Responses_to_QuestionsNIHOD2013398-NIH_CompMultipleCompWasteVer.5.docx

DOCX document 45 KB Posted

Attached to
NIH Comprehensive Multiple Component Waste Management Services
Solicitation number
NIHOD2013398
Issued by

About this file

Amendment 6 - Responses to Questions V.5

View the file

Other files

File Type Posted
Responses_to_QuestionsNIHOD2013398-NIH_CompMultipleCompWasteVer.6a.docx DOCX document
Responses_to_QuestionsNIHOD2013398-NIH_CompMultipleCompWasteVer.6.docx DOCX document
SF1449-12a.pdf PDF
Responses_to_QuestionsNIHOD2013398-NIH_CompMultipleCompWasteVer.4.docx DOCX document
Responses_to_QuestionsNIHOD2013398-NIH_CompMultipleCompWasteVer.3.docx DOCX document
Responses_to_QuestionsNIHOD2013398-NIH_CompMultipleCompWasteVer.2.docx DOCX document
NIHComprehensiveSolidWaste2013_FBO-RFP-Final.doc DOC document
Responses_to_QuestionsNIHOD2013398-NIH_CompMultipleCompWasteVer.2.docx DOCX document
NIHComprehensiveSolidWaste2013_FBO-RFP-Final.doc DOC document
Responses_to_QuestionsNIHOD2013398-NIH_Comprehensive_Multiple_Component_Waste.docx DOCX document
NIHComprehensiveSolidWaste2013_FBO-RFP.doc DOC document
NIHComprehensiveSolidWaste2013_FBO-RFP.doc DOC document
Att.9_MPWCollectionbldg.NIHWasteMgt .xlsx XLSX spreadsheet
Att_10-SolidWaste_MPWs_Campus_Collection-NIHWasteMgt.pdf PDF
Att_13__bldg_25-NIHWasteMgt.pdf PDF
Att_15-_Performance_stds-NIHWasteMgt..docx DOCX document
NIHComprehensiveMultCompWasteMgtSOW_Final_Copy_2012 2 .doc DOC document
Att_3_Government_Equipment-NIH_WasteMgt._.docx DOCX document
Att.19_Estimated_recycling_By_Bldg._NIH_Waste_Mgt.xlsx XLSX spreadsheet
Att__14__SolidWaste_InteriorRecycling-NIHWasteMgt.pdf PDF
Att.11_MPWPER_BLDG-NIHWasteMgt.xlsx XLSX spreadsheet
Att_7_SolidWaste_ExteriorCollection_Trash_cansNIHWasteMgt.pdf PDF
Att_4_SW_quantities_per_bldg-NIH_WasteMgt.docx DOCX document
Att_18-_Recycl_Containers_bldg-NIHWasteMgt..pdf PDF
Att_6__NIHAC_CRU_MPW_Dumpster-Poolsville.pdf PDF
Att_17__Recycling_Bin_Specs-NIHWasteMgt..pdf PDF
Att_16-_SolidWaste_RecyclingConsolidationSites-NIHWastemgt..pdf PDF
ATT.2_NIH_Installations_Waste_Services_TableAtt_2.docx DOCX document
Att_12__MPW_SOP_Rev0312-NIH_WasteMgt.doc DOC document
Att_20_Equipment_template-NIHWasteManagment.xlsx XLSX spreadsheet
Attach_22_MPW_Pick_up_schedule 1 .docx DOCX document
Att_8-_SolidWaste_CRUsBigBelly-NIHWasteMgt._.pdf PDF
Attach_21_MPW_Pick_up_schedule 1 .docx DOCX document
Att_5__SolidWaste_ExteriorTrashConsolidationLocations 1 .pdf PDF
DOL_WageDetermination.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NIH Comprehensive Multiple Component Waste

Management Services

NIHOD2013398

Responses to Questions:

1.

Question- Where is the composting material (animal bedding and food waste) being taken currently?

Answer- This is what we are judging the contractor on, their

choices and submittal. We feel they have to propose
these things and prove they have a network and understanding of
the industry.

2.

Question - Where are toner cartridges being taken currently?

Answer- This is what we are judging the contractor on, their choices andsubmittal. We feel they have to propose these things and prove they
have a network and understanding of the industry.

3.

Question- Does the current contractor have someone on-site full time to handle recycling removal?

Answer- They need to read the SOW and Performance Standards and provide a response based on what we are seeking in those documents.

4.

Question- The most recent solicitation modification states that the closing date
for the proposal is March 15, 2013. However, severalparagraphs later states that the Business and Technical proposals
must be received by March 14, 2014. Please clarify?

Answer- The date of March 15, 2015 for receipt of proposals is a typographical

error. The correct date is March 15, 2013 3PM EST. The correction to
the FBO description area has since been amended to correct the date.
NIH Comprehensive Multiple Component Waste
Management Services
NIHOD2013398

5.

Question- I am unable to locate specific information regarding the number of
proposals that must be submitted. There is reference to Attachment
23 on page of 109, which may contain that information, however
Attachment 23 is not provided.
Answer- Attachment 23 is the solicitation. The number of proposals requested is6 Technical proposals and 3 Business proposals.
See page 86 of Attachment 23.

6. Question- Is the Pre-Solicitation Conference sign in sheet available to the public?

Answer – A request must be submitted to the NIH FOIA office for a copy of the sign in sheet.

7. Question – 1. Item 3(f): Special projects - It is requested that we provide a unit price, however the type of project is unknown.

2. Item 7(e): Recycling pulls - should there be a line item forcompost pulls?
3. Item 7(l): Management handling fee references Line 7e.
Should the reference be 7c?
4. Item 9: Management handling fee references Line 8m.
Should the reference be 8k?

Answer(s) 1-4

1. Item 3F does not require the offeror to submit a price.Special projects are circumstances not covered in contract
2. Compost pulls line item added (see 7 (e) (v).
3. Management handling fee (see 7(j) Lines 5, 7c only)
4. Management handling fee references Line 8 (i) only.
8. Question- 1. Where is the composting material (animal bedding and foodwaste) being taken currently?
2. Where are toner cartridges being taken currently?
3. Does the current contractor have someone on-site full time tohandle recycling removal?
NIH Comprehensive Multiple Component Waste
Management Services
NIHOD2013398

Answer(s) 1-4 1. The government is evaluating bidders based on their knowledge of the industry and their ability to propose plans that reflect that knowledge.

2.This is what we are judging the contractor on, their choices andsubmittal. We feel this proves offeror’s have a network and
understand the industry.
3. NIH desires offeror’s to read and obtain a clear understandingthe RFP firstly. Based on that understanding, NIH expects the
bidders to determine how many and what types of staffing are
required to perform the recycling work.

9. Question - 1) Item 7 (k) on the pricing schedule refers to “Remunerations for Recycling”. Article 11 (pg 42), paragraph (a) says “It is hereby understood and agreed that remuneration for the tonnage value of recycled materials shall be _____ [to be completed at time of award] of the amount received by the contractor from the recycling outlet(s).

Please clarify if the government is requiring a remuneration rate, in the form of a percentage, to be included with the pricing schedule Item 7(k) as part of the proposal, or is the remuneration rate determined at the time of award, as indicated in Article 11(a).

Answer – 1) The Recycling Remuneration rate is determined at the time of award. Remuneration rates will vary according to market rates for recycling commodities, so each recycling commodity will have an individual remuneration rate. I.e. Mixed paper, scrap metal, pallets, commingled recycling, etc.

Question-2) Item 1 (c)(i) on the pricing schedule refers to “Loading Ramps
Connecting to Dock”. Is there a specific loading ramp design or actual loadingramp at NIH that the proposer should use to determine the price for this item?
Answer – 2) The Loading Ramps Connecting to Dock” should be a “generic” pricethat would cover the contractor for constructing a variety of configurationsdepending on the need at a particular dock. The NIH has many different dockconfigurations. There is no set height for the loading docks nor a set
configuration for type of container at the dock. Some docks have a Front End
container, some an Open Top, and others have Compactors.
All the current ramps at the NIH are government property and will remain in
place. The need for a new dock will occur if a new building is constructed, a
modification to a dock is needed, a current ramp needs to be removed and
reconstructed at another location or the ramp is in such disrepair that it needs to
be replaced. In the past NIH required new ramps due to construction or a ramp
was removed for an emergency generator and a new ramp had to be
constructed at another location on the dock. A tour of the campus to see the
various ramp configurations may help the proposer determine a fair price to
propose.

10.

Question-Wastequip, a provider of compactor containers, would like tocomplete a quick equipment survey that would enable them to price
the 29 new containers we would purchase to service your bid.
At your convenience, can you provide me the protocol they would
need to follow to access the NIH compound to complete this survey?
Answer- Contractors are welcome to come onto the NIH campus as visitors andlook at anything they wish. Contractors should be aware that there is
an attachment (20) in the RFP that lists all the equipment.
The COR cannot go on tour with them on a tour as it would not be fair
and equitable to the other bidders.
As far as protocol, contractors just need to go through the visitors
center and get a visitor badge which is the same procedure they went
through to attend the meeting last week.

11.

Question - Regarding the NIH Comprehensive Multiple Component Waste
Management Services in Bethesda, MD, please provide FOIA contact
information to acquire sign in sheet for the pre-bid meeting.

Answer – Please contact the FOIA representative for your request

National Institutes of Health (NIH) Freedom of Information Officer Building 31, Room 5B35

9000 Rockville Pike
Bethesda, Maryland 20892
Phone: 301-496-5633
FOIA Officer: Susan Cornell
FOIA Public Liaison: Susan Cornell

12.

Question – If an interested party, offeror or firm did not attend the pre-bid meeting, are They still eligible to bid on this contract?

Answer – YES.

13.

Question- Previous Federal Contracts have required completion of a cover sheet (SF 1449) and acknowledgement of amendments using SF 30.

Neither of these documents are provided on the web site. Please provide if required.

Answer- A form 1449 will be attached. There is no need for a Form 30 at this time.

A PDF form SF 1449 will be attached for completion and submission as cover sheet for proposal.

14. Attachment 23 Pricing schedule 3. (a) and 4. (a) list 2008 hours for the service identified.

Question; should this value be 2080 hours?

Answer: No, 2008 hours is correct.

15. On page 86 and 90 of attachment 23 Past Performance is looked at in 2 different ways, Pg 86 called for it to be 1 of 3 distinct sections, and on Pg 90 section 10 states that it should be part of the technical proposal.

Question: which of these sections are correct

Answer: Regarding your past performance submission, the only important issue is to simply follow the instructions and format provided in Section 10, page 90.

16. Attachment 1 (NIH Installations Waste Services Table) list 30 locations outside of the Main Campus and the Poolesville location for Solid Waste Services, MPW Services, Full Recycling Services and Off-Site Recycling Rentals & Hauling Only. Attachment 22/7 (Minimum Off Campus MPW Collection Schedule) not sure which attachment number is correct her, none the less, list frequency of service. Some of these locations are closed on one attachment and open on another.

Question: Which off campus locations are currently receiving services that the prospective contractor will have to service, do we need to provide interior/exterior containers etc.

Answer: Attachment 21 (22) has the current list of service location in operation for MPW pickup locations. Att. 1 is a list of services provided at listed locations. If Att. 21 says location is closed it applies to Att. 1. Generators provide their own MPW containers as specified in SOW. Over-packs will be provided by Contractor in case of leaking MPW containers.

17. On page 16 read the last sentence…..refers to disposal of refrigerators and removing the Freon as the responsibility of the contractor.

Question: How many refrigerators have been decommissioned in this current contract period?

Answer: This is categorized as a “Special Project.” The Contractor is not required to provide a Cost for this as it may vary from 1 to X number of freezers and quantity is unknown.

18. On page 99 the second to last paragraph of the b) MPW Service: Specifies that two primary medical waste incinerators must be identified. It also specifies that "In addition, at least one other facility shall be identified that uses a treatment method other than conventional medical waste incineration"

Incineration is the most expensive method for treating regulated medical waste. There are currently about 14 commercial incinerators in the Country, and they are facing very stringent regulations forcing retrofits for 2014. This will be increasing the cost significantly. The pricing for the disposal of MPW identifies 2,000,000 pounds and only offers a single line for pricing. There is a significant difference in the pricing for alternative treatment methods. The industry is expecting the cost to increase dramatically over the next 5 years.

Question: Will a line be added for the pricing of alternative treatment methods so that the NIH can take the benefit of the reduced cost?

Answer: If an alternate disposal methodology is implemented during the course of the contract a modification to the contract will be made to accommodate the new methodology and a new price line item will be added with any additional requirements.

19. We noticed during the tour that NIH provides their own MPW packaging materials. We are concerned about supplies at the facilities “Off Campus”, especially the location in Baltimore.

Question: Are there any MPW pick up locations that will require MPW Packaging supplies to be provided by the contractor, other than the wet packages delivered repackaged at Bldg 25?

Answer: All MPW packaging is provided by the generators of the MPW both on campus and at leased facilities. The only container the contractor will need to provide for MPW are DOT approved over packs for leaking containers.

20. The truck for building 10 is identified as a holding unit.

Question 1: Is this unit refrigerated as the trailer is required to be at building 25?, Answer: No the truck for building 10 will not be required to be refrigerated.

Question 2: Does NIH provide electric for the bldg. 10 unit or the refrigerator trailer at bldg. 25?

Answer: Yes the NIH will provide electric for the refrigerated unit at building 25. There is also electric provided at building 10, but refrigeration for the Bldg. 10 truck is not required.