18R0008_amended_solicitation.doc
DOC document 56 KB Posted
- Attached to
- Shipping and Storage Containers, CNU-415E/E
- Solicitation number
- N6893618R0008
About this file
18R0008 amended solicitation
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 18R0008_Solicitation_Amendment.docx | DOCX document | |
| 18R0008_Solicitation_Amendment.docx | DOCX document | |
| 18R0008_Solicitation_Amendment.docx | DOCX document | |
| 18R0008_Solicitation_Amendment.docx | DOCX document | |
| 18R0008_Solicitation.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 19-Jul-2018 03:00 PM to 23-Jul-2018 03:00 PM.
The following have been added by full text:
QUESTIONS AND ANSWERS
N68936-18-R-0008, Missile Containers
Questions & Answers
*Please Note, the question period has ended
1. The option units in CLINS 0005-0011, are required 15 days after the option has been exercised. This lead time would not be feasible unless all the materials had already been purchased and were in stock waiting to be manufactured or if the containers were pre-built. Would the Government consider proposals with a longer lead time on these CLINS?
Answer: See revised delivery terms for Option CLINs in Section B. Contractor will receive at least a 30 day notice prior to exercise of option and then have 60 days to deliver containers. In total, contractor will have at least 90 days to deliver after notice to exercise option CLINs.
At this time the Government does not expect to exercise more than three options at a time.
2. Are the spares to be in 10 'kits' or just separated by item per the Missile Containers - Spares Breakdown spreadsheet?
Answer: Spares are NOT to be packaged in “kits”. They can be packaged by items. Section B CLIN 0003 now reflects 1 Lot. See also answer to question 3.
3. Is CLIN 0003 for a quantity 10 x the items listed in the spares breakdown or is it for 1 total lot of the items listed in the spares breakdown?
Answer: Section J Attachment 4 represents the total number of spares required in Section B CLIN 0003 (1 total lot). See also answer to question 2.
SECTION B - SUPPLIES OR SERVICES AND PRICES
CLIN 0003
The pricing detail quantity has decreased by 9.00 from 10.00 to 1.00.
The unit of issue Lot has been added.
CLIN 0005
The CLIN extended description has changed from:
The contractor shall fabricate, test, inspect and deliver the CNU-415E/E in accordance with Section C, Statement of Work and Section "J" Attachment 4, Missile Containers- Spares Breakdown.Contractor shall deliver missile containers 15 days after exercise of option.
To:
The contractor shall fabricate, test, inspect and deliver the CNU-415E/E in accordance with Section C, Statement of Work and Section "J" Attachment 4, Missile Containers- Spares Breakdown. Contractor shall deliver missile containers 60 days after exercise of option.
CLIN 0006
The CLIN extended description has changed from:
The contractor shall fabricate, test, inspect and deliver the CNU-415E/E in accordance with Section C, Statement of Work "J" Attachment 4, Missile Containers- Spares Breakdown.Contractor shall deliver missile containers 15 days after exercise of option.
To:
The contractor shall fabricate, test, inspect and deliver the CNU-415E/E in accordance with Section C, Statement of Work and Section "J" Attachment 4, Missile Containers- Spares Breakdown. Contractor shall deliver missile containers 60 days after exercise of option.
CLIN 0007
The CLIN extended description has changed from:
The contractor shall fabricate, test, inspect and deliver the CNU-415E/E in accordance with Section C, Statement of Work "J" Attachment 4, Missile Containers- Spares Breakdown.Contractor shall deliver missile containers 15 days after exercise of option.
To:
The contractor shall fabricate, test, inspect and deliver the CNU-415E/E in accordance with Section C, Statement of Work and Section "J" Attachment 4, Missile Containers- Spares Breakdown. Contractor shall deliver missile containers 60 days after exercise of option.
CLIN 0008
The CLIN extended description has changed from:
The contractor shall fabricate, test, inspect and deliver the CNU-415E/E in accordance with Section C, Statement of Work "J" Attachment 4, Missile Containers- Spares Breakdown.Contractor shall deliver missile containers 15 days after exercise of option.
To:
The contractor shall fabricate, test, inspect and deliver the CNU-415E/E in accordance with Section C, Statement of Work and Section "J" Attachment 4, Missile Containers- Spares Breakdown. Contractor shall deliver missile containers 60 days after exercise of option.
CLIN 0009
The CLIN extended description has changed from:
The contractor shall fabricate, test, inspect and deliver the CNU-415E/E in accordance with Section C, Statement of Work "J" Attachment 4, Missile Containers- Spares Breakdown.Contractor shall deliver missile containers 15 days after exercise of option.
To:
The contractor shall fabricate, test, inspect and deliver the CNU-415E/E in accordance with Section C, Statement of Work and Section "J" Attachment 4, Missile Containers- Spares Breakdown. Contractor shall deliver missile containers 60 days after exercise of option.
CLIN 0010
The CLIN extended description has changed from:
The contractor shall fabricate, test, inspect and deliver the CNU-415E/E in accordance with Section C, Statement of Work "J" Attachment 4, Missile Containers- Spares Breakdown.Contractor shall deliver missile containers 15 days after exercise of option.
To:
The contractor shall fabricate, test, inspect and deliver the CNU-415E/E in accordance with Section C, Statement of Work and Section "J" Attachment 4, Missile Containers- Spares Breakdown. Contractor shall deliver missile containers 60 days after exercise of option.
CLIN 0011
The CLIN extended description has changed from:
The contractor shall fabricate, test, inspect and deliver the CNU-415E/E in accordance with Section C, Statement of Work "J" Attachment 4, Missile Containers- Spares Breakdown.Contractor shall deliver missile containers 15 days after exercise of option.
To:
The contractor shall fabricate, test, inspect and deliver the CNU-415E/E in accordance with Section C, Statement of Work and Section "J" Attachment 4, Missile Containers- Spares Breakdown. Contractor shall deliver missile containers 60 days after exercise of option.
SECTION F - DELIVERIES OR PERFORMANCE
The following Delivery Schedule item for CLIN 0003 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
| 5 mths. AFATA |
| 10 |
| NMC DET EARLE |
BILL CARLINO
201 HIGHWAY #34
COLTS NECK NJ 07722
(732) 866-2092
FOB: Destination N60478
To:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
| 5 mths. AFATA |
| 1 |
| NMC DET EARLE |
BILL CARLINO
201 HIGHWAY #34
COLTS NECK NJ 07722
(732) 866-2092
FOB: Destination N60478
(End of Summary of Changes)
File details come from the government source that posted it.