Question Answers.docx
DOCX document 18 KB Posted
- Attached to
- Sewer Repairs La Jolla, CA Federal contract opportunity
- Solicitation number
- NFFR7000-20-01868CM2
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 4_ Expansion Tank.pdf | ||
| 20-01868 Statement of Work.docx | DOCX document | |
| 9100_System_RO139_ARJ1503_0220.pdf | ||
| Attachment 2_ Tsurumi Pump Specifications.pdf | ||
| Attachment 1 - DCW PRV report.pdf | ||
| Attachment 3_ SP-2 BJM Pump Specification.pdf | ||
| 20-01868 SF 18 Quote Form.doc | DOC document | |
| CONSTRUCTION TERMS FAC 2020-05.docx | DOCX document | |
| 20-01868 Statement of Work.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question & Answers NFFR7000-20-01868CM2
1. In the statement of work, the scope seems to be listed. In the DCW PRV report, it mentions “extensive site work and a new vault”. Is this part of the project? If so, we will need some parameters around the scope? Type of vault? Beginning and end of the replacement line?
a. There is no vault to be installed. It was an option that we did not elect to take. See statement of work for actual scope of work.
2. The scope mentions a ¾” copper pipe. The DCW report mentions a”3/4 inch capped with ball valve piping from cold water downstream of new indoor PRV station”. Where is this? How far”
a. The 3/4" line is for the expansion tank connection.
3. It would be nice to have as-built for the existing parts being replaced to see if additional work for fittings will be needed?
a. You can take as many pictures as you want during the site walk and document as-built equipment as you see fit.
4. What capabilities do the required epoxy coating need?
a. See attached