Statement of Work: Performance StandardsAttachment 145
Comprehensive Multiple Component Waste Management Services Including Solid Waste and Refuse, Medical Pathological Waste and Recycling
Solid Waste
| Required Service |
| Performance Standards |
| Acceptable Quality Level (AQL) Deviation from Performance Standard |
| Monitoring Method (Quality Assurance Plan) |
| Incentives or Penalties Related to Quality of Performance |
| Safe removal and disposal of solid waste for the NIH Campus. |
| Provide and install dumpsters at required locations with no interruption of service. |
| No required equipment missing or out of service for more than 2 hours during core hours unless replacement container provided. |
| Random inspection of any main campus containers or customer complaints. |
| (+ or -) 4 points |
| Empty dumpsters on schedules that allow continuous loading from the dock. |
| No dumpsters full and unable to receive additional trash on main campus during core hours. |
| Random inspection of any main campus containers and customer complaints. |
(Exception: 1 of the 2 B2 dock and 35 dock trash dumpsters allowed to be full.)
(+ or -) 8 points
| Maintain a compactor capable of accepting waste at Bldg 10 B2 loading dock at all times. (M-F). |
| Solid waste pulls from the Bldg 10 B2 Dock will be switched when both compactors are full and unable to receive additional trash or when second compactor is down due to mechanical failure. |
| Monthly observation of the switching process. |
| (+ or -) 8 points |
| Timely and efficient collection of solid waste from exterior CRUs, Big Belly Units, Front Ends and other randomly located containers on the main campus. |
| No containers full and unable to receive additional trash between the hours of 9:00 am and 4:00 pm. |
| Random inspections and customer complaints. |
| (+ or -) 2 points |
| Maintain housekeeping around containers. |
| No trash or debris around immediate area of Solid Waste containers. |
| Random inspections or customer complaints. |
| (+ or -) 2 points |
| Scanning of all solid waste compactors pulled from Bldg 10 and CRC by Radiation Safety Branch (RSB) prior to transport off NIH campus. |
| No containers shall be transported off NIH campus prior to RSB scanning. |
| RSB reports of pulls that were not scanned or rejected loads from Montgomery Co Transfer. |
| (+ or-) 8 points |
Total Points (+ or -)
(+ or -) 32 points
Medical Waste
| Required Service |
| Performance Standards |
| Acceptable Quality Level (AQL) Deviation from Performance Standard |
| Monitoring Method (Quality Assurance Plan) |
| Incentives or Penalties Related to Quality of Performance |
| Collection, Processing, and Treatment or Disposal of Medical Pathological Waste |
| Timely and efficient collection of MPW from within Bldg 10 clinical marshaling areas and labs to loading dock marshaling area. |
| No complaints from the NIH community of failure to collect MPW containers within 3 hours of being set out by generator during Bldg 10 working hours: 7 am to 3:30 pm M to-Sun. |
| Random monitoring and tracking of MPW awaiting collection via a customer complaint log. |
| (+ or -) 4 points |
| Timely and efficient collection of MPW containers from building interiors and loading docks on main campus. |
| No complaints from the NIH community of failure to collect MPW containers within 3 hours of being set out by generators during NIH main campus working hours; 8 am to 3:30 pm M-Fri. |
| Random monitoring and tracking of MPW awaiting collection via a customer complaint log. |
| (+ or -) 4 points |
| Timely and efficient collection of MPW containers from off-site installations. |
| 100% of all MPW containers collected from storage areas or docks on collection days. M-W-Fri scheduled collection days as outlined in SOW (Attch 7). |
| Random monitoring and tracking of MPW awaiting collection via a customer complaint log. |
| (+ or -) 4 points |
| Radioactive monitoring of all MPW containers processed in compliance with SOP for MPW Radiation Monitoring. |
| Inspection of 100% of all collected containers as per SOP. |
| Random visual inspection of MPW processing. |
| (+ or -) 4 points |
| Inspection of all MPW containers processed for leakage and refrigerated holding. |
| 100% inspection for leakers with all leakers over-packed prior to loading and no unrefrigerated holding of MPW containers in Bldg 25. |
| Random visual inspection of MPW processing. |
| (+ or -) 3 points |
| Ship MPW or other hazardous materials in compliance with all applicable local, state and federal regulations. |
| No shipments with identified DOT discrepancies as per Government inspections. |
| Pre and post-shipment inspections of vehicles and shipping papers for each shipment. |
| (+ or -) 3 points |
| Prompt off-site treatment of MPW |
| NIH MPW received at off-site facility on day of shipment and treated within 7 days of shipping as verified on a Certificate of Disposal from the Treatment Facility. |
| Monthly review of MPW Certificates of Disposal. |
| (+ or -) 2 points |
Total Points (+ or -)
(+ or -) 24 points
Recycling and Construction Debris
| Required Service |
| Performance Standards |
| Acceptable Quality Level (AQL) Deviation from Performance Standard |
| Monitoring Method (Quality Assurance Plan) |
| Incentives or Penalties Related to Quality of Performance |
| Collection, processing, consolidation and recycling or reuse of recyclable materials |
| Collection of recyclable materials from interior and exterior containers. Liners replaced as required in the SOW. |
| No containers full and unable to receive additional materials. |
| Random weekly inspections or customer complaints. |
| (+ or -) 8 points |
| Receive service requests for recycling collection, delivery or removal of interior recycling containers from Project Officer or customers by phone or electronic means. Document electronically and deliver within 24 hours. |
| 100% of all service request calls completed within 24 hours as documented in the electronic log or stating reasons outside Contractor’s control why service could not be provided. |
| Daily review of Contractor’s Recycling Service Request Log and complaints received by DEP. |
| (+ or -) 4 points |
| Deliver properly labeled recycling containers. |
| 100% of all containers properly labeled with the NIH logo centered on front of container opposite hinge and recycling label at front top edge of container. |
| Random inspections per contractor’s recycling service request log. |
| (+ or -) 2 points |
| Removal of wooden pallets and loose cardboard from main campus building loading docks and consolidation for recycling. |
| Discarded pallets and cardboard removed within 3 hrs. |
| Weekly inspection of select loading docks on main campus. |
| (+ or -) 3 points |
| Safe removal and disposal of construction debris and scrap metal recycling containers for the NIH Campus |
| Empty dumpsters on schedules that allows continuous loading from the dock with no interruption in service. |
| No dumpsters full and unable to receive additional material on main campus during core hours. |
| Random inspections or customer complaints. |
| (+ or -) 4 points |
Total Points (+ or -)
(+ or -) 21 points
Management
| Required Service |
| Performance Standards |
| Acceptable Quality Level (AQL) Deviation from Performance Standard |
| Monitoring Method (Quality Assurance Plan) |
| Incentives or Penalties Related to Quality of Performance |
| General Contract Management |
| Submission of monthly invoices including electronic reports and copies. |
| Invoices shall be 100% complete and accurate. |
| Review invoices and score monthly. |
| (+ or -) 3 points |
| General Contract Management |
| Dumpster labels. |
| All dumpsters shall be clearly labeled as to content on both dock and street sides. If missing, must replace within 2 business days. |
| Random Inspections |
| (+ or -) 2 points |
| General Contract Management |
| Safe Driving |
| All Contract drivers shall obey all State and local traffic laws and signage. |
| Random inspections and / or customer complaints |
| (+ or -) 3 points |
| General Contract Management |
| Contract employees shall be courteous to customer base. |
| No more than 1 verified customer complaints per month. |
| Review of complaints by Govt. staff. |
| (+ or -) 3 points |
Total Points (+ or -)
(+ or -) 11 points
Annual Performance Standards
| Required Service |
| Performance Standards |
| Acceptable Quality Level (AQL) Deviation from Performance Standard |
| Monitoring Method (Quality Assurance Plan) |
| Incentives or Penalties Related to Quality of Performance |
| Performance Standards to be Scored on an Annual Basis Only. |
| Recovery Operation Support Services provided if requested (retrieval of hazardous materials from solid waste containers). |
| Contractor responds and meets SOW specified time frames, containment criteria and reloading requirements. |
| On-site monitoring per event. |
| (+ or -) 6 points |
| Performance Standards to be Scored on an Annual Basis Only. |
| Delivery of required reports including electronic copies. |
| 100% on-time required. |
| Monthly review of required reports. |
| (+ or -) 6 points |
Total Points (+ or -)
(+ or -) 12 points
Total Annual Points Available
(+ or -) 100 points
| Contractor on-site management team that ensures all requirements are being performed. |
| Obtain annual overall score of no less than 92%. |
| Tabulation of annual overall score. |
| (+ or -) 3 points – will be applied back to each of 12 months |