NIHComprehensiveSolidWaste2013_FBO-RFP-Final.doc
DOC document 511 KB Posted
- Solicitation number
- NIHOD2013398
About this file
Corrections to SF 1449. Corrected proposal due date and last date for questions.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NIH Comprehensive Multiple Component Waste
Management Services
Attachment 23
SEQ CHAPTER \h \r 1
SF 1449 RFP
NIHOD2013398
Addendum - Continuation of SF-1449 (Blocks 19 - 24) Independently, and not as a agent of the Government, the Contractor shall manage and provide comprehensive waste management services for the collection, transportation and disposal of medical pathological and non-hazardous solid wastes generated by the National Institutes of Health (NIH) and the collection, transportation and recovery of recyclable materials in accordance with the terms and conditions set forth herein. Services shall be from the point of generation or the point of collection to final disposition. Major types of services to be provided are described in detail in the Statement of Work (Attachment 1). The services to be performed by the contractor will be provided on the NIH main campus located in Bethesda, MD, the NIH Animal Center, Poolesville, MD, and several local off-campus installations in the metropolitan area.
Pricing Schedule The estimated quantities shown for each item represents the Government’s best estimate of the services required under the contract during the stated period of contract performance. This information is furnished for the offeror’s information only and is not to be considered restrictive for proposal purposes.
Base Contract Period: through ______________.
[Specific dates to be completed at time of award]
Estimated
Unit
Quantity
Price
Total 1.
Roll-On/Roll-Off Services
(a) Cost per "pull" from:
(i) NIH Main Campus
1,600 ea.
(ii) NIHAC, Poolesville, MD
(iii) NIH, Bethesda, MD - construction debris
1,100 ea.
(vi) Waste Water Sludge, Poolesville, MD ea.
(includes drop charge)
(b) Rental units: Includes Delivery and Installation
30 cubic yard Open Top mos.
30 yd. Self Contained Compactor
(iv) 40 cubic yard open top
(v) 30 cubic yard, open top (construction debris) mos.
(vi) Lined Sludge Roll-off
Price
Total (c) Compactor Related Equipment
Loading Ramps Connecting to Docks
(d) Cleaning of Containers
Enclosed Roll Off
Open Top Roll Off
(e) Painting of Containers
Sub Total ROS Services
2.
Front End Loader (FEL) Services
Price Total (a) NIH Bethesda/Rockville, 8hrs/day days
(includes cost of Front End Scale) and Driver (b) NIHAC (estimated 18 dumps/week)
1,250 dumps
(c) Rental Units
Two cubic yards
Four cubic yards - trash / animal bedding
(iii) Eight cubic yards
Vertec Type 8 cuyd (including installation)
(v) Eight cubic yard dock can - Main Campus
Eight cubic yards - Animal Bedding
Price
Total (d) Cleaning FEL Containers
Painting FEL Containers
3.
Project Manager, Supervisory and Administrative Staff
(a) Project Manger
2,008 Hours
Supervisory Personnel
(Supervise Recycling and MPW personnel)
Office Staff
(Customer Service, Data entry, Invoicing, Create Reports)
Managerial / Supervisor
Hours
Overtime work outside of normal scheduled hours, Federal Holidays, or Federal Government snow days.
General Labor overtime
Work outside of normal scheduled hours, Federal Holidays, or Federal Government snow days (f) Special Projects as Approved by Project Officer ea.
Sub Total FEL Services
4.
Residential Control (RESCON) Services
Price
Total
Labor and Vehicle for Service
2,008 hrs.
Collection of residential recycling, trash; campus trash wire mesh cans and CRU's)
90 gallon roll out trash bins
Sub Total RESCON Services
Price
Total 5.
Special Repairs
LOT
6.
Solid Waste Disposal Fees
Price
Total (a) Solid Waste Fee - Front End Loader
2,250
TON
(b) Solid Waste Fee - Compactor Roll-Off
3,250
TON
(c) Solid Waste Fee - Open Top Roll-Off
TON
Yard Waste Disposal Fee
TON
Wastewater Sludge
(f) Construction Debris
6,000
(g) Organics' Composting Fee
(Animal bedding and food)
(h) Fines Levied by Montgomery County
Ea.
Sub Total Waste Disposal Fees
Sub Total Solid Waste Services
7.
Recycling Servicers
(a) Service Crews/Vehicles
Estimated
Price
Total
Labor/Vehicles to Service Interior
Month
(/Exterior Recycling)
Price
Total (ii) B2 Loading Dock/ Labor/ No Truck Bldg 10
Month (iii) Front End Truck (Animal Bedding and food waste) 252
Days
(No Driver, driver to operate FE trash and Animal Bedding).
(b) Recycling Receptacles
Estimated
Price
Total
Desk Top Receptacles
Ea.
(ii) Central Office Paper Collector Receptacles
Ea.
Residential Recycling Bins
(iv) Public Square Container Model # 2981 26"
Ea.
(v) Public Square Container Model # 2982 32"
Ea.
(vi) Public Square Container Model # 2983 37"
Ea.
(vii) Public Square Container Model # 2984 41"
Ea. ________ (viii) Campus Recycling Units (CRU)
(4 Ea.)
(ix) Campus Recycling Units (CRU) (Single Unit)
(1Ea)
(c) Expendable Supplies NOT to exceed $60,000
LOT
(Gloves, Plastic bags, Hampers, etc.)
(d) Trailer Hauling Services
Estimated
Price
Total (i) Open Road Trailer / Box Truck Hauling
1,000
Mile (ii) Recycling Trailer Rental - 45'
Month ______ Addendum - Continuation of SF-1449 (Blocks 19 - 24)
(e) Pulls to Recycling Outlets from NIH Main Campus Estimated
Price
Total
Scrap Metal
Mixed Paper
Cardboard
(iv) Commingled Glass, Plastic, Aluminum
Ea.
(v) Composting Materials (Animal Bedding, Food Waste) 144
Ea.
(f) Rental units: Includes Delivery and Installation
Estimated
Price
Total
30 yd Self-Contained - Cardboard
(ii) 20 cubic yards Open Top - Scrap Metal mos.
(iii) 40 cubic yards Open Top - Scrap Metal mos.
(iv) 30 cubic yards Open Top - Scrap Metal mos.
(g) Rental units: Front end
Estimated
Price
Total (i) Six cubic yards (NIHAC Cardboard) mos.
Two cubic yards (12 CB)
Four cubic yards (12 scrap)
Addendum - Continuation of SF-1449 (Blocks 19 - 24) Estimated
Price
Total (h) Removal of Hazardous Materials from Dumpsters year (2 hours, Roll off Driver, manager, and 2 staff)
Remunerations for Recycling
Sub Total Recycling Services
(j) Management Handling Fee - 15% (Lines 5, 7c only)
Total SW and Recycling
8.
Medical Pathological Waste (MPW) Services
Price
Total
Labor/Truck (NIH Campus)
Bldg 10 Labor no truck (M-F)
(c) Bldg 10 Labor (no truck) - weekends wkends
Bldg 10 Labor (no truck) - holiday
Holiday (e) Mobile Refrigerated MPW Storage Units
Mos
(f) MPW Disposal (Estimated 4000 boxes / wk) 2,000,000
Lbs
Bayview Research Center MPW
1,700 boxes
(h) MPW Handling Bldg 25 No truck (Mon-Fri) mos.
(i) Expendable Supplies (Not to Exceed $30,000.00)
LOT
MPW Carts
9.
Management Handling Fee - 15% (Line 8(i) only)
Sub Total MPW Services
Total Solid, Medical Wastes and Recycling Annual Cost
1st Option Period: through ______________.
[Specific dates to be completed at time of award]
Price
Total
1. Roll-On/Roll-Off Services
(a) Cost per "pull" from:
(iii) NIH, Bethesda, MD - construction debris
1,100 ea.
(vi) Waste Water Sludge, Poolesville, MD ea.
(includes drop charge)
(b) Rental units: Includes Delivery and Installation
(iv) 30 cubic yard, open top (construction debris) mos.
Price
Total
Cleaning of Containers
Painting of Containers
Price Total
NIHAC (estimated 18 dumps/week)
1,250 dumps
(c) Rental Units
Price
Total
Addendum - Continuation of SF-1449 (Blocks 19 - 24) 3.
Project Manager, Supervisory and Administrative Staff
(a) Project Manger
2,008 Hours
Overtime work outside of normal scheduled hours, Federal Holidays, or Federal Government snow days.
(f) Special Projects as Approved by Project Officer ea.
Price
Total
Collection of residential recycling, trash; campus trash wire mesh cans and CRU's)
Price
Total
Addendum - Continuation of SF-1449 (Blocks 19 - 24)
Price
Total (a) Solid Waste Fee - Front End Loader
2,250
TON
(b) Solid Waste Fee - Compactor Roll-Off
3,250
TON
(c) Solid Waste Fee - Open Top Roll-Off
TON
(Animal bedding and food)
(h) Fines Levied by Montgomery County
Ea.
Recycling Servicers
(a) Service Crews/Vehicles
Estimated
Price
Total (i) Labor/Vehicles to Service Interior
Month
B2 Loading Dock/ Labor/ No Truck Bldg 10
Month
(iii) Front End Truck (Animal Bedding and food waste) 252
Days
(No Driver, driver to operate FE trash and Animal Bedding).
Addendum - Continuation of SF-1449 (Blocks 19 - 24)
(b) Recycling Receptacles
Estimated
Price
Total
(ii) Central Office Paper Collector Receptacles
Ea.
(iv) Public Square Container Model # 2981 26"
Ea.
(v) Public Square Container Model # 2982 32"
Ea.
(vi) Public Square Container Model # 2983 37"
Ea.
(vii) Public Square Container Model # 2984 41"
Ea. _____ _______
(xi) Campus Recycling Units (CRU) (Single Unit)
(1Ea) (c) Expendable Supplies NOT to exceed $60,000
LOT
(Gloves, Plastic bags, Hampers, etc.)
(d) Trailer Hauling Services
Estimated
Price
Total (i) Open Road Trailer / Box Truck Hauling
1,000
Mile (ii) Recycling Trailer Rental - 45'
Month _____ _______
(e) Pulls to Recycling Outlets from NIH Main Campus Estimated
Price
Total
Addendum - Continuation of SF-1449 (Blocks 19 - 24) Estimated
Price
Total
(iv) Commingled Glass, Plastic, Aluminum
Ea.
(v) Composting Materials (Animal Bedding, Food Waste) 144
Ea.
(f) Rental units: Includes Delivery and Installation
Estimated
Price
Total
30 yd Self Contained - Cardboard
(ii) 20 cubic yards Open Top - Scrap Metal mos.
(iii) 40 cubic yards Open Top - Scrap Metal mos.
(iv) 30 cubic yards Open Top - Scrap Metal mos.
(g) Rental units: Front end
Estimated
Price
Total (i) Six cubic yards (NIHAC Cardboard) mos.
Estimated
Price
Total (h) Removal of Hazardous Materials from Dumpsters year (2 hours, Roll off Driver, manager, and 2 staff)
Addendum - Continuation of SF-1449 (Blocks 19 - 24)
Price
Total
(c) Bldg 10 Labor (no truck) - weekends wkends
(e) Mobile Refrigerated MPW Storage Units
Mos
(f) MPW Disposal (Estimated 4000 boxes / wk) 2,000,000
Lbs
(g) Bayview Research Center MPW
1,700 boxes
(h) MPW Handling Bldg 25 No truck (Mon-Fri) mos.
(i) Expendable Supplies (Not to Exceed $30,000.00)
LOT
2nd Option Period: through ______________.
[specific dates to be completed at time of award]
Price
Total 1.
Roll-On/Roll-Off Services
(iii) NIH, Bethesda, MD - construction debris
1,100 ea.
(vi) Waste Water Sludge, Poolesville, MD ea.
(includes drop charge)
(b) Rental units: Includes Delivery and Installation
30 yd. Self-Contained Compactor
(v) 30 cubic yard, open top (construction debris) mos.
Price
Total
Price Total
NIHAC (estimated 18 dumps/week)
1,250 dumps
(c) Rental Units
Price
Total
3.
Project Manager, Supervisory and Administrative Staff
(a) Project Manger
2,008 Hours
Federal Holidays or Federal Government snow days.
Federal Holidays or Federal Government snow days Addendum - Continuation of SF-1449 (Blocks 19 - 24) (f) Special Projects as Approved by Project Officer ea.
Price
Total
Collection of residential recycling, trash;
campus trash wire mesh cans and CRU's)
Price
Total
Price
Total (a) Solid Waste Fee - Front End Loader
2,250
TON
(b) Solid Waste Fee - Compactor Roll-Off
3,250
TON
(c) Solid Waste Fee - Open Top Roll-Off
TON
Addendum - Continuation of SF-1449 (Blocks 19 - 24)
_____ _______ (Animal bedding and food)
(h) Fines Levied by Montgomery County
Recycling Servicers
(b) Service Crews/Vehicles
Estimated
Price
Total (i) Labor/Vehicles to Service Interior
Month
Month (iii) Front End Truck (Animal Bedding and food waste) 252
Days (No Driver, driver to operate FE trash and Animal Bedding).
(b) Recycling Receptacles
Estimated
Price
Total
(ii) Central Office Paper Collector Receptacles
Ea.
(iv) Public Square Container Model # 2981 26"
Ea.
(v) Public Square Container Model # 2982 32"
Ea.
(vi) Public Square Container Model # 2983 37"
Ea.
(vii) Public Square Container Model # 2984 41"
Ea. _____ _______
Addendum - Continuation of SF-1449 (Blocks 19 - 24) (ix) Campus Recycling Units (CRU) (Single Unit)
(1Ea) (c) Expendable Supplies NOT to exceed $60,000
LOT
(Gloves, Plastic bags, Hampers, etc.)
(d) Trailer Hauling Services
Estimated
Price
Total (i) Open Road Trailer / Box Truck Hauling
1,000
Mile (ii) Recycling Trailer Rental - 45'
Month _____ _______
(e) Pulls to Recycling Outlets from NIH Main Campus Estimated
Price
Total
(iv) Commingled Glass, Plastic, Aluminum
Ea.
(v) Composting Materials (Animal Bedding, Food Waste) 144
Ea.
(f) Rental units: Includes Delivery and Installation
Estimated
Price
Total
(ii) 20 cubic yards Open Top - Scrap Metal mos.
(iii) 40 cubic yards Open Top - Scrap Metal mos.
(iv) 30 cubic yards Open Top - Scrap Metal mos.
(g) Rental units: Front end
Price
Total (i) Six cubic yards (NIHAC Cardboard) mos.
Estimated
Price
Total (h) Removal of Hazardous Materials from Dumpsters year
(2 hours, Roll off Driver, manager, and 2 staff)
Price
Total
(c) Bldg 10 Labor (no truck) - weekends wkends
(e) Mobile Refrigerated MPW Storage Units
Mos
(f) MPW Disposal (Estimated 4000 boxes / wk) 2,000,000
Lbs
Addendum - Continuation of SF-1449 (Blocks 19 - 24) (h) MPW Handling Bldg 25 No truck (Mon-Fri) mos.
(i) Expendable Supplies (Not to Exceed $30,000.00)
LOT
3rd Option Period: through ______________.
Price
Total 1.
(iii) NIH, Bethesda, MD - construction debris
1,100 ea.
(vi) Waste Water Sludge, Poolesville, MD ea.
(includes drop charge)
(b) Rental units: Includes Delivery and Installation
(iv) 30 cubic yard, open top (construction debris) mos.
Price
Total
Price Total
NIHAC (estimated 18 dumps/week)
1,250 dumps
(c) Rental Units
Price
Total
3.
Project Manager, Supervisory and Administrative Staff
(a) Project Manger
2,008 Hours
Federal Holidays, or Federal Government snow days.
(f) Special Projects as Approved by Project Officer ea.
Price
Total
Price
Total
Price
Total (a) Solid Waste Fee - Front End Loader
2,250
TON
(b) Solid Waste Fee - Compactor Roll-Off
3,250
TON
(c) Solid Waste Fee - Open Top Roll-Off
TON
(Animal bedding and food)
(h) Fines Levied by Montgomery County
Ea.
Recycling Servicers
(a) Service Crews/Vehicles
Estimated
Price
Total
Labor/Vehicles to Service Interior
Month
Month (iii) Front End Truck (Animal Bedding and food waste) 252
Days
(No Driver,to operate FE trash and Animal Bedding).
(b) Recycling Receptacles
Estimated
Price
Total
(ii) Central Office Paper Collector Receptacles
Ea.
(iv) Public Square Container Model # 2981 26"
Ea.
(v) Public Square Container Model # 2982 32"
Ea.
(vi) Public Square Container Model # 2983 37"
Ea.
(vii) Public Square Container Model # 2984 41"
Ea
(ix) Campus Recycling Units (CRU) (Single Unit)
(1Ea)
Estimated
Price
Total (c) Expendable Supplies NOT to exceed $60,000
LOT
(Gloves, Plastic bags, Hampers, etc.)
(d) Trailer Hauling Services
Estimated
Price
Total (i) Open Road Trailer / Box Truck Hauling
1,000
Mile
(ii) Recycling Trailer Rental - 45'
Month _______
(e) Pulls to Recycling Outlets from NIH Main Campus Estimated
Price
Total
Addendum - Continuation of SF-1449 (Blocks 19 - 24)
(iv) Commingled Glass, Plastic, Aluminum
Ea.
Rental units: Includes Delivery and Installation
Composting Materials (Animal Bedding, Food Waste) 144
Ea.
(f) Rental units: Includes Delivery and Installation
Estimated
Price
Total ( i) 30 yd Self-Contained - Cardboard
(ii) 20 cubic yards Open Top - Scrap Metal mos.
(iii) 40 cubic yards Open Top - Scrap Metal mos.
(iv) 30 cubic yards Open Top - Scrap Metal mos.
(g) Rental units: Front end
Estimated
Price
Total (i) Six cubic yards (NIHAC Cardboard) mos.
Estimated
Price
Total (h) Removal of Hazardous Materials from Dumpsters year
(2 hours, Roll off Driver, manager, and 2 staff)
Addendum - Continuation of SF-1449 (Blocks 19 - 24)
Price
Total
(c) Bldg 10 Labor (no truck) - weekends wknds
(e) Mobile Refrigerated MPW Storage Units
Mos
(f) MPW Disposal (Estimated 4000 boxes / wk) 2,000,000
Lbs
(h) MPW Handling Bldg 25 No truck (Mon-Fri) mos.
(i) Expendable Supplies (Not to Exceed $30,000.00)
LOT
(l)
4th Option Period: through ______________.
Price
Total 1.
(iii) NIH, Bethesda, MD - construction debris
1,100 ea.
(vi) Waste Water Sludge, Poolesville, MD ea.
(includes drop charge)
Price
Total
(b) Rental units: Includes Delivery and Installation
(iv) 30 cubic yard, open top (construction debris) mos.
Price
Total
Price Total
NIHAC (estimated 18 dumps/week)
1,250 dumps
(c) Rental Units
Price
Total
3.
Project Manager, Supervisory and Administrative Staff
Addendum - Continuation of SF-1449 (Blocks 19 - 24) (a) Project Manger
2,008 Hours
Federal Holidays or Federal Government snow days.
(f) Special Projects as Approved by Project Officer ea.
Price
Total
Price
Total
Price
Total (a) Solid Waste Fee - Front End Loader
2,250
TON
(b) Solid Waste Fee - Compactor Roll-Off
3,250
TON
(c) Solid Waste Fee - Open Top Roll-Off
TON
(Animal bedding and food)
(h) Fines Levied by Montgomery County
Ea.
Recycling Servicers
(a) Service Crews/Vehicles
Estimated
Price
Total (i) Labor/Vehicles to Service Interior
Month
Month Addendum - Continuation of SF-1449 (Blocks 19 - 24)
(iii) Front End Truck (Animal Bedding and food waste) 252
Days
(No Driver, driver to operate FE trash and Animal Bedding).
(b) Recycling Receptacles
Estimated
Price
Total
(ii) Central Office Paper Collector Receptacles
Ea.
(iv) Public Square Container Model # 2981 26"
Ea.
(v) Public Square Container Model # 2982 32"
Ea.
(vi) Public Square Container Model # 2983 37"
Ea.
(vii) Public Square Container Model # 2984 41"
Ea. _______
(ix) Campus Recycling Units (CRU) (Single Unit)
(1Ea)
(c) Expendable Supplies NOT to exceed $60,000
LOT
(Gloves, Plastic bags, Hampers, etc.)
(d) Trailer Hauling Services
Estimated
Price
Total (i) Open Road Trailer / Box Truck Hauling
1,000
Mile (ii) Recycling Trailer Rental - 45'
Month _______
Addendum - Continuation of SF-1449 (Blocks 19 - 24)
(e) Pulls to Recycling Outlets from NIH Main Campus Estimated
Price
Total
(iv) Commingled Glass, Plastic, Aluminum
Ea.
(v) Composting Materials (Animal Bedding, Food Waste) 144
Ea.
(f) Rental units: Includes Delivery and Installation
Estimated
Price
Total
(ii) 20 cubic yards Open Top - Scrap Metal mos.
(iii) 40 cubic yards Open Top - Scrap Metal mos.
(iv) 30 cubic yards Open Top - Scrap Metal mos.
(g) Rental units: Front end
Estimated
Price
Total (i) Six cubic yards (NIHAC Cardboard) mos.
Estimated
Price
Total
(h) Removal of Hazardous Materials from Dumpsters 4 mos
(2 hours, Roll off Driver, manager, and 2 staff)
Price
Total
(c) Bldg 10 Labor (no truck) - weekends wkends
(e) Mobile Refrigerated MPW Storage Units
Mos
(f) MPW Disposal (Estimated 4000 boxes / wk) 2,000,000
Lbs
(g) Bayview Research Center MPW
1,700 boxes
(h) MPW Handling Bldg 25 No truck (Mon-Fri) mos.
(i) Expendable Supplies (Not to Exceed $30,000.00)
LOT
Article 1 STATEMENT OF WORK Independently, and not as an agent of the government, the contractor shall be required to furnish all the necessary services, qualified personnel, management, resources, materials, and supplies, not otherwise provided by the government, as needed to perform the requirements set forth in the Statement of Work (Attachment 1) attached hereto and made a part of this contract.
Article 2 NON-PERSONAL SERVICES This contract is a “non-personal services contract” as defined in Federal Acquisition Regulation (FAR) Subpart 37.1. It is, therefore, understood and agreed that the Contractor and/or the Contractor’s employees: (1) shall perform the services specified herein as independent contractors, not as employees of the Government; (2) shall be responsible for their own management and administration of the work requirements and bear sole responsibility for complying with any and all technical, schedule, or financial requirements or constraints attendant to the performance of this contract; (3) shall be free from supervision or control by any Government employee with respect to the manner or method of performance of the services specified; but (4) shall, pursuant to the Government’s right and obligation to inspect, accept or reject the work, comply with such general direction of the Contracting Officer, or the duly authorized representative of the Contracting Officer, as is necessary to ensure accomplishment of the contract objectives.
Article 3 CONTRACTOR PERSONNEL a.
PERSONNEL
The Government shall not exercise any supervision or control over on-site Contractor employees who shall be accountable solely to the Contractor who, in turn, shall be accountable to the Government.
The Contractor shall provide proper supervision techniques, and keep personnel informed of changes in methods or scope of operations. All work shall be performed in such a manner so that there is no interruption to, or interference with the NIH mission.
Contractor supervisors shall be available at all times when the contract work is in progress, to receive notices, reports or requests from the Contracting Officer or his/her designated representative. The on-site supervisor(s) shall remain at the building site at all times when the contract work is in progress.
The Contractor shall be responsible for maintaining satisfactory standards of employee competency, conduct, appearance and integrity and shall be responsible for taking such disciplinary action with respect to his employees as may be necessary.
Contractor personnel are subject to the same rules of conduct as Government employees. The Contractor shall take appropriate personnel action as required in the event employees become involved with civilian authorities as a result of misconduct.
All personnel employed by the Contractor shall be trained, competent, and skilled in the performance of the work to which they are assigned. The Contractor shall require all of its employees to be courteous at all times, not to use loud or profane language, and to do their work as quietly and safely as possible and in a sanitary manner.
The Project Officer may require all Contractor personnel who work at NIH installations to attend a Biosafety Awareness class or other relevant training. New contract personnel will be scheduled into the next available class after being assigned to the NIH. This class provides basic instructions in working safely at biomedical research facilities. The Contractor is responsible for ensuring that contractor staff are given the additional training required for relevant safety or environmental hazards.
Contractor personnel shall be capable of recognizing hazard notification signs, symbols, and insignia and able to read health and safety information in English.
All personnel employed by the Contractor or a subcontractor shall conform to all NIH security regulations which may be in effect during the contract period and shall be subject to those regulations. Contract employees will not be permitted on the NIH campus if they fail to follow security regulations.
If the performance of on-site Contractor personnel is judged to be substandard by the Project Officer, the Contractor shall receive written notice of the problem. Within two weeks, the Contractor shall apply corrective measures and demonstrate improved performance by the employee. If satisfactory improvement is not observed after this period, the Contractor may be directed by the Project Officer to immediately remove the employee from assignment to NIH contract activities and expeditiously provide a replacement employee.
The Project Officer may direct the Contractor to remove, and the Contractor shall remove, any employee performing under this contract who is deemed incompetent, careless, insubordinate, unsuitable, or otherwise objectionable and whose continued deployment to the NIH is inconsistent with the best interests of the security or mission of the NIH, or for reasons of misconduct. Contractor personnel are subject to the same rules of conduct as Government employees.
All Contractor employees, including supervisors, must wear distinctive clothing for ready identification. The clothing shall have the Contractor’s name affixed in a permanent or semi-permanent manner. Employees shall be in uniform no later than ten (10) working days from the date of entering on duty. Employees shall wear shirts and trousers, coveralls, or full sized smocks, as appropriate. Any color or color combination, with the exception of blue, may be used for uniforms. Employees shall be required to dress neatly. The Government will restrict access if employees are improperly attired.
All Contractor personnel shall be required to obtain an NIH identification badge from the NIH Parking Office, Building 31, Room B3B04, within five (5) working days from the beginning date of this contract. The ID badge shall be worn clipped or pinned to the uniform shirt during contract work hours. When Contractor personnel are terminated or leave for other reasons, security checkout procedures require that NIH ID badge and any keys or card-keys assigned to the individual be immediately returned to the Project Officer. Information regarding obtaining DHHS identification badges may be found at:
http://www.ors.od.nih.gov/ser/dpsac/badge/Pages/applying.aspx The Contractor shall provide to the Project Officer a complete list of all contract employees under this contract to include names, position title, assigned area, their individual tours of duty, and schedule of work assignments. This list shall be submitted within five (5) work days following the contract start date and updated thereafter as changes occur.
The Contractor is responsible for ensuring that the employees performing under this contract are citizens of the United States or, if aliens, have immigration and naturalization registration cards on file.
b.
Environmental Compliance
Under this contract, the Contractor shall comply with all Federal, state and local laws, regulations, rules and NIH facility operating permits and licenses applicable to the collection, movement, and disposal of solid waste, special medical waste, and regulated asbestos waste and recyclable materials. The Contractor shall prepare the necessary shipping documents and verifications. The Contractor shall possess and maintain current knowledge of all applicable laws, regulations and rules as well as possess current licenses, permits and appropriate insurance coverage required by such regulations, rules and laws and this contract.
c.
Pertinent Laws and Regulations
The Agencies and regulatory titles listed below constitute the primary regulatory framework under which waste management operations described in this contract must be carried out. The Contractor shall comply with all applicable sections of the laws and regulations listed below and any other applicable laws and regulations that are not listed.
U.S. Environmental Protection Agency (EPA): Title 40 CFR.
U.S. Department of Transportation (DOT): Title 49 CFR. Title 49 regulations cover the shipment of hazardous materials.
U .S. Department of Labor (DOL): Title 29 CFR.
Maryland Department of the Environment (MDE). COMAR Titles 10 and 26.
Montgomery County Executive Regulation (MCER Chapter 48).
d.
Permits and Licenses, Contractor Held
The Contractor shall, without additional expense to the NIH, obtain necessary registrations, licenses and permits including but not limited to solid waste, recycling, special medical waste, haulers related to the performance of contract operations. The Contractor shall notify the Project Officer in writing within 4 working days of the Contractors knowledge of when required permits or licenses expire, are canceled, withdrawn, renewed, replaced or undergo significant modification and provide appropriate copies.
e.
Conduct of Work, Precautions and Damages The Contractor shall be responsible for all damage or injury to NIH property and personnel, resulting from the activities of its employees, the operation of its vehicles and equipment or otherwise resulting from the performance of the requirements described herein. The Contractor shall take all precautions necessary for the protection against injury to all persons at the NIH facilities and other locations associated with the performance of the requirements of this contract. Performance of the requirements described herein shall be such that it prevents undue wear, damage, or loss to property.
The Contractor and its employees shall observe all pertinent safety practices and comply with any applicable safety regulations.
f.
Holidays and Administrative Leave
The National Institutes of Health observes the following holidays:
New Year’s Day
Labor Day
Martin Luther King, Jr.’s Day Columbus Day
Presidents’ Day
Veterans Day
Memorial Day
Thanksgiving Day
Independence Day
Christmas Day
Any other day designated by Federal statute.
Any other day designated by Executive Order.
Any other day designated by President’s proclamation.
When any such day falls on a Saturday, the preceding Friday is observed. When any such day falls on a Sunday, the following Monday is observed. Observance of such days by Government personnel shall not be cause for an extension to the delivery schedule or period of performance or adjustment to the price, estimated cost, or fee(s), if any, except as set forth in the contract.
When the Government grants administrative leave to its employees, Contractor personnel shall also be dismissed. However, the Contractor shall continue to provide sufficient personnel to perform critical contract requirements already in progress or scheduled and shall be guided by the instructions issued by the Contracting Officer or his/her duly appointed representative.
Article 1 CLAUSES INCORPORATED BY REFERENCE (Feb 1998)(FAR 52.252-2) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address: https://www.acquisition.gov/far/
FEDERAL ACQUISITION REGULATION (FAR) (48 CFR Chapter 1) CLAUSES
52.228-5
Insurance - Work on a Government Installation (Jan 1997)
52.242-15 Stop Work Order (Aug 1989)
52.245-2
Government Property (Fixed-Price Contracts)(May 2004)
52.246-16 Responsibility for Supplies (Apr 1984)
52.247-35 F.O.B. Destination Within Consignee’s Premises (Apr 1984)
52.252-1, Solicitation Provisions Incorporated by Reference, in solicitations in order to incorporate provisions by reference.
52.252-2, Clauses Incorporated by Reference, in solicitations and contracts in order to incorporate clauses by reference.
52.252-3, Alterations in Solicitation, in solicitations in order to revise or supplement, as necessary, other parts of the solicitation that apply to the solicitation phase only, except for any provision authorized for use with a deviation.
52.252-4, Alterations in Contract, in solicitations and contracts in order to revise or supplement, as necessary, other parts of the contract, or parts of the solicitations that apply to the contract phase, except for any clause authorized for use with a deviation.
52.252-5, Authorized Deviations in Provisions, in solicitations that include any FAR or supplemental provision with an authorized deviation. Whenever any FAR or supplemental provision is used with an authorized deviation, the contracting officer shall identify it by the same number, title, and date assigned to the provision when it is used without deviation, include regulation name for any supplemental provision, except that the contracting officer shall insert “(DEVIATION)” after the date of the provision.
52.252-6, Authorized Deviations in Clauses, in solicitations and contracts that include any FAR or supplemental clause with an authorized deviation.
Article 2 PERIOD OF PERFORMANCE (a) Performance of the work called for in this contract shall be for a 12-month period commencing through [specific dates to be completed at time of award] with four successive 12-month options to extend contract performance.
If the Government exercises its option pursuant to FAR 52.217-9, Option to Extend the Term of the Contract, the period of performance will be extended as indicated below and the estimated contract amount increased accordingly:
Period of Performance
Contract Amount
Option 1
Option 2
[To be completed at time of award.]
Option 3
Option 4
The period of performance encompasses the submission and acceptance of the reports specified in the statement of work.
(d) The quality of the Contractor's work in carrying out the requirements of this contract shall be monitored by the Project Officer or the designated alternate through a continuous program of inspection of the Contractor's reports and on-site work performance. The Project Officer or designated alternate will not interfere with normal work in progress, however, the Government may redirect the work effort within the scope of the contract as conditions warrant.
(e) Final payment under the contract shall be contingent upon receipt and acceptance of all contract requirements.
Article 3 Reporting Requirements/Deliverables Satisfactory performance of this contract shall be deemed to occur upon performance of the work described in the statement of work and upon delivery and acceptance by the Contracting Officer, or the duly authorized representative, of the following items in accordance with the stated delivery schedule:
a.
The items specified below, as described in the statement of work, will be required to be delivered f.o.b. destination as set forth in FAR 52.247-35, F.O.B. DESTINATION, WITHIN CONSIGNEES PREMISES (Apr 1984), and in accordance with and by the date(s) specified below.
b.
For items delivered by means other than electronically, they shall be addressed and delivered to the Project Officer at the following address:
[To be completed at time of award.]
One copy of the above item(s) that are denoted with an asterisk (*) shall be submitted to the Contracting Officer at the following address:
Office of Logistics & Acquisitions
Attn: John Best
6011 Executive Blvd., Room 541C (MSC 7663)
Rockville, MD 20852
Telephone: 301-402-3063
E-mail: Bestj@od.nih.gov Article 4 REQUIREMENTS (Oct 1995) (FAR 52.216-21)
(a) This is a requirements contract for the supplies or services specified and effective for the period stated, in the Schedule. The quantities of supplies or services specified in the Schedule are estimates only and are not purchased by this contract. Except as this contract may otherwise provide, if the Government's requirements do not result in orders in the quantities described as "estimated" or "maximum" in the Schedule, that fact shall not constitute the basis for an equitable price adjustment.
(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. Subject to any limitations in the Order Limitations clause or elsewhere in this contract, the Contractor shall furnish to the Government all supplies or services specified in the Schedule and called for by orders issued in accordance with the Ordering clause. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.
(c) Except as this contract otherwise provides, the Government shall order from the Contractor all the supplies or services specified in the Schedule that are required to be purchased by the Government activity or activities specified in the Schedule.
(d) The Government is not required to purchase from the Contractor requirements in excess of any limit on total orders under this contract.
(e) If the Government urgently requires delivery of any quantity of an item before the earliest date that delivery may be specified under the contract, and if the Contractor will not accept an order providing for the accelerated delivery, the Government may acquire the urgently required goods or services from another source.
(f) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor's and Government's rights and obligations with respect to that order to the same extent as if the order were completed during the contract's effective period; provided that the Contractor shall not be required to make any deliveries under this contract after contract expiration, unless performance is extended by modification to the contract.
Article 5 ORDERING (Oct 1995)(FAR 52.216-18) (1) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the Schedule. Such orders may be issued from through [specific dates to be completed at time of award].
(2) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract shall control.
(3) If mailed, a delivery order or task order is considered "issued" when the Government deposits the order in the mail. Orders maybe issued orally, by facsimile, or by electronic commerce methods only if authorized in the Schedule.
Article 6 ORDER LIMITATIONS (Oct 1995)(FAR 52.216-19)
(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than $100.00 , the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.
(b) Maximum order. The Contractor is not obligated to honor--
(1) Any order for a single item in excess of the estimated total stated in the pricing Schedule;
(2) Any order for a combination of items in excess of the estimated total stated in the pricing Schedule;
(3) A series of orders from the same ordering office within 365 days that together call for quantities exceeding the limitation in subparagraph (1) or (2) of this section.
(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) of this section.
(d) Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 2 days after issuance, with written notice stating the Contractor's intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.
Article 7 METHOD OF ORDERING The Consignees/Ordering officials shall sign all orders (including written confirmation of oral/telephone orders) involving requests for services under this contract. The authorized designees are: [to be completed at time of award]
Name
Telephone No.
Article 8 INDEFINITE DELIVERY CONTRACT PAYMENT METHOD
To initiate and receive prompt payment, the Contractor shall comply with the following procedure:
a. Task/Delivery Order Number shall be given to you at the time the order is placed. The Contractor is cautioned not to accept an order unless one of these Numbers is issued.
b.
Invoices shall be submitted monthly to the address indicated in item 17. INVOICE SUBMISSION. Invoices shall cite the Contract Number and Task/Delivery Order Number for each order for which payment is being requested.
Article 9 OPTION TO EXTEND SERVICES (Nov 1999)(FAR 52.217-8) The Government may require continued performance of any services within the limits and at the rates stated in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed six months. The Contracting Officer may exercise the option by written notice to the contractor within 30 days prior to the expiration of the contract.
Article 10 OPTION TO EXTEND THE TERM OF THE CONTRACT (Mar 2000)(FAR 52.217-9) (a) The Government may extend the term of this contract by written notice to the Contractor within the time specified in the Schedule; provided, that the Government shall give the Contractor a preliminary written notice of its intent to extend at least 60 days before the contract expires. The preliminary notice does not commit the Government to an extension.
(b) If the Government exercises this option, the extended contract shall be considered to include this option provision.
(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 5 years.
Article 11 COST RECOVERIES - RECYCLED MATERIAL
(a) It is hereby understood and agreed that remuneration for the tonnage value of recycled materials shall be ______ [to be completed at time of award] of the amount received by the contractor from the recycling outlet(s). The amount shall appear as a credit to the Government on monthly invoices.
(b) The Contractor shall keep an accurate account of all payments received from recycled materials under the contract. The Contractor shall record as credits on monthly invoices to the Government the applicable amount due the Government. The remuneration must be credited to the Government in the billing period actually received.
Article 12 ECONOMIC PRICE ADJUSTMENT - DISPOSAL FEES (a) The fixed unit prices as set forth in the Schedule shall not be in excess of the established price imposed by the applicable termini in effect at the time of contract award. The term “established price” means a price that (1) is an established catalog or market price for a commercial item sold in substantial quantities to the general public, (2) meets the criteria of subsection 15.804-1 of the Federal Acquisition Regulation (FAR), and (3) is the net price after applying any standard trade discount offered.
(b) The contractor shall promptly notify the Contracting Officer of the amount and effective date of each decrease in any applicable established price. Each corresponding contract unit price shall be decreased by the same percentage that the established price is decreased. The decrease shall apply to those services provided on and after the effective date of the decrease. The Contractor shall certify (1) on each invoice that each unit price stated in it reflects all decreases required by this clause or (2) on the final invoice that all required price decreases have been applied as required by this clause.
(c) If the established price imposed by the termini is increased after the contract date, the corresponding contract unit price shall be increased, upon the Contractor’s written request to the Contracting Officer, by the same percentage that the established price is increased, and the contract shall be modified accordingly, subject to the following limitations:
(1) The increased contract unit price shall be effective (i) on the effective date of the increase in the applicable established price if the Contracting Officer receives the Contractor’s written request within 10 days thereafter or (ii) if the written request is received later, on the date the Contracting Officer receives the request.
(2) The increased contract unit price shall not apply to quantities scheduled under the contract for delivery before the effective date of the increased contract unit price, unless failure to delivery before that date results from causes beyond the control and without the fault or negligence of the Contractor, within the meaning of the Default clause.
(3) No modification increasing a contract unit price shall be executed under this paragraph (c) until the Contracting Officer verifies the increase in the applicable established price.
(4) Within 30 days after receipt of the Contractor’s written request, the Contracting Officer may cancel, without liability to either party, any undelivered portion of the contract items affected by the requested increase.
(a)
During the time allowed for the cancellation provided for in subparagraph (4) above, and thereafter if there is no cancellation, the Contractor shall continue deliveries according to the contract delivery schedule, and the Government shall pay for such deliveries at the contract unit price, increased to the extent provided in paragraph (c) above.
Article 12 CONTINUITY OF SERVICES (Jan 1991)(FAR 52.237-3)
(a) The Contractor recognizes that the services under this contract are vital to the Government and must be continued without interruption and that, upon contract expiration, a successor, either the Government or another contractor, may continue them. The Contractor agrees to–
(1) Furnish phase-in training; and
(2) Exercise its best efforts and cooperation to effect an orderly and efficient transition to a successor.
(b) The Contractor shall, upon the Contracting Officer’s written notice, (1) furnish phase-in, phase-out services for up to 90 days after this contract expires and (2) negotiate in good faith a plan with a successor to determine the nature and extent of phase-in, phase-out services required. The plan shall specify a training program and a date for transferring responsibilities for each division of work described in the plan, and shall be subject to the Contracting Officer’s approval. The Contractor shall provide sufficient experienced personnel during the phase-in, phase-out period to ensure that the services called for by this contract are maintained at the required level of proficiency.
(c) The Contractor shall allow as many personnel as practicable to remain on the job to help the successor maintain the continuity and consistency of the services required by this contract. The Contractor also shall disclose necessary personnel records and allow the successor to conduct on-site interviews with these employees. If selected employees are agreeable to the change, the Contractor shall release them at a mutually agreeable date and negotiate transfer of their earned fringe benefits to the successor.
(d) The Contractor shall be reimbursed for all reasonable phase-in, phase-out costs (i.e., costs incurred within the agreed period after contract expiration that result from phase-in, phase-out operations) and a fee (profit) not to exceed a pro rata portion of the fee (profit) under this contract.
Article 13 PROJECT OFFICER The following Project Officer(s) will represent the Government for the purpose of this contract:
[to be completed at time of award]
The Project Officer is responsible for: (1) monitoring the contractor's technical progress, including the surveillance and assessment of performance and recommending to the Contracting Officer changes in requirements; (2) interpreting the statement of work and any other technical performance requirements; (3) performing technical evaluation as required; (4) performing technical inspection and acceptance required by this contract; and (5) assistance in the resolution of technical problems encountered during performance. The Contracting Officer is responsible for directing or negotiating any changes in terms, conditions, or amounts cited in the contract.
For guidance from the Project Officer to the Contractor to be valid, it must: (1) be consistent with the description of work set forth in the contract; (2) not constitute new assignment of work or change to the expressed terms, conditions, or specifications incorporated into the contract; (3) not constitute a basis for an extension to the period of performance or contract delivery schedule; (4) not constitute a basis for any increase in the contract price.
The Contracting Officer is the only person with the authority to act as an agent of the Government under this contract. Only the Contracting Officer has authority to: (1) direct or negotiate any changes in the statement of work or specifications; (2) modify or extend the period of performance; (3) change the delivery schedule; or (4) otherwise change any terms and conditions of this contract.
The Government may unilaterally change its Project Officer designation.
Article 14 TECHNICAL DIRECTION Work performance shall be subject to the technical direction of the COTR. The term “technical direction” is defined to include, without limitation, the following:
1. Directions to the contractor which redirect the contract effort, such as shift work emphasis between work areas or tasks, require pursuit of certain lines of inquiry, fill in details or otherwise serve to accomplish the contractual statement of work.
a.
Provision of information to the Contractor which assists in the interpretation of drawings, specifications or technical portions of the work description.
b.
Review and, as required by the contract, approval of technical reports, drawings, specifications or technical information to be delivered by the Contractor to the Government.
Technical direction must be within the general scope of the work stated in the contract. The COTR does not have authority to and may not issue any technical direction which (i) constitutes an assignment of additional work outside the general scope of the contract; (ii) constitutes a change as defined in the contract clause entitled “Changes;” (iii) in any manner causes an increase or decrease in the total estimated contract cost, the fixed fee or the time required for contract performance; or (iv) change any of the expressed terms, conditions, or specifications of the contract.
The Contractor shall proceed promptly with the performance of technical direction duly issued by the COTR in the manner prescribed by this Article and within his authority under the provisions of this Article.
If, in the opinion of the Contractor, any instruction or direction issued by the COTR is within one of the categories as defined in (a) through (b) above, the Contractor shall not proceed but shall notify the Contracting Officer in writing within five (5) working days after the receipt of any such instruction or direction and shall request the Contracting
Officer to modify the contract accordingly. Upon receiving such notification from the Contractor, the Contracting Officer shall issue an appropriate contract modification or advise the Contractor in writing that, in his opinion, the technical direction is within the scope of this Article and does not constitute a change under the Changes clause of the contract. The Contractor shall thereupon proceed immediately with the direction given. A failure to the parties to agree upon the nature of the instruction or direction or upon the contracting action to be taken with respect thereto shall be subject to the provisions of the contract clause entitled “Disputes.”
Article 15 KEY PERSONNEL The personnel specified in this contract are considered to be essential to the work to be performed hereunder. Prior to diverting any of the specified individuals to other programs, the Contractor shall notify the Contracting Officer reasonably in advance and shall submit justification (including proposed substitutions) in sufficient detail to permit evaluation of the impact on the program.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .