Past_Performance_Matrix.doc

DOC document 38 KB Posted

Attached to
Re-Utilization and Disposal Services Federal contract opportunity
Solicitation number
N6893616R0013
Issued by
Department of the Navy Naval Air Systems Command Naval Air Warfare Center

About this file

Past Performance Matrix

View the file

Other files for this federal contract opportunity

Other files attached to Re-Utilization and Disposal Services, newest first.
File Type Posted
16-R-0013_RFP_Amend_5.docx DOCX document
Attachment_7.pptx PPTX presentation
16-R-0013_RFP_Amend_4.docx DOCX document
DD254.pdf PDF
Conformed_Copy_of_Section_B.docx DOCX document
16-R-0013_RFP_Amend_3.docx DOCX document
16-R-0013_RFP_Amend_2.docx DOCX document
16-R-0013_RFP_Amend.docx DOCX document
Draft_CDRLs.docx DOCX document
WD_Ventura_2005-2071.pdf PDF
Past_Performance_Questionnaire.doc DOC document
WD_Kern_2015-5603.pdf PDF
RFP_Solicitation.docx DOCX document
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAST PERFORMANCE MATRIX

INSTRUCTIONS FOR COMPLETION

(1)
Under the heading of “References,” list for each reference the Government Activity/Company Name, Address, CAGE Code, Point of Contact with Telephone number, email address and Contract number.
(2)
Under the heading of “$ Value,” provide the value of the contract to the million dollar. For example: If the contract was for $7,500,000, list the value as 7.5M. If the contract was for $350,000, list the value as 0.35M.
(3)
Under the heading of “Work Description,” provide a very brief description of the work.
(4)
Under the heading of “CCT” which is the abbreviation for Contract Completed on Time, insert “Y” for “Yes” if the contract was completed on time. Insert “N” for “No” if the contract was not completed on time. If inserted a “N” that provide a brief explanation under heading of “Explanation for N Answers.”
(5)
Under the heading of “CCC” which is the abbreviation for Contract Completed at cost, insert “Y” for “Yes” if the contract was completed at cost. Insert “N” for “No” if the contract was not completed at cost. If inserted a “N” that provide a brief explanation under heading of “Explanation for N Answers.”
(6)
Under the heading of “Explanation for N Answers” provide explanation of any “N’s” under CCT or CCC. If there were no “N’s”, then leave this column blank.
(7)
Under the heading of “Confirmation,” provide the date, point of contact that confirmed receipt of the Past Performance Questionnaire Package for Services, and the method of transmittal. Merely a statement by the Offeror that the Past Performance Questionnaire Package for Services was delivered to the customer on a specific date is not sufficient. If contract is in the Contractor Performance Assessment Reporting System (CPARS), and the assessment report is not more than 12 months old, annotate in this column that the contract is in CPARS and the date of the most recent Contractor Performance Assessment Report.
(8)
The instructions page may be removed from the Attachment when being completed .

N68936-16-R-0013 Attachment 3

PAST PERFORMANCE MATRIX

References
$ Value
Work Description
CCT
CCC
Explanation for N Answers
Confirmation