Attachment 1 - DCW PRV report.pdf
PDF 301 KB Posted
- Attached to
- Sewer Repairs La Jolla, CA Federal contract opportunity
- Solicitation number
- NFFR7000-20-01868CM2
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 20-01868 Statement of Work.docx | DOCX document | |
| Attachment 4_ Expansion Tank.pdf | ||
| Question Answers.docx | DOCX document | |
| 9100_System_RO139_ARJ1503_0220.pdf | ||
| Attachment 2_ Tsurumi Pump Specifications.pdf | ||
| Attachment 3_ SP-2 BJM Pump Specification.pdf | ||
| CONSTRUCTION TERMS FAC 2020-05.docx | DOCX document | |
| 20-01868 Statement of Work.docx | DOCX document | |
| 20-01868 SF 18 Quote Form.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DSE - 301 Enterprise Street, Suite 3, Escondido, CA 92029 (760) 741-7484 www.dsemec.com
DSEngineering, Inc.
DOMESTIC COLD WATER PRESSURE ISSUE
RECOMMENDED REPORT
December 20, 2019
Location: NOAA - Southwest Fisheries Science Center 8901 La Jolla Shores Drive, La Jolla, CA 92037
Executive Summary
Our firm “DS Engineering Inc” (DSE), has provided site visits to the facility located at address above, to observe with recommendations of excessive building pressures related to the domestic cold water main.
From site visits July 23, 2019, and December 18, 2019, meetings with facilities engineering staff, this report provides a recommendation to replace and upgrade the existing building pressure reducing valve (PRV) station located at LOWER LEVEL Parking area. The new PRV assembly should improve the overall building domestic water pressure including when a large volume of water for SAND FILTER FLUSH process uses approximately 400 gallons for 5 minutes, twice a week, occur for the aquarium (per NOAA).
Recommend to use a “ZURN Wilkins” Model ZW209-O-Y-V-HP-GL 4” size pressure reducing valve assembly, complete with additional 2.0” ZW209 bypass as noted from manufacturer’s cut-sheet.
Recommend to also provide a ¾” capped cold water line with ball-valve for future expansion tank, to be located at discharge of new indoor PRV station. The expansion tank will be mounted in an adjacent open vault next to PRV station, at lower Garage Level.
Technical Existing Conditions & Recommendations:
EXISTING CONDITIONS:
The facility has the main domestic water service from (2) existing “City of San Diego” water meters, 2 inch size, with backflow preventer’s and PRV’s. The incoming water pressure from the street is 150-170 PSIG, and exceeds the 2016 California Plumbing Code water pressure to inside building of 80 PSIG. Both existing PRV’s are set to reduce street pressure to around 90 PSIG currently.
NOAA facilities engineering discussed how the (2) existing PRV’s fail after 1 year, and constantly need to be replaced. The facility has an additional PRV that is set from 90 PSIG to 70 PSIG, to comply with code requirements of water pressure to inside buildings. Over the years, this additional PRV appears to fail to hold the water pressure to 80 PSIG or less, and the building experiences large pressure fluctuations.
BUILDING PRV RECOMMENDATIONS:
1. LOWEST COST SOLUTION – Instead of replacing the (2) existing PRV stations at the street water meter location, recommend to replace the indoor PRV assembly with a new PRV system.
2. HIGHER COST SOLUTION – Replace both PRV stations, and (2) 2 inch reduced pressure backflow devices with new 4 inch sized PRV and backflow assembly. This is a much higher cost due to dealing with existing valves near storm water detention/bio-swale landscape, and cost of underground trenching plus large concrete vault to house the new plumbing valves and assemblies.
REPORT NOTES:
The report from DSE is based upon basic observations of the existing site conditions and information received from “NOAA” plus discussions at site meetings. This report does not include any unforeseen conditions, site civil conditions, or process systems that are connected to the existing building domestic water system.
DSEngineering, Inc.
Photographs with notes:
Photo Observed
Conditions Description
Photograph Proposed Solution
Existing location of (2) water meters/PRV’s/backflow devices and adjacent storm water/landscape area
A. Replacing all valves with new larger 4 inch domestic water valve systems will require extensive site work, new underground vault, and shut-down of building water system.
Indoor additional PRV brand “OCD” recommended to be replaced.
A. Recommend to replace “OCD” brand PRV with new “ZURN WILKINS” primary and bypass PRV station, to improve control of building domestic water pressure fluctuations.
DSEngineering, Inc.
Location at existing underground VAULT next to indoor PRV station, for future expansion tank.
A. Recommend to provide ¾” capped with ball valve piping from cold water downstream of new indoor PRV station. Expansion tank will assist further on control of building pressurization conditions/fluctuations.
DSEngineering, Inc.
Appendix A
Recommended (PRV) from “ZURN” for
INDOORS
REPLACMENT ONLY
Zurn Industries, LLC | Wilkins
| Zurn Industries Limited
*��0�1��0#�������"���"���#�#�� www.zurn.com
Rev. K
Date: 9/16
Document No. ACV-ZW209
Product No. Model ZW209
Model ZW209 Pressure Reducing Valve
2.)3��.' $4���5$.'� 40.26��5306�2.)3 �'406 �5306 2.)36')��.''6�5$.' ��6����6���5$'4
�00� �.�5
�6)��6) �.�5
5�
& & �""�7�*�� !� ���8�9��9 %8 ���8�9��9
�����"��#�"�7�*��
���8#9���9 �9��"9 ���8#9��"9 ����""���""�7�*��
��+ & �""�7�*�� !� ���8#9��"9 %8 ���8#9��"9
,$'$,�,�$'065���6����6��"���$
�56,�6��5��6���5$'4:� ����� �$0.5����$'4���'46:� ���������"�7�*
Standard Features
�� 67�!����
| / | &�� )���77 |
| �+ | & |
| �� �*��/���� | ���� |
<� =�� >�5�7 ��/
| <� .7 | %*%-��7 | &���%/ |
| ���?�*@ | �����8�9����9A |
/*�%�1
| �� $%� | /� |
| %&�.(/� | /�� |
| ��( | |
| �4 | |
| (- | � |
�� ��77 �5(�*%-� %&�2
Options ?�&&��(BB*!�� // ��/��C�#"�A �� �� �� �"D0#�E�&
(�*���� �F�G*/��$��� /*�%�1 �� 0� �� ��������*%-��7 &���%/ ��H� �� .� �� ����.7 %*%-��7 &���%/ &����8�9���9A 2�&�
| �� �� �� �%-� | ��/�� | �2�&� |
| �� �� �� � | &(� | &��� |
/�2�&� �� 4� �� $���4 �� 5E� �� '�5�5�
�� 3� �� �'�$��� *%�1 �+ �.7/*�%� �� 1� �� 1*/�%��(��
/ &���"° �?���8�9��9��� �� �G*/��90�9�� �9E�9�.7/*�%A �� C� �� C�$�1*�(
�� 0�� �� ��#��7�*�0�G��
| ��( | |
| �� | |
| %- | ��1���)��*��/ |
| 7� | |
| � | ����D0A |
�� E�� �� �"��""�7�*�E*-���
| ��( | |
| �� | |
| %- | ��1���)��*��/� |
| 7� | |
| � | ����D0A |
| 7� | |
| � | �� |
���B*//*%-���7*��/�+ %&���77 � � � =40>�.7/*�%�*%��(& &A �� �E� �� �/ *%� ����/ ��2
| *& | &�E�� | ��?�%��� |
| 7� | ||
| � | �� |
� � � ��77 �5(�*%-A��
| �� �1� �� �*��/��%�� | + |
| � | ��*& |
| �� 40� �� 0*I(*&� *�� | &�4 |
DIRECTION OF FLOW
Application
| 5� | �C( |
| %��*�F*%��,�& | ��C�#"���*��/�.7 |
| / | &�� | ||
| ��( | |||
| � | |||
| � | &(�*%-�1 | ||
| �+ | �*��& | �*-% | &�B� |
77�*� /*�%��G�
| � | ||
| /� | � | |
| &(�/*�%��B��*-��*%� | /�7 | |
| ��( | ||
| ��/��� | ||
| B | � |
| �� | � | |
| �(/� | /�7 | |
| ��( | ||
| �*�� | ||
| I(* | ||
| &��5� | �7*��/� | |
| �� | ����� |
%- ��*%�&�G%�/
��7
| ��( | |
| � | |
| ���G*%-�/� | �� |
| / | �� | /G | %�/� | ����� | &� |
| %&��7 | %�7��*/*�%� | %�( |
%/�&�G%�/
| ��� | /�7 | ||
| ��( | |||
| ��.%� | �/� | �&�G%�/ |
| ��( |
| � |
�� ��/� �7*��/�� //*%-��/� �� �+ �G*���� ��(/�7
- �&�G%�/
| ��( |
| � |
| -(� |
%�/�& 7 %& %/�(7�%�B��G�
| / | �� |
| �(�/*%-�*%��*%*� |
��7
| ��( |
| � |
| �(-��/� | �+ | ||
| �+ | ��$%� | ||
| &&*/*�%�/� | �,�& | ��C�#"����� | �� |
&�G*/�� 7�!���� ����B�
��*�%�7
| �/ | �/*�%�� |
| ��G | ��� |
%&�7
| ��( |
| �� |
(- ��B� �I(*�F�
| *%/ | % |
| %� | �� |
Standards Compliance:
<��'�$8��������"
| <�, | /��/� | � | |
| I(* | |||
| � | %/���B�'� 8�'�$���H |
H?"�#�J�,�D���6$4E56)��16��46�06�)��.'56'5A
Materials
*%�1 �+ �2�&�� � )(�/*� �$ �%���5,����� *%�1 �+ �2�%% /� )(�/*� �$ �%���5,�����
| )*���4(*& | � � �/ | |
| *%� | ����/ | � |
)*��� � � 2(%
7�
| -�� � '���%�� | *%B� |
| � | &�2(% |
| �/ | ��� � � �/ | |
| *%� | ����/ | � |
�7
H5� �����*%-��7 &���%/ ���?�7/*�% �A��%�/�*��+
�G ���� ��7 %� �?�A�/(
%���BB�*/���
Schematic Diagram
*7/*�%��B��/ *%�1 #� ��"D0�$��� /*�%�1 �� �D0�9�� 9�5�7 ��/
| ��( |
| �4 |
�� ��D0��
| ��( | |
| �� | &(�*%-���%/ |
NSF/ANSI 61
Proposed new INDOOR PRESSURE REDUCING VALVE (PRV) for NOAA - La Jolla CA Domestic Water pressure controls DSE Inc. 12.19.19 provide with CLASS 250 or 300 Flanges
| Zurn Industries Limited
*��0�1��0#�������"���"���#�#�� www.zurn.com Page 2 of 4
Globe and Angle Main Valve Dimensions
DIM FULL PORT
VALVE SIZE INCHES (mm)
���8��?�#A ���8#?��A #�?�"A #��8#�?��A ��?�"A ��?�""A ��?��"A ��?#""A �"�?#�"A �#�?�""A ���?��"A ���?�""A
5�
& & ���8� ���8� ���8�� �� �#��8# %- ���8# ���8� �� �# �� #" #���8� #���8� �� �� ����8� %- � �" ����8� ����8� ����8� #� #���8�� ����8� ����8# �"��8# ����8#
��+ & ���8# � �� �#��8# �� #" #���8� #���8� 2 )* ���8� ���8� ���8� � ���8�� �����8�� ����8� #"��8� #����8�� #���8# ����8� ����8# !� ���8� ���8� ���8�� ���8� � �"��8�� �#��8�� ����8�� ����8� #"��8�� ##���8�� #���8�
5�
| & | &84 |
| ��+ | & ���8� ���8� ���8� #��8� #��8�� ���8�� � � ����8�� ���8� ���8� ����8�� |
%- #��8# � ���8# ���8� ���8# ���8# ���8� � ���8# �"��8# ����8� %- � ���8� ���8� ���8� � ���8� ���8# ���8� �"��8� ����8# �#��8�
6 '�5�2�&��5 7 �8� �8� �8� �8# �8# �8� �8� � � � � � '�5��+ ����(-�5 7 �8# �8# �8# �8# �8# �8� �8� � � � � � 4 '�5���+ �5 7 �8� �8� �8� �8# �8# �8� �8� � � � � �
E
5�
& & ���8� ���8� ���8� ���8# ���8� %- � ���8� ���8# � ���8# �" �#���8�� ����8� %- ���8� � � ���8�� � �"��8# ����8� ����8��
��+ & ���8�� ���8� ���8# � ���8# �" �#���8�� ����8�
K
5�
& & ����8�� ����8�� ���8� � ���8# %- � ���8� � � � � � ���8� %- ���8� ���8# ���8�� ���8�� ���8�� ���8# ���8# ����8��
��+ & ���8�� ���8� � ���8� � � � ���8� ��5�
&� �"��# �"��# �"��# �"��# �8��#" �8��#" �8��#" �8���� �8���� �8���� �8�8�� �8����
�/ ��5
+ ��?*%A �8�� �8�� �8� �8� � ���8�� ���8� #��8� #���8�� ���8�� ����8�� ���8�� �77 �!���/��?���A ## #� �� �� �" ��" #�" ��" �#" �#" �#"" ���"
B
C
F G
B
C
E A
D
B
GF
J
H
DIM
VALVE SIZE INCHES (mm)
�9�?�"A �9�?�""A �9�?��"A �9�?#""A �"9�?#�"A
%- �"��8� �� ����8� #���8�� #�
%- �� ����8# �����8�� ##��8�� #���8��
2 )* ���8� ���8�� �����8�� ����8� #"��8�
! ���8� ���8�� �#��8�� ����8� ����8�
%- ���8� ���8# ���8# ���8� �
%- ���8� � ���8� ���8# ���8�
6 '�5�2�&��5 7 �8� �8# �8� �8� �
'�5��+ ����(-�5 7 �8� �8# �8� �8� �
4 '�5��+ ��5 7 �8� �8# �8� �8� �
��5�
& �"��# �8��#" �8��#" �8���� �8����
�/ ��5
+ ��?*%A �8� � ���8� ���8� #��8�
�77 �!���/��?0��A �� �" ��" #�� ��"
Reduced Port Main Valve Dimensions
A
C
B
D
E
B F
G
Reduced Port Body
PILOT SYSTEM
DIMENSIONS
VALVE SIZE INCHES (mm)
DIM
���8� ?�#A
���8# ?�"A
#9 ?�"A
#��8#9 ?��A
�9 ?�"A
�9 ?�""A
�9 ?��"A
�9 ?#""A
�"9 ?#�"A
�#9 ?�""A
��9 ?��"A
��9 ?�""A
2�&�
D ���8# ���8# ���8# ���8# ���8# �# �� �� ����8# #" #� #�
3 � � ���8# � ���8# � � �" �# �� �� ����8#
C ���8# ���8# �� � ���8# �" ����8# �� ����8# �� �� #"��8#
2�&�
D ���8# ���8# �# �� ��
3 ���8# ���8# � � �"
C � ���8# �" ����8# ��
2�&�
D � � � � �" �#��8# ����8# ����8# ��
3 � � � � � � � �" �#
C � � ���8# ���8# �" �"��8# �# ����8# ��
Angle Pilot System Dimensions
Globe Pilot System Dimensions
Pilot System Dimensions Y
Z
X
INLET
Z
X
Y
Primary 4" PRVBypass 2" PRV
| Zurn Industries Limited
*��0�1��0#�������"���"���#�#�� www.zurn.com Page 3 of 4
�(-- �/ &�B��G��
| �� | |||
| � | &��%�B��G�/� | ||
| �(-����� | &(� | ��"��*7 | ��, |
!*�(����%/*%(�(��B��G�*��
| �!��#"�B/�8� | �� |
| ?����� | / |
| �8� | �A�L�� |
| �!��#��B/�8� | ��?����� | / |
| �8� | �A� |
%&��*%*�(����%/*%(�(��B��G�*��
| B/�8� | ��?"���� | / |
| �8� | �A��, |
%��B
| �����(�&�� | ���%�*& | |
| &�*%��*@*%-�7 | ||
| ��( | ||
| � | ||
| &(�*%-�+ | ||
| �+ | ��*%��(&*%-�*%� | /�7 |
| ��( | ||
| ���(/� | /� |
| ��( |
| � |
%&�B��G�
Operation
5� �,�& ��C�#"��(/*�*@ �� �7
| ��( | |
| � | |
| &(�*%-�7*��/�+ | |
| �+ | �/� |
| �����%�/� | �&*��� | ||
| - | ��*& | ��B�/� | ���%/ |
���5� �7*��/� �����7 %���7 7�
| / | &�+ | |
| �+ | ���5� | ��7 |
/*�%��B�/� �C�#"��� -*%��G*/��
| / | ����*@*%-�/� | �+ | ||
| �+ | ��/� | %�B*% | �/(%*%-�/� | ���%/ |
| &M(�/*%-�/� | �7*��/��7 | |
| *%-�/��/� | �& | �* |
| &�&�G%�/ |
��7
| ��( | ||||
| � | ||||
| $%� | /�7 | |||
| ��( | ||||
| �*��7*7 | &�/��/� | �*%� | /�7� | |
| /��B�/� | �7 | |||
| ��( | ||||
| � | ||||
| &(�*%-�7*��/����� | %�*%-��*% | � |
����B
| ���/� | �&*��� | |
| - | ��*& | ��B� |
| /� | �7*��/�/��*/����G |
7�
-���5�(���&�G%�/
��7
| ��( | |||||
| � | !� | &*%-�/� | �7 | ||
| � | /� | ||||
| �/��/������ | � | ||||
| /� | �7*��/�G�*� | �/� | � |
&M(�/
| �� | ��7 | ||||
| *%-�� | F��/��F | 7�*/��7 | %��5� | � | |
| �(�/�*�� |
�/*�%�*%�/� �7*��/�/�
| %��*// | &�/�� | ||
| /� | ���%% | /��B�/� | �� |
�+ ��5�*���
/*�%��B�/� �&* 7�
�+ ��)�G%�/
| ��( |
| �*��� |
*% &�G*/�*%�%
�G��*�*/��
| - | |
| &� | ����B��� |
%-*%-�B��G�
| �*%-�*%� | /�7 |
| ��( | |
| �� |
Typical Installation
Notice:
| � | ��G� | |
| �& | �*-%�B��G�B | |
| ����� | ��G�/� | ��*%*�(����%/*%(�(��B��G� |
���G�B��G����7
| ���� | �*%�/ |
| �� | &� |
Specifi cations
| 5� | �� | |
| ��( | ||
| ��� | &(�*%-�1 | |
| �+ | ��� | |
| ���� | � |
7�
| / | &��7*��/���%/ | |
| ��� | &�+ | |
| �+ | ��5� | �� |
| �+ | ���&���� | |
| ���� | �&(�/*� | �* |
��5,��������5� ��/ ���B�/� ��
| �+ | ��� | |
| ���� | �-(*& | &�/�7� |
| %&���//����5� | �&* |
7�
B ��B
B
| � | ���� |
| ���� | ��� |
| / | &�G*/�� |
��*-��I(
| �*/���B(�*�%� | 7�!���� |
| /*%-��5� | �7*��/���%/ |
| ���� | � |
| B* | �&� |
&M(�/
| �� | �B |
| ������7�*�/����"�7�*���5� | �+ |
| �+ | ��� |
| ���� | �� |
| /*B* | &�/��'� 8�'�$��/ |
| &�����5� | �� | |
| ��( | ||
| �� | &(�*%-�1 | |
| �+ | ��� |
| � | � |
| �C��'��$0N$'��,�& | ��C�#"�� |
DIRECTION OF FLOW
INLET SHUT-OFF OUTLET SHUT-OFF
INLET SHUT-OFF OUTLET SHUT-OFF
/�4��� �
| �%-� | �1 |
| �+ | ��*@ |
| *%�� | ��?��A |
���8� ?�#A
���8# ?�"A
?�"A
#��8# ?��A
?�"A
?�""A
?��"A
?#""A
?#�"A
?�""A
?��"A
?�""A
| 4��� | �1 | ||
| �+ | ��*@ | *%�� | ��?��A |
?�"A
?�""A
?��"A
?#""A
?#�"A
�(-- �/ &� ��G� ?4�,A
�(-- �/ &� ��G ?0*/ �8� �A
Flow Characteristics need bypass for low flow 2.0" size
Bypass 2" PRV Primary 4" PRV
| Zurn Industries Limited
*��0�1��0#�������"���"���#�#�� www.zurn.com Page 4 of 4
* Notes for Body Minimum Friction Loss Chart:
| ,*%*�(��*%� | /�7 |
| ��( | |
| �*���"�7�*��*-� |
| %�� | /�7�*%/�� |
| �/� | � |
����&��B /�*%/ %& &�B��G��G�*�� + ?B ��� �*�7� /�B��G�� ��+ �#"�B/8�A 6!
| �7� | :����>�+ | ||
| �+ | �*%/ | %& | &�/��B��G�#"""�4�,� |
/���"�7�*�� �B *�/*�%�������B�#"�7�*�
| /�#"""�4�,��5� | ��*%*�(��*%� | /�7 |
| �� |
| �G�(�&�� | ���"�O�#"�P���"�7�*���� | %�*%� | /�7 | ||
| ��( | |||||
| �*��� | ��G�� | /�7�*%/��/� | ��(/� | /�7 | |
| ��( | |||||
| �G*���� | �/� | �7 | |||
| ��( | |||||
| � | |||||
| /�/� | �*%� | /� | |||
| �*%(��/� | �B |
/ 0 1 2 3 4 2 5 0 6 7 8 9 : 3 8 2
; 3 7 < 2 : 3 8 2
= > ? > @ A B C D A E C F G A H F ? F I
J 0 K 7 6 0 6 7 3 8 L 0 M 0 9 2 : 3 8 2 N 7 8 6 2 5 M 7 6 6 2 8 6
3 4 2 5 0 6 7 3 8 0 O O 3 P 2 L Q
Job Name Contractor
Job Location Engineer
Flow Characteristics
10 100 1000 10000
P R
E S
S U
R E
D
R O
P
P S
I)
FLOW (GPM)
BODY MINIMUM FRICTION LOSS
�8 �9 �4 �L
�8 #9
�8 #9 �4
#9 �4
#9
�8 #9 �4
�8 #9
�9
�9 �4 �L
�9
�9 � �9 �4
�9 �4
�9 �4
9��
9�4
9�4
9�4
9�4
"NOAA" La Jolla proposed Pressure Reducing valve for MAIN 4" location, use NEW 4 inch size, & (1) 2 inch as bypass valve.
Pressure loss approx 3 psig