N6945020R0010 SectionF_Amend0004.pdf

PDF 229 KB Posted

Attached to
Naval Station Guantanamo Bay Base Operations Support Services Federal contract opportunity
Solicitation number
Amendment_0004
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

This document outlines deliverables required under a Naval Station Guantanamo Bay Base Operations Support Services contract amendment. The contractor must provide regular status reports, schedules, logs, and plans across multiple areas of base operations including management and administration, family housing, facility management, custodial services, pest control, solid waste management, swimming pools maintenance, grounds maintenance, utilities management, electrical services, wastewater treatment, water services, and base support vehicles and equipment. Deliverables include quality management and safety plans, personnel rosters, preventative maintenance schedules, inspection and testing results, service call reports, and integrated maintenance program documentation. Submission dates and frequencies are specified for each deliverable type. The amendment modifies an existing Navy contract for base operations support at Guantanamo Bay.

View the file

Other files for this federal contract opportunity

Other files attached to Naval Station Guantanamo Bay Base Operations Support Services, newest first.
File Type Posted
N6945020R0010_0004.pdf PDF
N6945020R0010 SectionC_Amend0004.pdf PDF
JB-1 FTE_N6945020R0010_0004.xlsx XLSX spreadsheet
N6945020R0010 SectionJ_Amend0004.pdf PDF
J-0200000-13ELINs_N6945020R0010_0004.xlsx XLSX spreadsheet
JL-9_N6945020R0010_GPI_0004.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N69450-20-R-0010 Amendment 0004

SECTION F: DELIVERIES OR PERFORMANCE

Section F – 0200000 Management and Administration

DELIVERABLES

Spec Item

Form Attachment

Number Deliverable Title Date(s) of

Submission

Distribution

Frequency Original

Copies (includin g original)

2.2.1.2 N/A Request to Work

Outside Government’s Regular Working Hours

At least two calendar days prior to requested day.

KO 1 As required

2.3.1 N/A Sign-In Sheets and

Minutes

Within two working days.

KO/COR/

all attendees

1 As required

2.3.1 N/A Final Revision of

Minutes

Within two working days.

KO/COR/

all attendees

1 As required

2.3.4 N/A Permits and

Licenses

30 Days before work commences and as requested by the KO.

KO/COR 1 As specified

2.3.5 N/A Certificate of

Insurance

At least Within 30 calendar days prior to start of contract performance.

KO/COR 1 As specified

2.3.18 N/A Re-Entry Medical

Screening Questionnaire Report/Results

Immediately after completion.

KO/Base Medical

1 As specified/ Electronic

2.3.18 N/A Annual Medical

Screenings Report

Within 48 hours after each completion.

KO/Base Medical

1 As required /Electronic

2.6.2 N/A Status Updates Within 30

minutes of the inquiry during regular working hours, and by

0800 the following work day for inquiries after regular working hours

KO/COR 1 As required

2.6.3 N/A Difficulty in

Scheduling Work

By the end of each workday

KO/COR 1 As required

Amendment 0004

Form Attachment

Number Deliverable Title Date(s) of

Submission

Distribution

Frequency Original

Copies (includin g original)

2.6.4 N/A Status of

Deliverables

Within 30 minutes of the inquiry during regular working hours, and by

0800 the following work day for inquiries after regular working hours

KO/COR 1 As required

2.6.6.3 J-0200000-12 List of Personnel

Requiring

MAXIMO

Accounts

At least 30 calendar days prior to start of contract performance and within 15 calendar days prior to any changes.

KO/COR 1 As specified

2.6.6.5 N/A Weekly MAXIMO

Work Order Report

By 0900 the first workday of each week

COR/KO/

PWO/DP

WO/FMD

1 Weekly

2.6.7.1 N/A Quality

Management Plan

At least 30 calendar days prior to start of contract performance and within 15 calendar days prior to any changes.

KO/COR 1 As specified

2.6.7.2 N/A QC Inspection File Within five

calendar days of completion/ termination of the contract.

KO/COR 1 As specified

2.6.7.3 N/A Contractor Quality

Inspection and Surveillance Report

First work day of each month.

KO/COR 1 Monthly

2.6.8 N/A Property

Management Plan

At least 30 calendar days prior to start of contract performance.

KO/COR 1 As specified

Amendment 0004

Form Attachment

Number Deliverable Title Date(s) of

Submission

Distribution

Frequency Original

Copies (includin g original)

2.6.10 N/A Plans of Action

and Milestones (POA&Ms)

Within 15 calendar days prior to contract start and within seven calendar days of changes.

KO/COR/

Command Security Manager

1 As required

2.6.11 N/A Cybersecurity

Incident

Immediately upon discovery during regular working hours and by 0800 the following work day for discoveries after regular working hours

KO/COR/

Command Security Manager

1 As required

2.7.1 N/A List of Key

Personnel and Qualifications

At least 30 calendar days prior to start of contract performance.

2.7.1 N/A Organizational

Chart

At least 15 calendar days prior to start of contract performance.

KO/COR 1 As specified

2.7.2 N/A Monthly Employee

Roster

Fifth day of each month.

KO/COR 1 Monthly/ Electronic/

Yes

2.7.2 N/A Weekly Population

Report 0800 each Monday

KO/COR 1 Weekly/ Electronic/

Yes

2.7.4 N/A Contractor Labor

Hours (eCMRA) Report

No later than 31 October

KO/COR 1 Annually for labor executed during the period of performance during each Government fiscal year

(FY)

2.8.1 N/A Employee List Upon request. KO/COR 1 As required

Amendment 0004

Form Attachment

Number Deliverable Title Date(s) of

Submission

Distribution

Frequency Original

Copies (includin g original)

2.8.7 N/A Personnel Security

Investigation (PSI), Fingerprint Card (FD87), and OF- 306 Declaration for Federal Employment

Prior to employee access to sensitive unclassified information.

KO/

Security

Manager/

COR

1 As required

2.9.2 N/A Accident

Prevention Plan

At least 30 calendar days prior to start of contract performance and 15 calendar days prior to any changes.

KO/COR 1 As specified

2.9.3 N/A Activity Hazard

Analysis

Together with the Accident

Prevention Plan and for changes.

KO/COR 1 As specified

2.9.4 N/A Compliance Plans, Programs, and Procedures

Together with the Accident

Prevention Plan and for changes.

KO/COR 1 As specified

2.9.4.7 N/A GTMOSAF -

LOTO

(Verification and Notification Form)

By COB the third workday of each month

KO/COR 1 Monthly

2.9.5 J-0200000-05 NAVFAC

Contractor Incident Reporting System

(CIRS)

Within one calendar days of accident.

KO/COR 1 As required

2.9.5 J-0200000-05 Weight Handling

Equipment Accident Report

Within 15 working days of accident.

KO/COR 1 As required

2.9.5 J-0200000-05 Crane and Rigging

Gear Near Miss Report

Within 15 working days of accident.

KO/COR 1 As required

2.9.5.1 N/A Initial Accident

Reporting Notification Report

Immediately after that an accident or near miss.

KO/COR 1 As specified/ Electronic

Amendment 0004

Form Attachment

Number Deliverable Title Date(s) of

Submission

Distribution

Frequency Original

Copies (includin g original)

2.9.5.1 N/A Follow-on

Accident Reporting Notification Report

Close of business the day of the accident, or if the accident occurs after hours, at start of business the following morning.

KO/COR 1 As specified/ Electronic

2.9.5.1 N/A Final Accident

Reporting Notification Report

Within 24 hours after completing the investigation of the accident.

KO/COR 1 As specified/ Electronic

2.9.7 N/A Monthly On-Site

Labor Report

First work day of each month.

KO/COR 1 Monthly

2.9.8 N/A OSHA Citations

and Violations Corrective Action Report

Within 48 hours after receiving a citation.

KO/COR 1 As required

2.9.9 N/A Safety Inspection

and Monitoring Report

Upon request. KO/COR 1 As required

2.9.10 N/A Safety

Certifications

At least 15 calendar days prior to start of contract performance and prior to expiration of certifications.

KO/COR 1 As specified

2.10 N/A EMS Goals and

Policy Measurement Information

Upon request. KO/COR 1 As required

2.10.1.1 N/A Water

Conservation Plan

At least 30 calendar days prior to start of contract performance and 15 calendar days prior to any changes.

KO/COR 1 As specified

2.10.2 N/A ECATTS Training

Documentation/ Certificates

Within 60 calendar days after award and for changes.

KO/COR/

PWD

Environm ental

Manager

1 As specified/

Amendment 0004

Form Attachment

Number Deliverable Title Date(s) of

Submission

Distribution

Frequency Original

Copies (includin g original)

2.10.2.1 N/A Written Sampling

Plan

Prior to each sampling event

KO /COR 1 As required

2.10.2.1 N/A Sampling Results Within 24 hours

after receipt of laboratory analysis

KO/COR 1 As required

2.10.2.2 N/A Class I and II ODS

Report

Within 24 hours following delivery of refrigerant to

DLA

KO/COR/

PWD

Environm ental

Manager

1 As required

2.10.2.4 N/A Waste Stream

Determination

At least 30 calendar days prior to start of contract performance and within 14 days of identification of any new waste stream.

KO/COR 1 As required

2.10.2.6 N/A Spill Report Within 48 hours

of spill occurrence

KO/COR 1 As required

2.10.2.7 N/A Emergency

Planning and Community Right- To-Know Act (EPCRA) Report

At least 15 calendar days prior to start of contract performance and not less than 10 working days prior to planned use of hazardous material.

KO/COR 1 As specified

2.10.2.7 J-0200000-05 Contractor

Hazardous Material Inventory Log

Within 15 calendar days after the end of each calendar year and at termination of the contract.

KO/COR 1 Annually

2.10.2.11 N/A Asbestos

Containing Material (ACM)

Written notification within 24 hours of discovery

Amendment 0004

Form Attachment

Number Deliverable Title Date(s) of

Submission

Distribution

Frequency Original

Copies (includin g original)

2.10.3 N/A Sustainable

Procurement and Practices Plan

Within 15 calendar days after award and within 15 calendar days after exercised option periods.

KO/COR/

PWD

Environm ental

Manager

1 Annually

2.10.3 N/A Sustainable

Delivery of Services Report

Within five calendar days after each contract period.

KO/COR/

PWD

Environm ental

Manager

1 Annually

2.10.3.2 N/A Recovered

Material Certification

As specified KO/COR/

PWD

Environm ental

Manager

1 When a product containing recovered materials is equal to or better than the original and could be used.

2.14.2 N/A Detailed Scope of

Work and Detailed Estimate

Within two work days

KO/COR 1 As required

2.15.1.1 N/A Non-Recurring

Work Quantities Ordered via FedMall

First work day of each month.

KO/COR 1 Monthly

2.15.2.1 N/A Non-Recurring

Work Proposals

Within two working days following receipt of request

KO/COR 1 As required

2.15.2.2 N/A Work Status

Updates

Weekly and within 30 minutes of request by the

Government.

KO/COR 1 As Required

Section F – 1401000

Family Housing

Form Attachment

Number Deliverable

Title Date (s) of

Submission

Distribution

Frequency Original/ Copies

Number of Copies

(including original)

2.2.2 N/A Resumes of

Family Housing Key Personnel

15 calendar days after contract award

KO 2 Once for initial submittal, then as requested or change of personnel / Electronic

2.3.2 N/A Updated

Inventories

First work day of each quarter

KO 1 Quarterly

3 N/A GTMOSAF -

LOTO

(Verification and Notification Form)

By COB the third workday of each month

KO/COR/Housing Officer

2 Monthly

3.2 N/A FA&E Inventory

List

First work day of each quarter

KO/COR/Housing Officer

1 Quarterly

3.2 N/A FA&E Disposal

Documentation

Within 2 days of disposal

KO/COR/Housing Officer

1 As required

3.3.1 N/A

Maintenance Program

30 calendar days after contract award

KO/COR/Housing Officer

2 Annually

3.3.1 N/A Monthly PM

Work Schedule and Unaccomplished Maintenance Report

Five work days prior to the beginning of each month

KO/COR/Housing Officer

1 Monthly

3.3.2 N/A Daily Service

Call Report

0900 AM

Daily

Housing Officer/

KO/ FMD/ COR

4 Daily/ Electronic

3.3.2 N/A Monthly Service

Call Report

First work day of each month

KO/COR/Housing Officer

2 Monthly/ Electronic

3.3.3 N/A Playground PM

Program

45 calendar days after contract award

KO/COR/Housing Officer

2 Annually/ Electronic

3.3.3 N/A Monthly

Playground PM Work Schedule and

Five work days prior to the

KO/COR/Housing Officer

2 Monthly/

Amendment 0004

Unaccomplished Maintenance Report beginning of each month

3.3.4 N/A HVAC

Integrated Maintenance Program

45 calendar days after contract award and one business day after any changes

KO/COR/Housing Officer

2 Annually/ Electronic

3.3.4 N/A Monthly HVAC

IMP Schedule and HVAC IMP Maintenance and Repair Status

Five work days prior to the beginning of each month

KO/COR/Housing Officer

1 Monthly/ Electronic

3.3.5 N/A COM Inspection

Report

At completion of each

COM

KO/COR/Housing Officer

1 At completion of each

COM

3.3.4 N/A Scheduled

Maintenance Schedule

Five work days prior to the beginning of each month

KO/COR/Housing Officer

1 Monthly

3.3.6 N/A Housing Area

Sign Painting Schedule

45 calendar days after contract award

KO/COR/Housing Officer

2 Annually/

3.3.7 N/A

Preventive

Program Plan

30 calendar days after contract award and one working day after any changes

KO/COR/Housing Officer

2 Annually

3.3.7, 3.3.8 N/A Monthly PM Work Schedule

Five work days prior to the beginning of each month

KO/COR/Housing Officer

1 Monthly

3.3.7, 3.3.8 N/A Weekly Unaccomplished Work Report

0800 each Monday

KO/COR/Housing Officer

3 Weekly/

Section F – 1501000 Facility Management

Spec Item

Form Attachment

Number Deliverable Title Date (s) of Submission

Distribution

Frequency Original/

Copies

Number of Copies (includin g original)

2.3.1 N/A System Access

Personnel Listing

Within 30 calendar days after contract award

COR/KO 2 Upon award and any change in personnel

3 N/A GTMOSAF - LOTO

(Verification and Notification Form)

By COB the third workday of each month

COR/KO 2 Monthly

3.1.1 N/A MAXIMO Asset

Changes Report

By COB the third workday of each month

COR/KO

& FMD

3 Monthly

1502000 – Facility Investment

Section F – 1502000 Facility Investment

Form Attachment

Number Deliverable Title Date (s) of

Submission

Distribution

Frequency Original / Copies

Number of Copies

(including original)

2.2.1 N/A

Certification and Licenses

Within 15 days after award, as requested by the KO and within one business day after any personnel changes.

KO 1 Once for initial submittal, then as requested or after any personnel changes

2.2.2 N/A

Resumes of HVAC Supervisor

Within 15 days after award, as requested by the KO and within one business day after any personnel changes.

KO 1 Once for initial submittal, then as requested or change of personnel / Electronic

3 N/A GTMOSAF - LOTO

(Verification and Notification Form)

By COB the third workday of each month

COR/KO 2 Monthly

3.1 N/A Service Order

Summary Report

First work day of each month

KO/

COR/

FMD

2 Monthly

3.2 N/A

Program Plan

30 calendar days after contract award and one working day after any changes

KO/

COR/

FMD

2 Annually

3.2 N/A Monthly PM Work

Schedule

Five work days prior to the beginning of each month

KO/

COR/

FMD

1 Monthly

3.2, 3.3 N/A Weekly Unaccomplished Maintenance Report

0800 each Monday

KO/COR

3 Weekly/

3.3 N/A

Integrated

Program Plan

30 calendar days after contract award and one working day after any changes

KO/

COR/

FMD

2 Annually

Amendment 0004

3.3 N/A Monthly IMP

Schedule and IMP Maintenance and Repair Status

Five work days prior to the beginning of each month

KO/

COR/

FMD

1 Monthly

3.4 N/A

Inspection, Testing, and Certification Program Summary Report

First work day of each month

KO/

COR/

FMD

Inspection, Testing

Schedule and Equipment Certifications

First work day of each month

KO/

COR/

FMD

3.4.2 N/A

Certification of Load Test and Condition Inspection Form

First work day of each month

KO/

COR/

FMD

3.4.4 N/A

Inspection and Test Report for Vertical Transportation Equipment

First work day of each month

KO/

COR/

FMD

3.5 N/A

Other Recurring Services Program Summary Report

First work day of each month

KO/

COR/

FMD

2 Monthly

3.5 N/A Other Recurring

Work Schedule

Five work days prior to the beginning of each month

KO/COR

/ FMD

3 Monthly/ Electronic

3.5.3 N/A Exterior Lighting

Systems Inspection, Re-lamping, and Repair Program

30 calendar days after contract award and one working day after any changes

KO/

COR/

FMD

3 Annually and as specified/ Electronic

3.6 N/A Minor Maintenance, Repair, and Replacement Report of Accomplish and Unaccomplished Work

Five work days prior to the beginning of each month

KO/ UH

Manager

Section F – 1502000 (DHA)

Form Attachment

Number Deliverable Title Date (s) of Submission

Distribution

Frequency/ Media Original

Copies (including

15 calendar days after award or as requested by the

KO

KO/ COR/

USNH

Facility

Manager

3 Once for initial submittal, then as requested or change of personnel /

Resumes of Key Personnel

15 days after award or as requested by the

KO

KO/ COR/

USNH

Facility

Manager

3 Once for initial submittal, then as requested or change of personnel / Electronic

2.3.2 J-1502000-

02(DHA)

Above Ceiling Work Permits

Prior to any work where ceiling tiles are moved

COR/ USNH

Facility

Manager

As specified/ Electronic

2.3.3.1 J-1502000-

02(DHA)

Infection Control Construction Permit Form

Five business days prior to any work involving construction, repairs, demolition or evasive maintenance Features of

USNH facilities

COR/ USNH

Facility

Manager

As specified/ Electronic

2.3.4 J-1502000-

02(DHA)

Pre-Construction Survey-External Form

Five business days prior to any work involving construction, repairs, demolition or evasive maintenance Features of

USNH facilities

COR/ USNH

Facility

Manager

As specified/ Electronic

2.3.5 J-1502000-

02(DHA)

Life Assessment Tool Form

Five business days prior to any work involving work to Life Safety Feature of USNH facilities

Features of USNH facilities

COR/ USNH

Facility

Manager

As specified/

Amendment 0004

Form Attachment

Number Deliverable Title Date (s) of Submission

Distribution

Frequency/ Media Original

Copies (including original)

3 J-0200000-05 GTMOSAF - LOTO

(Verification and Notification Form)

By COB the third workday of each month

COR/KO 2 Monthly

3.1 N/A

Service Call Summary Report

First work day of each month

KO/ COR/

USNH

Facility

Manager

3 Monthly/

Program Plan

45 calendar days after award and one business day after any changes

KO/ COR/

USNH

Facility

Manager

3 Annually and as specified /

Electronic beginning of each month

KO/ COR/

USNH

Facility

Manager

3 Monthly/ Electronic

3.2, 3.3 N/A Weekly Unaccomplished Maintenance Report

0800 each Monday

KO/ COR/

USNH

Facility

Manager

3 Weekly/

Program Plan

45 calendar days after award and one business day after any changes

KO/ COR/

USNH

Facility

Manager

3 Annually and as specified /

Electronic

3.3 N/A Monthly IMP

Schedule and IMP Maintenance and Repair Status

Five work days prior to the beginning of each month

KO/ COR/

USNH

Facility

Manager

3 Monthly/

Program Summary Report

First work day of each month

KO/ COR/

USNH

Facility

Manager

3 Monthly/

Schedule and Equipment Certifications

First work day of each month

KO/ COR/

USNH

Facility

Manager

3 Monthly/

3.4.3 N/A

Transportation Equipment

First work day of each month

KO/ COR/

USNH

Facility

Manager

3 Monthly/ Electronic

3.4.4 N/A Medical Air, Gas &

Vacuum Systems Certification And System Verification Documentation And Reports

Within 30 calendar days from inspection.

KO/ COR/

USNH

Facility

Manager

3 As Specified/

Amendment 0004

Form Attachment

Number Deliverable Title Date (s) of Submission

Distribution

Frequency/ Media Original

Copies (including original)

3.4.5 N/A Fire Doors And Fire

Walls Inspections And The Findings Report

No later than 14 calendar days from the completion of each inspection

KO/ COR/

USNH

Facility

Manager

3 As Specified/ Electronic

3.5 N/A Other Recurring

Service Program

45 calendar days after award and one business day after any changes

KO/ COR/

USNH

Facility

Manager

3 Annually/ Electronic

3.5 N/A Other Recurring

Work Schedule

Five work days prior to the beginning of each month

KO/ COR/

USNH

Facility

Manager

3 Monthly/ Electronic

3.5 N/A Other Recurring

Services Program Summary Report

Five work days prior to the beginning of each month.

KO/ COR/

USNH

Facility

Manager

3 Monthly/ Electronic

3.5.1 N/A Schedule For

Cleaning And Sanitizing Designated Grease Trap

45 calendar days after award and one business day after any changes

KO/ COR/

USNH

Facility

Manager

3 Annually and as specified/

1502000 (JTF) – Facility Investment

Section F – 1502000 (JTF)

Form Attachment

Number Deliverable Title Date (s) of

Submission

Distribution

Frequency Original / Copies

Number of Copies

(including

Within 15 days after award, as requested by the KO and within one business day after any personnel changes.

KO/COR

/JTF

Engineer

1 Once for initial submittal, then as requested or after any personnel changes

Resumes of HVAC Supervisor

Within 15 days after award, as requested by the KO and within one business day after any personnel changes.

KO/COR

?JTF

Engineer

1 Once for initial submittal, then as requested or change of personnel / Electronic

2.3.4 N/A Updated Inventories First work day of

each quarter

KO/COR

.JTF UH

Manager

1 Quarterly

3 N/A GTMOSAF - LOTO

(Verification and Notification Form)

By COB the third workday of each month

COR/KO

/JTF

Engineer

2 Monthly

3.1 N/A Service Order

Summary Report

First work day of each month

KO/

COR/

FMD/

JTF

Engineer ing

Program Plan

30 calendar days after contract award and one working day after any changes

KO/

COR/

FMD/

JTF

Engineer ing

2 Annually beginning of each month

KO/

COR/

FMD/

JTF

Engineer ing

Amendment 0004

3.2, 3.3 N/A Weekly Unaccomplished Maintenance Report

0800 each Monday

KO/COR

/JTF

Engineer ing

3 Weekly/

Program Plan

30 calendar days after contract award and one working day after any changes

KO/

COR/

FMD/

JTF

Engineer ing

2 Annually

3.3 N/A Monthly IMP

Schedule and IMP Maintenance and Repair Status

Five work days prior to the beginning of each month

KO/

COR/

FMD/

JTF

Engineer ing

Program Summary Report

First work day of each month

KO/

COR/

FMD/

JTF

Engineer ing

Schedule and Equipment Certifications

First work day of each month

KO/

COR/

FMD/

JTF

Engineer ing

3.4.3 N/A

Transportation Equipment

First work day of each month

KO/

COR/

FMD/

JTF

Engineer ing

3.5 N/A

Other Recurring Services Program Summary Report

First work day of each month

KO/

COR/

FMD/

JTF

Engineer ing

2 Monthly

3.5 N/A Other Recurring

Work Schedule

Five work days prior to the beginning of each month

KO/COR

/ FMD/

JTF

Engineer ing

4 Monthly/ Electronic

3.5.3 N/A Minor Maintenance, Repair, and Replacement Report of Accomplish and Unaccomplished Work

Five work days prior to the beginning of each month

KO/

COR/JT

F UH

Manager

2 Monthly/ Electronic

3.5.4 N/A FA&E Inventory

List

First work day of each quarter

KO/COR

/ JTF UH

Manager

1 Quarterly

Amendment 0004

3.5.4 N/A FA&E Disposal

Documentation

Within 2 days of disposal

KO/COR

/ JTF UH

Manager

1 As required

3.5.5, 3.5.6 N/A Monthly PM Work Schedule

Five work days prior to the beginning of each month

KO/COR

/ JTF UH

Manager

1 Monthly

3.5.5, 3.5.6 N/A Weekly Unaccomplished Work Report

0800 each Monday

KO/COR

/ JTF UH

Manager

3 Weekly/

Section F – 1503010 Custodial

Annex/ Spec Item

Form Attachment

Number Deliverable

Title Date (s) of

Submission

Distribution

Frequency Original/ Copies

Number of Copies (including original)

1503010/ 2.2.1

N/A Pathogen Training Certificates

Upon request KO/COR 1 Upon request

1503010/ 3.1

N/A Annual Work Schedule

Within 15 calendar days prior to contract start

KO/COR/

School

Principal

1 Annually and five calendar days prior to implementing any changes to the schedule 1503010/ 3.1

N/A Monthly Work Plan

First work day of each month and five calendar days prior to implementing any changes to the schedule

KO/COR 2 Monthly

1503010/ 3.2

N/A Custodial Service Order Report

First work day of each month

KO/COR 2 Monthly

Section F – 1503020 Pest Control

Form Attachment

Number

Deliverable Title Date(s) of

Submission

Distribution

Frequency Original / Copies

Number of Copies (includin g original)

2.2.1 N/A Copy of State

Certification for Contractor Personnel

15 calendar days prior to start of work.

Copies of renewed certifications shall also be submitted.

KO/COR

/IPMC

3 As required

2.3.1 N/A Permits 5 days prior to

the start of work requiring permits.

KO/COR 2 As required

2.3.3 N/A Ultra-Low Volume

(ULV) Equipment Calibration and Droplet Analysis Report

15 days prior to the start of work and thereafter every 50 hours of ULV equipment use.

KO/COR 2 As required

2.3.4 J-1503020-02 Planned Pesticide Use

Sheets including Pesticide Labels and Safety Data Sheets

(SDS)

By 31/Oct/2020.

Note: Any proposed changes in pesticide usage shall be submitted for KO approval at least 5 business days in advance of pesticide use.

KO/COR

/IPMC

3 1 for each pesticide per pest as required

3 N/A Contractor's Work Plan

By 31/Oct/2020.

KO/COR

/IPMC

3 1 per proposal

3 N/A Report of Conditions Conducive to Pest Infestation

1 working day after citing conditions.

KO/COR

/IPMC

3 As required

3, 4 N/A Five-year Termite Treatment Warranties

10 days following the treatment.

KO/COR

/IPMC

3 As required

Amendment 0004

Form

Submission

Distribution

Frequency Original / Copies

Number of Copies (includin g original)

3, 4 N/A Termite and Wood Decay Inspection (DD Form 1070) (per the appropriate Pest Group Sheet)

10 working days after inspection completed.

KO/COR

/IPMC

3 As required

3, 4 N/A Adult Mosquito Catch (per the appropriate Pest Group Sheet)

The same day as collected in a labeled, resealable plastic bag.

Installati on

Preventiv e

Medicine Departm ent

2 As required

3, 4 N/A Larval Mosquito Survey Report (per the appropriate Pest Group Sheet)

Within 1 day of the survey.

KO/COR

/IPMC

3 As required

3, 4 N/A Stored Product Pest Survey (per the appropriate Pest Group Sheet)

Within 1 day of the survey.

KO/COR

/IPMC

3 As required

3, 4 N/A Pharaoh Ant Treatment: Floor Plan Diagram (per the appropriate Pest Group Sheet)

2 calendar days prior to beginning the treatment.

KO/PAR 2 As required

3, 4 N/A Tick Survey Report (per the appropriate Pest Group Sheet)

Within 1 day of the survey.

Installati on

Preventiv e

Medicine Departm ent/KO/P

AR

3 As required

3, 4 N/A Mole Cricket Survey Report (per the appropriate Pest Group Sheet)

Within 1 day of the survey.

KO/PAR 2 As required

3.1.2 N/A Monthly Larvaciding

Work Schedule

Five work days prior to the beginning of each month and immediately after any revisions

KO/COR

/IPMC

3 Monthly /

Amendment 0004

Form

Submission

Distribution

Frequency Original / Copies

Number of Copies (includin g original)

3.2 N/A Service Call Summary

Report

First work day of each month

KO/COR 2 Monthly / Electronic

3.3 J-1503020-14 Report of Pest

Management Operations

Electronically once per month by the 15th of the following month (Example:

July data must be submitted by August

15).

KO/COR

/IPMC

3 Monthly

Instructions for Contractor's Work Plan

The CWP shall adhere to applicable publications and directives contained in J-1503020-04 (Applicable Publications and Directives). The CWP will require approval by the Contracting Officer (KO). The CWP shall establish the strategy and methods for conducting a safe, effective, and environmentally sound pest management program in compliance with these specifications. Prospective contractors may review the installation’s historical records of pest activity and abatement actions, survey facilities and grounds, and consult with the Installation PMC in development of a plan. The CWP shall address continuous monitoring, pest response and removal procedures, record keeping, warranties, education and communication to installation personnel to prevent pests and disease vectors, bird control on applicable airfields and in hangars, etc. The IPM approach should use targeted (i.e., effective, environmentally sound) methods including habitat/facility modification, biological/genetic/cultural control, mechanical/physical control, and where necessary, the judicious use of least hazardous pesticides. The CWP shall include labels, MSDS sheets, and planned pesticide use sheets and comply with all applicable local, state, and Federal regulations, and the

IPMP.

Instructions for Field Pest Management Record Form

The Contractor shall use the NAVFAC PPMC approved/provided on-line reporting system to provide a summary printout electronic copy of the data. The website is: https://clients.emainc.com/dcs/ pestmanagement/PesticideLogon.asp. The regional NAVFAC Applied Biology Center should be contacted to obtain a password and instructions to use the system. The report shall include individual daily records of all pest control operations, both chemical and non-chemical, including surveys. Records should be electronically submitted on a monthly basis to the KO by the 15th day of the month in Microsoft Excel (1997 or later version) via diskette, e-mail attachment, etc. J-1503020-14 (Field Pest Management Record Form) may be used as a field data entry sheet at the contractor’s discretion.

Section F – 1503030

Integrated Solid Waste Management

Item

Form Attachment

Number Deliverable

Title Date (s) of

Submission

Distribution

Frequency Original/ Copies

Number of Copies (including original)

2.3.1 N/A Weight Tickets As

specified

KO 12 With invoice/Monthly

3.1 N/A Solid Waste

Collection Schedule

As specified

KO 1 15 days after award/Annually

3.1 N/A Weekly Solid

Waste Collection Work Completion Report

At 0900 on Tuesday of each week.

KO 2 Weekly / Electronic

3.1.1.2, 3.1.2.2, 3.2.2

J-1503030-06 Recyclable Products Report

Submit by 5th of the month following the end of the Quarter

KO 2 Quarterly / Electronic

3.1.1.2, 3.1.2.2, 3.2.2

J-1503030-07 Recoverable Recyclable Products Collection Report

Submit by 5th of following month

KO /

Environmental

Department

2 Monthly / Electronic

3.1.1.2 N/A Recycling

Residents Weekly Report

At 0900 on Tuesday of each week

KO /

Environmental

Department

2 Weekly / Electronic

3.1.1.3, 3.1.2.3

N/A Weekly Curbside Bulk Item Pickup Program

At 0900 on Tuesday of each week

KO 2 Weekly / Electronic

3.5 N/A Recyclable

Stockpile Processing Schedule

60 days after contract award

KO 2 Annually / Electronic

3.6 N/A Landfill Daily

Logs

Upon Request of

KO

KO 2 As specified

3.6 N/A Landfill Monthly

Reports

Submit by 5th of following month

KO /

Environmental

Department

2 Daily / Electronic

3.6 N/A Landfill

Quarterly Reports

Submit by 5th of the month following the end of the Quarter

KO /

Environmental

Department

2 Quarterly /

1503040 – Other (Swimming Pools)

Section F – 1503040 Other (Swimming Pools)

Item

Form Attachment

Number Deliverable Title Date (s) of

Submission

Distribution

Frequency Original

Copies (including original)

2.2.1 N/A Certifications and

Training

Within 15 days after award or as requested by the KO

KO 1 Once for initial submittal, then as requested or change of personnel / Electronic

3 N/A Maintenance Summary Report

First work day of each month

KO/COR 2 Monthly/

Maintenance Plan

Within 45 days after award or as requested by the KO

KO/COR 2 Annually/ Electronic

3.1 N/A Monthly IMP

schedule

Five work days prior to the beginning of each month

KO/COR 2 Monthly/ Electronic

3.1 N/A Unaccomplished

maintenance report

Five work days prior to the beginning of each month

KO/COR 2 Monthly/ Electronic

3.1 N/A Repair status

report

Five work days prior to the beginning of each month

KO/COR 2 Monthly/ Electronic

3.1 N/A Summary of

maintenance and repair accomplished under the IMP report

Five work days prior to the beginning of each month

KO/COR 2 Monthly/ Electronic

3.1.1 N/A Water Analysis

Report

First work day of each

KO 1 Monthly

Section F – 1503050

Grounds Maintenance and Landscaping

Form Attachment

Number Deliverable

Title Date (s) of Submission

Distribution

Frequency Original/ Copies

Number of Copies (including original)

2.3 N/A Permits Within 15

calendar days prior to start of work.

KO/COR 2 As required

2.3.1.3 N/A Planned

Pesticide/ Herbicide Use Sheets including Pesticide/ Herbicide Labels and Safety Data Sheets (SDS)

Within 15 calendar days prior to contract start and at least 10 business days for any proposed changes.

KO, COR,

PPMC

3 Annually for each pesticide/herbicide, as required.

2.3.1.4 N/A Pest

Management Operations Report

Electronically by the 15th of the following month (Example:

July data must be submitted by August 15) on the format approved by

PMC.

KO, COR,

PPMC

2 Monthly

2.3.9.1 N/A Water

Conservation Plan

As specified KO 2 15 days after award/Annually

3.1 N/A Improved

Grounds Schedule

Five work days prior to the beginning of each month

KO/COR 2 Monthly/ Electronically

3.1.1.3 N/A Soil Analysis Within 15

days after receipt of the test results by the Contractor

KO/COR 2 As Required

3.1.1.3 N/A Top Dressing

and Over Seeding Seed Type

Within 15 calendar days prior to contract start

KO/COR 2 Annually and five calendar days prior to implementing changes to the schedule

Amendment 0004

3.1.2 N/A Vegetation

Control Schedule

As specified KO 2 15 days after award/Annually

3.1.4 N/A Debris

Removal Schedule

As specified KO 2 15 days after award/Annually

3.2.5 N/A Policing of

Roads and Locations

45 calendar days after award

KO/COR 2 Annually/ Electronically

3.4 N/A Grounds

Maintenance Service Order Summary of Completion Report

By the fifth day of each

KO/COR 2 Monthly

Section F – 1601000 Utilities Management

Form Attachment

Number Deliverable Title Date (s) of

Submission

Distribution

Frequency Original/

Copies

Number of Copies (including original)

2.3.1 N/A System Access

Personnel Listing

Within 30 calendar days after contract award

COR/KO/

Utilities

Branch Head

2 Upon award and any change in personnel

3 N/A

Mid-to-Mid Report 0900 each day

KO/COR/

Utilities

Branch Head

3 Daily/ Electronic

3 N/A GTMOSAF - LOTO

(Verification and Notification Form)

By COB the third workday of each month

COR/KO 2 Monthly

Service Order Summary Report

Monday

KO/COR/

Utilities

Branch Head

3 Weekly/ Electronic

3.2.2 N/A Scheduled Outage

Plan/ Service Disruption Plan

Within 15 days prior to contract start

KO/COR/

Utilities

Branch Head

2 Once for initial submittal, then as requested / Electronic

3.2.2 N/A Unscheduled Outage

Report

Within one business day of the outage.

KO/COR/

Utilities

Branch Head

2 As needed/ Electronic

3.2.2 J-1601000-

Outage Request Form Within three business days of the outage.

KO/COR/

Utilities

Branch Head

2 As needed/ Electronic

3.2.3 N/A Monthly Meter

Reading Report

By the 25th day of each month

Utilities Branch

Head/KO

2 Monthly

3.2.4 N/A Excavation Permit Upon

issuance

Utilities Branch

Head/COR and KO

3 As required

3.2.5 N/A Utility Locate

Documentation

By COB the third workday of each month

KO/COR/

Utilities

Branch Head

3.3.1 N/A MAXIMO Asset

Changes Report

By COB the third workday of each month

COR/KO &

FMD/

Utilities Branch Head

4 Monthly

Section F – 1602000

Electrical

Form Attachment

Number Deliverable

Title Date (s) of

Submission

Distribution

Frequency Original/ Copies

Number of Copies (including

Certification and Licenses

30 calendar days after award and as required by the KO

KO/COR 2 Once for initial submittal, then as requested or change of personnel / Electronic

3.1 N/A Standard

Operation Procedures

Within 30 days after contract start and within five days of any changes

KO/COR/UEM 4 Once. Update if the requirements change.

3.1 N/A Fuel Tickets Close of

Business each day

KO/COR/UEM 2 Daily

3.1.2 N/A Mid to Mid

Report

By 0900 each day

KO/COR/UEM 1 Daily

3.1.2 N/A Operating

Records Report, Diesel/Gas

3 days after following the end of the month during which work is performed

KO/COR 4 Monthly

3.3 N/A Integrated

Maintenance

Program (IMP)

15 days after award

KO/COR 4 Annually and one business day after any change is made to the schedule

3.3 N/A Monthly IMP

schedule By the 25th day of each month

KO/COR 4 Monthly

3.3 N/A Unaccomplished

maintenance report

0800 each Monday

KO/COR 4 Weekly

3.3 N/A Repair status

report

3 days after following the end of the month

KO/COR 4 Monthly

Amendment 0004

Section F – 1602000 Electrical

Form Attachment

Number Deliverable

Title Date (s) of

Submission

Distribution

Frequency Original/ Copies

Number of Copies (including original)

3.3 N/A Summary of

maintenance and repair accomplished under the IMP report

3 days after following the end of the month

KO/COR 4 Monthly

3.3 N/A Corrosion

Control Plan

45 days after award

KO/COR 2 Annually/ Electronic and one business day after any changes

3.4 N/A Other Recurring

Services Program Summary

Report

Five work days prior to the beginning of each month.

KO/COR 2 Monthly/

Section F – 1604000 Wastewater

Spec Item Form Attachment

Number

Deliverable Title

Date (s) of Submission

Distribution Frequency

Original/ Copies

Number of Copies (including

Certification and Licenses

15 days after award

KO/COR 2 Once for initial submittal, then as requested or change of personnel / Electronic

3.1, 3.2 N/A Standard Operation Procedures

Within 30 days after contract start and within five days after making changes to any plant operating procedure, equipment or component.

KO/COR

and

Onsite/ Utilities Branch Head

4 Once. Update if the requirements change.

3.1.1, 3.2.1 J-1604000-

Laboratory Analysis of Wastewater

Effluent Report

Within 2 days of discovery when found non-compliant.

4 days after the end of the month if compliant.

KO/COR/

Utilities Branch Head

4 Monthly or within 2 days if found non-compliant

3.1.2, 3.2.2 N/A Schedule of Operator

Attendance

7 prior to the start of work

Within 2 days of Request

KO/COR/

Utilities Branch Head

4 7 prior to the start of work and as requested

3.1.3, 3.2.3 J-1604000-

Wastewater Treatment Operating

Records, Logs and Reports

3 days after the end of the month during which work is performed

KO/COR/

Utilities Branch Head

3.3 N/A Integrated

Program (IMP)

15 days after award

KO/COR/

Utilities Branch Head

4 Annually and any time a change is made.

3.3 N/A Monthly IMP

Schedule

By the 25th day of each month

KO/COR/

Utilities Branch

Amendment 0004

Section F – 1604000 Wastewater

Attachment

Number

Deliverable Title

Date (s) of Submission

Distribution Frequency

Original/ Copies

Number of Copies (including original)

3.3 N/A IMP

Maintenance and Repair

Status Report

Monday 0900 KO/COR/ Utilities Branch Head

4 Weekly

3.3 N/A Corrosion

Control Plan

45 calendar days after award

KO/COR/

Utilities Branch Head

2 Annually/ Electronic and one business day after any changes

3.4 N/A Other Recurring

Services Program

45 calendar days after award

KO/COR/

Utilities Branch Head

2 Annually/ Electronic and one business day after any changes

3.4 N/A Other Recurring

Services Program Summary

Report

Five work days prior to the beginning of each month.

KO/COR/

Utilities Branch Head

2 Monthly/ Electronic

3.4.2 N/A Bilge and Oily

Waste Removal

Report

2 business days after each service

KO/COR/

Utilities Branch Head

2 As Needed/ Electronic

3.4.3 N/A Pier Side Sewer

Removal Report

2 business days after each service

KO/COR/

Utilities Branch Head

2 As Needed/

Section F - 1606000

Water

Form Attachment

Number Deliverable

Title Date (s) of Submission

Distribution

Frequency Original / Copies

Number of Copies

(including original)

2.2 N/A Key Personnel At a

minimum of 30 calendar days prior to start of contract performanc e and immediately upon any changes

KO/COR

/ Utilities Branch Head/

Environ mental

Director

2 Once for initial submittal, then as requested or change of personnel / Electronic

2.2.1 N/A Proof of all

Certification, Training, and Licensing Requirements

Within 30 days following award and as requested by KO

KO/COR

/ Utilities Branch Head/

Environ mental

Director

2 Once for initial submittal, then as requested or change of personnel / Electronic

3 N/A Outage Request At a minimum of ten workdays prior to commence ment of work

KO/COR

/ Utilities Branch Head

2 As required

3.1 N/A Standard

Operating Procedures

15 days after award and 5 days after changes

KO/COR

/ Utilities Branch Head

4 As required

3.1 J-1606000-05 Water

Interruption/Bre ak Report

Within 24hrs of break/servic es interruption

KO/COR

/ Utilities Branch Head

4 As required

3.1 N/A Notification of

Unsafe Conditions Report

Within 24 hours of occurrence

KO/COR

/ Utilities Branch Head

4 ea per occurrence

As Specified

3.1 J-1606000-04 Chemical

Usage/Storage Report

3 days following the end of the month

KO/COR

/ Utilities Branch

4 As Specified

Amendment 0004

3.1.1 J-1606000-08 Certified

Laboratory Analyses Report

Daily KO/COR / Utilities Branch Head/

Environ mental

Director

2 As Specified / Electronic

3.1.1 N/A Quality

Control/Quality Assurance Plan

Daily KO/COR / Utilities Branch Head/

Environ mental

Director

2 As Specified / Electronic

3.1.1 N/A Monthly Water

Quality (FAC, Inorganic/Organ ic Chemicals, and Radiological Results) Report

Within three working days following the end of the month

KO/COR

/ Utilities Branch Head/

2 Monthly

3.1.1 N/A Fecal Coliform

Report

Within two days after positive result and Monthly

KO/COR

/ Utilities Branch Head/

2 As Specified

3.1.1 N/A Total Coliform

Report

Within three working days following the end of the month

KO/COR

/ Utilities Branch Head/

2 Monthly

3.1.1 N/A Disinfection

Profiling and Benchmarking - Monitoring, Profiling and Analysis Report

Within three working days following the end of the month

KO/COR

/ Utilities Branch Head/

2 Monthly

3.1.1 N/A Point Test -

Results and Analysis

By the 15th of October

KO/COR

/ Utilities Branch Head/

2 Annually

3.1.3 N/A Operating

Records, Logs, and Reports

3 days following the end of the month

KO/COR

/ Utilities Branch

3.1.3 J-1606000-05 Physical

Inspection Program (PIP) Report

5th day of month

KO/COR

/ Utilities Branch Head/

Environ mental

Director

4 Monthly

3.1.3 J-1606000-06 Bacteriological

Sampling Plan

Within 15 days after

KO/COR

/ Utilities Branch

4 Once. Update as changes occur

Amendment 0004 award of contract

Head/ Environ mental

Director

3.1.3 J-1606000-07 Disinfection

Profile, Disinfection Benchmark, CT Calculation

Within 30 days after award of contract

KO/COR

/Utilities Branch Head

Electronic Once, Update as changes occur

3.1.1 N/A Cross

Connection and Backflow Prevention Plan

Within 30 days after award of contract

KO/COR

/ Utilities Branch Head

4 Once. Update as changes occur

3.1.3 J-1606000-09 Mid-To-Mid

Report

Daily by

KO/COR

/ Utilities Branch Head

Electronic Daily by 0900

3.1.3 J-16060000-10 Daily Water

Report

Daily by

KO/COR

/ Utilities Branch Head/

Environ mental

Director

Electronic Daily by 0900

3.1.3 N/A Unidirectional

Flushing Program

Within 30 days after award of contract

KO/COR

/ Utilities Branch Head

Once. Update as changes occur

3.1.3 N/A Emergency

Response Plan

Within 30 days after award of contract

KO/COR

/ Utilities Branch Head

Once. Update as changes occur

3.23 N/A Integrated

Maintenance Program (IMP)

Within 15 days following award

KO/COR

/ Utilities Branch

4 As specified

3.23 N/A IMP Schedule

and IMP Maintenance and Repair Status Report

3 days following the end of the month/0800 each Monday

KO/COR

/ Utilities Branch Head

4 Monthly/Weekly

3.23 N/A Corrosion

Control Plan

45 calendar days after award

KO/COR

/ Utilities Branch Head

2 Annually/ Electronic and one business day after any changes

3.23.1 J-1606000-11 Valve Exercise

Spreadsheet 3 days following the end of the month

KO/COR

/ Utilities Branch Head

3 Monthly/ Electronic -update spreadsheet as tests are completed throughout year

Amendment 0004

3.23.1 J-1606000-13 Annual Hydrant

Flow Test Spreadsheet

First work day of each month

KO/COR

/UEM

Monthly/ Electronic -update spreadsheet as tests are completed throughout year

3.23.1 J-1606000-14 Annual Hydrant

Flow Test Report

Maintain file and provide as requested

KO/COR

/UEM

1 As completed

3.2.2 N/A Backflow

Prevention (BFP) and Cross Connection Control (CCC) Program

At a minimum of 30 calendar days prior to commence ment of work and 5 working days after changes

KO/COR

/ Utilities Branch Head

2 Once. Update as changes occur.

3.34 N/A Other Recurring

Services Program Summary Report

Within 30 days following award

KO/COR

/ Utilities Branch Head

2 Annually/ Electronic and one business day after any changes

3.3.4 N/A Water System

Instrumentation and Control Devices’ Testing and Calibration Schedule

At a minimum of 30 calendar days prior to commence ment of work and 5 working days after changes

KO/COR

/ Utilities Branch Head

2 As Specified

3.3.5.1 N/A Water Service

Emergency Plan

At a minimum of 15 calendar days prior to commence ment of work and 5 working days after changes

KO/COR

/ Utilities Branch Head

2 Once. Update as changes occur.

3.3.5.2 N/A Public

Notification Procedure

As Specified

KO/COR

/ Utilities Branch Head

/Public

As necessary to meet requiremen t

As Required

Amendment 0004

3.3.5.2 N/A Water Quality

Public Notification and Water Quality Violation Report

As Specified

KO/COR

/ Utilities Branch Head

/Public

As necessary to meet requiremen t

As Required

3.3.5.3 N/A Consumer

Confidence Reporting

Draft by April 1st, Final by June 1st, Distribute and make available to population before July

1st

KO/COR

/ Utilities Branch Head

/Public

As necessary to meet requiremen t

Annually

Section F – 1700000

Base Support Vehicles and Equipment

Attachmen t Number

Report Title Date (s) of Submission

Distribution Frequency

Original/ Copies

Number of Copies (including

45calendar days after award or as requested by the

KO

KO/COR

/BSVE

Manager

2 Once for initial submittal, then as requested or change of personnel /

Resumes of Key Personnel

45calendar days after award or as requested by the

KO

KO/COR

/BSVE

Manager

1 Once for initial submittal, then as requested or change of personnel / Electronic

2.3.1.4 N/A Temporary

Suspension of Downtime Accumulation

Within two hours of notice to the Contractor that the material delays will cause the downtime standard to be missed.

KO/COR

/BSVE

Manager

2 As required

3.1.4 N/A C-Pool VSO

Completion Report

0900 Tuesday of each week

KO/COR

/BSVE

Manager

2 Weekly/ Electronic

3.1.4 N/A VSO Completion

Report

By the 25th day of the preceding month

KO/COR

/BSVE

Manager

2 Monthly/ Electronic

3.2.2 N/A C-Pool Vehicle

Assignment Report

Every Morning by 0900

KO/COR

/BSVE

Manager

2 Daily/ Electronic

3.2.2 N/A C-Pool Utilization

Report

0900 Tuesday of each week

KO/COR

/BSVE

Manager

2 Weekly/ Electronic

3.2.3 N/A Vehicle Washing

Completion Report

By the 25th day of the preceding month

KO/COR

/BSVE

Manager

2 Monthly/ Electronic

3.3 N/A Critical Spare Parts

List

45 calendar days after award

KO/COR

/BSVE

Manager

2 Once for initial submittal, then as requested / Electronic

3.3 N/A Vehicle Accident

Reports

Monthly KO/COR

/BSVE

Manager

4 Within five calendar days of the start of the month

Amendment 0004

Section F – 1700000 Base Support Vehicles and Equipment

Attachmen t Number

Report Title Date (s) of Submission

Distribution Frequency

Original/ Copies

Number of Copies (including original)

3.3 N/A Vehicle Maintenance

and Repair Status Report

Every Morning by 0900

KO/COR

/BSVE

Manager

4 Daily/ Electronic

3.3.2 N/A Schedule for Testing

and Certification

As required KO/COR

/BSVE

Manager

4 Annually and as required after repairs

3.3.2 N/A Testing and

Certification Qualifications

As required KO/COR

/BSVE

Manager

4 Prior to start of contract, annually and, prior to a new employee starting work.

3.3.3 N/A Preventive

Maintenance Schedule

Annually KO/COR

/BSVE

Manager

4 15 calendar days prior to the start of work and annually.

3.3.5 N/A MTV Preventive

Maintenance Schedule

By the 25th day of the preceding month

KO/COR