Identity Verification (PIV)…
This is the start of the file's text. The full file is on GovTribe.